Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: L-2021-063, Subsequent License Renewal Application Notification, L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report, L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response, L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4, ML21215A316, ML21285A107, ML21351A238, ML21351A239, ML21351A241, ML21351A248, ML21354A837, ML21356A011, ML22010A094, ML22010A096, ML22010A097, ML22010A100, ML22012A263, ML22012A282, ML22012A391, ML22013A277, ML22013A282, ML22013A284, ML22013A288, ML22013A292, ML22013A293, ML22013A294, ML22013A295, ML22013A296, ML22013A297, ML22013A301, ML22013A302, ML22013A303, ML22013A304, ML22013A305, ML22013A307, ML22013A316, ML22013A317, ML22013A334, ML22188A086, ML23200A123
|
MONTHYEARL-2021-064, Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C)2021-03-17017 March 2021 Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C) Project stage: Request L-2021-063, Subsequent License Renewal Application Notification2021-03-17017 March 2021 Subsequent License Renewal Application Notification Project stage: Other ML21215A3192021-08-0303 August 2021 Appendix E - Applicants Environmental Report for St. Lucie Project stage: Request ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses Project stage: Request ML21215A3172021-08-0303 August 2021 Enclosure 2: Affidavits Supporting Withholding Proprietary Information from Public Disclosure Project stage: Request ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary Project stage: Other L-2021-181, Subsequent License Renewal Application - Environmental Report Supplement 12021-09-13013 September 2021 Subsequent License Renewal Application - Environmental Report Supplement 1 Project stage: Supplement ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 Project stage: Other L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report Project stage: Other L-2021-209, Refueling Outage SL1-30 Steam Generator Tube Inspection Report2021-11-0101 November 2021 Refueling Outage SL1-30 Steam Generator Tube Inspection Report Project stage: Request ML22013A2772021-11-21021 November 2021 2.4 Structural Scoping and Screening Breakout Questions Project stage: Other ML21351A2382021-12-17017 December 2021 Trp 148.1 St. Lucie SLRA - Breakout Questions for TLAA Section 4.7.1 Rev. 1 Project stage: Other ML21351A2392021-12-17017 December 2021 Trp 14 St. Lucie SLRA - Buried Pipe Breakout Questions - Allik.Docx Project stage: Other ML21351A2412021-12-17017 December 2021 Trp 15 St. Lucie SLRA - Internal Coatings Breakout Questions - Allik Project stage: Other ML21351A2482021-12-17017 December 2021 Trp 26 St. Lucie SLRA - Fire Protection Breakout Questions Project stage: Other ML21356A0112021-12-17017 December 2021 Trp 148.3 and 148.4 St Lucie SLRA Breakout Questions Project stage: Other ML21354A8372021-12-20020 December 2021 Trp 11 St. Lucie SLRA Breakout Questions Project stage: Other ML22013A2972021-12-21021 December 2021 Trp 77 St. Lucie SLRA - Breakout Questions Corrosion Structural Project stage: Other ML22013A3052021-12-21021 December 2021 Trp 143.4 St Lucie SLRA - Breakout Questions HELB Project stage: Other ML22013A2922021-12-21021 December 2021 Trp 41 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A3042021-12-21021 December 2021 Trp 143.3 St Lucie SLRA - Breakout Questions EAF Project stage: Other ML22013A3032021-12-21021 December 2021 Trp 143.2 St Lucie SLRA - Breakout Questions Non-Class 1 Fatigue Project stage: Other ML22013A3022021-12-21021 December 2021 Trp 143.1 St Lucie SLRA - Breakout Questions Class 1 Fatigue Project stage: Other ML22013A3012021-12-21021 December 2021 TRP60 St. Lucie SLRA - Breakout Questions Fatigue Monitoring Project stage: Other ML22013A2962021-12-21021 December 2021 Trp 74 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2952021-12-21021 December 2021 Trp 47 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2942021-12-21021 December 2021 Trp 46 St. Lucie SLRA - Breakout Questions Structures Monitoring Project stage: Other ML22013A2882021-12-21021 December 2021 Trp 23 & 147.8 St. Lucie SLRA - Breakout Questions Cranes AMP-TLAA Project stage: Other ML22013A2842021-12-21021 December 2021 Trp 18 St. Lucie SLRA - Breakout Questions Bolting Integrity Project stage: Other ML22013A2822021-12-21021 December 2021 SLRA - Breakoutt Questions Corrosion OE Project stage: Other ML22013A2932021-12-21021 December 2021 Trp 45 St. Lucie SLRA - Breakout Questions Masonry Walls Project stage: Other ML21356A5772021-12-22022 December 2021 Slar Breakout Questions - Fire Protection Scoping and Screening Project stage: Approval ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout Project stage: Other ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar Project stage: Other ML22010A1002022-01-0707 January 2022 Trp 033 Psl Selective Leaching Breakout Questions - Allik Project stage: Other ML22010A0972022-01-0707 January 2022 Trp 038 Psl Internal Surfaces Breakout Questions - Allik Project stage: Other ML22012A2822022-01-10010 January 2022 TRP142- St. Lucie SLRA Section 4.2 - Breakout Questions Project stage: Other ML22012A2632022-01-10010 January 2022 Trp 3 - St. Lucie Psl SLRA Breakout Question Reactor Head Closure Stud Bolting Project stage: Other ML22012A3912022-01-11011 January 2022 Scoping and Screening 2.3.3.2 & 2.3.3.4 St. Lucie SLRA - Breakout Questions Project stage: Other ML22130A6542022-01-11011 January 2022, 21 January 2022 SLRA - Audit Report - Audit Questions Transmitted to Florida Power & Light (FPL) Project stage: Request ML22013A3342022-01-11011 January 2022 TRP16 - St. Lucie SLRA Breakout Questions_Pwr Internals Project stage: Other ML22013A3072022-01-11011 January 2022 Trp 084 St Lucie SLRA - Ssnial Scclombreakoutq Project stage: Other ML22013A3172022-01-12012 January 2022 Trp 030 - St. Lucie SLRA Breakout Questions_Fuel Oil Project stage: Other ML22013A3162022-01-12012 January 2022 Trp 020 - St. Lucie SLRA Breakout Questions_Occw Project stage: Other L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 Project stage: Supplement L-2022-044, Subsequent License Renewal Application Revision 1, Supplement 22022-04-13013 April 2022 Subsequent License Renewal Application Revision 1, Supplement 2 Project stage: Supplement L-2022-071, Subsequent License Renewal Application Revision 1 - Supplement 32022-05-19019 May 2022 Subsequent License Renewal Application Revision 1 - Supplement 3 Project stage: Supplement L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response2022-06-13013 June 2022 Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response Project stage: Request ML22188A0862022-07-0707 July 2022 SLRA - Audit Report Project stage: Other L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response2022-07-11011 July 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response Project stage: Other 2022-01-10
[Table View] |
Text
Page 1 of 4 St. Lucie SLRA: Breakout Questions SLRA Section 4.3.1, Metal Fatigue of Class 1 Components TRP: 143.1 Note: Breakout Questions are provided to the applicant and will be incorporated into the publicly-available audit report.
Technical Reviewer Seung Min 12/9/2021 Technical Branch Chief Matt Mitchell 12/21/2021 Breakout Session Date/Time To be filled in by PM Applicant Staff NRC staff To be filled out by PM during breakout Question Number SLRA Section SLRA Page Background / Issue (As applicable/needed)
Discussion Question / Request Outcome of Discussion 1
4.3.1 4.3-2 SLRA Tables 4.3.1-1 and 4.3.1-2 describe the 80-year projected cycles for the design transients, which were included in the original PSL LRA for PSL Units 1 and 2 respectively.
The SLRA indicates that the 80-year projections of the transient cycles use the cumulative cycle counts for each transient monitored on each unit up to December 31, 2019. The SLRA also explains that the cycle counts are projected to 80 years of operation (1) based on a direct extrapolation of the cycle counts through the subsequent
- 1. Explain why the second cycle projection method uses only the recent 10 years of the cycle counting for 80-year cycle projections. As part of the response, clarify whether the second projection method results in the more conservative 80-year cycle projections (i.e., more projected cycles) than the first projection method (i.e.,
the direct extrapolation of the cycle count).
Page 2 of 4 Question Number SLRA Section SLRA Page Background / Issue (As applicable/needed)
Discussion Question / Request Outcome of Discussion period of extended operation (SPEO) or (2) based on cycle accumulation over the recent 10 years of cycle counting (up to December 31, 2019) and then by pro-rating the counts for the remaining years to the end of the SPEO.
However, the SLRA does not clearly explain why the second cycle projection method for some transients uses only the cycle counts from the recent 10 years of the cycle counting.
2 4.3.1 4.3-10 4.3-11 SLRA Tables 4.3.1-1 and 4.3.1-2 describe the design transients, which were included in the original PSL LRA for PSL Units 1 and 2 respectively. These tables indicate that some transients will not be monitored in the Fatigue Monitoring program (e.g., plant loading, 5 percent/minute and 10 percent step load increase transients).
In addition, Tables 1 and 2 of Westinghouse LTR-SDA-II-20-32-NP indicate that the transients, which will not be monitored in the Fatigue Monitoring program, are consistent with the transients that are not monitored in the current licensing basis (i.e., the initial license renewal term up to 60-year operation). The tables explain that these design transients were excluded from the monitoring of the Fatigue Monitoring
- 1. For the transients excluded from fatigue monitoring based on cycle margins, describe the cycle margins (e.g., margins beyond the actually accumulated cycles with respect to 80-year projected cycles and design cycle) to confirm that cycle margins are large enough to exclude the transients from fatigue monitoring.
- 2. For the transients excluded from fatigue monitoring based on fatigue usage contributions, clarify whether the 80-year evaluation considers all the
Page 3 of 4 Question Number SLRA Section SLRA Page Background / Issue (As applicable/needed)
Discussion Question / Request Outcome of Discussion program because the transients resulted in a fatigue usage less than 0.1 or large margins were present with respect to actual cycle counts versus allowable cycle limits.
The staff found a need to confirm that the basis of excluding these transients from fatigue monitoring remains valid for 80 years of operation.
contributions of the excluded transients on fatigue usage to confirm that the total contributions of the transients for an applicable location do not exceed the contribution limit (0.1), as opposed to a single contribution of a specific transient. If not, justify why the combined effects of the transients on fatigue usage are not considered in the determination for fatigue monitoring exclusion.
3 4.3.1 4.3-2 4.3-12 SLRA Seciton 4.3.1 states that the transients, which are included in the current PSL Fatigue Monitoring program but not included in the original PSL LRA for PSL Units 1 and 2, are presented in Tables 4.3.1-3 and 4.3.1-4, respectively.
The SLRA also indicates that SLRA Tables 4.3.1-5 and 4.3.1-6 describe the 80-year projections for additional transients (e.g., loss of letdown flow transient cycles) that support subsequent period of extended operation (SPEO) fatigue evaluations.
The SLRA does not clearly discuss whether the Fatigue Monitoring program
- 1. Clarify whether the Fatigue Monitoring program will monitor the additional transients that are described in SLRA Tables 4.3.1-5 and 4.3.1-6. If not, justify why the additional transients in the table do not need to be monitored in the Fatigue Monitoring program for SPEO.
- 2. With respect to the pressurizer spray nozzle cumulative usage factor addressed in SLRA Table
Page 4 of 4 Question Number SLRA Section SLRA Page Background / Issue (As applicable/needed)
Discussion Question / Request Outcome of Discussion will monitor the additional transients for 80 years of operation, which are described in SLRA Tables 4.3.1-5 and 4.3.1-6.
In addition, SLRA Table 4.3.1-4 addresses the pressurizer spray nozzle cumulative usage factor in the column for the additional Unit 2 transients that are included in the fatigue monitoring.
However, this item does not clearly describe relevant transients and their cycle limits, accumulated cycles and 80-year projected cycles. The staff found a need to clarify the transients and associated cycles for this item.
4.3.1-4, describe the relevant transients and their cycle limits, accumulated cycles and 80-year projected cycles, consistent with the other transient listings.
4 4.3.1 4.3-4 SLRA Section 4.3.1 addresses the metal fatigue TLAA for Class 1 components and piping.
However, the section does not clearly discuss the following items: (1) the design transients used in the cumulative usage factor (CUF) calculations for pressurizer surge lines; (2) the associated design cycles, actual cycles and projected 80-year cycles; and (3) how the applicant ensures that actual cycles do not exceed the design cycles.
- 1. Discuss the following items: (1) the design transients used in the cumulative usage factor (CUF) calculations for pressurizer surge lines; (2) the associated design cycles, actual cycles and projected 80-year cycles; and (3) how the applicant ensures that actual cycles do not exceed the design cycles.