ML20155J191: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:- - - - - _ _ . - - - . - - - -            - - - - . -      - - - -            - - - - -
                                                                                                                                  ,    ,
                                    *^
                                                                                                                                /;
                            .                              .                                                                        't
                                                                                                                              'A b -
            -                        -    -
                                                                                                                    ..
                                                                                                                          . q
                                                                                                                      L cW
                                            -
                                  .
                                                                                                                  s:          ,
                                                                                                                              ~
                                                                                  OCT 13 88
                                      Docket Nos. 50-369, 50-370
                                      License Nos. NPF-9, NPF-17
                                      Duke Power Depany
                                    @TTN: Mr. H. B. Tucker Vice President
                                              Nuclear Production Department
                                      422 South Church Street
                                      Charlotte, NC 28242
                                      Gentlemen:                                                                                          ;
                                                                                                                                          l
                                      SUBJECT:              NRC INSPECTION REPORT NOS. 50-369/88-26 AND 00 370/88-26
                                      This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
                                      K. Van Doorn, W. Orders, D. Nelson, and R. Croteau on August 20 - September 23,
                                      1988.  The inspection included a review of activitivs authorized for ) cur
                                      McGuire facility. At the conclusion of the inspection, tile findings were
                                      discussed with those members of your staff identified in the enclosed
                                        inspection report.
                                                                                                                                          >
                                      Areas examined during the inspection are identified in the report. Within
                                      these areas, the inspection consisted of selective examinations of procedures
                                      and representative records, interviews with persc'inel, and observation of
i                                      activities in progress.                                                                            :
                                                                                                                                          i
                                      The inspection findings indicate that certain activities appeared to violate                      '
                                      NRC requirements. However, because all of the criteria for categorization of
                                      licensee-identified violations were met, the violation is not being cited. The
                                      details pertaining to the licensee-identified violation are described in the
                                      enclosed Inspection Report.
                                        In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2
                                      Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
                                      will be placed '.n the NRC Public Document Room.                                                  ,
                                      Should you have any questions concerning this letter, please contact us.
                                                                                              Sincerely,                                  >
                                                                                                    si
.
                                                                                              Vir9 1 L. Brownlee, Chief
'
                                                                                              Reactor Projects Branch 3                    ,
                                                                                              Divisien of Reactor Projects                i
                                        Enclosure:            (See page 2)
                                                          e81025037400d0$g    69
                                                          PDR ADOCK O      p                                                    ,
                                                          o                                                                      i l    l
                                                                                                                                ZEcf
 
, _ _ _ - _ _ _ _
                            _ _ _ _ _ _
          *                            '
                  . .
              ,
                  Duke' Power Company              2
                                                      OCT 1 L 1908
                  Enclosure:
                  NRC Inspection Report
                  cg w/ encl:
                LT. L. McConnell, Station Manager
                kenior Resident inspector - Catawba
                  State of North Carolina
                  bec w/ encl:
                  LliRC Resident Inspector
l
'
                  DRS. Technical Assistant
                s F.' h' cod NRR
                  Document Control Desk
1
i                  Rll                    Rl!  ,?
                                            ~7 f
'
                                      '
                    m g-
                ~BB6nser:ht              TAPl[ebles
                  10/,Nj88              10/A/SS
                                            f
l
}}
}}

Latest revision as of 05:05, 17 December 2020

Forwards Insp Repts 50-369/88-26 & 50-370/88-26 on 880820-0923.Violation Not Being Cited Because All Criteria for Categorization of licensee-identified Violations Met
ML20155J191
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 10/13/1988
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
Shared Package
ML20155J194 List:
References
NUDOCS 8810250374
Download: ML20155J191 (2)


See also: IR 05000369/1988026

Text

- - - - - _ _ . - - - . - - - - - - - - . - - - - - - - - - -

, ,

  • ^

/;

. . 't

'A b -

- - -

..

. q

L cW

-

.

s: ,

~

OCT 13 88

Docket Nos. 50-369, 50-370

License Nos. NPF-9, NPF-17

Duke Power Depany

@TTN: Mr. H. B. Tucker Vice President

Nuclear Production Department

422 South Church Street

Charlotte, NC 28242

Gentlemen:  ;

l

SUBJECT: NRC INSPECTION REPORT NOS. 50-369/88-26 AND 00 370/88-26

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

K. Van Doorn, W. Orders, D. Nelson, and R. Croteau on August 20 - September 23,

1988. The inspection included a review of activitivs authorized for ) cur

McGuire facility. At the conclusion of the inspection, tile findings were

discussed with those members of your staff identified in the enclosed

inspection report.

>

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with persc'inel, and observation of

i activities in progress.  :

i

The inspection findings indicate that certain activities appeared to violate '

NRC requirements. However, because all of the criteria for categorization of

licensee-identified violations were met, the violation is not being cited. The

details pertaining to the licensee-identified violation are described in the

enclosed Inspection Report.

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2

Title 10, Code of Federal Regulations, a copy of this letter and its enclosures

will be placed '.n the NRC Public Document Room. ,

Should you have any questions concerning this letter, please contact us.

Sincerely, >

si

.

Vir9 1 L. Brownlee, Chief

'

Reactor Projects Branch 3 ,

Divisien of Reactor Projects i

Enclosure: (See page 2)

e81025037400d0$g 69

PDR ADOCK O p ,

o i l l

ZEcf

, _ _ _ - _ _ _ _

_ _ _ _ _ _

  • '

. .

,

Duke' Power Company 2

OCT 1 L 1908

Enclosure:

NRC Inspection Report

cg w/ encl:

LT. L. McConnell, Station Manager

kenior Resident inspector - Catawba

State of North Carolina

bec w/ encl:

LliRC Resident Inspector

l

'

DRS. Technical Assistant

s F.' h' cod NRR

Document Control Desk

1

i Rll Rl! ,?

~7 f

'

'

m g-

~BB6nser:ht TAPl[ebles

10/,Nj88 10/A/SS

f

l