NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS
ML19175A303
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/24/2019
From: Robert Kuntz
Plant Licensing Branch III
To: Scarpello M
Indiana Michigan Power Co
References
L-2018-LLA-0246
Download: ML19175A303 (2)


Text

NRR-DRMAPEm Resource From: Kuntz, Robert Sent: Monday, June 24, 2019 10:24 AM To: mkscarpello@aep.com Cc: Helen L Levendosky

Subject:

D.C. Cook Nuclear Plant Unit No. 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS (EPID L-2018-LLA-0246)

By letter dated May 30, 2019 (Agencywide Documents Access and Management System Accession No. ML19155A074), Indiana Michigan Power Company submitted a alternative request for the Donald C. Cook Nuclear Plant, Unit No. 2. The proposed alternative is to the requirements of American Society of Mechanical Engineers,Section XI, IWA-2430(d)(2) for CNP Unit 2 reactor vessel examinations that were extended by relief request previously..

The purpose of this e-mail is to provide the results of the NRC staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR),

the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 120 hours5 days <br />0.714 weeks <br />0.164 months <br /> to complete. The NRC staff expects to complete this review in approximately 4 months, which is October, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me at 301-415-3733.

Sincerely, Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_DRMA Email Number: 66 Mail Envelope Properties (BL0PR0901MB4131631E93D8A184B2DEF84A99E00)

Subject:

D.C. Cook Nuclear Plant Unit No. 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS (EPID L-2018-LLA-0246)

Sent Date: 6/24/2019 10:23:57 AM Received Date: 6/24/2019 10:23:00 AM From: Kuntz, Robert Created By: Robert.Kuntz@nrc.gov Recipients:

"Helen L Levendosky" <hllevendosky@aep.com>

Tracking Status: None "mkscarpello@aep.com" <mkscarpello@aep.com>

Tracking Status: None Post Office: BL0PR0901MB4131.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3044 6/24/2019 10:23:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: