MONTHYEARML24221A4172024-08-0101 August 2024 DC Cook 2024 PI&R Inspection Request for Information ML24178A0432024-06-26026 June 2024 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML24156A0072024-05-30030 May 2024 NRR E-mail Capture - Final RAI - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - License Amendment Request Regarding Reserve Feed Enclosure ML24156A0052024-05-22022 May 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Reserve Feed Enclosure ML24103A1392024-04-12012 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant, Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Adoption of 10 CFR 50.69 ML24096A1132024-04-0505 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Delay in Issuance of License Amendment Regarding Neutron Flux Instrumentation ML24093A0582024-04-0202 April 2024 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Request Regarding Technical Specification 3.4.12, Low Temperature Overpressure Protection (LTOP) System, ML23361A1022023-12-21021 December 2023 Security Rule Exemption Request - ISFSI Docket No. Reference ML23321A1222023-11-17017 November 2023 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - License Amendment Request Regarding Neutron Flux Instrumentation ML23052A1502023-02-21021 February 2023 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Neutron Flux Instrumentation ML22307A2532022-11-0303 November 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Verbal Authorization of Relief Request ISIR-5-06 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML22122A0902022-04-29029 April 2022 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-554, Revision 1 ML22250A6712022-02-16016 February 2022 Outline Submittal Notification Email DC-Cook 2022 ML21341A6252021-12-0707 December 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-577, Revision 1 ML21307A3352021-11-0303 November 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Final RAI - License Amendment Request Regarding Containment Water Level Instrumentation ML21236A0262021-08-23023 August 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML21140A3052021-05-20020 May 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21113A2812021-04-23023 April 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request Regarding Containment Water Level Instrumentation ML21089A0222021-03-24024 March 2021 DC Cook Power Operated Valves (POV) Preliminary Request for Information ML21082A0262021-03-22022 March 2021 Acceptance of Relief Request ISIR-4-11, Impractical Examinations for the Fourth 10-Year ISI Interval ML21049A2682021-02-16016 February 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Final RAI - License Amendment Request for One-Time Extension Containment Type a ILRT ML21026A3472021-01-26026 January 2021 NRR E-mail Capture - Final RAI - D.C. Cook 1 & 2 - Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML21008A4742021-01-0808 January 2021 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Extension Containment Type a ILRT ML20366A1012020-12-31031 December 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance of License Amendment Request for One-Time Deferral of Steam Generator Inspection ML20316A0152020-11-0606 November 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request REL-PP2 for Pump and Valve IST Fifth 10-year Interval ML20318A0202020-10-16016 October 2020 NRR E-mail Capture - Regarding Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A7122020-10-15015 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20290A4252020-10-15015 October 2020 Verbal Authorization of Relief Request ISIR-5-04 Regarding Alternative to N-729-6 for RPV Head Visual Examination ML20318A0192020-10-15015 October 2020 NRR E-mail Capture - (External_Sender) Supplemental Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20289A1192020-10-0909 October 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request for Alternative to N-729-4 for RPV Head Visual Examination ML20318A0182020-10-0909 October 2020 NRR E-mail Capture - (External_Sender) Public Comment on D.C. Cook, Unit 1 Request for Relief from Nozzle Inspections, Code Case N-729 ML20181A4122020-06-29029 June 2020 NRR E-mail Capture - Final RAI - D.C. Cook 1 - One-Time Extension, Containment Type a ILRT Frequency ML20149K6272020-05-28028 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment and Exemptions Regarding UFSAR 10 CFR 50.71(e)(4) Update Schedule (Epids: L-2020-LLA-0100, L-2020-LLE-0052, L-2020-LLE-0053) ML20149K4332020-05-26026 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-567, Revision 1 ML20141L6062020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-541, Revision 2 ML20141L8112020-05-20020 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of Relief Request Regarding Impracticality for Inservice Inspection for Certain Welds ML20136A5162020-05-15015 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance of License Amendment Request to Revise Technical Specifications Consistent with TSTF-412, Revision 3 ML20133J9662020-05-11011 May 2020 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 1 - Acceptance of License Amendment Regarding Changes to Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements ML20232B4562020-04-27027 April 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Fragility Questions ML20232B4432020-03-25025 March 2020 Request for Supporting Information for the D.C. Cook SPRA Audit Review - Plant Response Model Questions ML19345F9382019-12-0909 December 2019 D.C. Cook 50.54(f) SPRA Submittal - Completeness Review Done and Path Forward ML19333B8042019-11-29029 November 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-569 (L-2019-LLA-0248) ML19309F9212019-11-0505 November 2019 Request for Eportal Access for Audit Review of the DC Cook SPRA Supporting Documents ML19270E7372019-09-26026 September 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-421, Reactor Coolant Pump Flywheel Inspection Program ML19207A4642019-07-26026 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Delete Diesel Generator Load Test Resistor Banks ML19204A0962019-07-23023 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Request for Additional Information Related to Unit 2 Leak Before Break Analysis and Deletion of Containment Humidity Monitors for Unit Nos. 1 and 2 ML19211C3032019-07-0303 July 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 & 2 - Request for Additional Information Related to LAR to Address NSAL-15-1 ML19175A3032019-06-24024 June 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit No. 2 - Acceptance Review for LAR to Revise Battery Monitoring and Maintenance TS ML19092A4802019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Adopt TSTF-563 ML19092A4792019-04-0202 April 2019 NRR E-mail Capture - D.C. Cook Nuclear Plant Unit Nos. 1 and 2 - Acceptance Review for LAR to Address Issues Identified in Westinghouse Document NSAL-15-1 2024-08-01
[Table view] |
Text
From: Philpott, Stephen To: "jrwaters@aep.com" Cc: Valentin-Olmeda, Milton
Subject:
D.C. Cook 50.54(f) SPRA Submittal - Completeness Review Done and Path Forward Date: Monday, December 09, 2019 6:01:00 PM Good afternoon Joe, The purpose of this email is to inform you that: 1) the NRC staff has finished its completeness (similar to an acceptance) review of the D.C. Cook 50.54(f) seismic probabilistic risk assessment (SPRA) submittal (ADAMS Accession No. ML19310D805), 2) the submittal contains sufficient information to proceed to stage 2 - the detailed audit review, 3) to share our proposed review timeline, and 4) to request that information be provided on the DC Cook SPRA e-Portal audit folder to support the staffs detailed review of the submittal.
Completeness (Acceptance) Review The staff has completed its Completeness review (Stage 1) and has determined that sufficient information has been provided to proceed to Stage 2.
The tentative review schedule for the staffs review can be found below.
Proposed Review Timeline (subject to change)
Stage (1): Completeness Review - DONE Stage (2): Verify that SPRA is Suitable for Decision-Making and Develop Recommendation Prepare first draft of the Technical Review Checklist (ADAMS Accession No. ML17041A327) - March 2020 Clarification call with licensee and NRC staff (if needed) - March 2020 Updated Technical Review checklist using responses to clarification questions and determine tentative recommendation - June 2020 Technical Review Board Briefing - July 2020 Senior Management Review Panel (SMRP) Briefing - August 2020 Issue Staff Response Letter - September 2020, unless SMRP concludes that further evaluation (Stage 3) is needed
Request for e-Portal Information The staffs review of the SPRA report follows the generic audit plan dated July 6, 2017 (ADAMS Accession No. ML17177A446). The audit process is used to confirm statements in the SPRA submittal. To support the Staffs review, please make the following documents (or portions supporting the submittal) and information available in your e-Portal:
- 1. PWROG-18062-P, Revision 0 Peer Review of the D.C. Cook 1&2 Seismic Probabilistic Risk Assessment, dated January 2019. [Reference 6].
- 2. Report AEPDCC-00058-REPT-001, SPRA F&O Independent Assessment and Focused-Scope Peer Review, Donald C. Cook Nuclear Plant Units 1 and 2, Revision A. [Reference 64]
- 3. CNP Document 15C4313-RPT-002, Fragility Analysis Plan for Cook Nuclear Plant (CNP) Unit 1 & 2 Seismic PRA, Revision 3. [Reference 30]
- 4. CNP document 15C4313-RPT-003, Summary of Building Response Analysis for the Cook Nuclear Plant (CNP) Unit 1 & Unit 2 SPRA, Revision 4. [Reference 63]
- 5. CNP document 15C4313-CAL-010 Response Analysis of Auxiliary Building, Revision 3. [Reference 69]
- 6. Fragility Analysis Report [Reference 40 and any others]; specifically, appropriate documentation that shows estimation of fragility parameters for the following structures, systems, and components:
- a. Turbine Building Collapse, SF-NSCIBTB1 (Table 5.4-2).
- b. Seismic Induced Very Small LOCA, SF-VSLOCA (Table 5.4-2).
- c. Seismic Failure of Relay Group D_1, RELAY_D_1 (Table 5.4-2).
- d. Seismic Failure of Train CD Battery Rack, SF-BATCD (Table 5.4-2).
- e. SC-I Building Auxiliary Building, SF-SCIBAB (Table 5.5-2).
- f. Supplemental Diesel Generator System Components, SF-SDG (Table 5.5-2).
- g. Seismic-Induced Fire Originating from Boiler, SF-NSFIRE30 (Table 5.5-2).
- h. SC-I Building - Containment Building, SF-SCIBCONT (Table 5.5-2).
- i. Control Room Ceiling Section 3, SF-CRCEIL-3 (Table 5.5-2).
In addition, please include the structural analysis of the building where these components are located so that the staff can assess the process for development of the In-Structure Response Spectra (ISRS).
- 7. SPRA Peer Review Reports (Full-Scope, Focused-Scope, and Close-Out, as applicable) [if any others, in addition to References 6 and 64 noted above]
- 8. SPRA Human Reliability Analysis Notebook [Reference 47 and any others]
- 9. SPRA Plant Response Notebook
- 10. SPRA Quantification Notebook [Reference 12]
- 11. SPRA Modeling Notebook [Reference 50]
- 12. Seismic-Induced Fire and Flood Assessment
- 13. Uncertainty and Sensitivity, if separate from Quantification Notebook
- 14. SPRA Relay Chatter Impact Evaluation [Reference 46]
- 15. Internal Events PRA Peer Review Report (Full-Scope, Focused-Scope, and Close-Out, as applicable) [Reference 60, or any others]
- 16. Confirmation that the licensees SPRA model incorporates the latest resolutions to all IEPRA peer review finding level F&Os (open as well as closed). Provide justification that the exclusion of those resolutions from the SPRA as well as dispositions of open findings does not significantly change the corresponding results.
The rationale for requesting items 15 and 16 is to determine the acceptability of the base IEPRA model.
Please feel free to give me a call if you have any questions regarding this email of if you would like to discuss this request. Just to confirm for you, I will be the primary NRC project manager for this review, so you can reach out to me as your primary POC. Milton will still be involved as a backup resource, so he is still available as well.
We may have additional information needs in the near future and we will communicate those as the review progresses.
Please let me know as you are able upload these documents to the DC Cook SPRA audit folder.
Thank you in advance.
Respectfully, Steve Steve Philpott Project Manager Nuclear Regulatory Commission (NRR/DORL/LPMB) phone: 301-415-2365 e-mail: Stephen.Philpott@nrc.gov