St. Lucie SLRA: Breakout Questions SLRA Section B.2.3.13, Inspection of Overhead Heavy Load and Light Load (Related to Refueling) Handling Systems TRP 023 TLAA: 4.7.6 Crane Lo ad Cycle Limits.

TRP: 147.8

Note: Breakout Questions are provided to the applicant and will be incorporated into the publicly-available audit report.

Technical Reviewer Ata Istar 12/14/2021 Technical Branch Chief Joseph Colaccino 12/17/21 Breakout Session Date/Time To be filled in by PM

Applicant Staff NRC staff To be filled out by PM during breakout

Question SLRA SLRA Background / Issue Discussion Question / Request Outcome of Discussion Number Section Page (As applicable/needed) 1 B.2.3.13 B-113 SLRA Section B.2.3.13 states The PSL Clarify whether all the load Inspection of Overhead Heavy Load and handling systems are Light Load (Related to Refueling) considered for periodic Handling Systems AMP is an existing structural monitoring in ADM-AMP that was evaluated as a portion of 17.32.

the PSL Structures Monitoring (Section B.2.3.33) AMP in the initial lic ense renewal application.

SLRA AM P basis document NEESL00008-REPT-063, Revision 0, Section 4.1 Scope of Program, lists the load handling systems for Units 1 and 2.

ADM-17.32, Structures Monitoring Program, Revision 7, Attachment 1,

License Renewal Scope: Structural System/Components, lists some of the load handling systems under Component/Commodity,

It is not clear whether all the load handling systems listed in SLRA AMP basis document, NEESL00008-REPT-063, Revision 0, are considered for periodic monitoring in ADM-17.32, Structures Monitoring Program, Revision 7.