Transmittal Letter for the St. Lucie SLRA Review
ML23200A123
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/21/2023
From: Beverly Smith
NRC/NRR/DNRL
To: Coffey R
Florida Power & Light Co
Shared Package
ML23200A122 List:
References
EPID L-2021-SLR-0002
Download: ML23200A123 (3)


Text

Mr. Robert Coffey Vice President, Nuclear &

Chief Nuclear Officer Florida Power & Light Company 700 Universe Boulevard Mail Stop: EX/JB Juno Beach, FL 33408

SUBJECT:

ST. LUCIE PLANT, UNITS 1 AND 2 - SAFETY EVALUATION FOR THE SUBSEQUENT LICENSE RENEWAL APPLICATION REVIEW, (EPID NO. L-2021-SLR-0002)

Dear Mr. Coffey:

By letter dated August 3, 2021 (Agencywide Documents Access and Management System Package Accession No. ML21215A314), as revised by letter dated October 12, 2021 (ML21285A107) and supplemented by letters dated April 7, 2022 (ML22097A202), April 13, 2022 (ML22103A014), May 19, 2022 (ML22139A083), June 13, 2022 (ML22164A802), July 11, 2022 (ML22192A078), August 9, 2022 (ML22221A134), September 8, 2022 (ML22251A202),

September 19, 2022 (ML22262A149), September 22, 2022 (ML22265A134), September 28, 2022 (ML22271A399), October 26, 2022 (ML22299A037), March 27, 2023 (ML23086B990),

April 21, 2023 (ML23111A129), April 30, 2023 (ML23109A113), June 14, 2023 (ML23165A114) and July 13, 2023 (ML23194A211), Florida Power & Light Company (FPL or the applicant) submitted an application for the subsequent license renewal (SLR) of Renewed Facility Operating License Nos. DPR-67 and NPF-16 for the St. Lucie Plant, Units 1 and 2 (St. Lucie), to the U.S. Nuclear Regulatory Commission (NRC). FPL submitted the application pursuant to Title 10 of the Code of Federal Regulations Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, for SLR.

The NRC staff determined that the application was complete and acceptable for docketing as communicated by letter dated September 24, 2021 (ML212464A091) and noticed in the Federal Register on August 16, 2021 (86 FR 45768).

The NRC staff has reviewed the St. Lucie Subsequent License Renewal Application (SLRA) and has developed the enclosed Safety Evaluation Related to the SLR of St. Lucie Plant, Units 1 and 2, hereinafter referred to as the safety evaluation (SE). The SE reflects the status of the NRC staffs safety review of the SLRA, as supplemented, through July 13, 2023.

The next milestone for this project is the Advisory Committee on Reactor Safeguards Full Committee meeting.

July 21, 2023

If you have any questions regarding this matter, please contact the SLR project manager, Mr. Vaughn Thomas, by email at Vaughn.Thomas@nrc.gov or Mr. Brian Harris, by email at Brian.Harrs2@nrc.gov.

Sincerely, Brian W. Smith, Director Division of New and Renewed Licenses Office of Nuclear Reactor Regulation Docket Nos. 50-335 and 50-389

Enclosure:

SE cc w/encl: Listserv Signed by Smith, Brian on 07/21/23

PKG: ML23200A122 LTR: ML23200A123 SE: ML23200A146

  • via-email **SE only OFFICE DEX/ELTB:BC*

DEX/ESEB:BC*

DSS/SCPB:BC*

DRA/APLB:BC*

NAME JPaige**

ITseng**

BWittick**

SMehta**

DATE 8/29/2022 9/15/2022 5/14/2022 7/6/2022 OFFICE DNRL/NVIB:BC*

DNRL/NPHP:BC*

DNRL/NCSG:BC*

OGC (NLO)*

NAME ABuford**

MMitchell**

SBloom**

MFWoods**

DATE 11/14/2022 9/6/2022 5/3/2023 7/10/2023 OFFICE DNRL:D*

DNRL/NLRP:PM DNRL/NLIB:LA DNLR/NLRP:BC NAME BThomson**

VThomas SGreen LGibson DATE 7/13/2023 7/14/2023 7/19/2023 7/20/2023 OFFICE DNRL:D NAME BSmith DATE