ML20138H945: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, OUTGOING CORRESPONDENCE
| page count = 3
| page count = 3
| project = TAC:M95903, TAC:M95904
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:- . . -          -            . - - -          . - - _ - - - - - - - _
      ~        -
;                                                        SAFEGUARD 8 INFORMAll0N l                    Mr. C. K. McCoy                                                  April 30,1997
~
Vice President - Nuclear i                    Vogtle Project l-                  Southern Nuclear Operating Company, Inc.
j                    P. O. Box 1295 Birmingham, Alabama 35201 l                   
 
==SUBJECT:==
DENIAL 0F REQUEST FOR APPROVAL 0F REVISION 1 TO AMENDMENT 31, 1                                PHYSICAL SECURITY AND CONTINGENCY PLAN, V0GTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. M95903 AND M95904) l                   
 
==Dear Mr. McCoy:==
* By {{letter dated|date=May 15, 1996|text=letter dated May 15, 1996}}, Georgia Power Company (GPC), submitted proposed Amendment 31 to the Physical Security and Contingency Plan for the Vogtle                                  -
Electric Generating Plant, Units 1 and 2. In response to a request for
!                    additional information by the staff, GPC, by {{letter dated|date=November 25, 1996|text=letter dated November 25, 1996}}.
j                    withdrew the May 15, 1996, proposal and submitted Revision 1 to Amendment 31 i                    for staff review. That review, which included an onsite tour of appropriate j                    facilities and interviews with licensee personnel, is complete and the staff has determined that the proposal should not be approved.
Details of the review are enclosed with this letter. The enclosure contains i                    information that has been determined to be exempt from public disclosure in accordance with 10 CFR 73.21 (Safeguards Information). Therefore, it will not                              i i                    be placed in the NRC Public Document Room (PDR) and will receive limited i                    distribution. This letter, without its enclosure, will be placed in the PDR l                    in accordance with 10 CFR 2.790(a).
l                    Please have your representative contact me at (301) 415-1444 if there are any j                    questions regarding this action.
SG ' Document transmitted herewith contains sensitivh"              /s/
;                  Unclassifiedinformation. When separated from Louis L. Wheeler, Senior Project Manager i                  enclosures, this document is decontrolled."            Project Directorate II-2 l                                                                          Division of Reactor Projects - 1/II                  ;
Office of Nuclear Reactor Regulation          ,
Docket Nos. 50-424 and 50-425                                                                  #
i                   
 
==Enclosure:==
As stated 302 Violation of protection requirements for SAFEGU
;                    cc: See next page                                          Uf0RMAT10N subject to CML and CRIMINAL Penahies  i i
Distribution (w/o enclosure):                                        N                                    i Docket File PUBLIC~'
HBerkow LBerry OGC ACRS IW h hf
                  .PD 11-2 Rdg.            LWheA                        JJohnson, RII                                        I SVarga                  LCuni.5 .gham                PSkinner, RII
          -To rcceive a copy of this document, indicate in the box:                        "C" = copy without attachment /4ncktsure        "E" = copy with attachmept/goclosure                  "N" = No copy _
0FFICE PM:PDIJp4 -            LA:PDIMhlp PSGSMPPM)f l 0GC NK)                      l  D:Pp @ t 7                  I NAME    LWHEEtfK:cn          LSERRY M(l'            LCVNN1lT@fA L  d/    Wary    p  HBfRKh /
DATE      // / 43' /97          @ / M 797 /f / 29 /97                      3//72rv /97    td / v /97    /    /97 J0CUMEN1 NAME: G:\V0GTLE\V0G95903. DEN                      OFFICIAL RECORD COPY 9705070340 970430 PDR  ADOCK 0500            4                      , @ Q g l % Q f, M { Q
 
p ct:                                                        g*g g 4                              UNITED STATES
{3              j 4"
NUCLEAR REGULATORY COMMISSION WA$HINGTON, D.C. 20066 0001
              %                                              April 30,1997 Mr. C. K. McCoy Vice President - Nuclear Vogtle Project                                                                                    I Southern Nuclear Operating Company, Inc.
P. O. Box 1295                                                                                    1 Birmingham, Alabama 35201                                                                          '
 
==SUBJECT:==
DENIAL OF REQUEST FOR APPROVAL OF REVISION 1 TO AMENDMENT 31, PHYSICAL SECURITY AND CONTINGENCY PLAN, V0GTLE ELECTRIC GENERATING                  )
i PLANT, UNITS 1 AND 2 (TAC NOS. M95903 AND M95904) l 1
 
==Dear Mr. McCoy:==
By {{letter dated|date=May 15, 1996|text=letter dated May 15, 1996}}, Georgia Power Company (GPC), submitted proposed Amendment 31 to the Physical Security and Contingency Plan for the Vogtle Electric Generating Plant, Units 1 and 2. In response to a request for additional information by the staff, GPC, by {{letter dated|date=November 25, 1996|text=letter dated November 25, 1996}},                      i withdrew the May 15, 1996, proposal and submitted Revision 1 to Amendment 31                      i for staff review. That review, which included an onsite tour of appropriate                        '
'.                facilities and interviews with licensee personnel, is complete and the staff has determined that the proposal should not be approved.                                          j Details of the review are enclosed with this letter. The enclosure contains information that has been determined to be exempt from public disclosure in accordance with 10 CFR 73.21 (Safeguards Information). Therefore, it will not be placed in the NRC Public Document Room (PDR) and will receive limited distribution. This letter, without its enclosure, will be placed in the PDR in accordance with 10 CFR 2.790(a).                                                                ;
Please have your representative contact me at (301) 415-1444 if there are any questions regarding this action.
Sincerely,
    $Q . 'Docyfnent transmitted hef0With contains tensillVO
;        unchss: fled Informat!on. When sopu ted from encl 0Sures, this dQCument l3 dCC0ntrolled.' '
gYt,gjheeer,SeniorProjectManager
:                                                              Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425
 
==Enclosure:==
As stated                        Vl0ftlIonOf proleelle requitsnents'foISAFEGUARD$
INFORMATION subject to CML and CRIMINAL Fenalties cc:    See next page SAfEGURDB NOMM
 
  .s  .
d
,                    Vogtle Electric Generating Plant l                    Units 1 and 2 cc:
Mr. W. G. Hairston, III                                    Harold Reheis, Director.                    -
President and Chief                                        Department of Natural Resources Executive Officer                                  205 Butler Street, SE. Suite 1252 Southern Nuclear Operating                                  Atlanta, Georgia 30334 Company, Inc.
P. O. Box 1295                                              Attorney General Birmingham, Alabama 35201-1295                              Law Department                              ,
132 Judicial Building Mr. J. A. Bailey                                            Atlanta, Georgia 30334 Manager, Licensing                                                                                      i Southern Nuclear Operating                                  Mr. Thomas P. Mozingo                        1 Company, Inc.                                      Program Manager P. O. Box 1295                                            Nuclear Operations Birmingham, Alabama 35201-1295                              Oglethorpe Power Corporation 2100 East Exchange Place Mr. J. B. Beasley                                          P. O. Box 1349 General Manager, Vogtle Electric                            Tucker, Georgia 30085-1349 Generating Plant Southern Nuclear Operating                                Charles A. Patrizia, Esquire Company, Inc.                                      Paul, Hastings, Janofsky & Walker P. O. Box 1600                                            10th Floor Waynesboro, Georgia 30830                                  1299 Pennsylvania Avenue Washington, DC 20004-9500 Regional Administrator, Region II                                                                      i U. S. Nuclear Regulatory Commission                        Arthur H. Domby, Esquire                    l 101 Marietta Street, NW., Suite 2900                      Troutman Sanders Atlanta, Georgia 30323                                      NationsBank Plaza 600 Peachtree Street, NE.
Office of Planning and Budget                              Suite 5200 Room 615B                                                  Atlanta, Georgia 30308-2216 270 Washington Street, SW.
Atlanta, Georgia 30334                                      Resident Inspector                          l U.S. Nuclear Regulatory Commission          '
Mr. J. D. Woodard                                          8805 River Road Executive Vice President                                  Waynesboro, Georgia 30830                    i Southern Nuclear Operating Company, Inc.                                      Office of the County Commissioner P. O. Box 1295                                            Burke County Commission Birmingham, Alabama 35201-1295                            Waynesboro, Georgia 30830 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW.
Atlanta, Georgia 30328-4684
                                                                        , - ,}}

Latest revision as of 00:21, 13 December 2021

Informs That Request for Approval of Rev 1 to Amend 31, Physical Security & Contingency Plan for Vogtle Electric Generating Plant,Units 1 & 2 Should Not Be Approved.Encl Contains Info Determined to Be Exempt from Public.W/O Encl
ML20138H945
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/30/1997
From: Larry Wheeler
NRC (Affiliation Not Assigned)
To: Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
References
TAC-M95903, TAC-M95904, NUDOCS 9705070340
Download: ML20138H945 (3)


Text

- . . - - . - - - . - - _ - - - - - - - _

~ -

SAFEGUARD 8 INFORMAll0N l Mr. C. K. McCoy April 30,1997

~

Vice President - Nuclear i Vogtle Project l- Southern Nuclear Operating Company, Inc.

j P. O. Box 1295 Birmingham, Alabama 35201 l

SUBJECT:

DENIAL 0F REQUEST FOR APPROVAL 0F REVISION 1 TO AMENDMENT 31, 1 PHYSICAL SECURITY AND CONTINGENCY PLAN, V0GTLE ELECTRIC GENERATING PLANT, UNITS 1 AND 2 (TAC NOS. M95903 AND M95904) l

Dear Mr. McCoy:

Electric Generating Plant, Units 1 and 2. In response to a request for

! additional information by the staff, GPC, by letter dated November 25, 1996.

j withdrew the May 15, 1996, proposal and submitted Revision 1 to Amendment 31 i for staff review. That review, which included an onsite tour of appropriate j facilities and interviews with licensee personnel, is complete and the staff has determined that the proposal should not be approved.

Details of the review are enclosed with this letter. The enclosure contains i information that has been determined to be exempt from public disclosure in accordance with 10 CFR 73.21 (Safeguards Information). Therefore, it will not i i be placed in the NRC Public Document Room (PDR) and will receive limited i distribution. This letter, without its enclosure, will be placed in the PDR l in accordance with 10 CFR 2.790(a).

l Please have your representative contact me at (301) 415-1444 if there are any j questions regarding this action.

SG ' Document transmitted herewith contains sensitivh" /s/

Unclassifiedinformation. When separated from Louis L. Wheeler, Senior Project Manager i enclosures, this document is decontrolled." Project Directorate II-2 l Division of Reactor Projects - 1/II  ;

Office of Nuclear Reactor Regulation ,

Docket Nos. 50-424 and 50-425 #

i

Enclosure:

As stated 302 Violation of protection requirements for SAFEGU

cc
See next page Uf0RMAT10N subject to CML and CRIMINAL Penahies i i

Distribution (w/o enclosure): N i Docket File PUBLIC~'

HBerkow LBerry OGC ACRS IW h hf

.PD 11-2 Rdg. LWheA JJohnson, RII I SVarga LCuni.5 .gham PSkinner, RII

-To rcceive a copy of this document, indicate in the box: "C" = copy without attachment /4ncktsure "E" = copy with attachmept/goclosure "N" = No copy _

0FFICE PM:PDIJp4 - LA:PDIMhlp PSGSMPPM)f l 0GC NK) l D:Pp @ t 7 I NAME LWHEEtfK:cn LSERRY M(l' LCVNN1lT@fA L d/ Wary p HBfRKh /

DATE // / 43' /97 @ / M 797 /f / 29 /97 3//72rv /97 td / v /97 / /97 J0CUMEN1 NAME: G:\V0GTLE\V0G95903. DEN OFFICIAL RECORD COPY 9705070340 970430 PDR ADOCK 0500 4 , @ Q g l % Q f, M { Q

p ct: g*g g 4 UNITED STATES

{3 j 4"

NUCLEAR REGULATORY COMMISSION WA$HINGTON, D.C. 20066 0001

% April 30,1997 Mr. C. K. McCoy Vice President - Nuclear Vogtle Project I Southern Nuclear Operating Company, Inc.

P. O. Box 1295 1 Birmingham, Alabama 35201 '

SUBJECT:

DENIAL OF REQUEST FOR APPROVAL OF REVISION 1 TO AMENDMENT 31, PHYSICAL SECURITY AND CONTINGENCY PLAN, V0GTLE ELECTRIC GENERATING )

i PLANT, UNITS 1 AND 2 (TAC NOS. M95903 AND M95904) l 1

Dear Mr. McCoy:

By letter dated May 15, 1996, Georgia Power Company (GPC), submitted proposed Amendment 31 to the Physical Security and Contingency Plan for the Vogtle Electric Generating Plant, Units 1 and 2. In response to a request for additional information by the staff, GPC, by letter dated November 25, 1996, i withdrew the May 15, 1996, proposal and submitted Revision 1 to Amendment 31 i for staff review. That review, which included an onsite tour of appropriate '

'. facilities and interviews with licensee personnel, is complete and the staff has determined that the proposal should not be approved. j Details of the review are enclosed with this letter. The enclosure contains information that has been determined to be exempt from public disclosure in accordance with 10 CFR 73.21 (Safeguards Information). Therefore, it will not be placed in the NRC Public Document Room (PDR) and will receive limited distribution. This letter, without its enclosure, will be placed in the PDR in accordance with 10 CFR 2.790(a).  ;

Please have your representative contact me at (301) 415-1444 if there are any questions regarding this action.

Sincerely,

$Q . 'Docyfnent transmitted hef0With contains tensillVO

unchss
fled Informat!on. When sopu ted from encl 0Sures, this dQCument l3 dCC0ntrolled.' '

gYt,gjheeer,SeniorProjectManager

Project Directorate 11-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos. 50-424 and 50-425

Enclosure:

As stated Vl0ftlIonOf proleelle requitsnents'foISAFEGUARD$

INFORMATION subject to CML and CRIMINAL Fenalties cc: See next page SAfEGURDB NOMM

.s .

d

, Vogtle Electric Generating Plant l Units 1 and 2 cc:

Mr. W. G. Hairston, III Harold Reheis, Director. -

President and Chief Department of Natural Resources Executive Officer 205 Butler Street, SE. Suite 1252 Southern Nuclear Operating Atlanta, Georgia 30334 Company, Inc.

P. O. Box 1295 Attorney General Birmingham, Alabama 35201-1295 Law Department ,

132 Judicial Building Mr. J. A. Bailey Atlanta, Georgia 30334 Manager, Licensing i Southern Nuclear Operating Mr. Thomas P. Mozingo 1 Company, Inc. Program Manager P. O. Box 1295 Nuclear Operations Birmingham, Alabama 35201-1295 Oglethorpe Power Corporation 2100 East Exchange Place Mr. J. B. Beasley P. O. Box 1349 General Manager, Vogtle Electric Tucker, Georgia 30085-1349 Generating Plant Southern Nuclear Operating Charles A. Patrizia, Esquire Company, Inc. Paul, Hastings, Janofsky & Walker P. O. Box 1600 10th Floor Waynesboro, Georgia 30830 1299 Pennsylvania Avenue Washington, DC 20004-9500 Regional Administrator, Region II i U. S. Nuclear Regulatory Commission Arthur H. Domby, Esquire l 101 Marietta Street, NW., Suite 2900 Troutman Sanders Atlanta, Georgia 30323 NationsBank Plaza 600 Peachtree Street, NE.

Office of Planning and Budget Suite 5200 Room 615B Atlanta, Georgia 30308-2216 270 Washington Street, SW.

Atlanta, Georgia 30334 Resident Inspector l U.S. Nuclear Regulatory Commission '

Mr. J. D. Woodard 8805 River Road Executive Vice President Waynesboro, Georgia 30830 i Southern Nuclear Operating Company, Inc. Office of the County Commissioner P. O. Box 1295 Burke County Commission Birmingham, Alabama 35201-1295 Waynesboro, Georgia 30830 Steven M. Jackson Senior Engineer - Power Supply Municipal Electric Authority of Georgia 1470 Riveredge Parkway, NW.

Atlanta, Georgia 30328-4684

, - ,