ML20092F968: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:,'                                                                -      pra          /
y
'                                                                          DCCKETED US,%RC LAW OFriCES OF BISHOP, LIBERMAN, COOK, PURCELL & REYNOLDS                                  22 Af t :52 12'00 S EVE N T E E N T H STR E CT, N. W.                                IN NEW YORK WASHINGTON, D. C. 20036                                      BISMOP, LIBER M AN & COO K 26 SROADWAY (202) 857-9000 N EW YORK N EW YO RK 10004 TELEX 440574 INTLAW UI                                            (292)248-6900 TELEX 222767 June 20, 1984 Peter B. Bloch, Esq.                                  Dr. Walter H. Jordan Atomic Safety and Licensing                            881 West Outer Drive Board                                                Oak Ridge, Tennessee            37830 U.S. Nuclear Regulatory Commission Washington, D.C.              20555 Dr. Kenneth A. McCollom Dean, Division of Engineering, Architecture & Technology Oklahoma State University Stillwater, Oklahoma 74074 Subj:        Texas Utilities Electric Company, et al.
(Comanche Peak Steam Electric Station, Units 1 and 2); Docket Nos. 50-445 and 50-446 Gentlemen:
Attached for your information is the third biweekly update of the schedule for the loading of fuel at Comanche Peak Unit 1.
Sincer, y Nichold S., eynolds Counse'! forf ,pplicants Attachment                                                      /
cc:  Service List 8406250022 840620                                                                                '
PDR ADOCK 05000445                                                                '
O                  PDR
 
4 1
TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER
* 400 NORTM OLIVE STREET. L.B. 81
* DALLAS.TEXAB 75308
: m. .e. e..c.o..ne.s June 18,1984 l
Mr. Darrell G. Eisenhut, Director                            Mr. John T. Collins, Regional Division of Licensing                                          Administrator Office of Nuclear Reactor Regulation                        Region IV United States Nuclear Regulatory Commission                United States Nuclear Regulatory      i Washington, D. C. 20555                                    Comission                        -
611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012                    ,
Gentlemen:
The following information represents our third biweekly update on the                              !
status of important schedule related issues for Comanche Peak fuel load in late September 1984. Information contained in the attachments is                                ,
the status through June 9, 1984.
Critical Path Refurbishment of the diesel generators remains as our primary critical path. As of June 9,1984, completion of the Train B reassembly remained four days behind our target. We are now scheduled to complete Train B operability checks by June 21, 1984. In response to a TDI Owner Group Request, we will be conducting special tests to collect block stress data which may have further impact on our schedule. We have scheduled this special test to begin June 22, 1984 and expect it to be completed                        -
by July 2,1984.
The Containment Spray Response Time and Chemical Addition Test and sub-                            <
sequent Safeguards Actuation Relay Test now shares the four day critical path. Probability of recovery is very high as work reseouencing is l                finalized and application of additional overtime is used.
The chemical and volume control system preop testing schedule is re-                                l sponding to overtime efforts as indicated by its current impact to the                              l j                target schedule being only two days which is a three day improvement                                l l                from our previous report.
Likewise, feedwater is now showing no impact to our target schedule, due to work resequencing and use of overtime work effort.
                                  ~
I i
_                                A DEV80lON OF TERAS tiTELETtEm ELECTRIC COMPANY _                    , _
 
Mr. Darrell G. Eisenhut                                    .
Mr. John T. Collins June 18, 1984 Page 2 Other Issues
: 1. -The following is the status for submitting Comanche Peak deferred preoperational testing items to be conducted after fuel load A. Items Submitted Main Steam Isolation Valves                                                        5-16-84 Safety Injection Check Valve Leakage                                              5-29-84 Containment Cooling System                                                        5-29-84 Reactor Collant Pump / Seal Performance                                            6-05-84                                                            l i
Turbine Driven Aux Feed Pump                                                      6-05-84 Thermal Expansion                                                                  5'-08-84 B. Schedule for Submitting Remaining Items                                                                                                                t Projected Transmittal Date                                                    Quantity 6-14-84                                                            2
: 2. Present Craft Work Effort for Unit 1:
Manpower Unit 1 Building / Labor                                                          198 Rigging                                                                    41 i
Paint                                                                      750 Pipe                                                                      108                                                                              ;
Insulation                                                                69 Millwright                                                                  42                                                                              ,
Fab /Hgrs                                                                106 Electrical                                                                336 Instrumentation                                                            15 TOTAL                    1,665
          .      Attachments Startup/ Testing ,                                            Appendix A - D Master Data Base' Status                                      Appendix E Paint Manhours - % Comolete                                  Appendix F Thermolag                                                    Appendix G & H i
      .. e                _ _ , ,    .  ._.. _ - .  , . _ _ _ _ . . ,        ,._._ , __,_ _      .    .          _ _ _ - . . . . . . _ . _    _.-.e,.--        -_ - -.y
 
Mr. Darrell G. Eisenhut Mr. John T. Collins June 18.1984 Page 3                                                                                                                                                              ,
In conclusion, since our June 4,1984 report, we have continued to make                                                                                              !
good progress to our scheduled fuel load date in late September 1984.                                                                                                ,
At this time, we know of no new issues that would preclude us meeting this objective.
Very t,                                    y yours, g-A                                                    \
I                                                        .
i                      ,
f P
JBG: pew Enclosure [s) cc:  T. Ippolito R. Reynolds 6
I l
l                                                    .
t
 
  ?
9                                                                      L g                                                                        STARTUP Status Week Ending: June 09, 1984 TURNOVERS:
Last Report            This Report Total        Accepted Total        Accepted Subsystems                    333            316    333            319 REMAINING TURNOVERS:                                                                  Date Accepted Battery Pack Emergency Lighting                                    06/06/84 Fire Detection Panel, Detectors and Cables Control Building Tornado Dampers and Blowout Panels Misc. Signal Control Panel Telephone Interface, Laergency Tone Gen. and Emergency Alert Circuits S.G. Building Tornado Dampers and Blowout Panels RCP Oil Collection System                                          06/06/84 Power Range Cables and Detector                                    06/01/84 Turbine Building Elevator Containment Elevator Auxiliary Building Elevator N-16 Cables and Detectors'                                ,
ERF Computer System Containment Access Rotating Platform Security Fence i                                        Co-Current Waste Low Volume Waste Solid Waste Disposal Hoist s
l l
l l
Appendix A
 
I
                                                                                                                                                        ,            4-O          ,,
9 C                                                                  'I yn
      \                    -
                                        '      g                                              hg E                                                      f$
          '                            N      u                                        Wwra                                                            e        -,
            \                                                                                                                                            3 -l s,
                    %                  w 4 I. AE. E.l
                                                                                                                                                                  ~*
D
      <              '4's W                                                Oh
                                                                                                                                                                  -s ,
4
                            , N,N
                              '                                                                                  . .      ..                                    .- d s .-
coaw w
                                      ,          s      -
g
* a s                                              _
1
: s.                          a, w
5 o.
                                                                                                                            =
N                d
                                            'N  s c                      in o. 8
                                                  \s                                                                      U                                                Te c                                        .s
                                                              's                                                          a
                                                                      's,                    .                              g
                                                                            '                                                t                                        3 .-
s                                                                                                      '
                                                                                  \
                                                                                    ',                                                                              -a s
N                                                                      -a ef k,                                                        -4
                                                                                                              ~.
                                                                                                                ~. ~
                                                                                                                                                                      .,g e
                                                                                                                                                                      -e
                                                                                                                                                                      -c
                                                                                                                                                                      -a
                                                                                                                                                                      -s-l r
                                                                                                                                                                      =tR Nx            ..
'                                                                                                                                                                      -: s            ,
3
                                                                                                                                                                        -e 5'M*_S675' 30 UN l$iiiill$$l$1                                                            i 3          i i i i $ y'                    '
                                                                                                                                  $ i 0 n'              0Ae  s'                    .
1 Appendix B
 
      .                                                    s i
TESTING
 
==SUMMARY==
(Last Report: MAY 26, 1984)                                                                  !
FIELD TESTING                          RESULTS TOTAL              IN-PROGRESS                      COMPLETE  APPROVED PREOPERATIONAL:
ORIGINAL                        149'                  14                            91            88 RETEST                              31                  3                            9              4                  i RE?ERFORM                          22                  2                            4              2 ACCEPTANCE:
ORIGINAL                            50                  0                          44            42 RETEST                                  /              1                            5              1 REPERFORM            ,
16                  2                            8              7 I
TOTALS                  275                  22                            161        144 TESTING
 
==SUMMARY==
 
(This Report: JUNE 09,'1984) r FIELD TESTING                          RESULTS TOTAL              IN-PROGRESS                      COMPLETE  APPROVED                    ,
PREOPERATIONAL:
ORIGINAL                        150                  15                          101            90
;              RETEST                              31                  2                          15              6 REPERFORM                          22                    1                          8              3 ACCEPTANCE:
ORIGINAL                            50                    1                          44            42 RETEST                                  7              0                            6              3 REPERFORM                            16                  4                            9              8                    +
s l
TOTALS                  276                  23                            183        152 i
Appendix C
 
                                                                                              *        *                                    '      a                    ,
m._._,.ew'E ai, .
                            == =-~x ,e -----~._,,_ n .w . _ ,_ _,,
                                                                                                                                                                                                          ,. - ,,, _ , _ s t
6 2:Q ~            t if.I all .                                                                                                                                          ,..
es      ..e4h.orsAs tr ,tg t rael s s e n e      4 M0 0(.114 40 St il laA4 A pat h48.4 4 A8'f*SMWS.89 A        Hf 8 8 *".85,6 ses tpr*l cot.u9 F.8 Els                                                                                          .
1CO ~            a      ses se *.3 s si ed ass 4 st ',T 6 49 A l'Ae'W ACr4 AttenNf n es.o p r itu '.s lif tun t EN ftf pAssersa cuer.uaAs 5                                                                  .
                        - sweas r.it n 9.struitr or sirie e.it                                                                                  -
160 -                                                                                                                            **
                                                                                                                            .. ,.                                                                                      e
                                                                                                    ..=*...*,.
s                                                            **.e*
  ,<o-                                                                  ..
                                                    &                        M                      <
                .w>                                                                          =
J 120 -        -
@  103 -
e                                                                                                                                                                                                                                          *
:3 Q.          .
B    80 -
60 -                                                                                                                            ,'
                                                                                                                              ,r
_ PhitHyl!AilufJAl. B 4 0 --                                                                                              ,
                                                                                                                                                                                                    . ann s> AHe.    .s s ?;i er <;.
                                                                                                      #                                                                                              " .g.a :
                                                                                                  ,#                                                                                                                I* I's A I 's I'll Al
                                                                                              ,'                                                                                                      en NJ81At    ~s58      '89
                                                                                                                                                                                                                                -    :P9
                                                                                            ,                                                                                                          e:s e s .e s    st      7    w j                                                                                                      .. ..          .
gg _
j                                                                                              . . . . . ,
seas As ;:  402 73 2T5
                                                                            )y*/                                                                                                                                                      y,'
_ f. -
                  -A                                                                                                                                                                !
0 d
                                - 16  II23h30 b 13 --20                    27        -I1                                                                                          1          25
                                                                                                                          - -IS
                                                                                                                              - - -l 22- 2 3- -        -20 13          --'-
27          1T 2'4 - at APR                  MAY                                JUN                          JUL                        AUG MAR
 
i-MASTER DATA BASE STATUS:
Last Report                    This Report Unit I and Common Total                                                          7400                6600 NOTE:      The above tabulation includes Unit I and Unit 2 work items remaining within the security boundary established for Unit 1                                                  ;
operation.
We are currently engaged in establishing prioritics of all work items which will include deferral of certain work items until after Unit 1 fuel load. We expect completion of this priortization activity by June 15, 1984 at which time this report will include a summary of Master Data Base items within the Unit I security boundary that are scheduled to be completed both prior to                                              ,
and after fuel load of Unit 1.
a 4
i i
l                                                                                                                                  .
Appendix E
 
  .                                          s PAINT MANHOURS AND MANPOWER:  REACTOR CONTAI!EENT BUILDING #1 BASELINE MANHOURS (APR 28, 1984) TO COMPLETE
                                          ^
CONCRETE: 60,500 MHS STEEL:      232,500 MHS EXPENDED WEEK (MAY 5)        EXP. TO DATE                    % TO DATE        MANPOWER CONCRETE:      2363 MHS        2363 MHS                          3.9 415 STEEL:      19149 MHS        19149 MHS                          8.2 EXPENDED WEEK (MAY 12)      EXP. TO DATE                    % TO DATE        MANPOWER CONCRETE:      2860 MHS        5223 MHS                          8.6
                                                                                . 450 STEEL:      18060 MHS        37209 MHS                        16.0 EXPENDED WEEK (MAY 19)        EXP. TO DATE                    % TO DATE        MANPOWER CONCRETE:      2098 MHS        7321 MHS                          12.1 470 STEEL:        23289 MHS        60498 MHS                          26.0 EXPENDED WEEK (MAY 26)      EXP. TO DATE                    % TO DATE        MANPOWER CONCRETE:    1869 MHS        9190 MHS                          15.2 520 STEEL:      21457 MHS        81955, MHS                        35.2 EXPENDED WEEK (JUNE 2)      EXP. TO DATE                    % TO DATE        MANPOWER CONCRETE:      1709 MHS        10899 MHS                          18.0 530 STEEL:      21085 MHS      103040 MHS                          44.3 EXPENDED WEEK (JUNE 9)      EXP. TO DATE                    1 TO DATE        MANPOWER CONCRETE:    2620 MHS        13519 MHS                          22.3 520 STEEL:      24909 MHS      127949 MHS                          55.0 l
5                                                                                  l Appendix F
 
P l                                                                                                                  .
                      ~
                  ~
THERM 0 LAG BASELINE (MAY 26,1984) TO COMPLETE i
REMAINING:    13,285 SQUARE FEET                                                                          !
i t%NPOWER:  166 PEOPLE i
l I
STATUS WEEK ENDING (JUNE 9,1984)
REfMINING:    7,069 SQUARE FEET                                                                          ,
t%NPOWER:  108 PEOPLE                                                                                    l r
f i
i
                            ~
l t
Appendix G
 
                                                                                                                      -~
65,000                                                                                                '
60,000
* 50,000                                                                                        i l
p 40,000 W
W                                                                                                                          .
CURRENT RATE 5,000                      kWK.
>  W (t:. 30,000 f4 h 'O 3                                                                                                                      I' 20,000
                                                            \
                                                                  \
10,000
                                                                    \
                                                                      \
                                                                        \
JAN              FEB  MAR I APR  MAY            JUN THERMOLAG  -
:  .}}

Latest revision as of 22:57, 12 May 2020

Forwards Third Biweekly Update of Fuel Loading Schedule at Unit 1.Related Correspondence
ML20092F968
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/20/1984
From: Reynolds N
BISHOP, COOK, PURCELL & REYNOLDS, TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Bloch P, Jordan W, Mccollom K
Atomic Safety and Licensing Board Panel
References
NUDOCS 8406250022
Download: ML20092F968 (12)


Text

,' - pra /

y

' DCCKETED US,%RC LAW OFriCES OF BISHOP, LIBERMAN, COOK, PURCELL & REYNOLDS 22 Af t :52 12'00 S EVE N T E E N T H STR E CT, N. W. IN NEW YORK WASHINGTON, D. C. 20036 BISMOP, LIBER M AN & COO K 26 SROADWAY (202) 857-9000 N EW YORK N EW YO RK 10004 TELEX 440574 INTLAW UI (292)248-6900 TELEX 222767 June 20, 1984 Peter B. Bloch, Esq. Dr. Walter H. Jordan Atomic Safety and Licensing 881 West Outer Drive Board Oak Ridge, Tennessee 37830 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Dr. Kenneth A. McCollom Dean, Division of Engineering, Architecture & Technology Oklahoma State University Stillwater, Oklahoma 74074 Subj: Texas Utilities Electric Company, et al.

(Comanche Peak Steam Electric Station, Units 1 and 2); Docket Nos. 50-445 and 50-446 Gentlemen:

Attached for your information is the third biweekly update of the schedule for the loading of fuel at Comanche Peak Unit 1.

Sincer, y Nichold S., eynolds Counse'! forf ,pplicants Attachment /

cc: Service List 8406250022 840620 '

PDR ADOCK 05000445 '

O PDR

4 1

TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER

  • 400 NORTM OLIVE STREET. L.B. 81
  • DALLAS.TEXAB 75308
m. .e. e..c.o..ne.s June 18,1984 l

Mr. Darrell G. Eisenhut, Director Mr. John T. Collins, Regional Division of Licensing Administrator Office of Nuclear Reactor Regulation Region IV United States Nuclear Regulatory Commission United States Nuclear Regulatory i Washington, D. C. 20555 Comission -

611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012 ,

Gentlemen:

The following information represents our third biweekly update on the  !

status of important schedule related issues for Comanche Peak fuel load in late September 1984. Information contained in the attachments is ,

the status through June 9, 1984.

Critical Path Refurbishment of the diesel generators remains as our primary critical path. As of June 9,1984, completion of the Train B reassembly remained four days behind our target. We are now scheduled to complete Train B operability checks by June 21, 1984. In response to a TDI Owner Group Request, we will be conducting special tests to collect block stress data which may have further impact on our schedule. We have scheduled this special test to begin June 22, 1984 and expect it to be completed -

by July 2,1984.

The Containment Spray Response Time and Chemical Addition Test and sub- <

sequent Safeguards Actuation Relay Test now shares the four day critical path. Probability of recovery is very high as work reseouencing is l finalized and application of additional overtime is used.

The chemical and volume control system preop testing schedule is re- l sponding to overtime efforts as indicated by its current impact to the l j target schedule being only two days which is a three day improvement l l from our previous report.

Likewise, feedwater is now showing no impact to our target schedule, due to work resequencing and use of overtime work effort.

~

I i

_ A DEV80lON OF TERAS tiTELETtEm ELECTRIC COMPANY _ , _

Mr. Darrell G. Eisenhut .

Mr. John T. Collins June 18, 1984 Page 2 Other Issues

1. -The following is the status for submitting Comanche Peak deferred preoperational testing items to be conducted after fuel load A. Items Submitted Main Steam Isolation Valves 5-16-84 Safety Injection Check Valve Leakage 5-29-84 Containment Cooling System 5-29-84 Reactor Collant Pump / Seal Performance 6-05-84 l i

Turbine Driven Aux Feed Pump 6-05-84 Thermal Expansion 5'-08-84 B. Schedule for Submitting Remaining Items t Projected Transmittal Date Quantity 6-14-84 2

2. Present Craft Work Effort for Unit 1:

Manpower Unit 1 Building / Labor 198 Rigging 41 i

Paint 750 Pipe 108  ;

Insulation 69 Millwright 42 ,

Fab /Hgrs 106 Electrical 336 Instrumentation 15 TOTAL 1,665

. Attachments Startup/ Testing , Appendix A - D Master Data Base' Status Appendix E Paint Manhours - % Comolete Appendix F Thermolag Appendix G & H i

.. e _ _ , , . ._.. _ - . , . _ _ _ _ . . , ,._._ , __,_ _ . . _ _ _ - . . . . . . _ . _ _.-.e,.-- -_ - -.y

Mr. Darrell G. Eisenhut Mr. John T. Collins June 18.1984 Page 3 ,

In conclusion, since our June 4,1984 report, we have continued to make  !

good progress to our scheduled fuel load date in late September 1984. ,

At this time, we know of no new issues that would preclude us meeting this objective.

Very t, y yours, g-A \

I .

i ,

f P

JBG: pew Enclosure [s) cc: T. Ippolito R. Reynolds 6

I l

l .

t

?

9 L g STARTUP Status Week Ending: June 09, 1984 TURNOVERS:

Last Report This Report Total Accepted Total Accepted Subsystems 333 316 333 319 REMAINING TURNOVERS: Date Accepted Battery Pack Emergency Lighting 06/06/84 Fire Detection Panel, Detectors and Cables Control Building Tornado Dampers and Blowout Panels Misc. Signal Control Panel Telephone Interface, Laergency Tone Gen. and Emergency Alert Circuits S.G. Building Tornado Dampers and Blowout Panels RCP Oil Collection System 06/06/84 Power Range Cables and Detector 06/01/84 Turbine Building Elevator Containment Elevator Auxiliary Building Elevator N-16 Cables and Detectors' ,

ERF Computer System Containment Access Rotating Platform Security Fence i Co-Current Waste Low Volume Waste Solid Waste Disposal Hoist s

l l

l l

Appendix A

I

, 4-O ,,

9 C 'I yn

\ -

' g hg E f$

' N u Wwra e -,

\ 3 -l s,

% w 4 I. AE. E.l

~*

D

< '4's W Oh

-s ,

4

, N,N

' . . .. .- d s .-

coaw w

, s -

g

  • a s _

1

s. a, w

5 o.

=

N d

'N s c in o. 8

\s U Te c .s

's a

's, . g

' t 3 .-

s '

\

', -a s

N -a ef k, -4

~.

~. ~

.,g e

-e

-c

-a

-s-l r

=tR Nx ..

' -: s ,

3

-e 5'M*_S675' 30 UN l$iiiill$$l$1 i 3 i i i i $ y' '

$ i 0 n' 0Ae s' .

1 Appendix B

. s i

TESTING

SUMMARY

(Last Report: MAY 26, 1984)  !

FIELD TESTING RESULTS TOTAL IN-PROGRESS COMPLETE APPROVED PREOPERATIONAL:

ORIGINAL 149' 14 91 88 RETEST 31 3 9 4 i RE?ERFORM 22 2 4 2 ACCEPTANCE:

ORIGINAL 50 0 44 42 RETEST / 1 5 1 REPERFORM ,

16 2 8 7 I

TOTALS 275 22 161 144 TESTING

SUMMARY

(This Report: JUNE 09,'1984) r FIELD TESTING RESULTS TOTAL IN-PROGRESS COMPLETE APPROVED ,

PREOPERATIONAL:

ORIGINAL 150 15 101 90

RETEST 31 2 15 6 REPERFORM 22 1 8 3 ACCEPTANCE

ORIGINAL 50 1 44 42 RETEST 7 0 6 3 REPERFORM 16 4 9 8 +

s l

TOTALS 276 23 183 152 i

Appendix C

  • * ' a ,

m._._,.ew'E ai, .

== =-~x ,e -----~._,,_ n .w . _ ,_ _,,

,. - ,,, _ , _ s t

6 2:Q ~ t if.I all . ,..

es ..e4h.orsAs tr ,tg t rael s s e n e 4 M0 0(.114 40 St il laA4 A pat h48.4 4 A8'f*SMWS.89 A Hf 8 8 *".85,6 ses tpr*l cot.u9 F.8 Els .

1CO ~ a ses se *.3 s si ed ass 4 st ',T 6 49 A l'Ae'W ACr4 AttenNf n es.o p r itu '.s lif tun t EN ftf pAssersa cuer.uaAs 5 .

- sweas r.it n 9.struitr or sirie e.it -

160 - **

.. ,. e

..=*...*,.

s **.e*

,<o- ..

& M <

.w> =

J 120 - -

@ 103 -

e *

3 Q. .

B 80 -

60 - ,'

,r

_ PhitHyl!AilufJAl. B 4 0 -- ,

. ann s> AHe. .s s ?;i er <;.

  1. " .g.a :

,# I* I's A I 's I'll Al

,' en NJ81At ~s58 '89

- :P9

, e:s e s .e s st 7 w j .. .. .

gg _

j . . . . . ,

seas As ;: 402 73 2T5

)y*/ y,'

_ f. -

-A  !

0 d

- 16 II23h30 b 13 --20 27 -I1 1 25

- -IS

- - -l 22- 2 3- - -20 13 --'-

27 1T 2'4 - at APR MAY JUN JUL AUG MAR

i-MASTER DATA BASE STATUS:

Last Report This Report Unit I and Common Total 7400 6600 NOTE: The above tabulation includes Unit I and Unit 2 work items remaining within the security boundary established for Unit 1  ;

operation.

We are currently engaged in establishing prioritics of all work items which will include deferral of certain work items until after Unit 1 fuel load. We expect completion of this priortization activity by June 15, 1984 at which time this report will include a summary of Master Data Base items within the Unit I security boundary that are scheduled to be completed both prior to ,

and after fuel load of Unit 1.

a 4

i i

l .

Appendix E

. s PAINT MANHOURS AND MANPOWER: REACTOR CONTAI!EENT BUILDING #1 BASELINE MANHOURS (APR 28, 1984) TO COMPLETE

^

CONCRETE: 60,500 MHS STEEL: 232,500 MHS EXPENDED WEEK (MAY 5) EXP. TO DATE  % TO DATE MANPOWER CONCRETE: 2363 MHS 2363 MHS 3.9 415 STEEL: 19149 MHS 19149 MHS 8.2 EXPENDED WEEK (MAY 12) EXP. TO DATE  % TO DATE MANPOWER CONCRETE: 2860 MHS 5223 MHS 8.6

. 450 STEEL: 18060 MHS 37209 MHS 16.0 EXPENDED WEEK (MAY 19) EXP. TO DATE  % TO DATE MANPOWER CONCRETE: 2098 MHS 7321 MHS 12.1 470 STEEL: 23289 MHS 60498 MHS 26.0 EXPENDED WEEK (MAY 26) EXP. TO DATE  % TO DATE MANPOWER CONCRETE: 1869 MHS 9190 MHS 15.2 520 STEEL: 21457 MHS 81955, MHS 35.2 EXPENDED WEEK (JUNE 2) EXP. TO DATE  % TO DATE MANPOWER CONCRETE: 1709 MHS 10899 MHS 18.0 530 STEEL: 21085 MHS 103040 MHS 44.3 EXPENDED WEEK (JUNE 9) EXP. TO DATE 1 TO DATE MANPOWER CONCRETE: 2620 MHS 13519 MHS 22.3 520 STEEL: 24909 MHS 127949 MHS 55.0 l

5 l Appendix F

P l .

~

~

THERM 0 LAG BASELINE (MAY 26,1984) TO COMPLETE i

REMAINING: 13,285 SQUARE FEET  !

i t%NPOWER: 166 PEOPLE i

l I

STATUS WEEK ENDING (JUNE 9,1984)

REfMINING: 7,069 SQUARE FEET ,

t%NPOWER: 108 PEOPLE l r

f i

i

~

l t

Appendix G

-~

65,000 '

60,000

  • 50,000 i l

p 40,000 W

W .

CURRENT RATE 5,000 kWK.

> W (t:. 30,000 f4 h 'O 3 I' 20,000

\

\

10,000

\

\

\

JAN FEB MAR I APR MAY JUN THERMOLAG -

.