NRR E-mail Capture - Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039)
ML23223A015
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 08/11/2023
From: Michael Mahoney
NRC/NRR/DORL/LPL2-2
To: Falkiewicz T
Florida Power & Light Co
References
L-2023-LLR-0039
Download: ML23223A015 (3)


Text

From: Michael Mahoney Sent: Friday, August 11, 2023 7:14 AM To: Falkiewicz, Timothy Cc: Mack, Jarrett

Subject:

Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039)

Mr. Falkiewicz, By letter L-2023-099, dated July 26, 2023 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML23208A057), Florida Power and Light Company (FPL, the licensee) submitted proposed alternative Pump Relief Request 10 (PR-10) to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code 2004/2006a, Subsection ISTB-6300, Systematic Error for St. Lucie Nuclear Plant, Unit 2. The proposed alternative would provide on a one-time basis, relief from the ASME OM ISTB-6300 requirement to conduct a retest of the Auxiliary Feedwater (AFW) 2C Pump until plant conditions are appropriate to support a comprehensive pump test in accordance with ASME OM ISTB-3400.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 140 hours0.00162 days <br />0.0389 hours <br />2.314815e-4 weeks <br />5.327e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 7 months, which is March 24, 2024. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application, and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me.

Thanks Mike Mahoney Project Manager, LPL2-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Desk: (301)-415-3867 Mobile: (301)-250-0450 Email: Michael.Mahoney@nrc.gov

Hearing Identifier: NRR_DRMA Email Number: 2191 Mail Envelope Properties (SA1PR09MB948604322447663DA86DF93FE510A)

Subject:

Acceptance Review Results - St. Lucie Nuclear Plant, Unit 2 Alternative PR-10 (L-2023-LLR-0039)

Sent Date: 8/11/2023 7:13:50 AM Received Date: 8/11/2023 7:13:54 AM From: Michael Mahoney Created By: Michael.Mahoney@nrc.gov Recipients:

"Mack, Jarrett" <Jarrett.Mack@fpl.com>

Tracking Status: None "Falkiewicz, Timothy" <Timothy.Falkiewicz@fpl.com>

Tracking Status: None Post Office: SA1PR09MB9486.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3619 8/11/2023 7:13:54 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: