ML20155D278: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20155D278
| number = ML20155D278
| issue date = 06/03/1988
| issue date = 06/03/1988
| title = Ack Receipt of 880531 Ltr Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0754/88-01
| title = Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0754/88-01
| author name = Montgomery J
| author name = Montgomery J
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
| author affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NUDOCS 8806150073
| document report number = NUDOCS 8806150073
| title reference date = 05-31-1988
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, NRC TO VENDOR/MANUFACTURER, OUTGOING CORRESPONDENCE
| page count = 1
| page count = 1
Line 16: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:'
hhk JUN - 31999 Docket No. 70-754 General Electric Company Vallecitos Nuclear Center P.O. Box 460, Vallecitos Road Pleasanton, CA 94566 Attention:      R. W. Darmitzel, Manager Irradiation Processing Gentlemen:
Thank you for your {{letter dated|date=May 31, 1988|text=letter dated May 31, 1988}}, in response to our Notice of Violation dated May 3, 1988.
Your corrective actions will be examined during the next inspection:
Sincerely, 0r(9u,a.I Gigne.d James L. Montgomery, Chief Nuclear Materials Safety and Safeguards Branch bec w/c,opy of letter dated 5/31/88:
G. Cook A. Johnson B. Faulkenberry J.- Martin Docket File J. Zollicoffer bec w/o copy of letter dated 5/31/88:
M. Smith Mr k/ oan                      ergast    R                                              JM    mery 6/8/88              .5/88        6/3/88                                        6/)/88 L              REQUEST    Y]          T COPY ] REQUEST      Y ] REQUEST CJRY ]
YES / NO          YES    NO    ] YES /    0                  ] YES / ff40/                ]
                      -        -                        v TO PDR ]
                                                                                                      / NO  ]
                                                                                                                                                                                  \(
8806150073 880603                                                                                                                                                      I f/\h
{DR ADOCK0700g4                                                                                                                                                    g L.,(/  [
 
m                                            (a~ Gr Nuclear Energy
: c. eve: {: w, VdiPC :: ?mWit  j' {Vit*
PC E,r E O.'ai% %S RG&1
                                                  %aw' * (A S15f6 May 31, 1988 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk
 
==Subject:==
Reply To Notice.of Violation
 
==References:==
(1) License SNM 960, Docket 70-754.
(2) Inspection Report No. 70 754/88 01.
,      Gentlemen:
This letter is in response to a notice of violation contained in Inspection Report No. 70-754/88-01. The violation concerned the failure to hydrostatically test and to tag self-contained breathing apparatus (SCBA) cylinders as required by the site respiratory protection program manual.
All cylinders had been inspected and recorded in a log on a monthly basis.
However, the cylinders were marked after inspection with a date stamp which was sometimes difficult to read and was subject to smudging.
The failure to hydrostatically test the cylinders was due to oversight.
All cylinders were hydrostatically tested as of April 21, 1988. To prevent recurrence of the problem, the cylinders will be scheduled for retesting every-five years, and a tag will be placed on each unit noting the required test date. This will be completed by June 30, 1988. Additionally, a gummed paper tag is also nov placed on each cylinder following ecch monthly inspection.
With the hydrostatic testing of the cylinders and the adoption of the new tag, the respiratory program is now in compliance.
Very truly yours, R. W. Darmitsel, Manager Irradiation Processing ec: USNRC Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 w  Oh h n } F)..) hg
__}}

Latest revision as of 21:48, 9 December 2021

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 70-0754/88-01
ML20155D278
Person / Time
Site: 07000754
Issue date: 06/03/1988
From: Jonathan Montgomery
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Darmitzel R
GENERAL ELECTRIC CO.
References
NUDOCS 8806150073
Download: ML20155D278 (1)


Text

'

hhk JUN - 31999 Docket No.70-754 General Electric Company Vallecitos Nuclear Center P.O. Box 460, Vallecitos Road Pleasanton, CA 94566 Attention: R. W. Darmitzel, Manager Irradiation Processing Gentlemen:

Thank you for your letter dated May 31, 1988, in response to our Notice of Violation dated May 3, 1988.

Your corrective actions will be examined during the next inspection:

Sincerely, 0r(9u,a.I Gigne.d James L. Montgomery, Chief Nuclear Materials Safety and Safeguards Branch bec w/c,opy of letter dated 5/31/88:

G. Cook A. Johnson B. Faulkenberry J.- Martin Docket File J. Zollicoffer bec w/o copy of letter dated 5/31/88:

M. Smith Mr k/ oan ergast R JM mery 6/8/88 .5/88 6/3/88 6/)/88 L REQUEST Y] T COPY ] REQUEST Y ] REQUEST CJRY ]

YES / NO YES NO ] YES / 0 ] YES / ff40/ ]

- - v TO PDR ]

/ NO ]

\(

8806150073 880603 I f/\h

{DR ADOCK0700g4 g L.,(/ [

m (a~ Gr Nuclear Energy

c. eve: {: w, VdiPC :: ?mWit j' {Vit*

PC E,r E O.'ai% %S RG&1

%aw' * (A S15f6 May 31, 1988 U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk

Subject:

Reply To Notice.of Violation

References:

(1) License SNM 960, Docket 70-754.

(2) Inspection Report No. 70 754/88 01.

, Gentlemen:

This letter is in response to a notice of violation contained in Inspection Report No. 70-754/88-01. The violation concerned the failure to hydrostatically test and to tag self-contained breathing apparatus (SCBA) cylinders as required by the site respiratory protection program manual.

All cylinders had been inspected and recorded in a log on a monthly basis.

However, the cylinders were marked after inspection with a date stamp which was sometimes difficult to read and was subject to smudging.

The failure to hydrostatically test the cylinders was due to oversight.

All cylinders were hydrostatically tested as of April 21, 1988. To prevent recurrence of the problem, the cylinders will be scheduled for retesting every-five years, and a tag will be placed on each unit noting the required test date. This will be completed by June 30, 1988. Additionally, a gummed paper tag is also nov placed on each cylinder following ecch monthly inspection.

With the hydrostatic testing of the cylinders and the adoption of the new tag, the respiratory program is now in compliance.

Very truly yours, R. W. Darmitsel, Manager Irradiation Processing ec: USNRC Region V 1450 Maria Lane, Suite 210 Walnut Creek, CA 94596 w Oh h n } F)..) hg

__