ML17143A358: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(8 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML17143A358 | | number = ML17143A358 | ||
| issue date = 05/23/2017 | | issue date = 05/23/2017 | ||
| title = | | title = Summary of Public Meeting for James A. Fitzpatrick and Nine Mile Point | ||
| author name = Dimitriadis A | | author name = Dimitriadis A | ||
| author affiliation = NRC/RGN-I/DRP/PB1 | | author affiliation = NRC/RGN-I/DRP/PB1 | ||
Line 12: | Line 12: | ||
| document type = Meeting Summary | | document type = Meeting Summary | ||
| page count = 2 | | page count = 2 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 May 23, 2017 MEETING | |||
==SUMMARY== | |||
LICENSEES: ENTERGY NUCLEAR OPERATIONS INC (Entergy) and EXELON NUCLEAR GENERATION COMPANY, LLC. (Exelon) | |||
FACILITIES: JAMES A. FITZPATRICK NUCLEAR POWER PLANT (FitzPatrick) and NINE MILE POINT NUCLEAR GENERATING STATION (Nine Mile Point) | |||
==SUBJECT:== | |||
==SUMMARY== | |||
OF PUBLIC MEETING On April 20, 2017, from 4:00 p.m. to 6:30 p.m., at the Scriba Municipal Building in Oswego, NY, the NRC held an open-house to discuss its assessment of the safety performance at both FitzPatrick and Nine Mile Point for 2016. | |||
A notice of the open-house was issued March 15, 2017, and posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17076A082. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. | |||
The NRC had poster boards, fact sheets, and was available to discuss its assessment of the safety performance of FitzPatrick and Nine Mile Point for the period of January 1 through December 31, 2016, as documented in our letters dated March 1, 2017 (ADAMS Accession No. ML17059D342 for FitzPatrick and ML17059C091 for Nine Mile Point). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Nine Mile Point Nuclear Station can be found on the NRC's web site at: | |||
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. | |||
Members of the media and state and local officials attended the open-house and were offered the opportunity to question the NRC regarding FitzPatrick and Nine Mile Point performance, and the role of the agency in ensuring safe plant operations. | |||
/RA/ | |||
Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects | |||
==Enclosure:== | |||
Public Meeting Sign-In Sheet and Handout (ML17143A190) | |||
ML17143A358 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME ARosebrook ABurret/AD ADimitriadis DATE 05/23/17 05/23/17 05/23/17}} |
Latest revision as of 16:49, 4 February 2020
ML17143A358 | |
Person / Time | |
---|---|
Site: | Nine Mile Point, FitzPatrick |
Issue date: | 05/23/2017 |
From: | Anthony Dimitriadis Reactor Projects Branch 1 |
To: | |
References | |
Download: ML17143A358 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 May 23, 2017 MEETING
SUMMARY
LICENSEES: ENTERGY NUCLEAR OPERATIONS INC (Entergy) and EXELON NUCLEAR GENERATION COMPANY, LLC. (Exelon)
FACILITIES: JAMES A. FITZPATRICK NUCLEAR POWER PLANT (FitzPatrick) and NINE MILE POINT NUCLEAR GENERATING STATION (Nine Mile Point)
SUBJECT:
SUMMARY
OF PUBLIC MEETING On April 20, 2017, from 4:00 p.m. to 6:30 p.m., at the Scriba Municipal Building in Oswego, NY, the NRC held an open-house to discuss its assessment of the safety performance at both FitzPatrick and Nine Mile Point for 2016.
A notice of the open-house was issued March 15, 2017, and posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML17076A082. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC had poster boards, fact sheets, and was available to discuss its assessment of the safety performance of FitzPatrick and Nine Mile Point for the period of January 1 through December 31, 2016, as documented in our letters dated March 1, 2017 (ADAMS Accession No. ML17059D342 for FitzPatrick and ML17059C091 for Nine Mile Point). The NRC poster boards and fact sheets included background on the Reactor Oversight Process. Additional information relative to the NRC's Annual Assessment Process and the safety performance of Nine Mile Point Nuclear Station can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the media and state and local officials attended the open-house and were offered the opportunity to question the NRC regarding FitzPatrick and Nine Mile Point performance, and the role of the agency in ensuring safe plant operations.
/RA/
Anthony Dimitriadis, Chief Reactor Projects Branch 1 Division of Reactor Projects
Enclosure:
Public Meeting Sign-In Sheet and Handout (ML17143A190)
ML17143A358 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME ARosebrook ABurret/AD ADimitriadis DATE 05/23/17 05/23/17 05/23/17