(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML12073A151 | | | number = ML12073A151 |
| | issue date = 03/06/2012 | | | issue date = 03/06/2012 |
| | title = Discharge Headwall Project | | | title = NRR E-mail Capture - St. Lucie Discharge Headwall Project |
| | author name = Gless J | | | author name = Gless J |
| | author affiliation = Florida Power & Light Co | | | author affiliation = Florida Power & Light Co |
Line 77: |
Line 77: |
| If a sea turtle was to nest in a location within the project area where it could be disturbed, a relocation of the eggs to another area would be recommended. | | If a sea turtle was to nest in a location within the project area where it could be disturbed, a relocation of the eggs to another area would be recommended. |
|
| |
|
| LEGEND | | LEGEND 0 FDEP R- MONUMENTS WORK LIMITS DUNE PRESERVATION ZONE PERIMETER ROAD SILT FENCE PROPOSED SEAWALL TURTLE BARRIER(10' seaward of seawall) |
| #
| | PROPOSED DUNE FILL DISCHARGE CANAL 0 R-81 ATLANTIC OCEAN PERIMETER ROAD EFeet 60 0 60 120 PROJECT BOUNDARIES: PROJECT C2009-088 PROJECT BOUNDARIES TAYLOR ENGINEERING INC. ST. LUCIE NUCLEAR POWER ST. LUCIE NUCLEAR POWER PLANT 10151 DEERWOOD PARK BLVD PLAN DISCHARGE DISCHARGE CANAL HEADWALL CANAL HEADWALL DRAWN BY BLDG 300 SUITE 300 STABILIZATION STABILIZATION PROJECT PROJECT RC JACKSONVILLE, FL 32256 ST. LUCIE COUNTY, FL ST. LUCIE COUNTY, FL DATE FEB 2012}} |
| 0 FDEP R- MONUMENTS WORK LIMITS DUNE PRESERVATION ZONE PERIMETER ROAD SILT FENCE PROPOSED SEAWALL TURTLE BARRIER(10' seaward of seawall) | |
| PROPOSED DUNE FILL DISCHARGE CANAL | |
| #
| |
| 0 R-81 ATLANTIC OCEAN PERIMETER ROAD EFeet 60 0 60 120 PROJECT BOUNDARIES: PROJECT C2009-088 PROJECT BOUNDARIES TAYLOR ENGINEERING INC. ST. LUCIE NUCLEAR POWER ST. LUCIE NUCLEAR POWER PLANT 10151 DEERWOOD PARK BLVD PLAN DISCHARGE DISCHARGE CANAL HEADWALL CANAL HEADWALL DRAWN BY BLDG 300 SUITE 300 STABILIZATION STABILIZATION PROJECT PROJECT RC JACKSONVILLE, FL 32256 ST. LUCIE COUNTY, FL ST. LUCIE COUNTY, FL DATE FEB 2012}} | |
|
---|
Category:E-Mail
MONTHYEARML24002A7272023-12-16016 December 2023 NRR E-mail Capture - (External_Sender) November 2023 FPL Marine Turtle Removal Monthly Report ML23332A0352023-11-27027 November 2023 Conversion to Improved Technical Specifications Change in Estimated Review Schedule ML23326A0252023-11-20020 November 2023 NRR E-mail Capture - (External_Sender) October 2023 FPL Marine Turtle Removal Monthly Report ML24008A1582023-11-14014 November 2023 NRR E-mail Capture - (External_Sender) Psl Monthly Turtle Report for October 2023 ML23254A2852023-09-11011 September 2023 NRR E-mail Capture - (External_Sender) August 2023 FPL Marine Turtle Removal Monthly Report ML23243A9182023-08-31031 August 2023 NRR E-mail Capture - Re Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23243A9862023-08-31031 August 2023 NRR E-mail Capture - Draft RAIs for EP Staff Augmentation Times LAR (L-2022-LLA-0166) ML23228A1482023-08-16016 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PSL2-I5-RR-01 (L-2023-LLR-0038) ML23226A0762023-08-14014 August 2023 NRR E-mail Capture - Request for Additional Information - St. Lucie Plant, Units 1 and 2 - Adopt 10 CFR 50.69 (L-2022-LLA-0182) ML23226A0692023-08-12012 August 2023 NRR E-mail Capture - (External_Sender) July 2023 FPL Marine Turtle Removal Monthly Report ML23223A0152023-08-11011 August 2023 NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039) ML23191A1952023-07-10010 July 2023 NRR E-mail Capture - (External_Sender) June 2023 FPL Marine Turtle Removal Monthly Report ML23216A1412023-06-30030 June 2023 August 2023 RP Inspection Document Request ML23248A1292023-06-29029 June 2023 NRR E-mail Capture - St Lucie 50.69 - Additional Audit Questions ML23198A0662023-06-22022 June 2023 NRR E-mail Capture - (External_Sender) Green Turtle Nest on Canal Bank, June 2023 ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23198A0642023-06-12012 June 2023 NRR E-mail Capture - (External_Sender) Loggerhead Nest on Canal Bank, May 2023 ML23163A1732023-06-10010 June 2023 NRR E-mail Capture - (External_Sender) May 2023 FPL Marine Turtle Removal Monthly Report ML23163A1222023-05-30030 May 2023 NRR E-mail Capture - (External_Sender) Nest on Intake Canal Bank ML23137A0942023-05-17017 May 2023 NRR E-mail Capture - Audit Plan - St Lucie Plant, Units 1 and 2 - 10 CFR 50.69 LAR ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23135A0292023-05-12012 May 2023 NRR E-mail Capture - (External_Sender) April 2023 FPL Marine Turtle Removal Monthly Report ML23129A8312023-05-0808 May 2023 NRR E-mail Capture - Audit Plan - St. Lucie ITS Conversion LAR - Setpoints ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23198A1592023-04-0707 April 2023 NRR E-mail Capture - (External_Sender) March 2023 FPL Marine Turtle Removal Monthly Report ML23074A2292023-03-15015 March 2023 NRR E-mail Capture - (External_Sender) February 2023 FPL Marine Turtle Removal Monthly Report ML23041A2262023-02-10010 February 2023 NRR E-mail Capture - (External_Sender) January 2023 FPL Marine Turtle Removal Monthly Report ML23065A1142023-02-0101 February 2023 NRR E-mail Capture - (External_Sender) FPL St. Lucie Plant Biological Opinion SERO-2019-03494 - Submittal ML23254A4022023-01-24024 January 2023 RP Inspection_2023-001_Document Request ML23019A0142023-01-18018 January 2023 NRR E-mail Capture - (External_Sender) Regarding St. Lucie Olive Ridley Capture 1/3/2023 ML23006A1882023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) December 2022 FPL Marine Turtle Removal Monthly Report ML23006A1822023-01-0606 January 2023 NRR E-mail Capture - (External_Sender) Psl Smalltooth Sawfish Capture 1/5/23 ML23006A0242023-01-0505 January 2023 NRR E-mail Capture - (External_Sender) Psl Olive Ridley Capture 1323 ML23019A2052022-12-24024 December 2022 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors - Acceptance Review ML22348A1002022-12-14014 December 2022 NRR E-mail Capture - (External_Sender) November 2022 FPL Marine Turtle Removal Monthly Report ML22325A0682022-11-18018 November 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA RAI Set 4 ML22319A0762022-11-15015 November 2022 NRR E-mail Capture - (External_Sender) October 2022 FPL Marine Turtle Removal Monthly Report ML22285A2222022-10-12012 October 2022 NRR E-mail Capture - (External_Sender) September 2022 FPL Marine Turtle Removal Monthly Report ML22270A1492022-09-26026 September 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 2 - Class 1 Fatigue ML22286A1612022-09-16016 September 2022 August 2022 FPL St. Lucie Marine Turtle Removal Report ML22234A1552022-08-22022 August 2022 NRR E-mail Capture - (External_Sender) July 2022 FPL Marine Turtle Removal Monthly Report ML22227A0522022-08-15015 August 2022 NMFS to NRC, Transmittal of Final Biological Opinion for Continued Operation of St. Lucie Nuclear Power Plant ML22217A0022022-08-0404 August 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA Second Round RAI Letter 1) ML22210A0782022-07-22022 July 2022 Stl 2022003 Document Request ML22194A0482022-07-12012 July 2022 NRR E-mail Capture - (External_Sender) June 2022 FPL Marine Turtle Removal Monthly Report ML22193A0862022-07-11011 July 2022 Email - St. Lucie SLRA - Request for Additional Information Set 3 ML22165A2992022-06-14014 June 2022 NRR E-mail Capture - (External_Sender) May 2022 FPL Marine Turtle Removal Monthly Report ML22147A0862022-05-26026 May 2022 Email from Brian Harris (NRC) to Robert Coffey (FPL) - St. Lucie SLRA - RCI Set 1 2023-09-11
[Table view] Category:Graphics incl Charts and Tables
MONTHYEARML22013A3172022-01-12012 January 2022 Trp 030 - St. Lucie SLRA Breakout Questions_Fuel Oil ML22013A3162022-01-12012 January 2022 Trp 020 - St. Lucie SLRA Breakout Questions_Occw ML22013A3342022-01-11011 January 2022 TRP16 - St. Lucie SLRA Breakout Questions_Pwr Internals ML22012A3912022-01-11011 January 2022 Scoping and Screening 2.3.3.2 & 2.3.3.4 St. Lucie SLRA - Breakout Questions ML22013A3072022-01-11011 January 2022 Trp 084 St Lucie SLRA - Ssnial Scclombreakoutq ML22012A2632022-01-10010 January 2022 Trp 3 - St. Lucie Psl SLRA Breakout Question Reactor Head Closure Stud Bolting ML22010A0972022-01-0707 January 2022 Trp 038 Psl Internal Surfaces Breakout Questions - Allik ML22010A1002022-01-0707 January 2022 Trp 033 Psl Selective Leaching Breakout Questions - Allik ML21356A5772021-12-22022 December 2021 Slar Breakout Questions - Fire Protection Scoping and Screening ML22013A3052021-12-21021 December 2021 Trp 143.4 St Lucie SLRA - Breakout Questions HELB ML22013A3042021-12-21021 December 2021 Trp 143.3 St Lucie SLRA - Breakout Questions EAF ML22013A3032021-12-21021 December 2021 Trp 143.2 St Lucie SLRA - Breakout Questions Non-Class 1 Fatigue ML22013A3022021-12-21021 December 2021 Trp 143.1 St Lucie SLRA - Breakout Questions Class 1 Fatigue ML22013A3012021-12-21021 December 2021 TRP60 St. Lucie SLRA - Breakout Questions Fatigue Monitoring ML22013A2972021-12-21021 December 2021 Trp 77 St. Lucie SLRA - Breakout Questions Corrosion Structural ML22013A2962021-12-21021 December 2021 Trp 74 St. Lucie SLRA - Breakout Questions ML22013A2952021-12-21021 December 2021 Trp 47 St. Lucie SLRA - Breakout Questions ML22013A2942021-12-21021 December 2021 Trp 46 St. Lucie SLRA - Breakout Questions Structures Monitoring ML22013A2922021-12-21021 December 2021 Trp 41 St. Lucie SLRA - Breakout Questions ML22013A2882021-12-21021 December 2021 Trp 23 & 147.8 St. Lucie SLRA - Breakout Questions Cranes AMP-TLAA ML22013A2842021-12-21021 December 2021 Trp 18 St. Lucie SLRA - Breakout Questions Bolting Integrity ML22013A2822021-12-21021 December 2021 SLRA - Breakoutt Questions Corrosion OE ML21354A8372021-12-20020 December 2021 Trp 11 St. Lucie SLRA Breakout Questions ML21351A2382021-12-17017 December 2021 Trp 148.1 St. Lucie SLRA - Breakout Questions for TLAA Section 4.7.1 Rev. 1 ML21351A2412021-12-17017 December 2021 Trp 15 St. Lucie SLRA - Internal Coatings Breakout Questions - Allik ML21351A2392021-12-17017 December 2021 Trp 14 St. Lucie SLRA - Buried Pipe Breakout Questions - Allik.Docx L-2021-137, GL 2004-02 Debris Transport Calculation Non-Conservatism2021-07-23023 July 2021 GL 2004-02 Debris Transport Calculation Non-Conservatism L-2018-067, Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table2018-03-19019 March 2018 Units 1 and 2 - Submittal of Joint Plant Access Shared Information Table L-2016-109, Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information2016-05-11011 May 2016 Official Service List Changes and Distribution for Safeguards Information and Official Use Only-Security-Related Information ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML15224B4492015-09-0303 September 2015 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15236A0762015-09-0303 September 2015 Enclosure, Revised St Lucie Tables-LQ-W ML15231A4122015-08-21021 August 2015 FPL St. Lucie Capture Summary 2015 ML15231A4172015-08-21021 August 2015 Power Plant Causal Turtles L-2015-093, Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report2015-03-24024 March 2015 Acceptance Criteria for Emergency Core Cooling Systems for Light Water Nuclear Power Reactors 10 CFR 50.46 Annual Report L-2014-340, RAI Reply - Fourth Ten-Year Interval Unit 2 Relief Request No. 42014-11-0606 November 2014 RAI Reply - Fourth Ten-Year Interval Unit 2 Relief Request No. 4 L-2013-067, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20122013-02-14014 February 2013 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2012 ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 ML12073A1512012-03-0606 March 2012 NRR E-mail Capture - St. Lucie Discharge Headwall Project L-2010-096, Extended Power Uprate Data for NRC Confirmatory EPU Analyses2010-06-0404 June 2010 Extended Power Uprate Data for NRC Confirmatory EPU Analyses L-2009-078, Extended Power Uprate Data for NRC Confirmatory EPU Analyses2009-04-0202 April 2009 Extended Power Uprate Data for NRC Confirmatory EPU Analyses L-2008-236, Extended Power Uprate, Data for NRC Confirmatory EPU Analyses2008-10-29029 October 2008 Extended Power Uprate, Data for NRC Confirmatory EPU Analyses L-2008-178, Fourth Ten-Year Interval In-Service-Test Program Submittal RAI Reply to Relief Request PR-042008-08-0505 August 2008 Fourth Ten-Year Interval In-Service-Test Program Submittal RAI Reply to Relief Request PR-04 ML0810502642008-03-19019 March 2008 NDE Report, on PSL-1 Pressurizer Nozzles, Attachment 2 ML0808506472008-03-19019 March 2008 NDE Report on PSL-1 Pressurizer Nozzles L-2008-018, Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection Results2008-02-21021 February 2008 Transmittal of Pressurized Butt Weld Alloy Report, and Mitigation Status and Swol Inspection Results L-2008-002, Corporate Merger of Decommissioning Trustee2008-01-0303 January 2008 Corporate Merger of Decommissioning Trustee ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists ML0526603212005-09-21021 September 2005 Tech Spec Pages for Amendment No. 196, Extension of the Reactor Coolant System Pressure/Temperature Curve Limits L-2004-293, Third 10-Year Inservice Inspection Interval Relief Request No. 2 Supplemental Information2004-12-28028 December 2004 Third 10-Year Inservice Inspection Interval Relief Request No. 2 Supplemental Information 2022-01-07
[Table view] Category:Letter
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] Category:Map
MONTHYEARML21286A6222021-10-27027 October 2021 Achp - Request for Scoping Comments Concerning the Environmental Review of St. Lucie Plant, Units 1 and 2 Subsequent License Renewal Application ML21287A1132021-10-22022 October 2021 Shpo - Request for Scoping Comments Concerning the Environmental Review of St. Lucie Plant, Units 1 and 2 Subsequent License Renewal Application L-2021-073, Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit2021-04-16016 April 2021 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit ML13360A2022013-12-12012 December 2013 EPA Echo Report Martin County, Fl ML12073A1512012-03-0606 March 2012 NRR E-mail Capture - St. Lucie Discharge Headwall Project ML18127B1491976-10-11011 October 1976 Response to Letter of 8/10/1976, Submits Answers to Beach Survey ML18127B1541976-09-29029 September 1976 Enclosed Is Final Design Drawing of Erosion Protection of Discharge Canal Peninsular Which Is Submitted for Review in Accordance with Letter of 6/22/1976 ML18127B6881975-05-0909 May 1975 Figure Q2.27-4 Topography South of Site. 2021-04-16
[Table view] |
Text
NRR-PMDA-ECapture Resource From: Gless, Jodie [Jodie.Gless@fpl.com]
Sent: Tuesday, March 06, 2012 2:40 PM To: Logan, Dennis Cc: Foster, Stacy; Hollowell, Ed; Frehafer, Ken; Cocotos, Peter; Orr, Franklin; MORGAN, Gary
Subject:
St. Lucie Discharge Headwall Project Attachments: 10 year nesting totals O_N.xlsx; 2004 to 2011 Monthly Nesting Data.xlsx; Seawall Boundary Figure.pdf; FDEP CCCL Seawall Permit 12-6-11 exp 2014.pdf; PSL Discharge Headwall Project.doc; Nesting segments.pdf Hi Dennis, FPL put together a narrative explaining the need, purpose and description of the project, as well as the proposed conditions for work and the species considered. In the narrative, nesting numbers, a figure and a map are referenced.
They are all attached to this email. I have also attached the FDEP CCCL permit.
Jeff Howe, from the Fish and Wildlife Service, has been involved in the project. He is aware that we are sending you the attached information. His contact information is 772-562-3909 X 283 and Jeffrey_Howe@fws.gov.
Please contact me if you need any additional information.
Thank you, Jodie Jodie Gless Florida Power & Light Company Environmental Services 561-691-2801 office 561-358-0374 cell Jodie.Gless@fpl.com 1
Table 1. The total number of sea turtle nests observed and the number marked for productivity analysis in each of the 1km zones "N" and "O" delineated by species for the past ten years.
Cc Cm Dc Total Nests Obs Nests Marked Total Nests Obs Nests Marked Total Nests Obs Nests Marked N O N O N O N O N O N O
- 1. 2002 220 239 3 5 14 6 4 0 7 2 2 0
- 2. 2003 152 202 2 10 2 7 0 3 12 8 1 1
- 3. 2004 162 167 4 4 8 7 0 0 8 6 2 0
- 4. 2005 206 204 4 5 13 14 1 2 8 3 1 0
- 5. 2006 92 142 2 4 4 5 0 0 6 3 6 2
- 6. 2007 144 86 2 1 12 7 0 1 7 4 0 0
- 7. 2008 152 172 2 6 7 11 0 3 7 4 0 0
- 8. 2009 129 164 3 1 10 8 3 1 12 13 1 3
- 9. 2010 233 168 10 3 9 17 2 4 6 2 0 0
- 10. 2011 242 301 7 8 26 42 2 5 7 5 4 0
March April May June July August September Zone O N O N O N O N O N O N O N Average nests per year for each month 2004 Cc 0 0 0 0 31 20 51 65 50 65 32 12 0 0 Zone March Cm 0 0 0 0 0 0 0 2 4 3 3 2 0 1 O 0.125 Dc 0 0 1 2 3 2 2 4 0 0 0 0 0 0 N 0.375 2005 Cc 0 0 0 0 27 30 75 93 83 62 18 21 0 0 April Cm 0 0 0 0 0 0 1 1 8 10 5 2 0 0 O 1.5 Dc 0 0 1 1 1 3 1 4 0 0 0 0 0 0 N 1.875 2006 Cc 0 0 0 0 34 19 44 38 50 29 14 6 0 0 May Cm 0 0 0 0 0 0 1 1 1 1 3 2 0 0 O 26.75 Dc 0 0 0 2 1 3 2 1 0 0 0 0 0 0 N 23.375 2007 Cc 0 0 0 0 12 17 30 60 29 46 14 19 1 0 June Cm 0 0 0 0 0 0 0 1 3 3 4 7 0 1 O 73 Dc 0 2 2 1 1 2 1 2 0 0 0 0 0 0 N 78.125 2008 Cc 0 0 0 0 24 19 80 65 52 48 16 19 0 0 July Cm 0 0 0 0 0 0 3 2 5 5 2 0 1 0 O 66.25 Dc 0 0 1 2 2 4 1 1 0 0 0 0 0 0 N 61.875 2009 Cc 0 0 0 0 9 15 79 55 58 45 17 13 1 0 August Cm 0 0 0 0 0 0 1 1 1 3 2 5 4 1 O 25 Dc 0 1 3 3 5 4 5 3 0 1 0 0 0 0 N 21.875 2010 Cc 0 0 0 0 11 19 59 103 70 80 28 30 0 1 September Cm 0 0 0 0 0 0 2 0 7 4 6 4 2 1 O 1.25 Dc 0 0 1 1 1 1 0 3 0 1 0 0 0 0 N 0.75 2011 Cc 0 0 1 0 50 28 134 109 90 79 26 26 0 0 Cm 0 0 0 0 1 0 12 9 18 9 10 7 1 1 Dc 1 0 2 3 1 1 0 2 1 1 0 0 0 0 TOTAL NEST= 1 3 12 15 214 187 584 625 530 495 200 175 10 6
St. Lucie Discharge Headwall Project Need for the Project A series of storms and hurricanes - Frances (2004), Jeanne (2004) and Wilma (2005) - have caused dune and beach erosion seaward of the discharge canal of the Florida Power and Light Company (FPL) St.
Lucie Nuclear Plant on Hutchinson Island in St. Lucie County. The damage eroded a critical area in front of the discharge canal. To protect the canal, FPL subsequently constructed several dune restoration projects, but storms have repeatedly eroded these repair attempts.
Purpose of the Project FPL proposes to protect the open coast shoreline fronting the discharge canal and northern headwall through construction of a sheet pile seawall. The seawall will provide an immediate protective barrier against an encroaching shoreline. In order for the work to be completed prior to the next hurricane season, work needs to be conducted during sea turtle nesting season. Since work will be conducted on the beach, which is known sea turtle nesting habitat for leatherback, loggerhead and green sea turtles, Jeff Howe from the Fish and Wildlife Service has indicated that the project may affect and is likely to adversely affect sea turtle nesting. An incidental take statement will be required to perform nesting relocations for construction purposes in the area of the sheet pile installation.
Description of Project A sand dune was placed seaward of the proposed seawall prior to the start of turtle nesting season (March 1). The sand restored the dune profile, which is approximately 45 feet from top to toe, and provides a stable work area for the construction of the seawall, immediately adjacent to the access road. The proposed seawall location will provide a rigid coastal structure to provide hurricane protection for FPLs St. Lucie Nuclear Plant discharge canal.
After March 1st, an approximately 7 to 10 foot area directly adjacent to the seaward side of the wall will be required for construction of the seawall. This area is required to support the following equipment and work activities.
- 1. A small drill rig and associated support (wood cribbing) used to drill in the tieback rods for the seawall may encroach, or extend into this area.
- 2. The sheet pile installer, which rides on top of the installed sheets will extend over this area directly adjacent to the seaward side of the wall but will not be putting pressure on the sand in this area. The initial sheet installation that requires the equipment to be supported on the ground will be started on the wing walls that are west of the rigid coastal structure, i.e. the north south portion of the proposed seawall. This equipment does not use vibration or a hammer to install the sheet pile. Reference http://www.giken.com/en/press-in/principle/ for information on the sheet pile installation process. As an additional precaution, FPL has employed an independent engineering company, Dunkelberger Engineering, to perform vibration monitoring during the installation process.
- 3. Some minor excavation, less than 4-5 feet in depth along the length of the wall will be required for form work and installation of the concrete tie beam at the top of the sea wall.
- 4. All other work in this 7-10 ft area directly adjacent to the seaward side of the wall will be construction foot traffic and hand tools, associated with installation of the tieback rods, and construction of the concrete tie beams.
Other than the work described above, the construction of the seawall will be able to be supported from the west side of the rigid coastal structure, i.e. the north south portion of the proposed seawall.
To provide a safe work area for people that may be walking on the beach and to provide a visible boundary of the work area for the contractor, FPL may install a fence approximately 10 ft east of the proposed location of the seawall. See attached Seawall Boundary Figure for location of proposed fence, identified as turtle barrier on the sketch.
The seawall sheet pile and anchor installation is scheduled to be completed prior to May 1st, with the remainder of the work, i.e.- concrete cap, anchor tensioning, and sheet pile bracing, scheduled to be complete by the middle of June.
Proposed conditions for work:
- As of March 1 and not later than April 30, FPL may conduct work on the beach under the following conditions:
o Work activities may occur no farther than 10 ft seaward of the coastal structure.
o No open trenches shall be left unattended. Any trenches open at the end of the workday shall be filled in to grade.
o The work area will be surveyed in accordance with the sea turtle protection plan prepared for St. Lucie County Development Review Board and provided as part of the permit application package. Night time turtle monitoring will be performed as requested by Florida Fish and Wildlife Conservation Commission.
o All nests within the ongoing construction survey area (600 feet) shall be marked with a protective barrier.
o If a nest occurs in zones O or N, specific marking requirements will be determined on a case-by-case basis through consultation with FWC/FWS.
o No nest may be relocated to accommodate construction activity unless an incidental take statement to relocate nest is obtained from FWS. If an incidental take statement is obtained, FPL will coordinate with FWC and FWS prior to nest relocation.
o FWC and FWS shall be contacted if a sea turtle emergence occurs in the project area during the construction period, including final dune planting activities.
o If FPL chooses to construct a fence to limit public access to the work area The fence will include posts imbedded in the sand (including no concrete or other similar post support material) spaced approximately 8 to 10 ft apart. The fence material will comprise orange plastic fencing or chain link fencing.
At sundown the fencing bottom elevation must occur no less than three feet above the surface of the beach/dune. The fence should be removed, rolled up, or otherwise modified to ensure night access to nesting sea turtles.
- As of May 1, no work will occur seaward of the seawall except as described below. Work may continue without restriction landward of the seawall.
o As of May 1 and no later than May 30, excavation may occur up to 2 feet seaward of the installed sheetpile to allow for construction of the seawall cap. All excavation shall be done by hand, and all pits/trenches shall be filled to grade by hand no later than sunset each day.
o FPL shall instruct the contractor to finish the more seaward sections of cap (those sections of the seawall cap parallel to the shoreline) first, then complete cap work on the wing walls extending landward. All excavation work for cap construction shall be completed by May 30.
o After May 30 only dune planting may occur seaward of the wall.
o The work area will be surveyed in accordance with the sea turtle protection plan prepared for St. Lucie County Development Review Board and provided as part of the permit application package. Night time turtle monitoring will be performed as requested by Florida Fish and Wildlife Conservation Commission.
o All nests within the ongoing construction survey area (600 feet) shall be marked with a protective barrier.
o If a nest occurs in zones O or N, specific marking requirements will be determined on a case-by-case basis through consultation with FWC/FWS.
o No nest may be relocated to accommodate construction activity unless an incidental take statement to relocate nest is obtained from FWS. If an incidental take statement is obtained, FPL will coordinate with FWC and FWS prior to nest relocation. FWC and FWS shall be contacted if a sea turtle emergence occurs in the project area during the construction period, including final dune planting activities.
- FPL will send FWC and FDEP permit compliance manager for the project a weekly email updating progress on the project.
- Turtle survey will continue through the entire nesting season.
Species Considered As stated earlier, the project area is known nesting habitat for leatherback, loggerhead and green sea turtles. The beach is separated into 1km segments for monitoring purposes. Since the border between N and O is directly in front of the discharge canal, the proposed project is located in both of the segments (see attached map). Spreadsheets have been provided with nesting data for all three species in the 1km beach segments N and O. However, it is worth noting that the construction will only take place on 400 ft (North to South) of the beach.
If a sea turtle was to nest in a location within the project area where it could be disturbed, a relocation of the eggs to another area would be recommended.
LEGEND 0 FDEP R- MONUMENTS WORK LIMITS DUNE PRESERVATION ZONE PERIMETER ROAD SILT FENCE PROPOSED SEAWALL TURTLE BARRIER(10' seaward of seawall)
PROPOSED DUNE FILL DISCHARGE CANAL 0 R-81 ATLANTIC OCEAN PERIMETER ROAD EFeet 60 0 60 120 PROJECT BOUNDARIES: PROJECT C2009-088 PROJECT BOUNDARIES TAYLOR ENGINEERING INC. ST. LUCIE NUCLEAR POWER ST. LUCIE NUCLEAR POWER PLANT 10151 DEERWOOD PARK BLVD PLAN DISCHARGE DISCHARGE CANAL HEADWALL CANAL HEADWALL DRAWN BY BLDG 300 SUITE 300 STABILIZATION STABILIZATION PROJECT PROJECT RC JACKSONVILLE, FL 32256 ST. LUCIE COUNTY, FL ST. LUCIE COUNTY, FL DATE FEB 2012