ML20151S126: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000348/1987011]]
{{Adams
| number = ML20151S126
| issue date = 04/21/1988
| title = Forwards Testing of 11 Bolts & Requests Addl Info Re Chemical Analysis & Mechanical Testing of Bolts Samples Obtained During Insp Repts 50-348/87-11 & 50-364/87-11 on 870511-22,including Results of Review of Test Data
| author name = Reeves E
| author affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee name = Mcdonald R
| addressee affiliation = ALABAMA POWER CO.
| docket = 05000348, 05000364
| license number =
| contact person =
| document report number = NUDOCS 8804280200
| package number = ML20151S130
| document type = CORRESPONDENCE-LETTERS, NRC TO UTILITY, OUTGOING CORRESPONDENCE
| page count = 3
}}
See also: [[see also::IR 05000348/1987011]]
 
=Text=
{{#Wiki_filter:[g>3 Mhg9,;                              UNITED STATES
    y  j g-      g                NUCLEAR REGULATORY CGMMISSION
  ,
    ;.            l                        WASHINGTON, D. C. 20555
    \, G /
        *****
                                                APR 211988
            Docket Nos. 50-348
                    and 50-364
            Mr. R. P. Mcdonald
            Senior Vice President
            Alabama Power Company
            Post Office Box 2641
            Birmingham, Alabama 35291-0400
            SUBJECT: BOLT SAMPLES OBTAINED DURING PROCUREMENT INSPECTION - JOSEPH
                        M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 (INSPECTION REPORT
                        N05. 50-348/87-11 AND 50-364/87-11)
            During the procurement inspection conducted May 11-22, 1987, at your rwley
            facilities, samples of safety-related fasteners were obtained for subsequent
            chemical analysis and mechanical testing.
            As noted in the enclosed test results, bolts identified as Nos. S0-18 through
            50-21 exceeded the limits for chromium and bolt No. 50-23 exceeded the maximum
            hardness limit.    The remaining fasteners met the mechanical and chemical
            properties of the material specification. These fasteners were obtained from
          your safety-related fastener material stock and were available for use in the
            plant.
(          Please provide us, within 30 days of the date of this letter, a written
l          statement containing:
L
            1.    The results of your review of the test data with respect to the use of
                  the fasteners in your plant and any corrective actions deemed necessary;
1
                  A description of the steps that have been or will be taken to prevent a
'
            2.
                  reoccurrence, i.e., assure that fasteners purchased meet specifications;
                  and
            3.    The dates your t.orrective action and preventive measures were or will
                  be completed.
            In addition, please identify the supplier (s)/ manufacturer (s) who furnished the
            five bolts.
            Yhe reporting and/or recordkeeping requirements contained in this letter
            affect fewer than ten respondents; therefore, OMB clearance is not required
            under P.L. 96-511.
      8804280200 BBO4D5
      PDR    ADOCK 050 g 8
      a
 
    i
y,            ,Mr. R. P. Mcdonald                        -2-
                If you have any questions concerning this matter, please contact me at (301)
                492-1457.
                                                        Sincerely,
                                                          C      CJ)JAan
                                                                  fat
                                                        Edward A. Reeves, Sr. Project Manager
                                                        Project Directorate 11-1
                                                        Division of Reactor Projects I/II
                                                        Office of Nuclear Reactor Regulation
                Enclosures
                Test Results
                cc:  See next page
                DISTRIBUTION
                Central Files
l              Docket File Nos. 50-348/50 364          NRC POR
l              VIB Reading                            Local PDR
                DRIS Reaoing                            OGC
                PD21 Reading                            E. Jordan
                J. Partlow                              ACRS(10T '
                B. Grimes
                J. Stone
                E. Baker
                J. Conway
                E. Reeves
                E. Adensam
                G. Lainas
                S. Varga
                E. Herschoff, RII
                *See previous page for concurrences.
                OFFICIAL RECORD COPY
                                                                                    A    ,      s-
i 0FC :VIB:DRIS          :ASC/VIB:DRIS:ABC/VIB:DRIS:D/DIR:DRIS :DIR:DRIS        :P @ :DRPR:D      21'.RPR
                                                                                                      .. ...
                                                                                  _.....___...:.
  .... -
        .:............:............:............:.....__.....:......__...
  NAs :JConway:jh* :EBaker*              :JStone*      :BGrimes*            ,IReeves:ch :EAdensam
                                                                    :JPartlow*
  .....:.........__:............:............:..........._:_.__......_:....7.___..:.......__..
                                                      : 04/07/88    : 04/07/88  : 4/1/88    : 4/3//88
  DATE : 03/28/88        : 03/28/88    : 04/04/88                            V    Y
                                                                                                  'f
 
.
    -
  .
,
    Mr. R. P. Mcdonald
    Alabama Power Company              Joseph M. Farley Nucl_ ear Plant
    cc:
    Mr. W. O. Whitt                    D. Biard MacGuineas, Esquire
    -Executive Vice President            Volpe, Boskey and Lyons
    Alabama power Company              918 16th Street, N.W.
    Post Office Box 2641                Washington, DC 20006
    Birmingham, Alabama 35291-0400
                                        Charles R. Lowman
    Mr. Louis B. Long, General Manager  Alabama Electric Corporation
    Southern Company Services, Inc.    Post Office Box 550
    Post Office Box 2625                Andalusia, Alabama 36420
    Birmingham, Alabama 35202
    Chai rman                          Regional Administrator, Region II
    Houston County Commission          U.S. Nuclear Regulatory Commission
    Dothan, Alabama 36301              101 Marietta Street, Suite 2900
                                        Atlanta, Georgia 30303
    Ernest L. Blake, Jr., Esquire
    Shaw, Pittman, Potts and Trowbridge Claude Earl Fox, M.D.
    2300 N Street, N.W.                State Health Officer
    Washington, DC 20037                State Department of Public Health
                                        State Office Building
                                        Montgomery, Alabama 36130
    Robert A. Buettner, Esquire
    Balch, Bingham, Baker, Hawthorne,  Mr. J. D. Woodard
      Williams and Ward                General Manager - Nuclear Plant
    Post Office Bcx 306                Post Office Box 470
    Birmingham, Alabama 35201          Ashford, Alabama 36312
    Resident Inspector
    U.S. Nuclear Regulatory Commission
    Post Office Box 24 - Route 2
    Columbia, Alabama 36319
                                              .
                        . _ _
}}

Latest revision as of 21:45, 14 June 2022

Forwards Testing of 11 Bolts & Requests Addl Info Re Chemical Analysis & Mechanical Testing of Bolts Samples Obtained During Insp Repts 50-348/87-11 & 50-364/87-11 on 870511-22,including Results of Review of Test Data
ML20151S126
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/21/1988
From: Reeves E
Office of Nuclear Reactor Regulation
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20151S130 List:
References
NUDOCS 8804280200
Download: ML20151S126 (3)


See also: IR 05000348/1987011

Text

[g>3 Mhg9,; UNITED STATES

y j g- g NUCLEAR REGULATORY CGMMISSION

,

. l WASHINGTON, D. C. 20555

\, G /

APR 211988

Docket Nos. 50-348

and 50-364

Mr. R. P. Mcdonald

Senior Vice President

Alabama Power Company

Post Office Box 2641

Birmingham, Alabama 35291-0400

SUBJECT: BOLT SAMPLES OBTAINED DURING PROCUREMENT INSPECTION - JOSEPH

M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 (INSPECTION REPORT

N05. 50-348/87-11 AND 50-364/87-11)

During the procurement inspection conducted May 11-22, 1987, at your rwley

facilities, samples of safety-related fasteners were obtained for subsequent

chemical analysis and mechanical testing.

As noted in the enclosed test results, bolts identified as Nos. S0-18 through

50-21 exceeded the limits for chromium and bolt No. 50-23 exceeded the maximum

hardness limit. The remaining fasteners met the mechanical and chemical

properties of the material specification. These fasteners were obtained from

your safety-related fastener material stock and were available for use in the

plant.

( Please provide us, within 30 days of the date of this letter, a written

l statement containing:

L

1. The results of your review of the test data with respect to the use of

the fasteners in your plant and any corrective actions deemed necessary;

1

A description of the steps that have been or will be taken to prevent a

'

2.

reoccurrence, i.e., assure that fasteners purchased meet specifications;

and

3. The dates your t.orrective action and preventive measures were or will

be completed.

In addition, please identify the supplier (s)/ manufacturer (s) who furnished the

five bolts.

Yhe reporting and/or recordkeeping requirements contained in this letter

affect fewer than ten respondents; therefore, OMB clearance is not required

under P.L.96-511.

8804280200 BBO4D5

PDR ADOCK 050 g 8

a

i

y, ,Mr. R. P. Mcdonald -2-

If you have any questions concerning this matter, please contact me at (301)

492-1457.

Sincerely,

C CJ)JAan

fat

Edward A. Reeves, Sr. Project Manager

Project Directorate 11-1

Division of Reactor Projects I/II

Office of Nuclear Reactor Regulation

Enclosures

Test Results

cc: See next page

DISTRIBUTION

Central Files

l Docket File Nos. 50-348/50 364 NRC POR

l VIB Reading Local PDR

DRIS Reaoing OGC

PD21 Reading E. Jordan

J. Partlow ACRS(10T '

B. Grimes

J. Stone

E. Baker

J. Conway

E. Reeves

E. Adensam

G. Lainas

S. Varga

E. Herschoff, RII

  • See previous page for concurrences.

OFFICIAL RECORD COPY

A , s-

i 0FC :VIB:DRIS :ASC/VIB:DRIS:ABC/VIB:DRIS:D/DIR:DRIS :DIR:DRIS :P @ :DRPR:D 21'.RPR

.. ...

_.....___...:.

.... -

.:............:............:............:.....__.....:......__...

NAs :JConway:jh* :EBaker* :JStone* :BGrimes* ,IReeves:ch :EAdensam

JPartlow*

.....:.........__:............:............:..........._:_.__......_:....7.___..:.......__..

04/07/88  : 04/07/88  : 4/1/88  : 4/3//88

DATE : 03/28/88  : 03/28/88  : 04/04/88 V Y

'f

.

-

.

,

Mr. R. P. Mcdonald

Alabama Power Company Joseph M. Farley Nucl_ ear Plant

cc:

Mr. W. O. Whitt D. Biard MacGuineas, Esquire

-Executive Vice President Volpe, Boskey and Lyons

Alabama power Company 918 16th Street, N.W.

Post Office Box 2641 Washington, DC 20006

Birmingham, Alabama 35291-0400

Charles R. Lowman

Mr. Louis B. Long, General Manager Alabama Electric Corporation

Southern Company Services, Inc. Post Office Box 550

Post Office Box 2625 Andalusia, Alabama 36420

Birmingham, Alabama 35202

Chai rman Regional Administrator, Region II

Houston County Commission U.S. Nuclear Regulatory Commission

Dothan, Alabama 36301 101 Marietta Street, Suite 2900

Atlanta, Georgia 30303

Ernest L. Blake, Jr., Esquire

Shaw, Pittman, Potts and Trowbridge Claude Earl Fox, M.D.

2300 N Street, N.W. State Health Officer

Washington, DC 20037 State Department of Public Health

State Office Building

Montgomery, Alabama 36130

Robert A. Buettner, Esquire

Balch, Bingham, Baker, Hawthorne, Mr. J. D. Woodard

Williams and Ward General Manager - Nuclear Plant

Post Office Bcx 306 Post Office Box 470

Birmingham, Alabama 35201 Ashford, Alabama 36312

Resident Inspector

U.S. Nuclear Regulatory Commission

Post Office Box 24 - Route 2

Columbia, Alabama 36319

.

. _ _