ML19225A446: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:Y
{{#Wiki_filter:Y
;
                                                                         'o
                                                                         'o
                                                                                                 ,I ( (_,/
                                                                                                 ,I ( (_,/
Line 61: Line 60:
0
0


  ;
1 VIRGlNIA ELECTRIC AND POWER COMPANY TO  Mr. James P. O'Reilly, Director      ' " ' ' ' * '
* 1 VIRGlNIA ELECTRIC AND POWER COMPANY TO  Mr. James P. O'Reilly, Director      ' " ' ' ' * '
3 It is our intent to provide a final report in accordance with IE Bulletin 79-03 to the NRC by July 11, 1979, which will finalize th2 incomplete items noted in I.A.2., I.B.2, II.A.1, and II.A.2 above.
3 It is our intent to provide a final report in accordance with IE Bulletin 79-03 to the NRC by July 11, 1979, which will finalize th2 incomplete items noted in I.A.2., I.B.2, II.A.1, and II.A.2 above.
V y trul y    ,s, s'~    s am C. Brown, Jr.
V y trul y    ,s, s'~    s am C. Brown, Jr.

Latest revision as of 10:58, 22 February 2020

Responds to IE Bulletin 79-03.Interim Rept Reveals That Only One Single Fitting Was Made by Yongstown Welding & Engineering Co.Final Rept Expected 790711
ML19225A446
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 06/11/1979
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7907190347
Download: ML19225A446 (3)


Text

Y

'o

,I ( (_,/

Nnc ne'r

' ? : T l.

VIRGINI A ELECTRIC AND POWER COMP ANY, RICHMOND. VIRGINI A 23261 ne 11, 1979 Mr. James P. O'Reilly, Director Serial No. 344A Office of Inspection & Enforcement PSE&C/JMM:bam: wang U. S. Nuclear Regulatory Cormiission Region II Docket Nos. 50-339 101 Marietta Street, Suite 3100 50-404 Atlanta, Georgia 30303 50-405

Dear Mr. O'Reilly:

NRC letter of March 12, 1979 forwarded IE Bulletin 79-03

" Longitudinal Weld Defects in ASME SA-312 Type 304 stainless steel pipe spools manuf actured by Youngstown Welding and Engineering Company."

Vepco letter Serial No. 344, docket Nos. 50-339, 50-40., and 50-405 dated May 10, 1979 indicated that due to the extensive records review required for compliance with IE Bulletin No. 79-03 an additional 30 days minimum would be required for a reply.

At this time Vepco has obtained information on the use of Youngstown Welding and Engineering Company, SA/A 312 type 304/316 material welded without filler metal (noted hereaf ter as " Youngstown Material") for most of the items and components in safety-related systems. We feel, however, that an additional 30 days will be required to complete the review and obtain written confirmation of the results of all reviews.

The following interim report of the progress of our review is provided: .

I. Docket No. 50-339: North Anna Unit 2:

A. Review of items purchased by the Architect-Engineer, Stone Webster Engineering Corporation:

1. Pipe and Fittings: A complete review of pipe and fittings has revealed only one item, a single fitting, which was made of Youngstown material. This item is an ASTM A 312, Type 304 welded without filler metal, 10" schedule A0S 90 degree short radius elbow in the Recirculation Spray System. The Recirculation Spray System is a Q-2 (equivalent to ASME III, Subsection NC) System with design pressure of 154 psig and design temperature of 219 F in the regio.) of the elbow. The elbow is located in the reactor containment. Vepco will perform 100% radiographic inspection of the longitudinal weld seam of this fitting to the re s 61rements and acceptance criteria of ANSI B 31.7.

,NO

?

J

~

h0h b 7 9 071g o 3 y 7 OMMAL OPY

y

.r VmGWA EMCTNC AND POm CWim To gp, James P. O'Reilly, Director 5""" -

2

2. Other equipment: The review of all othcr equipment where Youngstown material could have been used has been completed except for two items. No Youngstown material has been identified in any of the equipment reviewed.

B. Review of items manufactured / purchased by the Nuclear Steam Supply System Vendor, Westinghouse:

1. Primary system components: A review of all pipe, fittings, nozzles etc., purchased by Westinghouse has been completed and reveals that no Youngstown material was used.
2. Auxiliary components supplied by Westinghouse vendors:

This review has not been completed by Westinghouse.

For items which have been reviewed, it has been determined that no Youngstown material was used.

II. Docket Nos. 50-404 and 50-405: North Anna 3 and 4:

A. Review of items purchased by the Architect-Engineer, Stone and Webster Engineering Corporation:

1. Pipe and Fittings: A review of fabricated subassemblies, pipe and fittings is presently underway.

No Youngstown material has been identified in items reviewed. Also, no Youngstown pipe, or #ittings made from Youngstown pipe, are planned for use in Units 3 and 4. If Youngstown material is identified in our inventory or purchased later, all such material will be 100% radiographically inspected in accordance with ASME Section III, paragraph NB 2553. Material not meeting this criterion will not be used.

2. Equipment: The review of equipment has not been completed. No Youngstown material has been identified in items reviewed.

B. Review of items manuf actured/ purchased by the Nuclear Steam Supply System Vendor, Babcock & Wilcox (B&W):

1. Primary system components: A review of all pipe, fittings, nozzles etc. purchased by B&W has been completed -'d reveals that no Youngstown noterial w;s used.

E. Auxiliary components s0pplied by B&W vendors: This review has been completed and ieveals that no Youngstown mat" rial was used in any components.

,9- -

3LU JJv d

0

1 VIRGlNIA ELECTRIC AND POWER COMPANY TO Mr. James P. O'Reilly, Director ' " ' ' ' * '

3 It is our intent to provide a final report in accordance with IE Bulletin 79-03 to the NRC by July 11, 1979, which will finalize th2 incomplete items noted in I.A.2., I.B.2, II.A.1, and II.A.2 above.

V y trul y ,s, s'~ s am C. Brown, Jr.

Senior Vic President - Power ation Engin ering and Construct'on cc: Mr. John G. Davis, Acting Director Office of Inspection & Enforcement Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation e

~ [ v

(. E .

)'

.