=Text=
=Text=
{{#Wiki_filter:.. * ; ' * ', OFFICIAL CO:P~ ~/:} e *e : : , ' * I **, -VIRGINl:A.  
{{#Wiki_filter:..           ',
E:tECT_R~C;~N:>>  
                                                                                                                *e e                         :   : , '
POWER COMPANY , I R:rcHMoNn,V:r:aoINXA-
* I **,     -
23261 t 1 i *.June J-_; *:1981--. -; t.; ., i *i 1_* ' l... : d t,j Mr. James P. O'Reilly, Director Office of Inspection  
OFFICIAL CO:P~
and Enforcement  
                                                                                                                                    ~/:}
U. S. Nuclear Regulatory  
VIRGINl:A.         E:tECT_R~C;~N:>>                                       POWER COMPANY
Commission  
                                                                            ,     I R:rcHMoNn,V:r:aoINXA- 23261 t 1i *.June             J-_; *:1981-- . -;
Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 Dear Mr. O'Reilly:  
t.; ., i *i     1_*         ' l... : d t,j Mr. James P. O'Reilly, Director                                                                               Serial No. 287A Office of Inspection and Enforcement                                                                         NO/RMT:ms U. S. Nuclear Regulatory Commission                                                                           Docket Nos. 50-280 Region II                                                                                                                 50-281 101 Marietta Street, Suite 3100                                                                               License Nos. DPR-32 Atlanta, Georgia     30303                                                                                                 DPR-37
Serial No. 287A NO/RMT:ms
 
Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 In reference  
==Dear Mr. O'Reilly:==
to the telecon of May 19, 1981 between Mr. W. P. Kleinsorge  
 
and Mr. J. L. Wilson, the attached information  
In reference to the telecon of May 19, 1981 between Mr. W. P. Kleinsorge and Mr. J. L. Wilson, the attached information is being provided as agreed upon.
is being provided as agreed upon. This information  
This information was unintentionally omitted in our letter of May 22, 1981, Serial No. 287. The information contained in the attached pages is true and accurate to the best of my knowledge and belief.
was unintentionally  
Very truly yours,
omitted in our letter of May 22, 1981, Serial No. 287. The information  
                                                                                                              µ4;L~
contained  
B. R. :7sylvia Manager - Nuclear Operations and Maintenance Attachment City of Richmond Commonwealth of Virginia               .-re-<{
in the attached pages is true and accurate to the best of my knowledge  
Acknowledged before me this 3                             day of';-~,__,-, 19_{/
and belief. Attachment
r-(
City of Richmond Very truly yours, &#xb5;4;L~ B. R. :7sylvia Manager -Nuclear Operations  
                                    ,/'
and Maintenance  
                                    ... *}-\_............ _ ,_           .      !.i\ .' ~*-
Commonwealth  
Notary Public My Commission expires:       ~  - "l..           ::_               19 :') >
of Virginia .-re-<{ Acknowledged  
SEAL cc:   Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing
before me this 3 day of';-~,__,-, 19_{/ r-,/' !.i\ .' ~*-( ... *}-\_ ............  
*( 8107240379 810701 r
_ ,_ . Notary Public My Commission  
I PDR ADOCK 05000280 G                 PDR
expires: -"l.. ::_ 19 :') > cc: Mr. Steven A. Varga, Chief Operating  
                                  \
Reactors Branch No. 1 Division of Licensing  
 
SEAL ( 8107240379  
.           'I e
810701 r PDR ADOCK 05000280 I G PDR \
  ~ .*
.. .* * * ** 'I e SURRY POWER STATION RESPONSE TO NOTICE OF VIOLATION  
Attachment Page 1 SURRY POWER STATION RESPONSE TO NOTICE OF VIOLATION APPENDED TO INSPECTION REPORTS 50-280/81-11, 50-281/81-11 The following information is provided to amend and clarify the Vepco response to:
APPENDED TO INSPECTION  
Non-Compliance Item 280, 281/81-11-01, "Failure to Establish Adequate Controls for Protection of Equipment" VEPCO RESPONSE
REPORTS 50-280/81-11, 50-281/81-11  
: 1. The item as stated is correct.
Attachment
: 2. REASON FOR VIOLATION The scaffolding in question had shifted during use and, as a consequence, has come into contact with some Category I piping that the scaffold had been erected around. The scaffolding was correctly built, i.e~ it was not hung from the piping, but it had moved during use to touch the pipe in question.
Page 1 The following  
: 3. CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND RESULTS ACHIEVED The scaffolding was immediately removed and the piping examined to ensure that no damage had been incurred. The contractor was instructed not to rig from piping systems or to install scaffolding such that it could contact . equipment or piping. This was accomplished during the NRC inspection.
information  
: 4. CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATION Surveillance is conducted on a daily basis to ensure scaffolding has been properly installed.
is provided to amend and clarify the Vepco response to: Non-Compliance  
: 5. DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full Compliance has been achieved .
Item 280, 281/81-11-01, "Failure to Establish  
**}}
Adequate Controls for Protection  
of Equipment" VEPCO RESPONSE 1. The item as stated is correct. 2. REASON FOR VIOLATION  
3. 4. The scaffolding  
in question had shifted during use and, as a consequence, has come into contact with some Category I piping that the scaffold had been erected around. The scaffolding  
was correctly  
built, i.e~ it was not hung from the piping, but it had moved during use to touch the pipe in question.  
CORRECTIVE  
STEPS WHICH HAVE BEEN TAKEN AND RESULTS ACHIEVED The scaffolding  
was immediately  
removed and the piping examined to ensure that no damage had been incurred.  
The contractor  
was instructed  
not to rig from piping systems or to install scaffolding  
such that it could contact . equipment  
or piping. This was accomplished  
during the NRC inspection.  
CORRECTIVE  
STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATION  
Surveillance  
is conducted  
on a daily basis to ensure scaffolding  
has been properly installed.  
5. DATE WHEN FULL COMPLIANCE  
WILL BE ACHIEVED Full Compliance  
has been achieved .
}}

Latest revision as of 05:26, 23 February 2020

Forwards Supplemental Response to Violations Noted in IE Insp Repts 50-280/81-11 & 50-281/81-11.Scaffolding Immediately Removed & Piping Examined to Ensure That No Damage Has Been Incurred
ML18139B448
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/03/1981
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18139B447 List:
References
278A, NUDOCS 8107240379
Download: ML18139B448 (2)


Text

.. ',

  • e e  :  : , '
  • I **, -

OFFICIAL CO:P~

~/:}

VIRGINl:A. E:tECT_R~C;~N:>> POWER COMPANY

, I R:rcHMoNn,V:r:aoINXA- 23261 t 1i *.June J-_; *:1981-- . -;

t.; ., i *i 1_* ' l... : d t,j Mr. James P. O'Reilly, Director Serial No. 287A Office of Inspection and Enforcement NO/RMT:ms U. S. Nuclear Regulatory Commission Docket Nos. 50-280 Region II 50-281 101 Marietta Street, Suite 3100 License Nos. DPR-32 Atlanta, Georgia 30303 DPR-37

Dear Mr. O'Reilly:

In reference to the telecon of May 19, 1981 between Mr. W. P. Kleinsorge and Mr. J. L. Wilson, the attached information is being provided as agreed upon.

This information was unintentionally omitted in our letter of May 22, 1981, Serial No. 287. The information contained in the attached pages is true and accurate to the best of my knowledge and belief.

Very truly yours,

µ4;L~

B. R. :7sylvia Manager - Nuclear Operations and Maintenance Attachment City of Richmond Commonwealth of Virginia .-re-<{

Acknowledged before me this 3 day of';-~,__,-, 19_{/

r-(

,/'

... *}-\_............ _ ,_ .  !.i\ .' ~*-

Notary Public My Commission expires: ~ - "l..  ::_ 19 :') >

SEAL cc: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing

  • ( 8107240379 810701 r

I PDR ADOCK 05000280 G PDR

\

. 'I e

~ .*

Attachment Page 1 SURRY POWER STATION RESPONSE TO NOTICE OF VIOLATION APPENDED TO INSPECTION REPORTS 50-280/81-11, 50-281/81-11 The following information is provided to amend and clarify the Vepco response to:

Non-Compliance Item 280, 281/81-11-01, "Failure to Establish Adequate Controls for Protection of Equipment" VEPCO RESPONSE

1. The item as stated is correct.
2. REASON FOR VIOLATION The scaffolding in question had shifted during use and, as a consequence, has come into contact with some Category I piping that the scaffold had been erected around. The scaffolding was correctly built, i.e~ it was not hung from the piping, but it had moved during use to touch the pipe in question.
3. CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND RESULTS ACHIEVED The scaffolding was immediately removed and the piping examined to ensure that no damage had been incurred. The contractor was instructed not to rig from piping systems or to install scaffolding such that it could contact . equipment or piping. This was accomplished during the NRC inspection.
4. CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER VIOLATION Surveillance is conducted on a daily basis to ensure scaffolding has been properly installed.
5. DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED Full Compliance has been achieved .