ML17228A953: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:PRIORIEY1ACCELERATED RIDSPROCESSING)
{{#Wiki_filter:PRIORI EY 1 ACCELERATED RIDS PROCESSING)
REGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9412220102 DOC.DATE:
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9412220102 DOC.DATE: 94/11/30 NOTARIZED:
94/11/30NOTARIZED:
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION WHITE,C.D.
NOFACIL:50-335 St.LuciePlant,Unit1,FloridaPower&LightCo.50-389St.LuciePlant,Unit2,FloridaPower&LightCo.AUTH.NAMEAUTHORAFFILIATION WHITE,C.D.
Florida Power&Light Co.SAGER,D.A.
FloridaPower&LightCo.SAGER,D.A.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET N 05000335 05000389
FloridaPower&LightCo.RECIP.NAME RECIPIENT AFFILIATION DOCKETN0500033505000389


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptsforNov1994forSaintLucieUnits.1&2.W/941209 ltr.DISTRIBUTION CODE:IE24D-COPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report,(perTechSpecs)NOTES:RECIPIENT IDCODE/NAME PD2-2PDINTERNAL:
Monthly operating repts for Nov 1994 for Saint Lucie Units.1&2.W/941209 ltr.DISTRIBUTION CODE: IE24D-COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report, (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS~i FCE C~NTER 01 RR/DOPS/OECB EXTERNAL LITCO BRYCE i J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RRAB NRR/DISP/PIPB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 iNOTE TO ALL"RIDS" RECIPIENT'TS:
ACRS~iFCEC~NTER01RR/DOPS/OECB EXTERNALLITCOBRYCEiJHNRCPDRCOPIESLTTRENCL11101011111111RECIPIENT IDCODE/NAME NORRIS,JAEOD/SPD/RRAB NRR/DISP/PIPB RGN2NOACCOPIESLTTRENCL1111111111iNOTETOALL"RIDS"RECIPIENT'TS:
PLEASE HELP US TO REDUCE iVASTE!COYTACT'I'I IE DOCL'XIEYTCONTROL DESK, ROO!iI Pl-37<EXT.504-033)TO ELIXflbiATE
PLEASEHELPUSTOREDUCEiVASTE!COYTACT'I'I IEDOCL'XIEYTCONTROL DESK,ROO!iIPl-37<EXT.504-033)TOELIXflbiATE
'iOUR iAiIL PROil DIS'I RIBUTION LISTS I:OR DOCL!'i!Ei'I'S YOU DOi"I'l: I:.D!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20
'iOURiAiILPROilDIS'IRIBUTIONLISTSI:ORDOCL!'i!Ei'I'S YOUDOi"I'l:I:.D!TOTALNUMBEROFCOPIESREQUIRED:
~r~PPII December 9I 1994 L-94-308 10 CFR 50.36 Florida Powor 5 Light Company, P.O.Box 128, Fort Pierce, FL 34954-0128 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555*Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the November, 1994, Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us~Very truly yours, 486 D.A.Vice St.L er sident e Plant DAS/CDW cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident'Inspector, USNRC, St.Lucie Plant Attachments 9412220i02
LTTR20ENCL20
'P4ii30 PDR ADQCK 05000335 PDR an FPL Group cYmp'hrlf I
~r~PPIIDecember9I1994L-94-30810CFR50.36FloridaPowor5LightCompany,P.O.Box128,FortPierce,FL34954-0128 U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555*Re:St.LucieUnits1and2DocketNos.50-335and50-389Monthl0eratinReortAttachedaretheNovember, 1994,Operating StatusandSummaryofOperating Experience ReportsforSt.LucieUnits1and2.Shouldtherebeanyquestions onthisinformation, pleasecontactus~Verytrulyyours,486D.A.ViceSt.LersidentePlantDAS/CDWcc:StewartD.Ebneter,RegionalAdministrator, RegionII,USNRCSeniorResident'Inspector, USNRC,St.LuciePlantAttachments 9412220i02
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO UNIT.DATE COMPLETED BY: TELEPHONE:
'P4ii30PDRADQCK05000335PDRanFPLGroupcYmp'hrlf I
50-335 St.Lucie g1 12/09/94 C.D.White (407)468-4248 MONTH DAY 11/01/94 11/02/94 11/03/94 11/04/94 11/05/94 11/06/94 11/07/94 11/08/94 11/09/94 11/10/94 11/11/94 11/12/94 11/13/94 11/14/94 11/15/94 11/16/94 11/17/94 11/18/94 11/19/94 11/2'0/94 11/21/94 11/22/94 11/23/94 11/24/94 11/25/94 11/26/94 11/27/94 11/28/94 11/29/94 11/30/94 NOVEMBER 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)-4-4-3-3-3-3-3-3-3-4-4-3-3-3-3-3-3-3-4-4-3-4-4-4-8-26-30-29-34 OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 12/09/94 COMPLETED BY C.D.WHITE TELEPHONE 407/468/4248 l.UNIT NAME: ST.LUCIE UNIT 1 2.REPORTING PERIOD: NOVEMBER 1994 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9 POWER LEVEL TO WH I CH RESTRI CTED i I F ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LXNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNXT SERVICE FACTOR 20.UNXT AVAILABILITY FACTOR 21.CAPACXTY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USXNG DER NET)23.UNIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 13 REFUELING OUTAGE BEGAN OCTOBER 27, 720 41'0.0 0.0 0.0 0 0-5045 0.0 0.0 0.0 0.0 0.0 1994.8016 7049.7 0.0 6864.9 0.0 18104409 5920270 5594915 85.6 85.6 83.2 84.1 4.3 157296.0 122579.8 205.3 121219.7 39.3 313869710 103533560 97853277 77.1 77.1 76.4 75.8 4.0 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/1/94  
AVERAGEDAILYUNITPOWERLEVELDOCKETNOUNIT.DATECOMPLETED BY:TELEPHONE:
~~UNIT SHl3TDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: 12/09/94 COMPLETED BY: C.D.WHITE TELEPHONE:
50-335St.Lucieg112/09/94C.D.White(407)468-4248MONTHDAY11/01/9411/02/9411/03/9411/04/9411/05/9411/06/9411/07/9411/08/9411/09/9411/10/9411/11/9411/12/9411/13/9411/14/9411/15/9411/16/9411/17/9411/18/9411/19/9411/2'0/94 11/21/9411/22/9411/23/9411/24/9411/25/9411/26/9411/27/9411/28/9411/29/9411/30/94NOVEMBER1994AVERAGEDAILYPOWERLEVEL(MWe-Net) 4-3-3-3-3-3-3-3-4-4-3-3-3-3-3-3-3-4-4-3-4-4-4-8-26-30-29-34 OPERATING DATAREPORTOPERATING STATUSDOCKETNO50-335DATE12/09/94COMPLETED BYC.D.WHITETELEPHONE 407/468/4248 l.UNITNAME:ST.LUCIEUNIT12.REPORTING PERIOD:NOVEMBER19943.LICENSEDTHERMALPOWER(MWT):27004.NAMEPLATE RATING(GROSSMWE):8505.DESIGNELECTRICAL RATING(NETMWE):8306.MAXIMUMDEPENDABLE CAPACITY(GROSSMWE):8727.MAXIMUMDEPENDABLE CAPACITY(NETMWE):8398.IFCHANGESOCCURINCAPACITYRATINGS(XTEMSNUMBER3THROUGH7)SINCELASTREPORT,GIVEREASONS:9POWERLEVELTOWHICHRESTRICTEDiIFANY(NETMWE)10.REASONSFORRESTRICTIONS, IFANY:MONTHLY-YTD-CUMULATIVE 11.HOURSINREPORTPERIOD:12.NUMBEROFHOURSREACTORWASCRITICAL13.REACTORRESERVESHUTDOWNHOURS14.HOURSGENERATOR ON-LXNE15.UNITRESERVESHUTDOWNHOURS16.GROSSTHERMALENERGYGENERATED (MWH)17.GROSSELECTRICAL ENERGYGENERATED (MWH)18.NETELECTRICAL ENERGYGENERATED (MWH)19.UNXTSERVICEFACTOR20.UNXTAVAILABILITY FACTOR21.CAPACXTYFACTOR(USINGMDCNET)22.CAPACITYFACTOR(USXNGDERNET)23.UNITFORCEDOUTAGERATE24'HUTDOWNS SCHEDULED OVERNEXT6MONTHSCYCLE13REFUELING OUTAGEBEGANOCTOBER27,72041'0.00.00.000-50450.00.00.00.00.01994.80167049.70.06864.90.0181044095920270559491585.685.683.284.14.3157296.0122579.8205.3121219.739.3313869710 103533560 9785327777.177.176.475.84.025.IFSHUTDOWNATENDOFREPORTPERIOD,ESTIMATED DATEOFSTARTUP:12/1/94  
(407)468-4248 REPORT MONTH N VEMBER I 4 No.Date Type Duration (Hours)Reason~Method of Shutting Down Reactor Licensee Event Report&#xb9;System Code'omponent Codes Cause&Corrective Action to Prevent Recurrence 21 941027 0.0 N/A RC FUELXX Unit 1 remained off line for Cycle refueling.
~~UNITSHl3TDOWNS ANDPOWERREDUCTIONS DOCKETNO.:50-335UNITNAME:STLUCIEUNITIDATE:12/09/94COMPLETED BY:C.D.WHITETELEPHONE:
F Forced S Scheduled Reason A-EAtuipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training dc License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Insuuctions for Preparation of Data Entry Shccts Licensee Event Report (LER)File (NUREG41 6 1)Exhibit I-Same Source
(407)468-4248REPORTMONTHNVEMBERI4No.DateTypeDuration(Hours)Reason~MethodofShuttingDownReactorLicenseeEventReport&#xb9;SystemCode'omponent CodesCause&Corrective ActiontoPreventRecurrence 219410270.0N/ARCFUELXXUnit1remainedofflineforCyclerefueling.
 
FForcedSScheduled ReasonA-EAtuipment failure(explain)
==SUMMARY==
B-Maintenance orTestC-Refueling D-Regulatory restriction E-OperatorTrainingdcLicenseExamination F-Administrative G-Operational Error(Explain)
Op OPERATING EXPERIENCE DOCKET N00~UNIT: DATE: COMPLETED BY: TELEPHONE:
H-Other(Explain)
50-335 St.Lucie g1 12/09/94 C.D.White (407)468-4248 REPORT MONTH NOVEMBER 1994 Unit 1 remained off line during the month of November for its Cycle 13 Refueling Outage.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.  
Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain)
'\~)~(~I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT DATE~COMPLETED BY: TELEPHONE:
ExhibitG-Insuuctions forPreparation ofDataEntryShcctsLicenseeEventReport(LER)File(NUREG4161)ExhibitI-SameSource SUMMARYOpOPERATING EXPERIENCE DOCKETN00~UNIT:DATE:COMPLETED BY:TELEPHONE:
50-389 St.Lucie g2 12/09/94 C.D.White (407)468-4248 MONTH NOVEMBER 1994 DAY 11/01/94 11/02/94 11/03/94 11/04/94 11/05/94 11/06/94 11/07/94 11/08/94 11/09/94 11/10/94 11/11/94 11/12/94 11/13/94 11/14/94 11/15/94 11/16/94 11/17/94 11/18/94 11/19/94 11/20/94 11/21/94 11/22/94 11/23/94 11/24/94 11/25/94 11/26/94 11/27/94 11/28/94 11/29/94 11/30/94 AVERAGE DAILY POWER LEVEL (MWe-Net)841 840 839 841 842 840 840 841 841 841 839 839 842 843 843 841 841 845 844 844 843 843 842 845 837 843 838 837 831 831 1 4~
50-335St.Lucieg112/09/94C.D.White(407)468-4248REPORTMONTHNOVEMBER1994Unit1remainedofflineduringthemonthofNovemberforitsCycle13Refueling Outage.Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod.  
OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-389 DATE 12/09/94 COMPLETED BY CD D.WHITE TELEPHONE 407/468/4248 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: NOVEMBER 1994 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRXCAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRXCTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12'UMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LXNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABXLITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 720.0 0.0 720.0 0.0 1943676 638300 605226 100.0 100.0 100.2 101.3 0.0 8016 6360.1 0.0 6227.7 0.0 16289454 5304650 4999317 77.7 77.7 74.3 75.1 2.6 99193.0 83523.7 0.0 82123.0 0.0 213250379 70814200 66900488 82.8 82.8 81.3 81.7 7.0 2 5 I F SHUT DOWN AT END OF REPORT PER IOD~EST I MATED DATE OF STARTUP UNIT SHt JTDOWNS AZK)POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
'\~)~(~I AVERAGEDAILYUNITPOWERLEVELDOCKETNO.:UNITDATE~COMPLETED BY:TELEPHONE:
50-389 r ST LUCIE UNIT 2 12/09/94 C.D.WHITE-(407)468-4248 REPORT MONTH N VEMBER I 4 No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor Licensee System Event Report Code'omponent Codes Cause&Corrective Action to Prevent Recurrence Unit 2 operated at essentially full power during the entire month of November.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Rcfucling D-Regulatory restriction E-Operator Training A License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Liccnscc Event Report (LER)File (NUREG4161)
50-389St.Lucieg212/09/94C.D.White(407)468-4248MONTHNOVEMBER1994DAY11/01/9411/02/9411/03/9411/04/9411/05/9411/06/9411/07/9411/08/9411/09/9411/10/9411/11/9411/12/9411/13/9411/14/9411/15/9411/16/9411/17/9411/18/9411/19/9411/20/9411/21/9411/22/9411/23/9411/24/9411/25/9411/26/9411/27/9411/28/9411/29/9411/30/94AVERAGEDAILYPOWERLEVEL(MWe-Net) 841840839841842840840841841841839839842843843841841845844844843843842845837843838837831831 14~
Exhibit 1-Same Source
OPERATING DATAREPORTOPERATING STATUSDOCKETNO50-389DATE12/09/94COMPLETED BYCDD.WHITETELEPHONE 407/468/4248 1.UNITNAME:ST.LUCIEUNIT22.REPORTING PERIOD:NOVEMBER19943.LICENSEDTHERMALPOWER(MWT):27004.NAMEPLATE RATING(GROSSMWE):8505.DESIGNELECTRXCAL RATING(NETMWE):8306.MAXIMUMDEPENDABLE CAPACITY(GROSSMWE):8827.MAXIMUMDEPENDABLE CAPACITY(NETMWE):8398.IFCHANGESOCCURINCAPACITYRATINGS(ITEMSNUMBER3THROUGH7)SINCELASTREPORT,GIVEREASONS:9.POWERLEVELTOWHICHRESTRXCTED, IFANY(NETMWE)10.REASONSFORRESTRICTIONS, IFANY:MONTHLY-YTD-CUMULATIVE 11.HOURSINREPORTPERIOD:12'UMBEROFHOURSREACTORWASCRITICAL13.REACTORRESERVESHUTDOWNHOURS14.HOURSGENERATOR ON-LXNE15.UNITRESERVESHUTDOWNHOURS16.GROSSTHERMALENERGYGENERATED (MWH)17.GROSSELECTRICAL ENERGYGENERATED (MWH)18.NETELECTRICAL ENERGYGENERATED (MWH)19.UNITSERVICEFACTOR20.UNITAVAILABXLITY FACTOR21.CAPACITYFACTOR(USINGMDCNET)22.CAPACITYFACTOR(USINGDERNET)23.UNITFORCEDOUTAGERATE24.SHUTDOWNS SCHEDULED OVERNEXT6MONTHS720720.00.0720.00.01943676638300605226100.0100.0100.2101.30.080166360.10.06227.70.0162894545304650499931777.777.774.375.12.699193.083523.70.082123.00.0213250379 708142006690048882.882.881.381.77.025IFSHUTDOWNATENDOFREPORTPERIOD~ESTIMATEDDATEOFSTARTUP UNITSHtJTDOWNSAZK)POWERREDUCTIONS DOCKETNO.:UNITNAME:DATE:COMPLETED BY:TELEPHONE:
 
50-389rSTLUCIEUNIT212/09/94C.D.WHITE-(407)468-4248REPORTMONTHNVEMBERI4No.DateTypeDuration(Hours)ReasonMethodofShuttingDownReactorLicenseeSystemEventReportCode'omponent CodesCause&Corrective ActiontoPreventRecurrence Unit2operatedatessentially fullpowerduringtheentiremonthofNovember.
==SUMMARY==
FForcedSScheduled ReasonA-Equipment failure(explain)
OP OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE 50-389 St.Lucie g2 12/09/94 C.D.White (407)468-4248 REPORT MONTH NOVEMBER 1994 Unit 2 operated at essentially full power during the entire month of November.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.}}
B-Maintenance orTestC-Rcfucling D-Regulatory restriction E-OperatorTrainingALicenseExamination F-Administrative G-Operational Error(Explain)
H-Other(Explain)
Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain)
ExhibitG-Instructions forPreparation ofDataEntrySheetsLiccnsccEventReport(LER)File(NUREG4161)
Exhibit1-SameSource SUMMARYOPOPERATING EXPERIENCE DOCKETNO.UNIT:DATE:COMPLETED BY:TELEPHONE 50-389St.Lucieg212/09/94C.D.White(407)468-4248REPORTMONTHNOVEMBER1994Unit2operatedatessentially fullpowerduringtheentiremonthofNovember.
Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothePORVsorsafetyvalvesduringthereportperiod.}}

Revision as of 17:04, 7 July 2018

Monthly Operating Repts for Nov 1994 for Saint Lucie Units 1 & 2.W/941209 Ltr
ML17228A953
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/30/1994
From: SAGER D A, WHITE C D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-308, NUDOCS 9412220102
Download: ML17228A953 (13)


Text

PRIORI EY 1 ACCELERATED RIDS PROCESSING)

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9412220102 DOC.DATE: 94/11/30 NOTARIZED:

NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION WHITE,C.D.

Florida Power&Light Co.SAGER,D.A.

Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET N 05000335 05000389

SUBJECT:

Monthly operating repts for Nov 1994 for Saint Lucie Units.1&2.W/941209 ltr.DISTRIBUTION CODE: IE24D-COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report, (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS~i FCE C~NTER 01 RR/DOPS/OECB EXTERNAL LITCO BRYCE i J H NRC PDR COPIES LTTR ENCL 1 1 10 10 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME NORRIS,J AEOD/SPD/RRAB NRR/DISP/PIPB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 iNOTE TO ALL"RIDS" RECIPIENT'TS:

PLEASE HELP US TO REDUCE iVASTE!COYTACT'I'I IE DOCL'XIEYTCONTROL DESK, ROO!iI Pl-37<EXT.504-033)TO ELIXflbiATE

'iOUR iAiIL PROil DIS'I RIBUTION LISTS I:OR DOCL!'i!Ei'I'S YOU DOi"I'l: I:.D!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

~r~PPII December 9I 1994 L-94-308 10 CFR 50.36 Florida Powor 5 Light Company, P.O.Box 128, Fort Pierce, FL 34954-0128 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555*Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the November, 1994, Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should there be any questions on this information, please contact us~Very truly yours, 486 D.A.Vice St.L er sident e Plant DAS/CDW cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident'Inspector, USNRC, St.Lucie Plant Attachments 9412220i02

'P4ii30 PDR ADQCK 05000335 PDR an FPL Group cYmp'hrlf I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO UNIT.DATE COMPLETED BY: TELEPHONE:

50-335 St.Lucie g1 12/09/94 C.D.White (407)468-4248 MONTH DAY 11/01/94 11/02/94 11/03/94 11/04/94 11/05/94 11/06/94 11/07/94 11/08/94 11/09/94 11/10/94 11/11/94 11/12/94 11/13/94 11/14/94 11/15/94 11/16/94 11/17/94 11/18/94 11/19/94 11/2'0/94 11/21/94 11/22/94 11/23/94 11/24/94 11/25/94 11/26/94 11/27/94 11/28/94 11/29/94 11/30/94 NOVEMBER 1994 AVERAGE DAILY POWER LEVEL (MWe-Net)-4-4-3-3-3-3-3-3-3-4-4-3-3-3-3-3-3-3-4-4-3-4-4-4-8-26-30-29-34 OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-335 DATE 12/09/94 COMPLETED BY C.D.WHITE TELEPHONE 407/468/4248 l.UNIT NAME: ST.LUCIE UNIT 1 2.REPORTING PERIOD: NOVEMBER 1994 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRICAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9 POWER LEVEL TO WH I CH RESTRI CTED i I F ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12.NUMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LXNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNXT SERVICE FACTOR 20.UNXT AVAILABILITY FACTOR 21.CAPACXTY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USXNG DER NET)23.UNIT FORCED OUTAGE RATE 24'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 13 REFUELING OUTAGE BEGAN OCTOBER 27, 720 41'0.0 0.0 0.0 0 0-5045 0.0 0.0 0.0 0.0 0.0 1994.8016 7049.7 0.0 6864.9 0.0 18104409 5920270 5594915 85.6 85.6 83.2 84.1 4.3 157296.0 122579.8 205.3 121219.7 39.3 313869710 103533560 97853277 77.1 77.1 76.4 75.8 4.0 25.IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/1/94

~~UNIT SHl3TDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: 12/09/94 COMPLETED BY: C.D.WHITE TELEPHONE:

(407)468-4248 REPORT MONTH N VEMBER I 4 No.Date Type Duration (Hours)Reason~Method of Shutting Down Reactor Licensee Event Report¹System Code'omponent Codes Cause&Corrective Action to Prevent Recurrence 21 941027 0.0 N/A RC FUELXX Unit 1 remained off line for Cycle refueling.

F Forced S Scheduled Reason A-EAtuipment failure (explain)B-Maintenance or Test C-Refueling D-Regulatory restriction E-Operator Training dc License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Insuuctions for Preparation of Data Entry Shccts Licensee Event Report (LER)File (NUREG41 6 1)Exhibit I-Same Source

SUMMARY

Op OPERATING EXPERIENCE DOCKET N00~UNIT: DATE: COMPLETED BY: TELEPHONE:

50-335 St.Lucie g1 12/09/94 C.D.White (407)468-4248 REPORT MONTH NOVEMBER 1994 Unit 1 remained off line during the month of November for its Cycle 13 Refueling Outage.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

'\~)~(~I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: UNIT DATE~COMPLETED BY: TELEPHONE:

50-389 St.Lucie g2 12/09/94 C.D.White (407)468-4248 MONTH NOVEMBER 1994 DAY 11/01/94 11/02/94 11/03/94 11/04/94 11/05/94 11/06/94 11/07/94 11/08/94 11/09/94 11/10/94 11/11/94 11/12/94 11/13/94 11/14/94 11/15/94 11/16/94 11/17/94 11/18/94 11/19/94 11/20/94 11/21/94 11/22/94 11/23/94 11/24/94 11/25/94 11/26/94 11/27/94 11/28/94 11/29/94 11/30/94 AVERAGE DAILY POWER LEVEL (MWe-Net)841 840 839 841 842 840 840 841 841 841 839 839 842 843 843 841 841 845 844 844 843 843 842 845 837 843 838 837 831 831 1 4~

OPERATING DATA REPORT OPERATING STATUS DOCKET NO 50-389 DATE 12/09/94 COMPLETED BY CD D.WHITE TELEPHONE 407/468/4248 1.UNIT NAME: ST.LUCIE UNIT 2 2.REPORTING PERIOD: NOVEMBER 1994 3.LICENSED THERMAL POWER (MWT): 2700 4.NAMEPLATE RATING (GROSS MWE): 850 5.DESIGN ELECTRXCAL RATING (NET MWE): 830 6.MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRXCTED, IF ANY (NET MWE)10.REASONS FOR RESTRICTIONS, IF ANY: MONTHLY-YTD-CUMULATIVE 11.HOURS IN REPORT PERIOD: 12'UMBER OF HOURS REACTOR WAS CRITICAL 13.REACTOR RESERVE SHUTDOWN HOURS 14.HOURS GENERATOR ON-LXNE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GENERATED (MWH)17.GROSS ELECTRICAL ENERGY GENERATED (MWH)18.NET ELECTRICAL ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABXLITY FACTOR 21.CAPACITY FACTOR (USING MDC NET)22.CAPACITY FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 720 720.0 0.0 720.0 0.0 1943676 638300 605226 100.0 100.0 100.2 101.3 0.0 8016 6360.1 0.0 6227.7 0.0 16289454 5304650 4999317 77.7 77.7 74.3 75.1 2.6 99193.0 83523.7 0.0 82123.0 0.0 213250379 70814200 66900488 82.8 82.8 81.3 81.7 7.0 2 5 I F SHUT DOWN AT END OF REPORT PER IOD~EST I MATED DATE OF STARTUP UNIT SHt JTDOWNS AZK)POWER REDUCTIONS DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:

50-389 r ST LUCIE UNIT 2 12/09/94 C.D.WHITE-(407)468-4248 REPORT MONTH N VEMBER I 4 No.Date Type Duration (Hours)Reason Method of Shutting Down Reactor Licensee System Event Report Code'omponent Codes Cause&Corrective Action to Prevent Recurrence Unit 2 operated at essentially full power during the entire month of November.F Forced S Scheduled Reason A-Equipment failure (explain)B-Maintenance or Test C-Rcfucling D-Regulatory restriction E-Operator Training A License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets Liccnscc Event Report (LER)File (NUREG4161)

Exhibit 1-Same Source

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO.UNIT: DATE: COMPLETED BY: TELEPHONE 50-389 St.Lucie g2 12/09/94 C.D.White (407)468-4248 REPORT MONTH NOVEMBER 1994 Unit 2 operated at essentially full power during the entire month of November.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.