ML20127P496: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
| project = TAC:M84305
| stage = Approval
}}
}}



Latest revision as of 01:49, 22 August 2022

Forwards Amend 145 to License DPR-35 & Safety Evaluation. Amend Revises TS SRs for Station Batteries by Replacing Rated Load Discharge Test W/Svc Discharge Test once-per- Cycle & Performance Discharge Test Every Five Yrs
ML20127P496
Person / Time
Site: Pilgrim
Issue date: 01/25/1993
From: Eaton R
Office of Nuclear Reactor Regulation
To: Boulette E
BOSTON EDISON CO.
Shared Package
ML20127P497 List:
References
TAC-M84305, NUDOCS 9302010304
Download: ML20127P496 (3)


Text

_ . . _ _ - _ .._. _ _ _ . _ _ __ __ _

January 25, 1993" Docket No. 50-293 DISTRIBUTION: . _ . - _ _ _ . _.

" Docket-File 50-293- . G. Hill:(2)-PI-22 NRC & Local PCRs Wanda Jones-P-370 PDI-3 Reading = C. Grimes 'll F23' Mr. E. Thomas Boulette S..Varga E.:Y. Wang Senior Vice President - Nuclear J. Calvo ACRS (10) - P-315 Boston-Edison Company _ W. Butler OPA' .2 G5:

Pilgrim Nuclear Power Station T. Clark OC/LFDCB-MNBBil104-RfD #1 Rocky Hill Road R. Eaton J. Linville, RIl Plymouth, Massachusetts 02360 OGC - 15 B18-D. Hagan - MNBB 3206

Dear Mr. Boulette:

SUBJECT:

ISSUANCE OF AMENDMENT N0.145 TO FACILITY OPERATING LICENSE N0 :

DPR-35, PILGRIM NUCLEAR POWER STATION (TAC NO. M84305)'

The Commission has issued the enclosed Amendment No. 145 to Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station. This amendment is in response to your application dated August-10, 1992.-

This amendment revises the Technical Specifications surveill.ance requirements for the station batteries by replacing the rated load discharge test with a service discharge test once-per-cycle, and a performance discharge test every 5 years in place of the service test that'would normally _ occur _ within ,that .

time frame.

A copy of our Safety Evaluat_ ion is also enclosed. Notice of Issuance will.be -

included in the Commission's biweekly Federal ~ Reaister Notice.-

Si ncer ely,-

/S/

Ronald B. Eaton, Senior Project Manager Project Directorate I-3

-Division of Reactor Projects l/II Office of Nuclear Reactor Regulatio_n-

Enclosures:

1. -Amendment No. 145 to License No. DPR-35
2. Safety Evaluation cc w/ enclosures: J.

See next page- , #

LA:PDI-3,. PM:hlf3- OGC J/.s D:PDI-3 rh TClar k b REatb:m/- WButler d

- / //d/93 1 / 93 )-/1493 I- /2I/93 / / -L //

OFF ICIAL RECORD COPY Document Name: PIM84305.AMDL

_ _, . c. -

f 1 9302010304-930125 3 DR ADOCK-0500 .

('/

x

d.

  1. 'o UNITED STATES

['

p,,

'k p NUJLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555

\.../ January 25, 1993

)

Docket No. 50-293 Mr. E. Thomas Boulette Senior Vice President - Nuclear Boston Edison Company Pilgrim Nuclear Power Station RF0 #1 Rocky Hill Road Plymouth, Massachusetts 02360

Dear Mr. Boulette:

SUBJECT:

ISSUANCE OF AMENDMENT NO 145 TO FACILITY OPERATING LICENSE NO.

DPR-35, PILGRIM NUCLEAR POWER STATION (TAC N0. M84305)

The Commission has issued the enclosed Amendment No. 145 to Facility Operating License No. DPR-35 for the Pilgrim Nuclear Power Station. This amendment is in response to your application dated August 10, 1992.

This amendment revises the Technical Specificationr. surveillance requirements for the station batteries by replacing the rated load discharge test with a service discharge test once-per-cycle, and a performance discharge test every 5 years in place of the service test that would normally occur within that time frame.

A copy of our Safety Evaluation is also enclosed. Notice of Issuance will be

. included in the Commission's biweekly Federal Reaister Notice.

Sincerely,

[

onald B. Eaton, Senior Project Hanager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Rea-tor Regulation

Enclosures:

1. Amendment No. 145 to License No. DPR-35
2. Safety Evaluation cc w/eaclosures:

See next page

e e

4 -

Mr. E. Thomas Boulette Pilgrim Nuclear Power Station cc:

Mr. Edward S. Kraft, Mr. H. Ve-ran 0heim Vice President of Nuclear Manager, Reg. Affairs Dept.

Operations & St. tion Director Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station RFD #1 Pocky Hill Road RFD #1 Rocky Hill Road Plymouth. Massachusetts 02360 Plymouth, Massachusetts 02360 Mr. David F. Tarantino Resident inspector Nuclear Information Manager U. S. Nuclear Regulatory Commission Pilgrim Nuclear Power Station Pilgrim Nuclear Power Station RFD #1, Rocky Hill Road Post Office Box 867 Plymouth, Massachusetts 02360 Plymouth, Massachusetts 02360 Mr. Thomas Rapone Chairman, Board of Selectmen Secretary of Public Safety 11 Lincoln Street Executive Office of Public Safety Plymouth, Massachusetts 02360 One Ashburton Place-Boston, Massachusetts 02108 Office of the Connissioner Massachusetts Department of Mr. David Rodham, Director Environmental Protection Massachusetts Emergency Management One Winter Street Agency Boston, Massachusetts 02108 400 Worcester Road P.O. Box 1496 Office of the Attorney General Framingham, Massachusetts 01701-0317 One Ashburton Place Attn: James Mucterheide 20th Floor Boston, Massachusetts 02108 Chairmen, Citizens Urging i Responsible Energy Mr. Robert M. Hallisey, Director P. O. Box 2621 Radiation Control Program Duxbury, Massachusetts 02331 Massachusetts Department of Public Health Citizens at Risk 305 South Street P. O. Box 3803 Boston, Massachusetts 02130 Plymouth, Massachusetts 02361 Regional Administrator, Region I W. S. Stowe, Esquire U. S. Nuclear Regulator.y Commission Boston Edison Company 475 Allendale Rnad 800 Boylston St., 36th Floor King of Prussia, Pennsylvania 19406 Boston, Massachusetts 02199 Mr. Paul J. Hamilton Licensing Division Manager Boston Edison Comcany 25 Braintree Hill Park Braintree, Massachusetts 02184

- -_- _ -