ML19324C430: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 27: Line 27:
RE:      10CFR 50.74(a) 10CFR 55.55(a)
RE:      10CFR 50.74(a) 10CFR 55.55(a)
U. S. Nuclear Megulatory Commission Document Control Desk Washington, D.C.                  20555
U. S. Nuclear Megulatory Commission Document Control Desk Washington, D.C.                  20555
                                                                                                                              ;


==REFERENCE:==
==REFERENCE:==
Line 46: Line 45:
                                                                       / Step e E. Scace Station Superintendent 1
                                                                       / Step e E. Scace Station Superintendent 1
Millstone Nuclear Power Station p.
Millstone Nuclear Power Station p.
;
p                'SES/MJW/pab l                  c:    W. T. Russell, Region 1 R. M. Gallo, Region 1 W. J. Raymond, Senior Resident            Inspector
p                'SES/MJW/pab l                  c:    W. T. Russell, Region 1 R. M. Gallo, Region 1 W. J. Raymond, Senior Resident            Inspector
                                                                                                                   '\v 8911160315 091107 PDR- ADOCK 05000336
                                                                                                                   '\v 8911160315 091107 PDR- ADOCK 05000336
* h}}
* h}}

Latest revision as of 19:33, 18 February 2020

Informs That as of 891101,senior Operating Licenses SOP 3565-4 & SOP 2438-6 for Js Keenan & Dh Wright, Respectively,No Longer Exists
ML19324C430
Person / Time
Site: Millstone Dominion icon.png
Issue date: 11/07/1989
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
MP-13707, NUDOCS 8911160315
Download: ML19324C430 (1)


Text

~

~

P ;c.4 4 -

i e

General Offices

  • Seiden Street, Berlin, Connecticut w tow.icie ut i e scaa cm.,

g

.E7aC,,7Uc1.,,, . H ARTFORD, CONNECTICUT OS141-0270

==wav iuca.ewneco- c (203) 665-5000 November 7, 1989 MP-13707 ,

RE: 10CFR 50.74(a) 10CFR 55.55(a)

U. S. Nuclear Megulatory Commission Document Control Desk Washington, D.C. 20555

REFERENCE:

Facility Operating License No. DPR-65 Docket No. 50-336 Notification of Change in operator or Senior Operator Status, Millstone Unit 2.

Dear Gentlemen:

Northeast Nuclear Energy Company has determined that their no longer exists the need to maintain the Senior Operating License of the following personnel of Millstone, Unit 2. This determination is effective November 1,.1989. ,

John S. Keenan ,

SOP 3565-4 Donald H. Wright SOP 2438-6 l- .

t I

Yours truly, L

- NORTHEAST NUCLEAR ENERGY COMPANY

(.

l l

/

CML-

\'

/ Step e E. Scace Station Superintendent 1

Millstone Nuclear Power Station p.

p 'SES/MJW/pab l c: W. T. Russell, Region 1 R. M. Gallo, Region 1 W. J. Raymond, Senior Resident Inspector

'\v 8911160315 091107 PDR- ADOCK 05000336

  • h