Other: L-2021-063, Subsequent License Renewal Application Notification, L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report, L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response, L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4, ML21215A316, ML21285A107, ML21351A238, ML21351A239, ML21351A241, ML21351A248, ML21354A837, ML21356A011, ML22010A094, ML22010A096, ML22010A097, ML22010A100, ML22012A263, ML22012A282, ML22012A391, ML22013A277, ML22013A282, ML22013A284, ML22013A288, ML22013A292, ML22013A293, ML22013A294, ML22013A295, ML22013A296, ML22013A297, ML22013A301, ML22013A302, ML22013A303, ML22013A304, ML22013A305, ML22013A307, ML22013A316, ML22013A317, ML22013A334, ML22188A086, ML23200A123
|
MONTHYEARL-2021-064, Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C)2021-03-17017 March 2021 Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C) Project stage: Request L-2021-063, Subsequent License Renewal Application Notification2021-03-17017 March 2021 Subsequent License Renewal Application Notification Project stage: Other ML21215A3192021-08-0303 August 2021 Appendix E - Applicants Environmental Report for St. Lucie Project stage: Request ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses Project stage: Request ML21215A3172021-08-0303 August 2021 Enclosure 2: Affidavits Supporting Withholding Proprietary Information from Public Disclosure Project stage: Request ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary Project stage: Other L-2021-181, Subsequent License Renewal Application - Environmental Report Supplement 12021-09-13013 September 2021 Subsequent License Renewal Application - Environmental Report Supplement 1 Project stage: Supplement ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 Project stage: Other L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report Project stage: Other L-2021-209, Refueling Outage SL1-30 Steam Generator Tube Inspection Report2021-11-0101 November 2021 Refueling Outage SL1-30 Steam Generator Tube Inspection Report Project stage: Request ML22013A2772021-11-21021 November 2021 2.4 Structural Scoping and Screening Breakout Questions Project stage: Other ML21351A2382021-12-17017 December 2021 Trp 148.1 St. Lucie SLRA - Breakout Questions for TLAA Section 4.7.1 Rev. 1 Project stage: Other ML21351A2392021-12-17017 December 2021 Trp 14 St. Lucie SLRA - Buried Pipe Breakout Questions - Allik.Docx Project stage: Other ML21351A2412021-12-17017 December 2021 Trp 15 St. Lucie SLRA - Internal Coatings Breakout Questions - Allik Project stage: Other ML21351A2482021-12-17017 December 2021 Trp 26 St. Lucie SLRA - Fire Protection Breakout Questions Project stage: Other ML21356A0112021-12-17017 December 2021 Trp 148.3 and 148.4 St Lucie SLRA Breakout Questions Project stage: Other ML21354A8372021-12-20020 December 2021 Trp 11 St. Lucie SLRA Breakout Questions Project stage: Other ML22013A2972021-12-21021 December 2021 Trp 77 St. Lucie SLRA - Breakout Questions Corrosion Structural Project stage: Other ML22013A3052021-12-21021 December 2021 Trp 143.4 St Lucie SLRA - Breakout Questions HELB Project stage: Other ML22013A2922021-12-21021 December 2021 Trp 41 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A3042021-12-21021 December 2021 Trp 143.3 St Lucie SLRA - Breakout Questions EAF Project stage: Other ML22013A3032021-12-21021 December 2021 Trp 143.2 St Lucie SLRA - Breakout Questions Non-Class 1 Fatigue Project stage: Other ML22013A3022021-12-21021 December 2021 Trp 143.1 St Lucie SLRA - Breakout Questions Class 1 Fatigue Project stage: Other ML22013A3012021-12-21021 December 2021 TRP60 St. Lucie SLRA - Breakout Questions Fatigue Monitoring Project stage: Other ML22013A2962021-12-21021 December 2021 Trp 74 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2952021-12-21021 December 2021 Trp 47 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2942021-12-21021 December 2021 Trp 46 St. Lucie SLRA - Breakout Questions Structures Monitoring Project stage: Other ML22013A2882021-12-21021 December 2021 Trp 23 & 147.8 St. Lucie SLRA - Breakout Questions Cranes AMP-TLAA Project stage: Other ML22013A2842021-12-21021 December 2021 Trp 18 St. Lucie SLRA - Breakout Questions Bolting Integrity Project stage: Other ML22013A2822021-12-21021 December 2021 SLRA - Breakoutt Questions Corrosion OE Project stage: Other ML22013A2932021-12-21021 December 2021 Trp 45 St. Lucie SLRA - Breakout Questions Masonry Walls Project stage: Other ML21356A5772021-12-22022 December 2021 Slar Breakout Questions - Fire Protection Scoping and Screening Project stage: Approval ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout Project stage: Other ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar Project stage: Other ML22010A1002022-01-0707 January 2022 Trp 033 Psl Selective Leaching Breakout Questions - Allik Project stage: Other ML22010A0972022-01-0707 January 2022 Trp 038 Psl Internal Surfaces Breakout Questions - Allik Project stage: Other ML22012A2822022-01-10010 January 2022 TRP142- St. Lucie SLRA Section 4.2 - Breakout Questions Project stage: Other ML22012A2632022-01-10010 January 2022 Trp 3 - St. Lucie Psl SLRA Breakout Question Reactor Head Closure Stud Bolting Project stage: Other ML22012A3912022-01-11011 January 2022 Scoping and Screening 2.3.3.2 & 2.3.3.4 St. Lucie SLRA - Breakout Questions Project stage: Other ML22130A6542022-01-11011 January 2022, 21 January 2022 SLRA - Audit Report - Audit Questions Transmitted to Florida Power & Light (FPL) Project stage: Request ML22013A3342022-01-11011 January 2022 TRP16 - St. Lucie SLRA Breakout Questions_Pwr Internals Project stage: Other ML22013A3072022-01-11011 January 2022 Trp 084 St Lucie SLRA - Ssnial Scclombreakoutq Project stage: Other ML22013A3172022-01-12012 January 2022 Trp 030 - St. Lucie SLRA Breakout Questions_Fuel Oil Project stage: Other ML22013A3162022-01-12012 January 2022 Trp 020 - St. Lucie SLRA Breakout Questions_Occw Project stage: Other L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 Project stage: Supplement L-2022-044, Subsequent License Renewal Application Revision 1, Supplement 22022-04-13013 April 2022 Subsequent License Renewal Application Revision 1, Supplement 2 Project stage: Supplement L-2022-071, Subsequent License Renewal Application Revision 1 - Supplement 32022-05-19019 May 2022 Subsequent License Renewal Application Revision 1 - Supplement 3 Project stage: Supplement L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response2022-06-13013 June 2022 Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response Project stage: Request ML22188A0862022-07-0707 July 2022 SLRA - Audit Report Project stage: Other L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response2022-07-11011 July 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response Project stage: Other 2022-01-10
[Table View] |
Text
St. Lucie SLRA: Breakout Questions SLRA Sections 2.3.3.2 & 2.3.3.4 Scoping and Screening:
TRP:
Note: Breakout Questions are provided to the applicant and will be incorporated into the publicly-available audit report.
Technical Reviewer David Nold 12/27/2021 Acting Technical Branch Chief Steve Jones 01/11/2022 Breakout Session Date/Time To be filled in by PM Applicant Staff NRC staff To be filled out by PM during breakout Question Number SLRA Section SLRA Page Background / Issue (As applicable/needed)
Discussion Question / Request Outcome of Discussion 1
2.3.3.2 Component Cooling Water System 491 of 1572 (Page 3.3-99)
FSAR Section 9.2.2.3.3 Service Environment reads in part:
The component cooling water pumps, heat exchangers and portions of the piping and valves are located outdoors.
These components are designed to operate under the following environmental conditions: ambient air temperature from 30°F to 120°F, 100 percent humidity, salt laden atmosphere, torrential rains and hurricane winds.
SLR-8770-G-083 Florida Power And Light St. Lucie Nuclear Unit 1 - Flow Diagram Component Cooling System Sheet 1A, Coordinate H-6 displays the SLRA Table 3.3.2-2 Component Cooling Water -
Summary of Aging Management Evaluation for Component Type Pump Casing (component cooling water) does not contain an Environment of Air - outdoor (ext) for the Unit 1 Component Cooling Water pumps 1A, 1B & 1C.
The staff requests additional clarification as to whether Unit 1 Pump 1A, 1B & 1C casings
component cooling water pumps, thermowells, heat exchangers and portions of the piping and valves as being in the Component Cooling Area..
are exposed to the harsher outdoor environment as described in FSAR Section 9.2.2.3.3.
2 2.3.3.4 Diesel Generators And Support Systems 521 &
522 of 1572 (Pages 3.3-129 &
3.3-130)
SLRA Table 3.3.2-4 Diesel Generators and Support Systems - Summary of Aging Management Evaluation contains a Component Type Tank (Unit 1 diesel oil storage) for the Material Coating with an Environment of Air - outdoor (int).
In contrast, Table 3.3.2-4 contains two line-items for two different internal tank environments for the Component Type Tank (Unit 2 diesel oil storage) pertaining to the Material Coating. The internal tank environments listed are: Air
- indoor uncontrolled (int) and Fuel Oil (int).
The staff requests information pertaining to the lack of symmetry between the Unit 1 and Unit 2 Diesel Oil Storage tanks internal environments.
3 2.3.3.4 Diesel Generators And Support Systems 2.1.4.2 Nonsafety-Related Affecting Safety-Related 500 thru 526 of 1572 (Table 3.3.2-
- 4)
SLRA Section 2.1.4.2 Nonsafety-Related Affecting Safety-Related - 10 CFR 54.4(a)(2) reads in part:
In accordance with 10 CFR 54.4(a)(2),
the SSCs within the scope of license renewal include:
All nonsafety-related systems, structures, and components whose failure could prevent satisfactory accomplishment of any of the functions identified in 10 CFR 54.4(a)(1)(i), (ii), or (iii).
This scoping criterion requires an assessment of NNS SSCs with respect to the following application or configuration categories:
The subject Vent to Outside Diesel Generator Bldg lines appear to meet the requirements of 10 CFR 54.4(a)(2) (i.e., the first bullet above). The staff request additional information:
- to clarify the intended function of the Unit 2 screening components and where these components are reflected in SLRA Table 3.3.2-4;
- to clarify whether the Unit 1 Vent to Outside Diesel Generator Bldg lines contain similar screen components but
- NNS SSCs that may have the potential to prevent satisfactory accomplishment of safety functions,
- NNS SSCs directly connected to SR SSCs that provide structural support for the SR SSCs, and
- NNS SSCs that are not directly connected to SR SSCs but have the potential to affect SR SSCs through spatial interactions.
SLR-2998-G-096 Florida Power And Light St. Lucie Nuclear Unit 2 - Flow Diagram Emergency Diesel Generator System Diesel Engine 2A1 Sheet 1A, Coordinate A-4 displays Quality Group D pipe 2-DG-237 as a Vent to Outside Diesel Generator Bldg from the Diesel Oil Day Tank 2A1. The last component on the end of this pipe is not defined on the Unit 2 Legend drawing 2998-G-078 contained on the Curtiss Wright e-portal.
This last component appears to be a type of screening (e.g., strainer / bird screen) device. In addition, there is no flame arrestor displayed as being contained in this vent line. SLRA Table 3.3.2-4:
Diesel Generators and Support Systems
- Summary of Aging Management Evaluation does not contain a component type Screen and the listings of Component Type Strainer do not contain an external environment of Air -
outdoor (ext) with an internal environment of Diesel exhaust (int).
not shown on the respective SLR boundary drawings; and
- whether the Unit 1 & Unit 2 Vent to Outside Diesel Generator Bldg lines contain flame arrestors subject to AMR with an intended function of fire protection.
Nearly similar Unit 2 configurations are displayed on drawings: SLR-2998-G-096, Sheet 2A (for Diesel Oil Day Tank 2A2);
SLR-2998-G-096, Sheet 1B (for Diesel Oil Day Tank 2B1); and SLR-2998-G-096, Sheet 2B (for Diesel Oil Day Tank 2B2).
In comparison, Unit 1 drawing SLR-8770-G-096, Sheet 1A Florida Power And Light St. Lucie Nuclear Unit 1 - Flow Diagram Emergency Diesel Generator System Diesel Engine 1A1, Coordinate F-3, displays Quality Group D pipe 2-DG-193 as a Vent to Outside Diesel Generator Bldg from the Diesel Oil Day Tank 1A1.
Pipe 2-DG-193 does not display a screen component at the discharge of the pipe nor does the drawing show flame arrestors within the pipe from Tank 1A1 to the atmosphere. Nearly similar Unit 1 configurations are displayed on drawings: SLR-8770-G-096, Sheet 1B (for Diesel Oil Day Tank 1A2); SLR-8770-G-096, Sheet 2A (for Diesel Oil Day Tank 1B1); and SLR-8770-G-096, Sheet 2B (for Diesel Oil Day Tank 1B2).