ML20209F854: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 1: Line 1:
#REDIRECT [[IR 05000382/1987006]]
{{Adams
| number = ML20209F854
| issue date = 04/14/1987
| title = Insp Rept 50-382/87-06 on 870323-27.Violations Noted:Failure to Properly Control,Store & Protect QA Records.Unresolved Item Identified Re Certified Packaging Registration
| author name = Murray B, Nicholas J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
| addressee name =
| addressee affiliation =
| docket = 05000382
| license number =
| contact person =
| document report number = 50-382-87-06, 50-382-87-6, NUDOCS 8704300406
| package number = ML20209F811
| document type = INSPECTION REPORT, NRC-GENERATED, INSPECTION REPORT, UTILITY, TEXT-INSPECTION & AUDIT & I&E CIRCULARS
| page count = 7
}}
See also: [[see also::IR 05000382/1987006]]
 
=Text=
{{#Wiki_filter:r                                                    .
      .. .
                                                      APPENDIX B
                                          U.S. NUCLEAR REGULATORY COMMISSION
                                                        REGION IV
              NRC Inspection Report:      50-382/87-06              License:  NPF-38
              Docket:    50-382
              Licensee:    Louisiana Power and Light Company (LP&L)
                            317 Baronne Street
                            P. O. Box 60340                        -
                            New Orleans, Louisiana      70160
              Facility Name:    Waterford Steam Electric Station, Unit 3 (Wat-3)
              Inspection At:    Taft, St. Charles Parish, Louisiana
              Inspection Conducted:      March 23-27, 1987
              Inspector:        \/    dl A 0.3lh4tr///                                    NI
                                J. B. Nicholas ~, Senior fadiation Specialist        Date
                        .f04FacilitiesRadiologicalProtectionSection
              Approved:          (  f4O}lMA@n                                            /
                                B.Murray, Chief,FacflitiesRadiological                Date
                                    Protection Section/
  i
              Insp1ction Summary
              Inspection Conducted March 23-27, 1987 (Report 50-382/87-06)
              Areas Inspected:      Routine, unannounced inspection of the licensee's solid
              radioactive waste and transportation programs including: organization and
              managnent controls, training and qualifications, solid radioactive waste
              packaging, radioactive waste management, transportation activities, and
              low-level radioactive waste storage facilities.
              Results: Within the areas inspected, one violation was identified (failure to
              properly control, store, and protect quality assurance records, paragraph 4).
              One unresolved item was identified (certified packaging registration,
              paragraph 5). .No deviations were identified.
'
          0704300406 870428
          PDR  ADOCK 05000382
,
          g                  PDR
                                                                      ._ -  ,  - ,. -
 
, . .
                                              2
                                            DETAILS
      1.  Persons Contacted
          LP&L
        *R.  P. Barkhurst, Vice President-Nuclear, Nuclear Operations
          S. A. Alleman, Assistant Plant Manager, Technical Services
        *J. R. McGaha, Acting Plant Manager
        *P. N. Backes, Acting Nuclear Quality Assurance (QA) Manager
        *K. L. Brewster, Operations Licensing Engineer
        *J. L. Etheridge, Radwaste Engineer, Nuclear Special Projects
          W. M. Finnerity, Operations Training Instructor
        *C. R. Gaines, Staff Assistant
          T. O. Gray, Supervisor, Operations QA
        *W. T. LaBonte, Radiation Protection Superintendent
          R. P. Lee, QA Auditor, Operations.
          G. G. Miller, Health Physics Training Instructor
          W. M. Morgan, Manager, Vendor QA
        *J. M. O'Hern, Training Superintendent, Technical Support
        *P. V. Prasankumar, Acting Assistant Plant Manager, Plant Services
        *D. M. Rieder, Radwaste Associate Engineer
        *L. R. Simons, Radwaste Engineer
        *D. B. Stevens, Radwaste Supervisor
        *G. E. Wuller, Operations Licensing Engineer
        *J. J. Zabritski, Acting QA Manager, Operations
          Others
          J. G. Luehman, NRC Senior Resident Inspector
          A. W. Grella, NRC Senior Health Physicist (Transportation)
        * Denotes those present during the exit' briefing on March 27, 1987.
      2.  Inspector-Observations
          The following are observations the NRC inspector discussed with the
          licer.see during the inspection and at the exit briefing on March 27, 1987.
          These observations are neither violations nor unresolved items. These
          items were identified for licensee consideration for program improvement,
          but they have no specific regulatory requirement.
          a.    Radwaste Segregation Facility - The licensee had not established an
                efficient, well maintained, and permanent area for the surveying and
                segregating of contaminated materials for radwaste processing.
          b.    Low-Level Radioactive Waste Storage Facility - The licensee does not
                have inside weather-tight storage for the present quantity of
 
  . .
,
                                                3
                  low-level radioactive waste which is awaiting segregation,
                  processing, or shipment to a burial site. The present facilities    do
                  not provide handling, packaging, and transport loading areas.
        c.      Tracking of Radioactive Waste Shipments - The licensee did not have
                  in a procedure detailed steps to track, investigate, and make
                  required notifications following incidents of overdue or not received
                  shipments of radioactive waste materials.
        d.      Defective Type B Packages - The licensee did not have a procedure to
                  define and perform the required notifications regarding defects in
                  Type B packages.
        e.      Hazardous Materials Incidents - The licensee did not have a procedure
                  to perform the required immediate notification following certain
                  hazardous materials transportation incidents,
        f.      Record Requirements - The licensee had not provided sufficient detail
                  in the radwaste procedure RW-1-200, " Records Preparation, Filing, and
                  Storage," Revision 0, dated November 19, 1984, to incorporate the
                  requirements of Nuclear Operations Procedure (N0P)-003, " Records
                  Management System," Revision 2, dated February 19, 1987, which
                  directs Wat-3 procedures to contain as a minimum a list of records
                  generated as a result of performing the procedure, interim storage
                  requirements for the records, and the frequency of submittal of the
                  records to project files for final retention.
      3. Program Areas Inspected
        The following program areas were inspected. Unless otherwise noted, the
        inspection was completed and revealed no violations, deviations,
        unresolved items, or open items. Notations after a specific inspection
        item are used to identify the following:        I = item not inspected or only
        partially inspected; V = violation; D = deviation; U = unresolved item;
        and 0 = open item.
        Inspection Procedure          Inspection Requirements
                    83722              Radiation Protection, Plant _Chamistry, and
                                      Radwaste: Organization and hanagement Controls
                                      (Minimum / Basic)
                                      02.01 - Organization - I
                                      02.02 - Staffing - I
                                      02.03 - Radiation Protection Manager - I
                                      02.04 - Identification and Correction of
                                                  Weaknesses - I
                                      02.05 - Audits and Appraisals - I
            _ _ .                              _                                  .-    _-
 
_
  , . .
                          4
        83522  Radiation Protection, Plant Chemistry, Radwaste,
                and Environmental:    Organization and Management
                Controls (Supplemental)
                02.01 - Organization, Responsibilities, and
                            Authorities - I
                02.02 - Staffing - I
                02.03 - Identification and Correction of
                            Weaknesses - I
                02.04 - Audits and Appraisals - I
                02.05 - Communication to Employees - I
                02.06 - Documentation and Implementation - I
        83723  Training and Qualifications: General Employee
                Training, Radiation Safety, Plant Chemistry,
                Radwaste, and Transportation (Minimum / Basic)
              _ 02.01 - Training Adequacy - I
                02.02 - Employee Knowledge Retention - I
                02.03 - Transportation /Radwaste Training - I
                02.04 - Staff Qualification Requirements - I
                02.05 - Replacement Personnel - I
                02.06 - Accreditation Status - I
                02.07 - Audits and Appraisals - I
                02.08 - Identify Training not Covered by
                            Accreditation - I
        83523  Radiation Protection, Plant Chemistry, Radwaste,
                Transportation, and Environmental:    Training and
                Qualifications (Supplemental)
                02.01 - Training and Qualifications Program - I
                02.02 - Education and Experience - 1
                02.03 - Adequacy - I
        84722  Solid Wastes (Minimum / Basic)
                02.01 - Audits and Appraisals
                02.02 - Changes
                02.03 - Processing and Storage
                02.04 - Disposal of Low-Level Wastes
        84522  Solid Wastes (Supplemental)
                02.01 - Solid Waste System Construction and
                            Installation - I
                02.02 - Liquid Leakage, Overflow, and Spillage
                02.03 - Sampling
                02.04 - Test Program for Solid Waste System
                02.05 - Test Completion for Solid Waste System
 
  , . . .
                                    5
                          02.06 - Process Monitors - I
4
                          02.07 - Programs, Plans, and Procedures for
                                      Solid Waste System
                          02.08 - Disposal of Low-Level Wastes
                84850    Radioactive Waste Management - Inspection of
                          Waste Generator Requirements of 10 CFR 20 and        ,
                          10 CFR 61
                          02.01 - Management Controls
                          02.02 - Quality Control (QC)
                          02.03 - Waste Manifests
                          02.04 - Waste Classification
                          02.05 - Waste Form and Characterization
                          02.06 - Waste Shipment Labeling
                          02.07 - Tracking of Waste Shipments
'-                        02.08 - Disposal Site License Conditions
                86721    Transportation (Basic)
                          02.01 - Audits and Appraisals
                          02.02 - Procedures
                          02.03 - Procurement and Reuse of Packagings
                          02.04 - Implementation
                          02.05 - Transportation Incidents
                86740    Inspection of Transportation Activities
                          02.01 - Management Control
                          02.02 - Indoctrination and Training Programs
                          02.03 - Audit Program
                          02.04 - Quality Assurance Program
                          02.05 - Procurement and Selection of Packagings
                                      - U (see paragraph 5)
                          02.06 - Preparation of Packages for Shipment
                          02.07 - Delivery of Completed Packages to
                                      Carriers
                          02.08 - Receipt of Packages
                          02.09 - Periodic Maintenance of Packagings
l                          02.10 - Records and Reports - V (see
                                      paragraph 4)
                65051    Low-Level Radioactive Waste Storage Facilities
                          02.01 - Basis for Construction
                          02.02 - Quality Assurance
                          02.03 - Procedures for Construction
                          02.04 - Review of Construction
                          02.05 - Organization and Staffing
                          02.06 - Training and Qualifications
                          02.07 - Startup and Operations Procedures
                          02.08 - Effluent Monitoring Changes
          - - -    .  - -  .          .-    . - . .  -
                                                          -        ._. . - . -
 
              .                                      -  -
                                                                              .        .
                                                                                            . - -      ..                                  . . -                =
                    _
                                                                            %
                                              ~
                                    -
        ,.s;.                                          ,
k ._
                '
                                                                                        6
                                                                                                *
;
[                  4.  Apparent Violation
                      '86740, Item 02.10 - Records and Reports
^
                        On March 23, 1987, the NRC inspector noted that the completed original
                      . lifetime QA records' generated from radioactive waste shipments made.during
'
                        1986 and 1987 were: stored in an unlocked standard file cabinet in the
                        Radwaste Supervisor's office in the reactor auxiliary building and had not
-      ''              been transmitted to plant records management for final retention. The
                        licensee's Technical Specification 6.8.1 requires that written procedures
                        be established, implemented, and maintained covering.the activities
                        referenced in~ Appendix. A of Regulatory Guide 1.33, Revision 2, dated
                        February 1978. _ The licensee's Nuclear Operations Management
i                      Manual (NOPM), Section V, Appendix A, " Regulatory Guidance Documents,"
                        Revision 1,. dated August 12,.1985, contains a listing of ANSI standards
                        and Regulatory Guides which LP&L is committed to for operation of Wat-3.
                        Regulatory Guide 1.88, " Collection, Storage and Maintenance of Nuclear
.                      Power Plant Quality Assurance Records for Nuclear Power Plants" and
'
                        ANSI N45.2.9-1974, " Requirements for Collection, Storage, and Maintenance
                        of Quality-Assurance Records for Nuclear Power Plants" are included in
3.                      that list.      NOMM, Section VI, Chapter 5, " Radioactive Waste Management,"
<
                        Revision 2, dated February 14, 1986, states in paragraph 3.2.15(g) that
                        the quality records program applies to records relating to packaging and
"
                        shipment of radioactive waste material. N0P-003, " Records Management
                        System," Revision 2, dated February 19, 1987, in paragraph 3.5 defines
'
                        records as being QA records when they are completed and all appropriate
                                                                                          _
                        information and signatures have been entered and paragraph 3.6 defines
                        interim storage as.the storage or safekeeping of records from the time
                        they are completed until submitted to project files for final. retention.
'
                        N0P-003, paragraph 5.3.1,. states, " Interim storage of completed records
                        shall be in lockable, 1-hour rated, fireproof. file cabinets or access
-                      shall be controlled when the records are not in locked cabinets." The
                        failure to properly store and protect lifetime QA records associated with
1
                        radioactive waste shipments made during 1986 to the present is an apparent
-
                        violation of Technical Specification 6.8.1.                                  (382/8706-01)                                                          P
                    5.  Unresolved Item
                        86740, Item 02.05 - Procurement and Selection of Packaging
J
                        An unresolved item is a matter about which additional information is
C                      needed for determination whether the item is acceptable, a violation, or a
                        deviation. One unresolved item is discussed below.
'
                        10 CFR Dart 71.12(c)(3) requires that a licensee " submit in writing to the
                        Director, Office of Nuclear Material Safety and-Safeguards, prior to the
                        licensee's first use of a certified package, the licensee's name and.
                        license number and the package identification number specified in the
                        package approval." The NRC inspector determined that the licensee had
                        used two' certified packages (NUS-14-1701, USA /9151/A, and CNS-14-170,
                        USA /9079/A) in performing radwaste material shipments during 1986. The
    -
      -    --    _      --    _m  - . _ ., _ . . ,      . , _ , , _ . . . _ . , , _            -  _ _ _ . . , , _ _ _ _ _ , , , , , _ ,      _ _ _ . , _ _ .  . _ , _
 
.
                                                                                        ,
  , . , .
                                                7
            licensee was determined to be a licensed user of these packages according
            to the user's lists for each of the above identified packages listed in
            NUREG-0383, Volume 1, Revision 9, dated October 1986.  However, the
            licensee was unable to locate copies of the. license application and the
            NRC approval letter licensing LP&L as a licensed user of the above
            identified packages. This item will be considered unresolved pending
            location of copies of the license application and the NRC license approval
            to use the above identified packages. (382/8706-02)
          6. Exit Briefing
            The NRC inspector met with the licensee representatives denoted in
            paragraph 1 at the conclusion of the inspection on March 27, 1987. The
            NRC inspector summarized the scope of the inspection'and discussed the
            inspection findings.
}}

Latest revision as of 12:13, 19 December 2021

Insp Rept 50-382/87-06 on 870323-27.Violations Noted:Failure to Properly Control,Store & Protect QA Records.Unresolved Item Identified Re Certified Packaging Registration
ML20209F854
Person / Time
Site: Waterford Entergy icon.png
Issue date: 04/14/1987
From: Murray B, Nicholas J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20209F811 List:
References
50-382-87-06, 50-382-87-6, NUDOCS 8704300406
Download: ML20209F854 (7)


See also: IR 05000382/1987006

Text

r .

.. .

APPENDIX B

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

NRC Inspection Report: 50-382/87-06 License: NPF-38

Docket: 50-382

Licensee: Louisiana Power and Light Company (LP&L)

317 Baronne Street

P. O. Box 60340 -

New Orleans, Louisiana 70160

Facility Name: Waterford Steam Electric Station, Unit 3 (Wat-3)

Inspection At: Taft, St. Charles Parish, Louisiana

Inspection Conducted: March 23-27, 1987

Inspector: \/ dl A 0.3lh4tr/// NI

J. B. Nicholas ~, Senior fadiation Specialist Date

.f04FacilitiesRadiologicalProtectionSection

Approved: ( f4O}lMA@n /

B.Murray, Chief,FacflitiesRadiological Date

Protection Section/

i

Insp1ction Summary

Inspection Conducted March 23-27, 1987 (Report 50-382/87-06)

Areas Inspected: Routine, unannounced inspection of the licensee's solid

radioactive waste and transportation programs including: organization and

managnent controls, training and qualifications, solid radioactive waste

packaging, radioactive waste management, transportation activities, and

low-level radioactive waste storage facilities.

Results: Within the areas inspected, one violation was identified (failure to

properly control, store, and protect quality assurance records, paragraph 4).

One unresolved item was identified (certified packaging registration,

paragraph 5). .No deviations were identified.

'

0704300406 870428

PDR ADOCK 05000382

,

g PDR

._ - , - ,. -

, . .

2

DETAILS

1. Persons Contacted

LP&L

  • R. P. Barkhurst, Vice President-Nuclear, Nuclear Operations

S. A. Alleman, Assistant Plant Manager, Technical Services

  • J. R. McGaha, Acting Plant Manager
  • P. N. Backes, Acting Nuclear Quality Assurance (QA) Manager
  • K. L. Brewster, Operations Licensing Engineer
  • J. L. Etheridge, Radwaste Engineer, Nuclear Special Projects

W. M. Finnerity, Operations Training Instructor

  • C. R. Gaines, Staff Assistant

T. O. Gray, Supervisor, Operations QA

  • W. T. LaBonte, Radiation Protection Superintendent

R. P. Lee, QA Auditor, Operations.

G. G. Miller, Health Physics Training Instructor

W. M. Morgan, Manager, Vendor QA

  • J. M. O'Hern, Training Superintendent, Technical Support
  • P. V. Prasankumar, Acting Assistant Plant Manager, Plant Services
  • D. M. Rieder, Radwaste Associate Engineer
  • L. R. Simons, Radwaste Engineer
  • D. B. Stevens, Radwaste Supervisor
  • G. E. Wuller, Operations Licensing Engineer
  • J. J. Zabritski, Acting QA Manager, Operations

Others

J. G. Luehman, NRC Senior Resident Inspector

A. W. Grella, NRC Senior Health Physicist (Transportation)

  • Denotes those present during the exit' briefing on March 27, 1987.

2. Inspector-Observations

The following are observations the NRC inspector discussed with the

licer.see during the inspection and at the exit briefing on March 27, 1987.

These observations are neither violations nor unresolved items. These

items were identified for licensee consideration for program improvement,

but they have no specific regulatory requirement.

a. Radwaste Segregation Facility - The licensee had not established an

efficient, well maintained, and permanent area for the surveying and

segregating of contaminated materials for radwaste processing.

b. Low-Level Radioactive Waste Storage Facility - The licensee does not

have inside weather-tight storage for the present quantity of

. .

,

3

low-level radioactive waste which is awaiting segregation,

processing, or shipment to a burial site. The present facilities do

not provide handling, packaging, and transport loading areas.

c. Tracking of Radioactive Waste Shipments - The licensee did not have

in a procedure detailed steps to track, investigate, and make

required notifications following incidents of overdue or not received

shipments of radioactive waste materials.

d. Defective Type B Packages - The licensee did not have a procedure to

define and perform the required notifications regarding defects in

Type B packages.

e. Hazardous Materials Incidents - The licensee did not have a procedure

to perform the required immediate notification following certain

hazardous materials transportation incidents,

f. Record Requirements - The licensee had not provided sufficient detail

in the radwaste procedure RW-1-200, " Records Preparation, Filing, and

Storage," Revision 0, dated November 19, 1984, to incorporate the

requirements of Nuclear Operations Procedure (N0P)-003, " Records

Management System," Revision 2, dated February 19, 1987, which

directs Wat-3 procedures to contain as a minimum a list of records

generated as a result of performing the procedure, interim storage

requirements for the records, and the frequency of submittal of the

records to project files for final retention.

3. Program Areas Inspected

The following program areas were inspected. Unless otherwise noted, the

inspection was completed and revealed no violations, deviations,

unresolved items, or open items. Notations after a specific inspection

item are used to identify the following: I = item not inspected or only

partially inspected; V = violation; D = deviation; U = unresolved item;

and 0 = open item.

Inspection Procedure Inspection Requirements

83722 Radiation Protection, Plant _Chamistry, and

Radwaste: Organization and hanagement Controls

(Minimum / Basic)

02.01 - Organization - I

02.02 - Staffing - I

02.03 - Radiation Protection Manager - I

02.04 - Identification and Correction of

Weaknesses - I

02.05 - Audits and Appraisals - I

_ _ . _ .- _-

_

, . .

4

83522 Radiation Protection, Plant Chemistry, Radwaste,

and Environmental: Organization and Management

Controls (Supplemental)

02.01 - Organization, Responsibilities, and

Authorities - I

02.02 - Staffing - I

02.03 - Identification and Correction of

Weaknesses - I

02.04 - Audits and Appraisals - I

02.05 - Communication to Employees - I

02.06 - Documentation and Implementation - I

83723 Training and Qualifications: General Employee

Training, Radiation Safety, Plant Chemistry,

Radwaste, and Transportation (Minimum / Basic)

_ 02.01 - Training Adequacy - I

02.02 - Employee Knowledge Retention - I

02.03 - Transportation /Radwaste Training - I

02.04 - Staff Qualification Requirements - I

02.05 - Replacement Personnel - I

02.06 - Accreditation Status - I

02.07 - Audits and Appraisals - I

02.08 - Identify Training not Covered by

Accreditation - I

83523 Radiation Protection, Plant Chemistry, Radwaste,

Transportation, and Environmental: Training and

Qualifications (Supplemental)

02.01 - Training and Qualifications Program - I

02.02 - Education and Experience - 1

02.03 - Adequacy - I

84722 Solid Wastes (Minimum / Basic)

02.01 - Audits and Appraisals

02.02 - Changes

02.03 - Processing and Storage

02.04 - Disposal of Low-Level Wastes

84522 Solid Wastes (Supplemental)

02.01 - Solid Waste System Construction and

Installation - I

02.02 - Liquid Leakage, Overflow, and Spillage

02.03 - Sampling

02.04 - Test Program for Solid Waste System

02.05 - Test Completion for Solid Waste System

, . . .

5

02.06 - Process Monitors - I

4

02.07 - Programs, Plans, and Procedures for

Solid Waste System

02.08 - Disposal of Low-Level Wastes

84850 Radioactive Waste Management - Inspection of

Waste Generator Requirements of 10 CFR 20 and ,

10 CFR 61

02.01 - Management Controls

02.02 - Quality Control (QC)

02.03 - Waste Manifests

02.04 - Waste Classification

02.05 - Waste Form and Characterization

02.06 - Waste Shipment Labeling

02.07 - Tracking of Waste Shipments

'- 02.08 - Disposal Site License Conditions

86721 Transportation (Basic)

02.01 - Audits and Appraisals

02.02 - Procedures

02.03 - Procurement and Reuse of Packagings

02.04 - Implementation

02.05 - Transportation Incidents

86740 Inspection of Transportation Activities

02.01 - Management Control

02.02 - Indoctrination and Training Programs

02.03 - Audit Program

02.04 - Quality Assurance Program

02.05 - Procurement and Selection of Packagings

- U (see paragraph 5)

02.06 - Preparation of Packages for Shipment

02.07 - Delivery of Completed Packages to

Carriers

02.08 - Receipt of Packages

02.09 - Periodic Maintenance of Packagings

l 02.10 - Records and Reports - V (see

paragraph 4)

65051 Low-Level Radioactive Waste Storage Facilities

02.01 - Basis for Construction

02.02 - Quality Assurance

02.03 - Procedures for Construction

02.04 - Review of Construction

02.05 - Organization and Staffing

02.06 - Training and Qualifications

02.07 - Startup and Operations Procedures

02.08 - Effluent Monitoring Changes

- - - . - - . .- . - . . -

- ._. . - . -

. - -

. .

. - - .. . . - =

_

%

~

-

,.s;. ,

k ._

'

6

[ 4. Apparent Violation

'86740, Item 02.10 - Records and Reports

^

On March 23, 1987, the NRC inspector noted that the completed original

. lifetime QA records' generated from radioactive waste shipments made.during

'

1986 and 1987 were: stored in an unlocked standard file cabinet in the

Radwaste Supervisor's office in the reactor auxiliary building and had not

- been transmitted to plant records management for final retention. The

licensee's Technical Specification 6.8.1 requires that written procedures

be established, implemented, and maintained covering.the activities

referenced in~ Appendix. A of Regulatory Guide 1.33, Revision 2, dated

February 1978. _ The licensee's Nuclear Operations Management

i Manual (NOPM),Section V, Appendix A, " Regulatory Guidance Documents,"

Revision 1,. dated August 12,.1985, contains a listing of ANSI standards

and Regulatory Guides which LP&L is committed to for operation of Wat-3.

Regulatory Guide 1.88, " Collection, Storage and Maintenance of Nuclear

. Power Plant Quality Assurance Records for Nuclear Power Plants" and

'

ANSI N45.2.9-1974, " Requirements for Collection, Storage, and Maintenance

of Quality-Assurance Records for Nuclear Power Plants" are included in

3. that list. NOMM,Section VI, Chapter 5, " Radioactive Waste Management,"

<

Revision 2, dated February 14, 1986, states in paragraph 3.2.15(g) that

the quality records program applies to records relating to packaging and

"

shipment of radioactive waste material. N0P-003, " Records Management

System," Revision 2, dated February 19, 1987, in paragraph 3.5 defines

'

records as being QA records when they are completed and all appropriate

_

information and signatures have been entered and paragraph 3.6 defines

interim storage as.the storage or safekeeping of records from the time

they are completed until submitted to project files for final. retention.

'

N0P-003, paragraph 5.3.1,. states, " Interim storage of completed records

shall be in lockable, 1-hour rated, fireproof. file cabinets or access

- shall be controlled when the records are not in locked cabinets." The

failure to properly store and protect lifetime QA records associated with

1

radioactive waste shipments made during 1986 to the present is an apparent

-

violation of Technical Specification 6.8.1. (382/8706-01) P

5. Unresolved Item

86740, Item 02.05 - Procurement and Selection of Packaging

J

An unresolved item is a matter about which additional information is

C needed for determination whether the item is acceptable, a violation, or a

deviation. One unresolved item is discussed below.

'

10 CFR Dart 71.12(c)(3) requires that a licensee " submit in writing to the

Director, Office of Nuclear Material Safety and-Safeguards, prior to the

licensee's first use of a certified package, the licensee's name and.

license number and the package identification number specified in the

package approval." The NRC inspector determined that the licensee had

used two' certified packages (NUS-14-1701, USA /9151/A, and CNS-14-170,

USA /9079/A) in performing radwaste material shipments during 1986. The

-

- -- _ -- _m - . _ ., _ . . , . , _ , , _ . . . _ . , , _ - _ _ _ . . , , _ _ _ _ _ , , , , , _ , _ _ _ . , _ _ . . _ , _

.

,

, . , .

7

licensee was determined to be a licensed user of these packages according

to the user's lists for each of the above identified packages listed in

NUREG-0383, Volume 1, Revision 9, dated October 1986. However, the

licensee was unable to locate copies of the. license application and the

NRC approval letter licensing LP&L as a licensed user of the above

identified packages. This item will be considered unresolved pending

location of copies of the license application and the NRC license approval

to use the above identified packages. (382/8706-02)

6. Exit Briefing

The NRC inspector met with the licensee representatives denoted in

paragraph 1 at the conclusion of the inspection on March 27, 1987. The

NRC inspector summarized the scope of the inspection'and discussed the

inspection findings.