ML20129H323

From kanterella
Jump to navigation Jump to search
Submits Advance Notice of Import Shipment of SNM Consisting of 1,488 Nuclear Fuel Rods in Form of UO2,to Ge,Wilmington, Nc
ML20129H323
Person / Time
Site: 07000754
Issue date: 09/17/1996
From: Holden D
GENERAL ELECTRIC CO.
To: Bennington G
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
GER-7563, NUDOCS 9611050152
Download: ML20129H323 (2)


Text

....... -. - -

. _ ~ ~ _.

. ~ -

~- -

[

SEPTEMBER 17,1996 (ono-ocost; l

'U.S.

NUCLEAR REGULATORY COMMISSION DIVISION OF INDUSTRIAL AND MEDICAL NUCLEAR SAFETY,NMSS WASHINGTON, DC 20555 ATTENTION:

MS. GLORIA BENNINGTON I.Mf%AT

SUBJECT:

ADVANCE NOTICE OF Fn%GGR-T. SHIPMENT OF SPECIAL NUCLEAR MATERIAL OF LOW STRATEGIC SIGNIFICANCE (rATEGORY IIT)

([

Reference:

GE Nuclear Energy Import Control Number GER-7563

)

DEAR MS. BENNINGTON:

AS REQUIRED BY 10 CFR 73.73 and CFR 40.66 GE Nuclear Energy is providing the subject advance notice.

1)

SHIPPER:

PreussenElektra AG Kernkraftwerk Wurgassen Postfach 48 49 30048 Hannover, Germany 49-05 11 4 39-2254 RECEIVER: GE Nuclear Energy 175 Curtner Avenue San Jose, CA 95125 408-925-5703 DESTINATION:

GE Wilmington, NC CARRIER:

Atlantic Container Lines (ACL) 801 Broad Street Portsmouth, VA 23707 1-800-225-1235 Tri-State Motor Transit Company East 7th Street Joplin, MO 64802 3 O 1-800-641-7580 l

9611050152 960917 PDR ADOCK 07000754 C

PDR u

MS. Gloria Bennington U.S.

NUCLEAR REGULATORY COMMISSION SEPTEMBER 17,1996 PAGE 2)

PHYSICAL DESCRIPTION: 1488 Nuclear Fuel Rods in the form of UO2 packed in 24 USA /4986/AF packages with a total of 127.146 Kgs U-235 contained in 4,186.147 Kgs of U-enriched not exceeding 4.0%

U-235.

3)

EXPORT LICENSE:

NRC General License:10 CFR 110.27(a) 4)

MODE (S) OF SHIPMENT, TRANSFER POINTS:

-NCS Truck-Origin to Bremerhaven, Germany, Port of Export

- ACL-Bremerhaven to Portsmouth, Virginia, Port of Import Tri-State Truck-Portsmouth to GE Wilmington, NC

~

5)

DEPARTING:

Wurgassen Site -

September 26,1996 Bremerhaven, Germany-September 27,1996 PORT OF CALLS:

ARRIVING:

Portsmouth VA-October 18,1996 ETA AT GE Wilmington, NC-October 23,1996 DESTINATION:

6)

ASSURANCE:

"THIS SHIPMENT WILL BE PROTECTED IN ACCORD-ANCE WITH ANNEX I TO THE CONVENTION ON l

THE PHYSICAL PROTECTION OF NUCLEAR MATERIALS."

l l

IF YOU HAVE ANY QUESTIONS OR NEED ADDITIONAL INFORMATION, PLEASE I

CONTACT THE UNDERSIGNED.

SINCERELY, GE NUCLEAR ENERGY 0. h ). W W

(

D.W.

HOLDEN,SR. SPECIALIST l

LICENSING & TRAFFIC l