| {{#Wiki_filter:Accession No. ML113330778 | | {{#Wiki_filter:Accession No. ML113330778 From: Tam, Peter Sent: Tuesday, November 29, 2011 3:24 PM To: 'jrwaters@aep.com'; Helen Etheridge Cc: Karwoski, Kenneth; Johnson, Andrew; Beltz, Terry; Cusumano, Victor |
| | |
| From: Tam, Peter Sent: Tuesday, November 29, 2011 3:24 PM To: 'jrwaters@aep.com'; Helen Etheridge Cc: Karwoski, Kenneth; Johnson, Andrew; Beltz, Terry; Cusumano, Victor | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| D.C. Cook Unit 1 - Record of discussion by phone regarding steam generator inspection (TAC ME7321) | | D.C. Cook Unit 1 - Record of discussion by phone regarding steam generator inspection (TAC ME7321) |
| Helen: The NRC technical staff provided a summary (see below) of the conference call on 10/5/11 with you and others on the subject issue. Upon completion of the discussion, we have closed the TAC number shown above. | | Helen: |
| Peter S. Tam Senior Project Manager (for D. C. Cook and Monticello) Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 | | The NRC technical staff provided a summary (see below) of the conference call on 10/5/11 with you and others on the subject issue. Upon completion of the discussion, we have closed the TAC number shown above. |
| >>>>>>>>>>>>>>>>>>
| | Peter S. Tam Senior Project Manager (for D. C. Cook and Monticello) |
| | Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451 |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF CONFERENCE CALL WITH DONALD C. COOK NUCLEAR PLANT UNIT 1 REGARDING THE 2011 STEAM GENERATOR TUBE INSPECTION RESULTS DOCKET NO. 50-315 | | OF CONFERENCE CALL WITH DONALD C. COOK NUCLEAR PLANT UNIT 1 REGARDING THE 2011 STEAM GENERATOR TUBE INSPECTION RESULTS DOCKET NO. 50-315 On October 5, 2011, the staff of the Steam Generator Tube Integrity and Chemical Engineering Branch (ESGB) of the Division of Engineering participated in a conference call with representatives of Indiana Michigan Power Company (the licensee) regarding their ongoing steam generator (SG) tube inspection activities at Donald C. Cook Nuclear Plant Unit 1. |
| | |
| On October 5, 2011, the staff of the Steam Generator Tube Integrity and Chemical Engineering Branch (ESGB) of the Division of Engineering participated in a conference call with representatives of Indiana Michigan Power Company (the licensee) regarding their ongoing steam generator (SG) tube inspection activities at Donald C. Cook Nuclear Plant Unit 1. | |
| Information provided by the licensee after the call is provided as an attachment to the enclosure (Agencywide Documents Access Management System (ADAMS) Accession Numbers ML112920165 and ML112920187). | | Information provided by the licensee after the call is provided as an attachment to the enclosure (Agencywide Documents Access Management System (ADAMS) Accession Numbers ML112920165 and ML112920187). |
| Donald C. Cook Nuclear Plant Unit 1 has four Model 51R recirculating SGs designed and fabricated by Babcock and Wilcox International. Each SG has 3,496 thermally treated Alloy 690 tubes that have an outside diameter of 0.875 inches, and a nominal wall thickness of 0.049 inches. The tubes are supported by Type 410 stainless steel, lattice-grid tube supports, and flat fan bars. The tubes were hydraulically expanded at each end for the full depth of the tubesheet. | | Donald C. Cook Nuclear Plant Unit 1 has four Model 51R recirculating SGs designed and fabricated by Babcock and Wilcox International. Each SG has 3,496 thermally treated Alloy 690 tubes that have an outside diameter of 0.875 inches, and a nominal wall thickness of 0.049 inches. The tubes are supported by Type 410 stainless steel, lattice-grid tube supports, and flat fan bars. The tubes were hydraulically expanded at each end for the full depth of the tubesheet. |
| | |
| Information provided by the licensee during the phone call that was not included in the attachments is summarized below. | | Information provided by the licensee during the phone call that was not included in the attachments is summarized below. |
| The SGs are approximately 11 years old and the last tube inspection was performed in 2006. During the 2006 inspection, approximately 50 percent of the SG tubes were inspected and approximately 51 fan bar wear indications were identified. At the time of the call, the current inspections were approximately 90 percent complete and over 2000 fan bar wear indications had been identified. The majority of the new fan bar wear indications were located in the U-bend region of high-row tubes (i.e., tubes in row 60 and above with larger bend radii). The licensee indicated that they would provide a tubesheet map to indicate the location of the tubes with fan bar wear. The tubesheet maps are included as attachments to this enclosure. | | The SGs are approximately 11 years old and the last tube inspection was performed in 2006. |
| | During the 2006 inspection, approximately 50 percent of the SG tubes were inspected and |
|
| |
|
| | approximately 51 fan bar wear indications were identified. At the time of the call, the current inspections were approximately 90 percent complete and over 2000 fan bar wear indications had been identified. The majority of the new fan bar wear indications were located in the U-bend region of high-row tubes (i.e., tubes in row 60 and above with larger bend radii). |
| | The licensee indicated that they would provide a tubesheet map to indicate the location of the tubes with fan bar wear. The tubesheet maps are included as attachments to this enclosure. |
| The planned inspection scope for the SG tubes was a 100 percent sample of all four SGs using the bobbin probe. At the time of the call, the largest wear indication found was 28 percent through wall and approximately 48 tubes with wear greater than 20 percent through wall had been detected. A rotating pancake coil (RPC) was being used to inspect a 20 percent sample of the largest fan bar wear indications. | | The planned inspection scope for the SG tubes was a 100 percent sample of all four SGs using the bobbin probe. At the time of the call, the largest wear indication found was 28 percent through wall and approximately 48 tubes with wear greater than 20 percent through wall had been detected. A rotating pancake coil (RPC) was being used to inspect a 20 percent sample of the largest fan bar wear indications. |
| At the time of the call, the licensee had not yet decided upon the future inspection frequency of the SGs, but indicated that they were planning on plugging the 13 tubes that had been identified with through wall wear greater than or equal to 23 percent. By plugging these tubes, the licensee calculated that they would maintain the option of skipping the SG inspections during the next refueling outage while ensuring that the tube integrity performance criteria will continue to be met. | | At the time of the call, the licensee had not yet decided upon the future inspection frequency of the SGs, but indicated that they were planning on plugging the 13 tubes that had been identified with through wall wear greater than or equal to 23 percent. By plugging these tubes, the licensee calculated that they would maintain the option of skipping the SG inspections during the next refueling outage while ensuring that the tube integrity performance criteria will continue to be met. |
| The licensee indicated that by comparing measured wear indications from this SG inspection with measured wear indications from the 2006 SG inspections, the upper 95 th percentile growth rate was calculated to be approximately 4.8 percent per effective full power year. However, in response to questions, the licensee also noted that a few tubes that showed no wear indications in 2006 showed greater than 20 percent wear indications this outage. Because this could potentially indicate a high growth rate mechanism in the SGs, the licensee was checking to see if the indications were previously detectable. The licensee also indicated that there were a small number of wear indications at the tube support plates (TSPs) in the SGs. | | The licensee indicated that by comparing measured wear indications from this SG inspection with measured wear indications from the 2006 SG inspections, the upper 95th percentile growth rate was calculated to be approximately 4.8 percent per effective full power year. However, in response to questions, the licensee also noted that a few tubes that showed no wear indications in 2006 showed greater than 20 percent wear indications this outage. Because this could potentially indicate a high growth rate mechanism in the SGs, the licensee was checking to see if the indications were previously detectable. The licensee also indicated that there were a small number of wear indications at the tube support plates (TSPs) in the SGs. |
| | | In response to questions, the licensee stated that they had not identified any transients or events since the 2006 inspections that might have influenced vibration levels (i.e. wear rates) such as major SG/plant upsets or major changes in SG fouling or feed/steam flow rates. |
| In response to questions, the licensee stated that they had not identified any transients or events since the 2006 inspections that might have influenced vibration levels (i.e. wear rates) such as major SG/plant upsets or major changes in SG fouling or feed/steam flow rates. | | Fouling at the TSPs in the SGs had been mapped during the 2006 inspections and approximately 100 pounds of total sludge had been indicated in all the SGs. The mapping was being repeated at the time of the call this outage. The inspection processes used in 2006 were the same as being used during the current outage and the noise and data quality from the current outage were virtually identical to that in the 2006 outage. |
| | |
| Fouling at the TSPs in the SGs had been mapped during the 2006 inspections and approximately 100 pounds of total sludge had been indicated in all the SGs. The mapping was being repeated at the time of the call this outage. The inspection processes used in 2006 were the same as being used during the current outage and the noise and data quality from the current outage were virtually identical to that in the 2006 outage. | |
| | |
| The licensee indicated that they had implemented a Measurement Uncertainty Recapture Power Uprate that the NRC approved in December 2002, but had not implemented any other types of power uprates. Additionally, the licensee indicated that they had experienced a turbine failure about 3 years ago, but could not identify and transients or operating experience that might account for the increased fan bar wear.}} | | The licensee indicated that they had implemented a Measurement Uncertainty Recapture Power Uprate that the NRC approved in December 2002, but had not implemented any other types of power uprates. Additionally, the licensee indicated that they had experienced a turbine failure about 3 years ago, but could not identify and transients or operating experience that might account for the increased fan bar wear.}} |
Similar Documents at Cook |
---|
Category:E-Mail
MONTHYEARML24221A4172024-08-0101 August 2024 DC Cook 2024 PI&R Inspection Request for Information ML24178A0432024-06-26026 June 2024 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML24156A0072024-05-30030 May 2024 NRR E-mail Capture - Final RAI - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - License Amendment Request Regarding Reserve Feed Enclosure ML24156A0052024-05-22022 May 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Reserve Feed Enclosure ML24103A1392024-04-12012 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of 10 CFR 50.69 ML24096A1132024-04-0505 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Delay in Issuance of License Amendment Regarding Neutron Flux Instrumentation ML24093A0582024-04-0202 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Request Regarding Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML23361A1022023-12-21021 December 2023 Security Rule Exemption Request - ISFSI Docket No. Reference ML23321A1222023-11-17017 November 2023 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML23052A1502023-02-21021 February 2023 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Neutron Flux Instrumentation ML22307A2532022-11-0303 November 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Verbal Authorization of Relief Request ISIR-5-06 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML22122A0902022-04-29029 April 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-554, Revision 1 ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML21341A6252021-12-0707 December 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-577, Revision 1 ML21307A3352021-11-0303 November 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation ML21236A0262021-08-23023 August 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML21140A3052021-05-20020 May 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21113A2812021-04-23023 April 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level Instrumentation ML21089A0222021-03-24024 March 2021 DC Cook Power Operated Valves (POV) Preliminary Request for Information ML21082A0262021-03-22022 March 2021 Acceptance of Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21049A2682021-02-16016 February 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT ML21026A3472021-01-26026 January 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML21008A4742021-01-0808 January 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Extension Containment Type a ILRT ML20366A1012020-12-31031 December 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Deferral of Steam Generator Inspection ML20316A0152020-11-0606 November 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML20318A0202020-10-16016 October 2020 NRR E-mail Capture - Regarding Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A7122020-10-15015 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20290A4252020-10-15015 October 2020 Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20318A0192020-10-15015 October 2020 NRR E-mail Capture - (External_Sender) Supplemental Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A1192020-10-0909 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request for Alternative to N-729-4 for RPV Head Visual Examination ML20318A0182020-10-0909 October 2020 NRR E-mail Capture - (External_Sender) Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20181A4122020-06-29029 June 2020 NRR E-mail Capture - Final RAI - D.C. Cook 1 - One-Time Extension, Containment Type a ILRT Frequency ML20149K6272020-05-28028 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment and Exemptions Regarding UFSAR 10 CFR 50.71(e)(4) Update Schedule (Epids: L-2020-LLA-0100, L-2020-LLE-0052, L-2020-LLE-0053) ML20149K4332020-05-26026 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-567, Revision 1 ML20141L6062020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-541, Revision 2 ML20141L8112020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request Regarding Impracticality for Inservice Inspection for Certain Welds ML20136A5162020-05-15015 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-412, Revision 3 ML20133J9662020-05-11011 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML20232B4562020-04-27027 April 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Fragility Questions ML20232B4432020-03-25025 March 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Plant Response Model Questions ML19345F9382019-12-0909 December 2019 D.C. Cook 50.54(f) SPRA Submittal - Completeness Review Done and Path Forward ML19333B8042019-11-29029 November 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-569 (L-2019-LLA-0248) ML19309F9212019-11-0505 November 2019 Request for Eportal Access for Audit Review of the DC Cook SPRA Supporting Documents ML19270E7372019-09-26026 September 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-421, Reactor Coolant Pump Flywheel Inspection Program ML19207A4642019-07-26026 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Delete Diesel Generator Load Test Resistor Banks ML19204A0962019-07-23023 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Request for Additional Information Related to Unit 2 Leak Before Break Analysis and Deletion of Containment Humidity Monitors for Unit Nos. 1 and 2 ML19211C3032019-07-0303 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 & 2 - Request for Additional Information Related to LAR to Address NSAL-15-1 ML19175A3032019-06-24024 June 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS ML19092A4802019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 ML19092A4792019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Address Issues Identified in Westinghouse Document NSAL-15-1 2024-08-01
[Table view] Category:Conference/Symposium/Workshop Paper
MONTHYEARML13189A2322013-07-15015 July 2013 Summary of Conference Telephone Call Regarding the 2013 Steam Generator Tube Inspections ML1133307782011-11-29029 November 2011 Record of Discussion by Phone on 10/5/11 Regarding Steam Generator Inspection 2013-07-15
[Table view] Category:Meeting Summary
MONTHYEARML24305A1002024-11-0101 November 2024 Summary of Meeting with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Units 1 and 2 ML24183A2292024-07-0101 July 2024 Summary of Public Outreach to Discuss the NRC 2023 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML24103A1872024-04-16016 April 2024 Summary of Meeting with Indiana Michigan Power Co., Regarding Surveillance Capsule Program for DC Cook Nuclear Plant, Unit 2 ML24031A5872024-02-0202 February 2024 Summary of Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23215A1662023-08-17017 August 2023 Summary of July 31, 2023, Meeting with Indiana Michigan Power Company Regarding Operating Power Sources for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML23199A2402023-07-19019 July 2023 Summary of the July 13, 2023, Public Outreach to Discuss the NRC 2022 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant, Units 1 and 2 ML22355A6022023-01-0303 January 2023 Summary of December 14, 2022, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22318A1992022-11-21021 November 2022 Summary of November 7, 2022, Meeting with Indiana Michigan Power Company Regarding Neutron Flux Instrumentation for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML22154A5342022-06-0909 June 2022 Summary of the June 1, 2022, Public Outreach to Discuss the NRC 2021 End-Of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML22011A2732022-01-13013 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Planned Final Response to Generic Letter 2004-02 for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21349B3092022-01-0303 January 2022 Summary of Meeting with Indiana Michigan Power Company to Discuss Potential Changes to the Quality Assurance Program for Donald C. Cook Nuclear Plant, Units 1 and 2 ML21202A1072021-07-23023 July 2021 Summary of July 20, 2021, with Indiana Michigan Power Company to Discuss Potential Changes to the Emergency Plan for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML21196A5182021-07-15015 July 2021 July 8, 2021, Summary of Public Webinar to Discuss the NRC 2020 End-Of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant ML21082A0052021-03-24024 March 2021 Summary of March 19, 2021, with Indiana Michigan Power Company Regarding Containment Water Level Channels for Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20349A0152020-12-17017 December 2020 Summary of November 30, 2020, Teleconference with Indiana Michigan Power Company Regarding a Planned License Amendment Request to Extend the Containment Integrated Leak Rate Testing Interval for Donald C. Cook Nuclear Plant, Unit No. 2 ML20282A2712020-10-14014 October 2020 Summary of October 2, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML20248H4752020-09-10010 September 2020 Summary of August 6, 2020, Teleconference with Indian Michigan Power Company Related to Steam Generator Eddy Current Testing License Amendment Request ML20209A6032020-07-27027 July 2020 Summary of the July 21, 2020, Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of the Donald C. Cook Nuclear Plant, Units 1 and 2 ML20133K1282020-05-21021 May 2020 Summary of May 4, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20121A0692020-05-0404 May 2020 Summary of Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML20041C9492020-02-13013 February 2020 Summary of February 6, 2020, Teleconference with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19350A0552019-12-30030 December 2019 Summary of 12/12/2019 Meeting with Indiana Michigan Power Company, License Amendment Request for D.C. Cook Nuclear Plant, Units 1 and 2 to Delete Surveillance Requirement Related to Diesel Generator Load Test Resistor Banks ML19212A5652019-07-30030 July 2019 Summary of Public Open House to Discuss NRC Activities and the 2018 End-Of-Cycle Performance Assessment of Donald C. Cook Nuclear Generating Plant, Units 1 and 2 ML19141A0622019-06-0606 June 2019 Summary of November 19, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19099A3262019-04-16016 April 2019 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML19067A0482019-03-12012 March 2019 Summary of Public Teleconference with Indiana Michigan Power Co. (I&M) Review of LAR for Approval of Leak-Before-Break Methodology for Reactor Coolant System Small Diameter Piping (EPID-2019-LLA-0054) ML18334A0402018-12-13013 December 2018 Summary of Meeting with Indian Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML18109A0692018-04-26026 April 2018 Summary of April 10, 2018, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML18052B0542018-02-26026 February 2018 Summary of February 15, 2018, Meeting with Indian Michigan Power Company Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 (EPID L-2018-LRM-0008 ML18018B1382018-01-22022 January 2018 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit No. 1 ML17265A4922017-10-0404 October 2017 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 2 ML17235B1232017-08-23023 August 2017 Summary of the July 27, 2017, Open House to Discuss the 2016 End-of-Cycle Plant Performance Assessment of Donald C. Cook Nuclear Plant ML17082A0762017-03-27027 March 2017 Summary of March 20, 2017, Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Unit Nos. 1 and 2 ML16308A1132016-11-16016 November 2016 Summary of October 27, 2016, Public Meeting with Indiana Michigan Power Company Regarding the Donald C. Cook Nuclear Plant, Units 1 and 2 ML16244A7062016-08-30030 August 2016 Summary of the August 22, 2016, Donald C. Cook Public Meeting ML16193A5912016-07-15015 July 2016 Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15271A0462015-10-0505 October 2015 Summary of Public Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML15237A3362015-09-0202 September 2015 Summary of August 24, 2015, Telephone Call to Provide Verbal Authorization of Relief Request ISIR-4-06, Alternate Repair of Socket Weld ML15107A0982015-04-24024 April 2015 April 14, 2015, Summary of Meeting with Indiana Michigan Power Company Regarding Donald C. Cook Nuclear Plant, Units 1 and 2 ML14311A3182014-11-14014 November 2014 Summary of Conference Call with Donald C. Cook Nuclear Plant, Unit 1 Regarding the Fall 2014 Steam Generator Inspections ML14231A0752014-08-27027 August 2014 Summary of the August 8, 2014, Pre-Application Meeting with American Electric Power Company to Discuss a Future License Amendment Request for Alternative Source Term and TSTF-490 ML14209A9422014-07-30030 July 2014 July 9, 2014, Summary of Category 1, Public Meeting with Indiana Michigan Power Company to Discuss Seismic Hazard Reevaluations Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1 ML14199A0802014-07-18018 July 2014 Summary of July 8, 2014 Donald C. Cook Public Annual Assessment Meeting ML14023A3872014-01-30030 January 2014 Summary of Joint Steering Committee Meeting to Discuss Activities Related to Lessons-Learned from the Fukushima Dai-Ichi Nuclear Power Plant Event ML13210A2272013-08-0202 August 2013 6/26/13, Summary of Pre-Application Meeting to Discuss Pending License Amendment Request to Modify the CNP Unit 1 Normal Operating Pressure and Temperature ML13189A2322013-07-15015 July 2013 Summary of Conference Telephone Call Regarding the 2013 Steam Generator Tube Inspections ML13154A4062013-06-0303 June 2013 5/30/2013 - Summary of the D.C. Cook Public Meeting ML12159A4022012-06-0707 June 2012 May 31, 2012 Summary of Public Meeting to Discuss the 2011 Annual Assessment Results for D.C. Cook ML1133307782011-11-29029 November 2011 Record of Discussion by Phone on 10/5/11 Regarding Steam Generator Inspection ML11129A2422011-06-0808 June 2011 Summary of Meeting with Indiana Michigan Power Company to Discuss Issues Related to a Future Submittal Using NFPA 805 2024-07-01
[Table view] |
Text
Accession No. ML113330778 From: Tam, Peter Sent: Tuesday, November 29, 2011 3:24 PM To: 'jrwaters@aep.com'; Helen Etheridge Cc: Karwoski, Kenneth; Johnson, Andrew; Beltz, Terry; Cusumano, Victor
Subject:
D.C. Cook Unit 1 - Record of discussion by phone regarding steam generator inspection (TAC ME7321)
Helen:
The NRC technical staff provided a summary (see below) of the conference call on 10/5/11 with you and others on the subject issue. Upon completion of the discussion, we have closed the TAC number shown above.
Peter S. Tam Senior Project Manager (for D. C. Cook and Monticello)
Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Tel. 301-415-1451
SUMMARY
OF CONFERENCE CALL WITH DONALD C. COOK NUCLEAR PLANT UNIT 1 REGARDING THE 2011 STEAM GENERATOR TUBE INSPECTION RESULTS DOCKET NO. 50-315 On October 5, 2011, the staff of the Steam Generator Tube Integrity and Chemical Engineering Branch (ESGB) of the Division of Engineering participated in a conference call with representatives of Indiana Michigan Power Company (the licensee) regarding their ongoing steam generator (SG) tube inspection activities at Donald C. Cook Nuclear Plant Unit 1.
Information provided by the licensee after the call is provided as an attachment to the enclosure (Agencywide Documents Access Management System (ADAMS) Accession Numbers ML112920165 and ML112920187).
Donald C. Cook Nuclear Plant Unit 1 has four Model 51R recirculating SGs designed and fabricated by Babcock and Wilcox International. Each SG has 3,496 thermally treated Alloy 690 tubes that have an outside diameter of 0.875 inches, and a nominal wall thickness of 0.049 inches. The tubes are supported by Type 410 stainless steel, lattice-grid tube supports, and flat fan bars. The tubes were hydraulically expanded at each end for the full depth of the tubesheet.
Information provided by the licensee during the phone call that was not included in the attachments is summarized below.
The SGs are approximately 11 years old and the last tube inspection was performed in 2006.
During the 2006 inspection, approximately 50 percent of the SG tubes were inspected and
approximately 51 fan bar wear indications were identified. At the time of the call, the current inspections were approximately 90 percent complete and over 2000 fan bar wear indications had been identified. The majority of the new fan bar wear indications were located in the U-bend region of high-row tubes (i.e., tubes in row 60 and above with larger bend radii).
The licensee indicated that they would provide a tubesheet map to indicate the location of the tubes with fan bar wear. The tubesheet maps are included as attachments to this enclosure.
The planned inspection scope for the SG tubes was a 100 percent sample of all four SGs using the bobbin probe. At the time of the call, the largest wear indication found was 28 percent through wall and approximately 48 tubes with wear greater than 20 percent through wall had been detected. A rotating pancake coil (RPC) was being used to inspect a 20 percent sample of the largest fan bar wear indications.
At the time of the call, the licensee had not yet decided upon the future inspection frequency of the SGs, but indicated that they were planning on plugging the 13 tubes that had been identified with through wall wear greater than or equal to 23 percent. By plugging these tubes, the licensee calculated that they would maintain the option of skipping the SG inspections during the next refueling outage while ensuring that the tube integrity performance criteria will continue to be met.
The licensee indicated that by comparing measured wear indications from this SG inspection with measured wear indications from the 2006 SG inspections, the upper 95th percentile growth rate was calculated to be approximately 4.8 percent per effective full power year. However, in response to questions, the licensee also noted that a few tubes that showed no wear indications in 2006 showed greater than 20 percent wear indications this outage. Because this could potentially indicate a high growth rate mechanism in the SGs, the licensee was checking to see if the indications were previously detectable. The licensee also indicated that there were a small number of wear indications at the tube support plates (TSPs) in the SGs.
In response to questions, the licensee stated that they had not identified any transients or events since the 2006 inspections that might have influenced vibration levels (i.e. wear rates) such as major SG/plant upsets or major changes in SG fouling or feed/steam flow rates.
Fouling at the TSPs in the SGs had been mapped during the 2006 inspections and approximately 100 pounds of total sludge had been indicated in all the SGs. The mapping was being repeated at the time of the call this outage. The inspection processes used in 2006 were the same as being used during the current outage and the noise and data quality from the current outage were virtually identical to that in the 2006 outage.
The licensee indicated that they had implemented a Measurement Uncertainty Recapture Power Uprate that the NRC approved in December 2002, but had not implemented any other types of power uprates. Additionally, the licensee indicated that they had experienced a turbine failure about 3 years ago, but could not identify and transients or operating experience that might account for the increased fan bar wear.