ML20134N447

From kanterella
Jump to navigation Jump to search

Forwards Significant Hazards Evaluation,Justification for Changes & Actual Proposed Changes to Secuity Plan.Encls Withheld,Per 10CFR73.21
ML20134N447
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/25/1996
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LCV-0811-A, LCV-811-A, TAC-M95903, TAC-M95904, NUDOCS 9611260349
Download: ML20134N447 (2)


Text

._m _ _ _ - - _ . _._ ._ . . ._ _ _ .._ _ _ __.___ _ _ _ _

Georgia Power Company I \ 40 invemess Center Parkway I r ing am Aabama 35201 N W SAFEGUARDS M m .. M j " Telephone 205 992-7122 UM SDMAM M M g m GeorgiaPower a C.K.McCoy the southem ekrtnc system

' Vice r) resident, Nuclear

    • "' # November 25, 1996 l

Docket Nos. 50-424 LCV-0811-A 50-425 TAC Nos. 95903,95904 i U. a Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555

VOGTLE ELECTRIC GENERATING PLANT REQUEST FOR ADDITIONAL INFORMATION l PHYSICAL SECURITY AND CONTINGENCY PLAN
PROPOSED AMENDMENT NO. 31 - Revision 1 4

2 Ladies and Gentlemen:

By letter LCV-0811, dated May 15,1996, Georgia Power Company (GPC) submitted i Amendment 31 to the Vogtle Electric Generating Plant (VEGP) Unit I and Unit 2

! Physical Security and Contingency Plan. Because of additional information requested by l NRR Safeguards Branch, GPC resubmits this change in accordance with 10 CFR 50.90 and 10 CFR 50.4 as Revision 1 to Amendment 31 along with its associated significant

[ hazards evaluation. This revision supersedes all previous correspondence and enclosures

regarding Amendment 31. By copy of this letter two copies of the proposed Amendment 31- Revision 1 Security Plan changes are also being provided to the NRC Region II office.

l l This Security Plan amendment proposes to change the tactical response deployment strategy utilized during certain security emergencies.

Enclosure 1 provides a significant hazards evaluation for this change and does not contain i safeguards information. Enclosure 2 contains thejustification for the changes and Enclosure 3 contains the actual proposed changes to the Security Plan. The information .

contained in enclosures 2 and 3 is safeguards information and should be withheld from 1

public disclosure in accordance with 10 CFR 73.21. t i

i

' 260165 NN '

j#' : g ti .'

! spesuussgegensmou .['; * ;J . a ;4g, ,H .-

g MOdg g EELOSLRENSAFERJARDS 950RMATMW 4-3 M ggpggg M -

.- H-I~[d 9611260349 961125 PDR ADOCK 05000424 b y

- _- --T-/jc_ .

F PDR

., SAFEGUARDSINFORMATION ENCLOSURE CONTAINS SAFEGUARDS INFORMATION GeoFgiaPower d UPON SEPARAT10N TH13 PAGE IS DECONTROLLED U. S. Nuclear Regulatory Commission LCV-0811-A Page 2 of 2 Contingent upon NRC approval, Georgia Power Company will re-transmit the official

. pages approved by this amendment for insertion into the Security Plan along with the latest VEGP Security and Contingency Plan effective page list.

Please contact this office ifyou have any questions.

Sincerely, C. K. McCoy 1

CKM/AFS

Enclosures:

1. Significant Hazards Evaluation
2. Changes and Justification (SafeguardsInformation)
3. Proposed Amendment 31-Revision 1, Security Plan Pages-(SafeguardsInformation) xc: Southern Nuclear Ooeratina Comoany Mr. B. R. Quick (w)

Georgia Power Comoany l Mr. J. B. Beasley (w/o) j 1

Mr. M. Sheibani (w/o)

Mr. D. G. Huyck (w)

U. S. Nuclear Regulatory Commission l Mr. S. D. Ebneter, Regional Administrator (w/2 copies)

Mr. L. L. Wheeler, Licensing Project Manager, NRR (w/o)

Mr. C. R. Ogle, Senior Resident Inspector, Vogtle (w/o) i l

ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THis PAGE IS DECONTROLLED