                                                                                      M a/
.
    *        *
                                              SEP 2 3 988
          Docket Nos. 50-325, 50-324
          License Nos. DPR-71, OPR-62
          Carolina Power and Light Company
      JTTN: Mr. E. E. Utley
                  Senior Executive Vice President
                  Power Supply and Engineering
                    and Construction
          P. O. Box 1551
          Raleigh, NC 27602
          Gentlemen:
          SUBJECT: NRC INSPECTION REPORT NOS. 50-325/88-28 AND 50-324/88-28
          This refers to the Nuclear Regulatory Comissior. (NRC) inspection conducted by
          C. A. Hughey on August 1-5, 1988. The inspection included a review of
          activities authorized for ycur Brunsw!ck facility. At the conclusion of the
          inspection, the findinos were discussed with those members of your staff
          identified in the enclosed inspection report.
          Areas examined during the inspection are identified in the report. Within
          these areas, the inspection consisted of selective examinatinns of procedures
          and representative records, interviews with personnel, and observation of
          activities in progress.
          Within the scope of the inspection, no violations or deviations were
          identified.
          The NRC expressed their concern regarding the apparent lack of management
          atts.,cion to the inoperability of gaseous effluent monitoring instrumentation
          in their letter to you, dated October 1,1987, NRC Inspection Report
          Nos. 50-325/87-33 and 50-324/87-32. Your letter of June 20, 1988, postpones          d
          your commitment to have the Reactor Building and Turbine Building ventilation        !
          flow rate measurement devices operational by January 13, 1989 un,il January 13,      '
          1990, due to project scheduling considerations. Your letter does not provide
          a basis for Brunswick to continue in an ACTION statement of the Technical
          Specifications. The intent of ACTION statements for Technical Specifications        !
          is to provide licensees an alternative reasonable short-time operatability          !
          period until corrective actions can be taken to place the system, equipment,        ;
          etc., in an operable condition.    You are requested to provide the NRC with        !
        your basis for continuing in an ACTION statement condition of the Technical          !
          Specifications until January 13, 1990,                                              l
          In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2
          Title 10 Code of Federal Regulations, a copy of this letter ud its enclosure
        will be placed in the NRC Public Document Room.
        8810130007 80092334
        PDR    ADOCK O
        a
                                                                                    '
                                                                                          @
                                                                                          .m
                                                                                            .
 
                *
      .
            '
    ,    .              .
            4
                      Carolina Power and Light Cortpany                                    2
                        Should you have any questions concerning this letter, please contact us.
                                                                                            Sincerely,
4
                                                                                            J. Nelson Grace                      l
                                                                                            Regional Administrator
                        Enclosure:
                        Ic.spection Report
                        cc w/ encl:
                    / P. W. Howe, Vice President
                            Brunswick Nuclear Project
                  sC. R. Dietz, Plant General Manager
                        State of North Carolina
                      pcc w/ encl:
                    /NRC Resider * Inspector
                        DRS Technical Assistant
                        Occument Centrol Desk
  !
                                                                                                                                  ,
4
                          I)-          I
                                                    j%            R1
                                                                                              Ril ) i
                                                                                                            RI
                /[t//u /88
                  '
                            hey [fa  J      e      DCollhs JPS ohr                          PF edrickson NErnst
,
              *
                L)
                                    q// /88        9/M/88 9/* /88                          9/go/88 tuki ' 9/J )/88
                                                                                                        vo
l
                                                                          _ - - - - - _ _ _                  _      _ _ _ . . __.
      _..            __          __      - _ - - -        _ _ _ . _ _ _                            __
}}
}}

Latest revision as of 17:33, 17 December 2020

Forwards Insp Repts 50-324/88-28 & 50-325/88-28 on 880801-05.No Violations or Deviations Noted.Concern Expressed Re Lack of Mgt Attention to Gaseous Effluent Monitoring Inoperability
ML20155E821
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 09/23/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20155E825 List:
References
NUDOCS 8810130007
Download: ML20155E821 (2)


See also: IR 05000324/1988028

Text

,

'

,

M a/

.

  • *

SEP 2 3 988

Docket Nos. 50-325, 50-324

License Nos. DPR-71, OPR-62

Carolina Power and Light Company

JTTN: Mr. E. E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P. O. Box 1551

Raleigh, NC 27602

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-325/88-28 AND 50-324/88-28

This refers to the Nuclear Regulatory Comissior. (NRC) inspection conducted by

C. A. Hughey on August 1-5, 1988. The inspection included a review of

activities authorized for ycur Brunsw!ck facility. At the conclusion of the

inspection, the findinos were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinatinns of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

The NRC expressed their concern regarding the apparent lack of management

atts.,cion to the inoperability of gaseous effluent monitoring instrumentation

in their letter to you, dated October 1,1987, NRC Inspection Report

Nos. 50-325/87-33 and 50-324/87-32. Your letter of June 20, 1988, postpones d

your commitment to have the Reactor Building and Turbine Building ventilation  !

flow rate measurement devices operational by January 13, 1989 un,il January 13, '

1990, due to project scheduling considerations. Your letter does not provide

a basis for Brunswick to continue in an ACTION statement of the Technical

Specifications. The intent of ACTION statements for Technical Specifications  !

is to provide licensees an alternative reasonable short-time operatability  !

period until corrective actions can be taken to place the system, equipment,  ;

etc., in an operable condition. You are requested to provide the NRC with  !

your basis for continuing in an ACTION statement condition of the Technical  !

Specifications until January 13, 1990, l

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2

Title 10 Code of Federal Regulations, a copy of this letter ud its enclosure

will be placed in the NRC Public Document Room.

8810130007 80092334

PDR ADOCK O

a

'

@

.m

.

.

'

, . .

4

Carolina Power and Light Cortpany 2

Should you have any questions concerning this letter, please contact us.

Sincerely,

4

J. Nelson Grace l

Regional Administrator

Enclosure:

Ic.spection Report

cc w/ encl:

/ P. W. Howe, Vice President

Brunswick Nuclear Project

sC. R. Dietz, Plant General Manager

State of North Carolina

pcc w/ encl:

/NRC Resider * Inspector

DRS Technical Assistant

Occument Centrol Desk

!

,

4

I)- I

j% R1

Ril ) i

RI

/[t//u /88

'

hey [fa J e DCollhs JPS ohr PF edrickson NErnst

,

L)

q// /88 9/M/88 9/* /88 9/go/88 tuki ' 9/J )/88

vo

l

_ - - - - - _ _ _ _ _ _ _ . . __.

_.. __ __ - _ - - - _ _ _ . _ _ _ __