ML20151S126
| ML20151S126 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/21/1988 |
| From: | Reeves E Office of Nuclear Reactor Regulation |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20151S130 | List: |
| References | |
| NUDOCS 8804280200 | |
| Download: ML20151S126 (3) | |
See also: IR 05000348/1987011
Text
[g>3 Mhg9,;
UNITED STATES
y j g-
g
NUCLEAR REGULATORY CGMMISSION
- .
l
WASHINGTON, D. C. 20555
,
\\, G /
APR 211988
Docket Nos. 50-348
and 50-364
Mr. R. P. Mcdonald
Senior Vice President
Alabama Power Company
Post Office Box 2641
Birmingham, Alabama 35291-0400
SUBJECT: BOLT SAMPLES OBTAINED DURING PROCUREMENT INSPECTION - JOSEPH
M. FARLEY NUCLEAR PLANT, UNITS 1 AND 2 (INSPECTION REPORT
N05. 50-348/87-11 AND 50-364/87-11)
During the procurement inspection conducted May 11-22, 1987, at your rwley
facilities, samples of safety-related fasteners were obtained for subsequent
chemical analysis and mechanical testing.
As noted in the enclosed test results, bolts identified as Nos. S0-18 through
50-21 exceeded the limits for chromium and bolt No. 50-23 exceeded the maximum
hardness limit.
The remaining fasteners met the mechanical and chemical
properties of the material specification.
These fasteners were obtained from
your safety-related fastener material stock and were available for use in the
plant.
(
Please provide us, within 30 days of the date of this letter, a written
l
statement containing:
L
1.
The results of your review of the test data with respect to the use of
the fasteners in your plant and any corrective actions deemed necessary;
1
2.
A description of the steps that have been or will be taken to prevent a
'
reoccurrence, i.e., assure that fasteners purchased meet specifications;
and
3.
The dates your t.orrective action and preventive measures were or will
be completed.
In addition, please identify the supplier (s)/ manufacturer (s) who furnished the
five bolts.
Yhe reporting and/or recordkeeping requirements contained in this letter
affect fewer than ten respondents; therefore, OMB clearance is not required
under P.L.96-511.
8804280200 BBO4D5
ADOCK 050 g 8
a
i
y,
,Mr. R. P. Mcdonald
-2-
If you have any questions concerning this matter, please contact me at (301)
492-1457.
Sincerely,
C
CJ)JAan
fat
Edward A. Reeves, Sr. Project Manager
Project Directorate 11-1
Division of Reactor Projects I/II
Office of Nuclear Reactor Regulation
Enclosures
Test Results
cc:
See next page
DISTRIBUTION
Central Files
l
Docket File Nos. 50-348/50 364
NRC POR
l
VIB Reading
Local PDR
DRIS Reaoing
PD21 Reading
E. Jordan
J. Partlow
ACRS(10T
B. Grimes
'
J. Stone
E. Baker
J. Conway
E. Reeves
E. Adensam
G. Lainas
S. Varga
E. Herschoff, RII
- See previous page for concurrences.
OFFICIAL RECORD COPY
A
s-
,
i
0FC :VIB:DRIS
- ASC/VIB:DRIS:ABC/VIB:DRIS:D/DIR:DRIS :DIR:DRIS
- P @ :DRPR:D
21'.RPR
-
_.....___...:.
.. ...
.... .:............:............:............:.....__.....:......__... ,IReeves:ch
NAs :JConway:jh* :EBaker*
- JStone*
- BGrimes*
- JPartlow*
- EAdensam
.....:.........__:............:............:..........._:_.__......_:....7.___..:.......__..
4/3//88
DATE : 03/28/88
- 03/28/88
- 04/04/88
- 04/07/88
- 04/07/88
- 4/1/88
'f
V
Y
.
-
.
,
Mr. R. P. Mcdonald
Alabama Power Company
Joseph M. Farley Nucl_ ear Plant
cc:
Mr. W. O. Whitt
D. Biard MacGuineas, Esquire
-Executive Vice President
Volpe, Boskey and Lyons
Alabama power Company
918 16th Street, N.W.
Post Office Box 2641
Washington, DC 20006
Birmingham, Alabama 35291-0400
Charles R. Lowman
Mr. Louis B. Long, General Manager
Alabama Electric Corporation
Southern Company Services, Inc.
Post Office Box 550
Post Office Box 2625
Andalusia, Alabama 36420
Birmingham, Alabama 35202
Chai rman
Regional Administrator, Region II
Houston County Commission
U.S. Nuclear Regulatory Commission
Dothan, Alabama 36301
101 Marietta Street, Suite 2900
Atlanta, Georgia 30303
Ernest L. Blake, Jr., Esquire
Shaw, Pittman, Potts and Trowbridge
Claude Earl Fox, M.D.
2300 N Street, N.W.
State Health Officer
Washington, DC 20037
State Department of Public Health
State Office Building
Montgomery, Alabama 36130
Robert A. Buettner, Esquire
Balch, Bingham, Baker, Hawthorne,
Mr. J. D. Woodard
Williams and Ward
General Manager - Nuclear Plant
Post Office Bcx 306
Post Office Box 470
Birmingham, Alabama 35201
Ashford, Alabama 36312
Resident Inspector
U.S. Nuclear Regulatory Commission
Post Office Box 24 - Route 2
Columbia, Alabama 36319
.
. _ _