Notification of St. Lucie Units 1 & 2 – Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request
ML23184A035
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/30/2023
From:
Division of Reactor Safety II
To: Coffey R
Florida Power & Light Co
References
IR 2023010
Download: ML23184A035 (7)


See also: IR 05000335/2023010

Text

June 30, 2023

Mr. Robert Coffey

Vice President, Nuclear Division

and Chief Nuclear Officer

Florida Power & Light Company

Mail Stop: EX/JB

700 Universe Blvd.

Juno Beach, FL 33408

SUBJECT: NOTIFICATION OF ST. LUCIE UNITS 1 & 2 - FOCUSED ENGINEERING

INSPECTION (FEI) 05000335/2023010 AND 05000389/2023010 AND INITIAL

INFORMATION REQUEST

Inspection Procedure:

71111.21N,03, Focused Engineering Inspection (FEI),

Attachment 21N.03, Commercial Grade Dedication, dated June

28, 2022 (ADAMS ML22075A251)

Inspection Report: 05000335/2023010 AND 05000389/2023010

(Standalone Inspection Report)

Inspectors:

T. Fanelli (Lead)

J. Hamman (Elec/CGD)

Inspect 3 (TBD)

The purpose of this letter is to notify St. Lucie that three inspectors from Region II will conduct

an inspection at your site in accordance with Inspection Procedure 71111.21N.03, Focused

Engineering Inspection (FEI), Attachment 21N.03, Commercial Grade Dedication,

Commercial Grade Dedication. This is not considered a team inspection. The inspection will

evaluate Watts Bars process for dedicating commercial-grade items, as required in applicable

portions of Appendix B to Title 10 of the Code of Federal Regulations (10 CFR) Part 50

(Appendix B), to ensure reasonable assurance is provided that these items will perform their

intended safety function. Additionally, this inspection will evaluate implementation of Watts

Bars procurement process for safety-related components, as required in Appendix B. The

inspectors will select samples of components that are risk significant and within the scope of the

program.

During a 6/30/2023, phone call Mr. Tim Falkiewicz, PSL Regulatory Affairs, we confirmed

arrangements for an information-gathering site visit and the two-week onsite inspection. The

schedule is as follows:

Information Gathering Visit: November 6, 2023; Preparation Week: November 20, 2023.

Onsite Weeks of November 27 and December 11, 2023.

On November 6, 2023, Mr. Theo Fanelli, a Senior Reactor Inspector from the NRCs Region II

office, will begin the inspection with an information gathering visit to the site. The purpose of the

R. Coffey

2

visit is to become familiar with the process for dedicating commercial-grade items and the

process for procuring safety-related components at ST. Lucie. This visit may include a tour of

onsite commercial-grade item dedication facilities, receipt inspection facilities, storage facilities,

and installed plant components associated with potential inspection samples. During the visit,

the team lead will also review the information provided in the initial information request to select

a list of potential inspection samples. The team lead may also identify other information needed

to support the inspection during this visit.

To minimize the impact on your staff and to ensure a productive inspection, we have enclosed

two separate requests for information needed prior to the onsite information gathering visit and

offsite inspection preparation week. The first request (Enclosure 1) is generally for information

that will be used to choose the inspection samples or information that will be applicable to all

inspection samples throughout the inspection. This information should be made available to the

team lead prior to the information gathering visit. The second request (Enclosure 2) is for

information specific to individual samples and should be made available prior to the offsite

preparation week.

Please provide the information requested in Enclosure 1 to the Region II Office or a file sharing

site by October 30, 2023. Additional documents may be requested during the information

gathering visit. The inspectors will try to minimize your administrative burden by specifically

identifying only those documents required for inspection preparation. The additional information

should be provided to the Inspectors in the Region II office or a file sharing site by November

20, 2023.

During the information gathering visit, Mr. Fanelli will also discuss the following inspection

support administrative details: (1) availability of knowledgeable plant engineering and licensing

personnel to serve as points of contact during the inspection, (2) method of tracking inspector

requests during the inspection, (3) computer access, (4) working space, (5) arrangements for

site access, and (6) other applicable information.

R. Coffey

3

INFORMATION REQUEST FOR ST. LUCIE UNITS 1 & 2 - FOCUSED ENGINEERING

INSPECTION (FEI) COMMERCIAL GRADE DEDICATION

Prior to the information gathering visit, please provide the information electronically in .pdf

files, Excel, or other searchable format on CDROM (or FTP site, SharePoint, etc.). The

CDROM (or website) should be indexed and hyperlinked to facilitate ease of use.

Contact Information: T. Fanelli

(404) 997-4433

tnf1@nrc.gov

Information Gathering Visit: An information gathering visit is currently scheduled the week of

November 6, 2023. During this visit, we would like to identify the component samples for this

inspection. Wed like to meet with procurement and dedication specialists to discuss the

upcoming inspection and our sample selection process. Purposes of the site visit are to: (a)

discuss the scope of the planned inspection; (b) obtain advance information to review in

preparation for the inspection; (c) ensure that the information to be reviewed is available at the

beginning of the inspection; and (d) verify that logistical issues (such as obtaining both site and

computer system access and arranging the location of the inspection team working area) will be

resolved prior to inspector arrival. Please reserve a room during the scheduled inspection

dates. We request the room have a telephone, wireless internet access, and a licensee

computer with access to procedures, corrective action program documents, and a printer.

Logistics:

Information gathering visit: week of November 6, 2023

Onsite inspection weeks: weeks of November 27 and December 11, 2023

Please schedule an entrance meeting for around 2:00 p.m. on Monday, November 27, 2023

(approximately 15 minutes). The date and time of the exit meeting will be discussed later. In

addition, Id like to have a daily debrief with your inspection support staff at a convenient time in

the afternoons for both onsite inspection weeks (Time TBD, approximately 30 minutes).

We will need a conference room as workspace for the inspectors. We will also need an area

available for conducting interviews.

Please provide access to your document system (preferably at least one computer in our

conference room), nearby printers, and Wi-Fi access.

During the information gathering visit, please provide info on (1) conference room location &

phone number, (2) cafeteria location/hours, and (3) procurement and engineering staff normal

working hours. Also, please let me know if there are any potential resource conflicts during our

scheduled inspection weeks (Fridays off, EP drills, management retreats) and well do our best

to accommodate.

R. Coffey

4

Team Members:

Theo Fanelli (Inspection Lead)

J. Hamman (Elec/CGD)

Inspect 3 (TBD)

Please verify the status of access authorization and requirements for unescorted access for

each inspector. Please provide me with a list of exceptions, and I will address them.

PAPERWORK REDUCTION ACT STATEMENT

This letter contains voluntary information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). The burden to the public

for these information collections is estimated to average 60 hours6.944444e-4 days <br />0.0167 hours <br />9.920635e-5 weeks <br />2.283e-5 months <br /> per response. Send

comments regarding this information collection to the Information Services Branch, Office of the

Chief Information Officer, Mail Stop: T6A10M, U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk

Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of

Management and Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to, a request

for information or an information collection requirement unless the requesting document

displays a currently valid OMB control number.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Enclosure

Documents Requested Prior to Information Gathering Visit

The documents and information requested below should generally be made available to the

inspection team for the team's use both on-site and off-site during the information gathering

visit. Electronic format is the preferred media. If electronic media is made available via an

internet-based remote document management system, then the remote document access must

allow inspectors to download, save, and print the documents in the NRC's regional office.

Electronic media on compact disc or paper records (hard copy) are acceptable. At the end of

the inspection, the documents in the team's possession will not be retained.

This document request is based on typical documents that a generic plant might have. As such,

it is not meant to imply that any specific plant is required to have all the listed documents. In

addition, your plant specific document titles may vary from the document titles listed below. We

also request that the information provided be sorted by the list below.

Documents requested by October 30, 2023:

1. Licensing basis documents such as the updated final safety analysis report and

technical specifications.

2. Procedures for dedicating commercial-grade items and for procurement of safety-related

components. Procedure controlling counterfeit, fraudulent, and suspect items.

3. List of commercial-grade items, with a brief description of application, that have been

dedicated for safety-related applications. These items may be dedicated by Site or

dedicated by a vendor (or another licensee) and procured by the Site. Please note

whether the item has been installed in the plant. The list should encompass the past six

years of dedication activities.

4. List of any commercial grade-items that failed after completing the dedication process.

The list should encompass the past six years of dedication activities.

5. List of components procured as safety-related, with descriptions, if not included above.

Please note whether the item has been installed in the plant. The list should encompass

the past six years of procurement activities.

6. List of corrective action program documents, with descriptions, related to commercial-

grade items, procurement, or storage, including any items that failed after completing the

dedication process. The list should encompass the past six years of these activities.

7. List of systems, system numbers/designators, and corresponding names.

2

Documents Requested Prior to Inspection Preparation Week

For the samples identified by the team lead, the documents and information requested below

should generally be made available to the inspection team for the team's use both on-site and

off-site during the inspection. Electronic format is the preferred media. If electronic media is

made available via an internet-based remote document management system, then the remote

document access must allow inspectors to download, save, and print the documents in the

NRC's regional office. Electronic media on compact disc or paper records (hard copy) are

acceptable. At the end of the inspection, the documents in the team's possession will not be

retained.

This document request is based on typical documents that a generic plant might have. As such,

it is not meant to imply that any specific plant is required to have all the listed documents. In

addition, your plant specific document titles may vary from the document titles listed below. We

also request that the information provided be sorted by the list below for each sample.

Documents requested by November 20, 2023:

1. Purchase requisition and purchase orders.

2. Other pertinent vendor/licensee correspondence.

3. Original and updated design specifications.

4. Catalog specifications.

5. Procurement basis evaluation such as like-for-like, equivalency, plant design change

packages, drawing and specification updates.

6. 10 CFR 50.59 documentation, if required.

7. Material receiving reports, packing lists/invoices, and other shipping documents.

8. Receipt inspection reports and any related test reports and evaluations (similarity etc.).

9. Other documents to trace the item from the time it was dedicated to the time it was

installed, tested, and accepted.

10. Certificates of conformance/compliance/quality.

11. Vendor test and inspection reports.

12. Third-party or sub-vendor test and inspection reports.

13. Shelf-life information.

14. Vendor dedication/partial dedication information.

3

15. Design/material/process change history information.

16. Completed commercial-grade dedication document, including safety classification;

identification of safety function/application requirements; identification of critical

characteristics; identification of verification methods and acceptance criteria for the

critical characteristics, evaluation of credible failure modes (if applicable); and

identification of the suppliers quality assurance program that meets 10 CFR Part 50,

Appendix B.

17. Any deviation from design, material, and performance characteristics relevant to the

safety function (nonconformance dispositions).

18. Documents showing objective evidence such as: special test and inspection procedures

and results; commercial-grade survey reports, showing item, design, material, and

specific performance characteristics (relevant to safety function); and source inspection

reports.

19. Completed post-installation test procedure and results.

20. Completed stock or material issue forms and installation work orders or reports.

21. Historical performance information.