ML20155F423
| ML20155F423 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold, 07000754 |
| Issue date: | 10/02/1998 |
| From: | Kirkland M GENERAL ELECTRIC CO. |
| To: | Bennington G NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| References | |
| NUDOCS 9811060027 | |
| Download: ML20155F423 (2) | |
Text
.
e GENucicar Energy GeneralDecinc Company 175 Curtoer Avenue. San Jose, CA 95125 October 02,1998 File S14-N-73 U.S. Nuclear Regulatory Commission b~3)[
l Spent Fuel Project Office l
Mail Stop 0-6 F-18 11555 Rockville Pike 0 - Q ~5 Rockville, MD 20852-2738 Attention: Ms. Gloria Bennington i
i
Subject:
Irradiated Reactor Fuel Shipment Completion Notice Ref:
Advance Notification dated August 18,1998 l
Dear Ms. Bennington:
GE Nuclear Energy (GENE)is hereby advising you of the shipment completion of two (2) l BWR reactor fuel rod froin Duane Arnold Energy Center (DEAC) under the provisions of our SNM-1270 license.
Shipper:
GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125
Contact:
Mr. M.W. Kirkland Telephone: 408-925-5703 at, Duane Arnold Energy Center Palo, Iowa Receiver:
GE Nuclear Energy Vallecitos Nuclear Center
{f l
Vallecitos Road - CA 84 East Pleasanton. CA 94566
()
Carrier:
Tri-State Motor Transit Company East 17* Street Road Joplin,MO 64801 l
Contact:
Mr. Randy Ledford Telephone: 1-800-922-0205 9811060027 981002 PDR ADOCK 05000331
}
F PDR I
I
l,-.
Ms. Gloria Bennington l
l*
U.S. NRC October 02,1998 Page_ l The shipment description is as follows:
Physical Form:
Solid Uranium Dioxide Fuel Rods Quantity & Type:
2BWR Original Enrichment:
2.8% U235 Total Weight U Pus Pu:
5,811 Kgs (Revised)
Packag.: Identification:
NLI-1/2, USA /9010/B()F The shipment moved entirely by Tri-State Motor Transit transport over route 163 as approved by your office on July 15,1998.
The actual departure and arrival times are as follows:
Departure DAEC (Origin), Palo, IA
- September 191998 @ 0035 hours4.050926e-4 days <br />0.00972 hours <br />5.787037e-5 weeks <br />1.33175e-5 months <br /> CST Arrival GE Vallecitos, Pleasanton, CA
- September 20,1998 @ 1855 hours0.0215 days <br />0.515 hours <br />0.00307 weeks <br />7.058275e-4 months <br /> CST Their were no reportable incidence or deviations other than the change in route as planned in the Salt Lake City area.
The shipment schedules are no longer classified as Safeguards Information subject to 10 CFR 73.21 requirements as this shipment was completed in access of 10 days of this notification.
Sincerely, 1%.10. X M 4 &
M.W. Kirkland, Sr. Specialist Licensing & Traffic M/C 200, Tel: 408-925-5703 NRCCompidionNotice. doc i
i: