Text

St. Lucie SLRA: Breakout Questions SLRA Section B.2.3.13, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems TRP 023 TLAA: 4.7.6 Crane Load Cycle Limits.

TRP: 147.8 Note: Breakout Questions are provided to the applicant and will be incorporated into the publicly-available audit report.

Technical Reviewer Ata Istar 12/14/2021 Technical Branch Chief Joseph Colaccino 12/17/21 Breakout Session Date/Time To be filled in by PM Applicant Staff NRC staff To be filled out by PM during breakout Question Number SLRA Section SLRA Page Background / Issue (As applicable/needed)

Discussion Question / Request Outcome of Discussion 1

B.2.3.13 B-113 SLRA Section B.2.3.13 states The PSL Inspection of Overhead Heavy Load and Light Load (Related to Refueling)

Handling Systems AMP is an existing AMP that was evaluated as a portion of the PSL Structures Monitoring (Section B.2.3.33) AMP in the initial license renewal application.

SLRA AMP basis document NEESL00008-REPT-063, Revision 0, Section 4.1 Scope of Program, lists the load handling systems for Units 1 and 2.

Clarify whether all the load handling systems are considered for periodic structural monitoring in ADM-17.32.

ADM-17.32, Structures Monitoring Program, Revision 7, Attachment 1, License Renewal Scope: Structural System/Components, lists some of the load handling systems under Component/Commodity, It is not clear whether all the load handling systems listed in SLRA AMP basis document, NEESL00008-REPT-063, Revision 0, are considered for periodic monitoring in ADM-17.32, Structures Monitoring Program, Revision 7.