|
---|
Category:Letter
MONTHYEARIR 05000335/20240032024-11-0707 November 2024 Integrated Inspection Report 05000335/2024003 and 05000389/2024003 ML24291A2862024-11-0101 November 2024 – Relief Request: Proposed Alternative in Accordance with 10 CFR 50.55a(Z)(1), Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2024-167, Correction to St. Lucie L-2024-132, 2024 Population Update Analysis2024-10-22022 October 2024 Correction to St. Lucie L-2024-132, 2024 Population Update Analysis IR 05000335/20250102024-10-21021 October 2024 Notification of St. Lucie Plant Units 1 & 2 Comprehensive Engineering Team Inspection - U.S. Nuclear Regulatory Commission Inspection Report 05000335/2025010 and 05000389/2025010 ML24227A9702024-10-18018 October 2024 Letter to Kenneth Mack Dir, License and Reg Compliance, NextEra Energy, Inc Response to Request Re Engagement Re Sub License Renewal Environmental Review - St Lucie Nuclear Plant 1 and 2 L-2024-085, Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results2024-10-15015 October 2024 Refueling Outage SL1-32 Low Pressure Turbine Rotor Inspection Results L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes L-2024-165, Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made2024-10-14014 October 2024 Report of 10 CFR 50.59 Plant Changes, Tests and Experiments Made L-2024-118, Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1)2024-10-0808 October 2024 Fleet License Amendment Request to Relocate Staff Qualifications from Technical Specifications to the Quality Assurance Topical Report (FPL-1) ML24255A3092024-09-30030 September 2024 SLRA - Revised SE Letter L-2024-155, Subsequent License Renewal Application, Third Annual Update2024-09-27027 September 2024 Subsequent License Renewal Application, Third Annual Update L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes 05000335/LER-2024-001, Unplanned Reactor Scram2024-09-25025 September 2024 Unplanned Reactor Scram IR 05000335/20240112024-09-18018 September 2024 Biennial Problem Identification and Resolution Inspection Report 05000335/2024011 and 05000389/2024011 L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-138, License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles2024-09-11011 September 2024 License Amendment Request L-2024-138, Fuel Methodology Changes in Support of St. Lucie, Unit 2 Transition to 24-Month Fuel Cycles L-2024-148, Submittal of Offsite Dose Calculation Manual (Odcm), Revision 552024-09-0909 September 2024 Submittal of Offsite Dose Calculation Manual (Odcm), Revision 55 ML24228A2962024-09-0606 September 2024 NRC to NMFS, Designation of FPL as the Non-Federal Representative for St. Lucie IR 05000335/20240052024-08-22022 August 2024 Updated Inspection Plan for St. Lucie, Units 1 & 2 - Report 05000335/2024005 and 05000389/2024005 L-2024-133, Snubber Program Plan Submittal2024-08-14014 August 2024 Snubber Program Plan Submittal L-2024-140, Cycle 28 Core Operating Limits Report2024-08-14014 August 2024 Cycle 28 Core Operating Limits Report L-2024-132, 2024 Population Update Analysis2024-08-13013 August 2024 2024 Population Update Analysis IR 05000335/20240022024-08-13013 August 2024 Integrated Inspection Report 05000335-2024002 and 05000389-2024002 L-2024-129, Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval2024-08-0707 August 2024 Relief Request (RR) 14. Limited Coverage Exams Due to Impractical Inservice Inspection Requirements - Fourth Ten-Year Inservice Inspection Program Interval 05000389/LER-2024-003, Unplanned Reactor Scram2024-08-0505 August 2024 Unplanned Reactor Scram ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-121, Subsequent License Renewal Commitment 30 Revision2024-07-30030 July 2024 Subsequent License Renewal Commitment 30 Revision L-2024-123, Submittal of In-Service Inspection Program Owners Activity Report (OAR-1)2024-07-29029 July 2024 Submittal of In-Service Inspection Program Owners Activity Report (OAR-1) L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24184B2822024-07-16016 July 2024 – Request to Use a Later Code Edition and Addenda of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan 05000389/LER-2024-002-01, Safety Injection Tank Vent Through Wall Leakage2024-07-11011 July 2024 Safety Injection Tank Vent Through Wall Leakage L-2024-110, Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake2024-07-10010 July 2024 Environmental Protection Plan Report, Unusual or Important Environmental Event - Manatee in Intake L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-109, Schedule for Subsequent License Renewal Environmental Review2024-07-0303 July 2024 Schedule for Subsequent License Renewal Environmental Review ML24172A1562024-06-27027 June 2024 Relief Request - PSL2-I5-RR-01 Proposed Alternative to Amse Code XI Code Examination Requirements - System Leakage Test of Reactor Pressure Vessel Bottom Head and Class 1 and 2 Piping in Covered Trenches L-2024-104, Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 102024-06-26026 June 2024 Response to Request for Additional Information, St. Luce Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1 Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 L-2024-097, Technical Specification Special Report2024-06-20020 June 2024 Technical Specification Special Report L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter L-2024-090, Revised Steam Generator Tube Inspection Reports2024-06-0404 June 2024 Revised Steam Generator Tube Inspection Reports IR 05000335/20244012024-06-0303 June 2024 Security Baseline Inspection Report 05000335/2024401 and 05000389/2024401 ML24135A0642024-05-17017 May 2024 Correction Letter - Amendment Nos. 253 and 208 Regarding Conversion to Improved Standard Technical Specifications L-2024-075, Notification of Improved Standard Technical Specifications (ITS) Implementation2024-05-13013 May 2024 Notification of Improved Standard Technical Specifications (ITS) Implementation IR 05000335/20240012024-05-10010 May 2024 Integrated Inspection Report 05000335/2024001 and 05000389/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-053, License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis2024-04-30030 April 2024 License Amendment Request L-2024-053, Updated Spent Fuel Pool Criticality Analysis L-2024-070, Cycle 32 Core Operating Limits Report2024-04-29029 April 2024 Cycle 32 Core Operating Limits Report L-2024-071, Cycle 27 Core Operating Limits Report2024-04-29029 April 2024 Cycle 27 Core Operating Limits Report 2024-09-09
[Table view] Category:Map
MONTHYEARML21286A6222021-10-27027 October 2021 Achp - Request for Scoping Comments Concerning the Environmental Review of St. Lucie Plant, Units 1 and 2 Subsequent License Renewal Application ML21287A1132021-10-22022 October 2021 SHPO - Request for Scoping Comments Concerning the Environmental Review of St. Lucie Plant, Units 1 and 2 Subsequent License Renewal Application L-2021-073, Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit2021-04-16016 April 2021 Environmental Protection Plan Report Request to Renew Industrial Wastewater Facility Permit ML13360A2022013-12-12012 December 2013 EPA Echo Report Martin County, Fl ML12073A1512012-03-0606 March 2012 NRR E-mail Capture - St. Lucie Discharge Headwall Project ML18127B1491976-10-11011 October 1976 Response to Letter of 8/10/1976, Submits Answers to Beach Survey ML18127B1541976-09-29029 September 1976 Enclosed Is Final Design Drawing of Erosion Protection of Discharge Canal Peninsular Which Is Submitted for Review in Accordance with Letter of 6/22/1976 ML18127B6881975-05-0909 May 1975 Figure Q2.27-4 Topography South of Site. 2021-04-16
[Table view] |
Text
U,S. NUCLEAR REGULATORY all SS ION DOCKET NUMBER NRC FORM 105 (2.70)
FILE NUMBER NRC DISTRIBUTION FoR PART 60 DOCKET MATERIAL TO: FROM l DATE OF DOCUMENT Mr Ziemann Florida Pwr It Light Co 9-29-76 Miami, Fla, DATE RECEIVED R E Uhrig 10-4-76 ALE TTE R 0 NOTOR IZE D PROP INPUT FORM NUMBER OF COPIES RECEIVED RORIGINAL SUNC LASSIF I ED 1 signed C3 COPY DESCRIPTION ENCLOSURE Ltr trans the following: Final design drawing with regard to discharge g*penal hurricane protection
~ ~ 4 ~ ~ 1 ~ ~ ~ ~
PLANT NAME: St Lucie 81
(/$ 'pg )Aye yyqr i pi
'"~P,"
SAFETY FOR ACTION/INFORMATION 10-7-76 ehf ASSIGNED Au: s V J mar.'n ec ~ ua pn~
BRANCH CHIEF:
PROJECT MANAGER: PRO ~F. IANA ~
LIC ASST INTERNAL D R I BUTION SYSTEMS SAFETY SITE NRC PDR HEINEMAN ENV 0 NA ICE 2- SCHROEDER BENAROYA 'N OELD GOSSICK 6 STAFF ENGINEERING IPPOLITO MIPC MACCARRY K RKI0 0 CASE KNIGIIT HANAUER SIHlPEIL OPERAT NG REAC 0 S A ES PAWLICKI PRO P
CT MANA EMEN COLLINS ROSS NOVAK ROSZTOCZY E'ST REACTOR SAFETY OPERA+~N, EISENII SHAO IIAER
'.F HOUSTON PETERSON CHECK BUTLER MELTZ QR MES HFLTEMES SKOVIIOLT SALTZMAN QLLINR RUTBERG EXTERNAL DISTRIOUTION CONTROL NUMOER LPDR , lc.Ice. NAT LAB: BRnoKHA FN TIC: REG, VIF. UI.RIKSON ORNL NSIC: LA PDR ASI.B~ CONSULTANTS ACRS l CYS ~F~A
~ ~ ~ ~ ~ ~ ~ ~ ~ ~
t P. O. BOX 013100, MIAMI, FL 33101 Q l/
8 Q
'C1 ~
ppCK<<~
SI/I1KQ 'LORIDA POWER 8c LIGHT COMPANY
~~ass<
uiS'~~gISS+<
September 29,: 1976
~154"I L-76-345 CP Office of Nuclear Reactor, Regulation (
Attn: Dennis L. Ziemann, Chief 8'@;,"'c Operating Reactors Branch 52 r4 Division of Operating Reactors 1g76 U. S. Nuclear Regulatory Commission i~ sP Washington, D. C. 20555
Dear Mr. Ziemann:
Re: St. Lucie Unit No. 1 Docket. No. 50-335 Facility Operating License DPR-67 Condition of License G.l Dischar e Canal Hurricane Protection Condition of Operating License G.l requires that .installation of erosion protection for that part of the discharge canal peninsula associated with St. Lucie Unit No. 1 be completed by June 30, 1977.
I Enclosed please find the final design drawing which is sub-mitted for youi review in accordance with our letter of June 22, 1976 (L-76-232).
To achieve our June 30, 1977 requirement, construction ac-.
tivities must be initiated in November of this year. Your timely review of the design, will, -r therefore be appreciated.:
1 >>I Yours very truly, Robert E. Uhrig Vice President REU/NLR/hlc cc: Norman C. Moseley, Region II Jack R. Newman, Esq.
PEOPLE... SERVING PEOPLE
J N
1i I
OISCHARGE CANAL (N 768.2S)
SHEET PILE 0.00 CONC PILE CAP
>u.O'
+t 42~0 EGIN 00 GRAQE EL lf OO f,~+~0 ~
I
"..IalYiig(L~ '
FASRIFORII o
QISCX.CANAL KL-I7.gQ P P238 GREE EL I4.00'+ ARIES <<4 c
~ I 8QT. OF SHEET SECT.-A-A BKLLQU9.'ISCH 0 5 IO 20 30 4Q o
LA26SS$ <<
\ \
t \
CANAL UNIT HO I C. SGSF'IO o
\
\
IIO 50 I I I 5- I I
'I g
I I
FUTURE DISCH CANAL UHIT H(} 2 I I GRAQE, EL I8.00 a I I I
'jc I
Sf L I I EL I FUTURE r I I s I ~ <<
798.5lI OIESEl. OIL ST%
TAt P f I ~I OIESKL O'LSTG 3l'II('2
~ I
'f!HII I C
~
o pl~ ~ I RQAQ E I~~'8-.6O '-
IOifl PLAN, IOO'OOO'00 300 400 COASCO SERVICES INCORPORATLO FLQRIOA POWER A LIGHT COMPANY.
o>r~H ooQAHA ~novas ST. LUCIE PLANT-UNIT 'I SK 877P-CIRCULATIHG WATER SYSTEM
( H 54p g
Dorr T ter C ISCHARGE CANAL HURRICANE PROTECTION