Letter Sequence Other |
|---|
|
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement, Supplement
Results
Other: L-2021-063, Subsequent License Renewal Application Notification, L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report, L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response, L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4, ML21215A316, ML21285A107, ML21351A238, ML21351A239, ML21351A241, ML21351A248, ML21354A837, ML21356A011, ML22010A094, ML22010A096, ML22010A097, ML22010A100, ML22012A263, ML22012A282, ML22012A391, ML22013A277, ML22013A282, ML22013A284, ML22013A288, ML22013A292, ML22013A293, ML22013A294, ML22013A295, ML22013A296, ML22013A297, ML22013A301, ML22013A302, ML22013A303, ML22013A304, ML22013A305, ML22013A307, ML22013A316, ML22013A317, ML22013A334, ML22188A086, ML23200A123
|
MONTHYEARL-2021-064, Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C)2021-03-17017 March 2021 Request for Exemption from the Schedular Requirements of 10 CFR 54.17 (C) Project stage: Request L-2021-063, Subsequent License Renewal Application Notification2021-03-17017 March 2021 Subsequent License Renewal Application Notification Project stage: Other ML21215A3192021-08-0303 August 2021 Appendix E - Applicants Environmental Report for St. Lucie Project stage: Request ML21215A3152021-08-0303 August 2021 Application for Subsequent Renewed Facility Operating Licenses Project stage: Request ML21215A3172021-08-0303 August 2021 Enclosure 2: Affidavits Supporting Withholding Proprietary Information from Public Disclosure Project stage: Request ML21215A3162021-08-0303 August 2021 Enclosure 1: Subsequent License Renewal Application Enclosures Summary Project stage: Other L-2021-181, Subsequent License Renewal Application - Environmental Report Supplement 12021-09-13013 September 2021 Subsequent License Renewal Application - Environmental Report Supplement 1 Project stage: Supplement ML21285A1072021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1 Project stage: Other L-2021-192, Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report2021-10-12012 October 2021 Subsequent Licensee Renewal Application, Revision 1, Appendix E, Applicant'S Environmental Report Project stage: Other L-2021-209, Refueling Outage SL1-30 Steam Generator Tube Inspection Report2021-11-0101 November 2021 Refueling Outage SL1-30 Steam Generator Tube Inspection Report Project stage: Request ML22013A2772021-11-21021 November 2021 2.4 Structural Scoping and Screening Breakout Questions Project stage: Other ML21351A2382021-12-17017 December 2021 Trp 148.1 St. Lucie SLRA - Breakout Questions for TLAA Section 4.7.1 Rev. 1 Project stage: Other ML21351A2392021-12-17017 December 2021 Trp 14 St. Lucie SLRA - Buried Pipe Breakout Questions - Allik.Docx Project stage: Other ML21351A2412021-12-17017 December 2021 Trp 15 St. Lucie SLRA - Internal Coatings Breakout Questions - Allik Project stage: Other ML21351A2482021-12-17017 December 2021 Trp 26 St. Lucie SLRA - Fire Protection Breakout Questions Project stage: Other ML21356A0112021-12-17017 December 2021 Trp 148.3 and 148.4 St Lucie SLRA Breakout Questions Project stage: Other ML21354A8372021-12-20020 December 2021 Trp 11 St. Lucie SLRA Breakout Questions Project stage: Other ML22013A2972021-12-21021 December 2021 Trp 77 St. Lucie SLRA - Breakout Questions Corrosion Structural Project stage: Other ML22013A3052021-12-21021 December 2021 Trp 143.4 St Lucie SLRA - Breakout Questions HELB Project stage: Other ML22013A2922021-12-21021 December 2021 Trp 41 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A3042021-12-21021 December 2021 Trp 143.3 St Lucie SLRA - Breakout Questions EAF Project stage: Other ML22013A3032021-12-21021 December 2021 Trp 143.2 St Lucie SLRA - Breakout Questions Non-Class 1 Fatigue Project stage: Other ML22013A3022021-12-21021 December 2021 Trp 143.1 St Lucie SLRA - Breakout Questions Class 1 Fatigue Project stage: Other ML22013A3012021-12-21021 December 2021 TRP60 St. Lucie SLRA - Breakout Questions Fatigue Monitoring Project stage: Other ML22013A2962021-12-21021 December 2021 Trp 74 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2952021-12-21021 December 2021 Trp 47 St. Lucie SLRA - Breakout Questions Project stage: Other ML22013A2942021-12-21021 December 2021 Trp 46 St. Lucie SLRA - Breakout Questions Structures Monitoring Project stage: Other ML22013A2882021-12-21021 December 2021 Trp 23 & 147.8 St. Lucie SLRA - Breakout Questions Cranes AMP-TLAA Project stage: Other ML22013A2842021-12-21021 December 2021 Trp 18 St. Lucie SLRA - Breakout Questions Bolting Integrity Project stage: Other ML22013A2822021-12-21021 December 2021 SLRA - Breakoutt Questions Corrosion OE Project stage: Other ML22013A2932021-12-21021 December 2021 Trp 45 St. Lucie SLRA - Breakout Questions Masonry Walls Project stage: Other ML21356A5772021-12-22022 December 2021 Slar Breakout Questions - Fire Protection Scoping and Screening Project stage: Approval ML22010A0942022-01-0404 January 2022 Trp 29 St. Lucie SLRA - Tank Breakout Project stage: Other ML22010A0962022-01-0505 January 2022 Trp 010 St Lucie SLRA - Boricacidcorrbreakoutq - Makar Project stage: Other ML22010A1002022-01-0707 January 2022 Trp 033 Psl Selective Leaching Breakout Questions - Allik Project stage: Other ML22010A0972022-01-0707 January 2022 Trp 038 Psl Internal Surfaces Breakout Questions - Allik Project stage: Other ML22012A2822022-01-10010 January 2022 TRP142- St. Lucie SLRA Section 4.2 - Breakout Questions Project stage: Other ML22012A2632022-01-10010 January 2022 Trp 3 - St. Lucie Psl SLRA Breakout Question Reactor Head Closure Stud Bolting Project stage: Other ML22012A3912022-01-11011 January 2022 Scoping and Screening 2.3.3.2 & 2.3.3.4 St. Lucie SLRA - Breakout Questions Project stage: Other ML22130A6542022-01-11011 January 2022, 21 January 2022 SLRA - Audit Report - Audit Questions Transmitted to Florida Power & Light (FPL) Project stage: Request ML22013A3342022-01-11011 January 2022 TRP16 - St. Lucie SLRA Breakout Questions_Pwr Internals Project stage: Other ML22013A3072022-01-11011 January 2022 Trp 084 St Lucie SLRA - Ssnial Scclombreakoutq Project stage: Other ML22013A3172022-01-12012 January 2022 Trp 030 - St. Lucie SLRA Breakout Questions_Fuel Oil Project stage: Other ML22013A3162022-01-12012 January 2022 Trp 020 - St. Lucie SLRA Breakout Questions_Occw Project stage: Other L-2022-043, Subsequent License Renewal Application Revision 1 - Supplement 12022-04-0707 April 2022 Subsequent License Renewal Application Revision 1 - Supplement 1 Project stage: Supplement L-2022-044, Subsequent License Renewal Application Revision 1, Supplement 22022-04-13013 April 2022 Subsequent License Renewal Application Revision 1, Supplement 2 Project stage: Supplement L-2022-071, Subsequent License Renewal Application Revision 1 - Supplement 32022-05-19019 May 2022 Subsequent License Renewal Application Revision 1 - Supplement 3 Project stage: Supplement L-2022-075, Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response2022-06-13013 June 2022 Subsequent License Renewal Application-Aging Management Requests for Additional Information (RAI) Set 1A Response and Request for Confirmation of Information (RCI) Set 1 Response Project stage: Request ML22188A0862022-07-0707 July 2022 SLRA - Audit Report Project stage: Other L-2022-108, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response2022-07-11011 July 2022 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 2 Response Project stage: Other 2022-01-10
[Table View] |
Text
St. Lucie SLRA: Breakout Questions SLRA Section B.2.3.9, Bolting Integrity TRP: 018 Note: Breakout Questions are provided to the applicant and will be incorporated into the publicly-available audit report.
Technical Reviewer Zuhan Xi 12/09/2012 Technical Branch Chief Joseph Colaccino 12/17/21 Breakout Session Date/Time To be filled in by PM Applicant Staff NRC staff To be filled out by PM during breakout Question Number SLRA Section SLRA Page Background / Issue (As applicable/needed)
Discussion Question / Request Outcome of Discussion 1
B.2.3.9 B-83 GALL-SLR Report, XI.M18 Bolting Integrity states that the use of molybdenum disulfide (MoS2) as a lubricant has been shown to be a potential contributor to SCC and should not be used.
The SLRA provides an enhancement to the Bolting Integrity AMP on Preventive Actions element to ensure that lubricants containing MoS2 (disulfide or polysulfide) or other lubricants containing sulfur will not be used on pressure-retaining bolted joints. However, it is not clear if these lubricants have been used considering that this enhancement will be a new Clarify if lubricants containing MoS2 or other lubricants containing sulfur have ever been used at PSL. If so, provide information on what measures have been or are being taken to manage them.
restriction moving forward. If they have been used, additional actions may be necessary to adequately manage them.
2 B.2.3.9 B-82 GALL-SLR Report, XI.M18 - Detection of Aging Effects, states, in part, that [i]n order to conduct 17 or 19 inspections at a unit in lieu of 25, the applicant states in the SLRA the basis for why the operating conditions at each unit are similar enough (e.g., chemistry) to provide representative inspection results. The basis should include consideration of potential differences such as the following:
Are there any systems which have had an out-of-spec water chemistry condition for a longer period of time or out-of-spec conditions, which have occurred more frequently?
For lubricating or fuel oil systems, are there any components that were exposed to the more severe contamination levels?
For raw water systems, is the water source from different sources where one or the other is more susceptible to microbiologically influenced corrosion or other aging mechanisms?
The SLRA states that air (indoor uncontrolled or outdoor), soil, or raw water environments are similar for both units.
Additional consideration of potential differences may be necessary to clarify the basis for why the operating conditions at each unit are similar enough (e.g.,
Describe the basis for the similarity/dissimilarity of operating condition at each Unit in accordance with the guidance by GALL-SLR Report to justify the acceptability of this reduction in number to 19 inspections per unit. Update the SLRA as necessary.
water chemistry, lubricating or fuel oil systems) to justify the use of a reduced sample size of 19 inspections per unit instead of the 25 generally recommended.
3 B.2.3.9 and Table 19-3 B-84, A1-70, and A2-71 Enhancement No. 6 for Detection of Aging Effects program element is made to indicate that closure bolting greater than 2-inches in diameter with actual yield strength greater than or equal to 150 ksi and closure bolting for which yield strength is unknown, volumetric examination in accordance with ASME Code Section XI, Table IWB-2500-1, Examination Category B-G-1, will be performed. However, no commitment (under Commitment No. 12) was identified to include/capture this aging detection as stated in the enhancement.
Clarify how the SLRA commitment aligns with the proposed Enhancement No. 6 to the AMP and to be consistent with the GALL-SLR Report. Update the SLRA as necessary.
4 19.2.2.9 A1-17 and A2-17 SLRA Section 19.2.2.9 (UFSAR summaries for the Bolting Integrity AMP) states, in part, that periodic system walkdowns and inspections are performed at least once per refueling cycle to provide reasonable assurance that indications of loss of preload (leakage), cracking, and loss of material are identified before leakage becomes excessive As stated in the GALL-SLR Report, this program monitors the effects of aging on the intended function of closure bolting. It seems that excessive leakage is a qualitative measurement and does not establish a clear requirement to ensure that the intended function is maintained Clarify how excessive is defined. Clarify if it means to state before leakage could result in loss of intended function.
consistent with the current licensing basis (CLB) regardless of how excessive the leakage (big or small) may or may not appear to be.
5 Table 3.2-1 and Table 3.3-1 3.2-20 and 3.3-31 SLRA Table items 3.2.1-012 and 3.3.1-010 state that there are no high-strength steel closure bolting in the engineered safety features systems and auxiliary systems.
Enhancement No. 6 includes actions of volumetric examination for high-strength closure bolting and closure bolting for which yield strength is unknown.
Describe how it was verified/confirmed that there are no high strength bolts present or being used in in the engineered safety features systems and auxiliary systems at PSL.