L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 6

From kanterella
Jump to navigation Jump to search

Subsequent License Renewal Application Revision 1 - Supplement 6
ML23194A211
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/13/2023
From: Strand D
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-2023-097
Download: ML23194A211 (1)


Text

Cc: Attachment Florida General Dianne Sincerely, Executed I declare Dockets St.

Lucie Chief, Senior Chief, Senior Regional Power Manager Strand 50-335 Nuclear on under Bureau Project USNRC, Resident & the Administrator, Light 13 penalty and Plant Regulatory th 50-389 of Manager, Division Company day Units Radiation Inspector, of of July perjury 1 and USNRC, of USNRC, Affairs Control, New USNRC, 2023. that 2

and the Division Region foregoing Florida Renewed St.

Lucie II Department of New Licenses Plant is true

and and of Renewed correct.

Health

Licenses

Page L-2023-097

2 of

2 Dockets St.

Lucie

50-335 Nuclear

and Plant Clarification 50-389 Units

SLRA 1 and

of 2 (2 PSL Supplement

pages Unit

follow) 2 SLRA 6 Attachment

Commitment

23

Attachment L-2023-097

1 References No. For Resolutions Schedule Response, Implementation The Issues Affected Clarification L-2023-097 Docket St.

2. 1. 23, clarification, response Lucie Response -Aging FPL Revision FPL with SLRA Nos. Units Letter Letter changes Attachment Attachment all to of 50-335 Management 1 -Supplement the Schedule Supplement Sections: PSL 1 and (ADAMS L-2023-059 L-2022-043 appropriate the previously final Unit and 2 version 2, 1 Page 50-389 Accession page of Appendix 2 Commitment Requests dated dated made Commitment 1, 1 (ADAMS revisions, of 13 Attachment 1 of April April SLRA by of A2, 2 No. for Supplement 15 21, 7, is Appendix (Ref. No. Section ML23111A129) Additional Accession 2022 provided 7, No.

2023 2), 23. page 23

-Subsequent inadvertently The 19.4, Information -Subsequent on A2, 1, 18 No. the Section Attachment response of Table ML22097A202) following 33 omitted (Ref. 19-3, (RAI) License License 19.4, to 7 (Ref. RAI 1 ), made Commitment Set page. Table the Set 4 Supplemental Renewal Renewal 1 ). Implementation 4 Supplemental 19-3, changes Application Commitment No.

Application to 23 the St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-2023-097 Attachment 1 Page 2 of 2

SLRA Appendix A2, Section 19.4, Table 19-3, page A2-89, is clarified as follows:

Table 19-3 List of Unit 2 SLR Commitments and Implementation Schedule

No. Aging Management NUREG-2191 Commitment Implementation Schedule Program or Activity Section (Section) 23 One-Time Inspection XI.M32 a) Implement the new PSL One-Time Inspection AMP. The new Program inspections begin 10 (19.2.2.20 ) AMP will include volumetric examinations consistent with years before the SPEO.

Table XI.M32-1 of NUREG-2191 XI.M32 One-Time Inspection Inspections that are to be program to examine the PSL Unit 2 EOG heat exchanger completed prior to the SPEO (radiator tubes) for the loss of material and cracking aging are completed 6 months prior to effects. the SPEO or no later than the last refueling outage prior to the SPEO.

Program and SLR enhancements are implemented 6 months prior to the SPEO, i.e.:

PSL2 : 10/06/2042