Text

__. _ _. __ _ . _ . _. . _ _. . _ . _ . . _ _ . . . _ . _ _ _ _ _ _ _

October 22, 1998 Mr. Ben M. Murray, Senior Licensing Engineer General Eldctric C'o mpany Vallecitos Nuclear Center 6705 Vallecitos Road Sunol, California 94586

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR CHANGES TO APPENDICES A & B (TAC NO. L31098) l

Dear Mr. Murray:

This refers to your application dated July 9,1998, requesting an amendment to Materials License SNM-960 for changes to Appendices A & B.

Our review of your application has identified additional information that is needed before final j action can be taken on your request. The additionalinformation, specified in the enclosure, should be provided within 30 days of the date of this letter. Please reference the above TAC No. in future correspondence related to this request.

If you have questions regarding this matter, please contact me at (301) 415-8166.

Sincerely,

~

artes . askin, Project Manager l Licensing Section 1 l Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70-754 License SNM-960

Enclosure:

As stated i Descriotion: w/ encl. (Control No. 740S) [ Partial]

Docket 70-754 PUBLIC NRC File Center REGION IV WBritz, RIV NMSS r/f FCSS r/f FCLB r/f WTroskoski 'btnar hh (g:\gev-rai.ceg]

OFC FCLB h FCLB h FCLB g FCLB 6 FCLB 6 FCLB NAME Cpjp;p PShea()J HFelsher95 HAstwoodph) Madams %4 l DATE b/N98 10/)(/9d 10/p/98 10/2a/98 10/p/98 C = COVER E = COVER & ENCLOSURE N = NO COPY OFFICIAL RECORD COPY f

t' n n e o n Te l. ( . , . .

I 9810290167 981022 .

' @p yn . , .-fEig' Q~; r ,gb 4 W, f Qi; z

PDR ADOCK 07000754- aa b C PDR l

' f"%

f  %

j UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. mt

,, # October 22, 1998 Mr. Ben M. Murray, Senior Licensing Engineer  !

General Electric Company Vallecitos Nuclear Center ,

6705 Vallecitos Road Sunol, California 94586 i

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION FOR CHANGES TO APPENDICES A & B (TAC NO. L31098)

Dear Mr. Murray.

This refers to your application dated July 9,1998, requesting an amendment to Materials License SNM-960 for changes to Appendices A & B. I Our review of your application has identified additional information that is needed before final l action can be taken on your request. The additional information, specified in the enclosure, should be provided within 30 days of the date of this letter. Please reference the above TAC l No. in future correspondence related to this request.

If you have questions regarding this matter, please contact me at (301) 415-8166.

Sincerely,

(. , n artes E. Gaskin, Project Manager Licensing Section 1 Licensing Branch Division of Fuel Cycle Safety and Safeguards, NMSS Docket 70 754 License SNM-960

Enclosure:

As stated 1

  • l Request for Additional Information Application Dated July 9,1998 General Electric Company (Vallecitos Nuclear Center)

Docket 70-754 Please provide the following criticality safety and environmental protection information:

1. Page A-5-4, Appendix A, Section 5.9.2: Correct the references to 10CFR70.24.

Did the, licensee intend to change its commitment regarding the criticality accident alarm .

system for 10CFR70.24 from 70.24(a)(2) to 70.24(a)(1) throughout the license? If so,  ;

correct the first reference from 70.24(a) to 70.24(a)(1).

2. Page A-5-4, Appendix A, Section 5.9.3 (new)[5.9.4 (old)]: Correct the reference to a "subcritical area" definition from Section 3.15 to Section 3.17.

l

3. Page 3-5, Appendix B, Section 3.8: Correct the reference to a "subcritical area" definition from Section 3.16 to Section 3.17.
4. Page 6-9, Appendix B, Figure 6.2: Add the locations of the three detectors around the 3

Radioactive Materials i aboratory to Figure 6.2 (as mentioned in Page 7-6, 1 Section 7.3.10).

1

5. Section 10.1.1 presents the licensee's proposed gaseous stack effluent action levels for the site. Some of the action levels listed are larger than the NRC's 10CFR Part 20  :

release limits. NRC assumes that these action levels are higher than Part 20 limits because the levels are measured at the stack and there would be dilution of these l emissions prior to reaching the site fence line, which is the boundary for the licensee to 1 meet Part 20 limits. However, there is not enough information provided for the NRC to  ;

determine if these action levels are sufficient to prevent gaseous discharges from l crossing the site boundary at levels greater than Part 20 limits. Provide the following i information to justify the request to change gaseous stack effluent action levels for the i site: l l

a) a detailed list of the specific isotopes (e.g., U-235, Pu-241) which are discharged j from the site; b) a detailed list of the specific isotopes (e.g., U-235, Pu-241) which are measured under each of the Gross Alpha, Gross Beta, and Noble Gases parameters; c) the specific information used to determine that the requested stack action levels will assure that the site will meet Part 20 limits (e.g., stack height, distance to fence line, wind rose information, X/O calculations, and dilution factors-enough information should be provided so that the NRC can perform confirmatory calculations); and, d) a written justification for the use of the new action levels and how these action levels will assure that Part 20 limits and, specifically, the 10 mrem /yr dose constraint contained in 10 CFR Part 20.1301(d) will be met.

ENCLOSURE

_ _ , _ _ _ ---