Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: L-2021-063, Subsequent License Renewal Application Notification, L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report, L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response, L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4, ML21215A316, ML21285A107, ML21351A238, ML21351A239, ML21351A241, ML21351A248, ML21354A837, ML21356A011, ML22010A094, ML22010A096, ML22010A097, ML22010A100, ML22012A263, ML22012A282, ML22012A391, ML22013A277, ML22013A282, ML22013A284, ML22013A288, ML22013A292, ML22013A293, ML22013A294, ML22013A295, ML22013A296, ML22013A297, ML22013A301, ML22013A302, ML22013A303, ML22013A304, ML22013A305, ML22013A307, ML22013A316, ML22013A317, ML22013A334, ML22188A086, ML23200A123
|
MONTHYEARL-2021-064, Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C)2021-03-17017 March 2021 Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C) Project stage: Request L-2021-063, Subsequent License Renewal Application Notification2021-03-17017 March 2021 Subsequent License Renewal Application Notification Project stage: Other ML21215A3192021-08-0303 August 2021 Appendix E - Applicants Environmental Report for St. Lucie Project stage: Request ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses Project stage: Request ML21215A3172021-08-0303 August 2021 Enclosure 2: Affidavits Supporting Withholding Proprietary Information from Public Disclosure Project stage: Request ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary Project stage: Other L-2021-181, Subsequent License Renewal Application - Environmental Report Supplement 12021-09-13013 September 2021 Subsequent License Renewal Application - Environmental Report Supplement 1 Project stage: Supplement ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 Project stage: Other L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report Project stage: Other L-2021-209, Refueling Outage SL1-30 Steam Generator Tube Inspection Report2021-11-0101 November 2021 Refueling Outage SL1-30 Steam Generator Tube Inspection Report Project stage: Request ML22013A2772021-11-21021 November 2021 2.4 Structural Scoping and Screening Breakout Questions Project stage: Other ML21351A2382021-12-17017 December 2021 Trp 148.1 St. Lucie SLRA - Breakout Questions for TLAA Section 4.7.1 Rev. 1 Project stage: Other ML21351A2392021-12-17017 December 2021 Trp 14 St. Lucie SLRA - Buried Pipe Breakout Questions - Allik.Docx Project stage: Other ML21351A2412021-12-17017 December 2021 Trp 15 St. Lucie SLRA - Internal Coatings Breakout Questions - Allik Project stage: Other ML21351A2482021-12-17017 December 2021 Trp 26 St. Lucie SLRA - Fire Protection Breakout Questions Project stage: Other ML21356A0112021-12-17017 December 2021 Trp 148.3 and 148.4 St Lucie SLRA Breakout Questions Project stage: Other ML21354A8372021-12-20020 December 2021 Trp 11 St. Lucie SLRA Breakout Questions Project stage: Other ML22013A2972021-12-21021 December 2021 Trp 77 St. Lucie SLRA - Breakout Questions Corrosion Structural Project stage: Other ML22013A3052021-12-21021 December 2021 Trp 143.4 St Lucie SLRA - Breakout Questions HELB Project stage: Other ML22013A2922021-12-21021 December 2021 Trp 41 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A3042021-12-21021 December 2021 Trp 143.3 St Lucie SLRA - Breakout Questions EAF Project stage: Other ML22013A3032021-12-21021 December 2021 Trp 143.2 St Lucie SLRA - Breakout Questions Non-Class 1 Fatigue Project stage: Other ML22013A3022021-12-21021 December 2021 Trp 143.1 St Lucie SLRA - Breakout Questions Class 1 Fatigue Project stage: Other ML22013A3012021-12-21021 December 2021 TRP60 St. Lucie SLRA - Breakout Questions Fatigue Monitoring Project stage: Other ML22013A2962021-12-21021 December 2021 Trp 74 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2952021-12-21021 December 2021 Trp 47 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2942021-12-21021 December 2021 Trp 46 St. Lucie SLRA - Breakout Questions Structures Monitoring Project stage: Other ML22013A2882021-12-21021 December 2021 Trp 23 & 147.8 St. Lucie SLRA - Breakout Questions Cranes AMP-TLAA Project stage: Other ML22013A2842021-12-21021 December 2021 Trp 18 St. Lucie SLRA - Breakout Questions Bolting Integrity Project stage: Other ML22013A2822021-12-21021 December 2021 SLRA - Breakoutt Questions Corrosion OE Project stage: Other ML22013A2932021-12-21021 December 2021 Trp 45 St. Lucie SLRA - Breakout Questions Masonry Walls Project stage: Other ML21356A5772021-12-22022 December 2021 Slar Breakout Questions - Fire Protection Scoping and Screening Project stage: Approval ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout Project stage: Other ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar Project stage: Other ML22010A1002022-01-0707 January 2022 Trp 033 Psl Selective Leaching Breakout Questions - Allik Project stage: Other ML22010A0972022-01-0707 January 2022 Trp 038 Psl Internal Surfaces Breakout Questions - Allik Project stage: Other ML22012A2822022-01-10010 January 2022 TRP142- St. Lucie SLRA Section 4.2 - Breakout Questions Project stage: Other ML22012A2632022-01-10010 January 2022 Trp 3 - St. Lucie Psl SLRA Breakout Question Reactor Head Closure Stud Bolting Project stage: Other ML22012A3912022-01-11011 January 2022 Scoping and Screening 2.3.3.2 & 2.3.3.4 St. Lucie SLRA - Breakout Questions Project stage: Other ML22130A6542022-01-11011 January 2022, 21 January 2022 SLRA - Audit Report - Audit Questions Transmitted to Florida Power & Light (FPL) Project stage: Request ML22013A3342022-01-11011 January 2022 TRP16 - St. Lucie SLRA Breakout Questions_Pwr Internals Project stage: Other ML22013A3072022-01-11011 January 2022 Trp 084 St Lucie SLRA - Ssnial Scclombreakoutq Project stage: Other ML22013A3172022-01-12012 January 2022 Trp 030 - St. Lucie SLRA Breakout Questions_Fuel Oil Project stage: Other ML22013A3162022-01-12012 January 2022 Trp 020 - St. Lucie SLRA Breakout Questions_Occw Project stage: Other L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 Project stage: Supplement L-2022-044, Subsequent License Renewal Application Revision 1, Supplement 22022-04-13013 April 2022 Subsequent License Renewal Application Revision 1, Supplement 2 Project stage: Supplement L-2022-071, Subsequent License Renewal Application Revision 1 - Supplement 32022-05-19019 May 2022 Subsequent License Renewal Application Revision 1 - Supplement 3 Project stage: Supplement L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response2022-06-13013 June 2022 Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response Project stage: Request ML22188A0862022-07-0707 July 2022 SLRA - Audit Report Project stage: Other L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response2022-07-11011 July 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response Project stage: Other 2022-01-10
[Table View] |
Text
St. Lucie Units 1 and 2 SLRA TRP 148.1 Breakout Audit Questions Technical Reviewer Eric Reichelt 12/08/2021 Technical Branch Chief Matt Mitchell 12/13/2021 TLAA Section 4.7.1 Leak-Before-Break of Reactor Coolant System Piping SLRA Section SLRA Page Question / Issue Why are we asking?
Outcome of Discussion
- 1.
4.7.1 963/964 In the Time Limited Aging Analysis (TLAA), it states that Alloy 82/182 welds are susceptible to primary water stress corrosion cracking (PWSCC) and have been conservatively evaluated to consider the effects of PWSCC.
Please provide additional information to specifically describe what evaluations were made to the Alloy 82/182 welds that are present at the Port St. Lucie (PSL) Unit 1 and 2 reactor coolant pump (RCP) suction and discharge nozzles. Please identify how the applicant is demonstrating that PWSCC is not a potential source of pipe rupture as required in Standard Review Plan (SRP) 3.6.3 Revision
- 1.
SRP 3.6.3 of NUREG-0800 states that PWSCC is considered an active degradation mechanism in Alloy 600/82/182 materials in PWRs and needs to be addressed.
- 2.
4.7.1 N/A Considering the evaluations made to the Alloy 82/182 welds by PSL as described above, is PSL considering an overlay of Alloy 52/152 to minimize the susceptibility to PWSCC? How is PSL planning to monitor these welds for potential leakage?
SRP 3.6.3 of NUREG-0800 states that PWSCC is considered an active degradation mechanism in Alloy 600/82/182 materials in pressurized water reactors (PWRs) and needs to be addressed.
- 3.
4.7.1 963 In the TLAA, it states that the fatigue crack growth flaw analysis originally included in CEN-367-A used generic design basis transient cycles that enveloped the projected Fatigue crack growth analysis is based on transient cycles. As a method for managing possible fatigue flaw growth, a monitoring
80 year transient cycles for PSL Units 1 and 2 to calculate the crack growth. Does PSL have a monitoring program that provides an acceptable method for managing the fatigue flaw growth aspect of the Leak Before Break (LBB) evaluation for the subsequent period of extended operation (SPEO)?
program may be an acceptable alternative.
- 4.
4.7.1 963 In the TLAA Evaluation, it states the fracture toughness correlations from NUREG/CR-4513 were used for the full aged condition and are applicable for plants operating at 15 effective full power years (EFPY) for the A351-CF8M materials. Please expand to state if Rev. 1 or Rev. 2 of NUREG/CR-4513 was used for the fracture toughness correlations. In addition, at the time of the correlations, was PSL aware of the errata for Rev. 2 of NUREG-4513 which had a recurring typographical error (the symbol ) was found in the document instead of the symbol. The errata corrected the symbols from 15 EFPY to read 15 EFPY for CF8M materials (refer to ML16145A082).
Please review the fracture toughness correlations used for the fully aged condition for plant operation based on the revised errata.
Fracture toughness correlations need to be to the correct version of NUREG-4513 Rev. 2 with errata.