ML17223B283: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:, ACCELERATED DIS UTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9110240239 DOC.DATE: 91/09/30 NOTARIZED:
{{#Wiki_filter:, ACCELERATED DIS                           UTION DEMONST             TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO FACIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.50-389 St.Lucie Plant, Unit 2, Florida Power&Light Co.AUTH.NAME AUTHOR AFFILIATION BREENIJ.J.
ACCESSION NBR:9110240239               DOC.DATE:   91/09/30   NOTARIZED: NO           DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power               & Light   Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power               & Light   Co. 05000389 AUTH. NAME             AUTHOR AFFILIATION BREENIJ.J.           Florida Power & Light Co.
Florida Power&Light Co.SAGER,D.A.
SAGER,D.A.           Florida     Power & Light Co.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000335 05000389
RECIP.NAME             RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating repts for Sept 1991 for St Lucie Units 1&2.W/911013 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR i ENCL L SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: D A RECIPXENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS AEOD/DS P/TPAB NRR/DOEA/OEAB RGN2 EXTERNAL EG&G BRYCE E J~H NSIC COPIES LTTR ENCL 3 3 1 1 10 10 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME PD2-2 PD AEOD/DOA NRg/J3LP EB10 R~.'"I LE 0 1 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D D D NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating repts           for Sept 1991   for St Lucie Units   1 &
D D PLEASE HELP US TO REDUCE WAFfE!CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24 P.Q, Box, Ft.Pierce, FL 34954-0128 OCT f 3 SS1 L-91-269 10 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:
ltr.                                                                D 2.W/911013 DISTRIBUTION CODE: IE24D             COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) i  ENCL  L  SIZE:
Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Attached are the September 1991 Operating Status and Summary of Operating Experience Reports for St.Lucie Units 1 and 2.Should you have any cpxestions on this information, please contact us~Very truly yours, D.A.Sa r Vice Pr s dent St.Luci Plant DAS:JJB:kw cc: Stewart D.Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant Attachments DAS/PSL N534-91 9ii0240239 9'i05'30 PDR ADQCK 05000335 R PDR an FPL Group company AVERAGE DAILY UNIT POWER DOCKET NO~50-335~11 COMPLETED BY J.J.Breen MONTH SEPTEMBER 1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)9/1/91 9/2/91 9/3/91 9/4/91'/91 9/6/91 9/7/91 9/8/91 9/9/91 9/10/91 9/11/91 9/12/91 9/13/91 9/14/91 9/15/91 9/16/91 9/17/91 9/18/91 9/19/91 9/20/91 9/21/91 9/22/91 9/23/91 9/24/91 9/25/91 9/26/91 9/27/91 9/28/91 9/29/91 9/30/91 849 847 845 845 846 847 844 840 838 839 838 835 779 565 833 842 840 357 221 844 839 ,839 840 838 841 842 840 839 839 837 lN'k 4 OPERATING DATA REPORT OPERATING STATUS DQCj(ET NQ 50-335 DATE'CT'J 8 N9$COMr-LETED BY J, J, BREEN TELEPHONE 4<)7/468/4248 UNIT NAME: ST.LUCIE UNIT 1 2.REPORTING PERIOD)SEPTEMBER 1991 3.LXCENSED THERMAL POWER (MAT): 2700 4.NAMFPLATE RATING (GROSS MHE): 850 5i DESTGN El ECTRXC*L RATXNG (NET MHE): 830 6o MAXIMUM DEPENDABLE CAPACXTY<GROSS MME)l 872 7i MAXIMUM DEPENDABLE CAPACITY<NET MHE)!839 8, XF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GIVE REASONS: 9i POWER LEVEL TO WHICH RESTRICTED~
NOTES:
IF ANY<NET MHE)10.REASONS FOR RESTRICTIONS IF ANY l MONTHLY-YTD-CUMULATXVE 11.12~1 3~14'5m 16'7 t 18.19'0'1'2+231 24<HOURS IN REPORT PERIOD: NUMBER OF HOURS REACTOR HAS CRITXCAL REACTOR RESERVE SHUTDOWN HQURS HOURS GENERATOR ON-LXNE UNXT RESERVE SHUTDOHN HOURS GROSS THERMAL ENERGY GENERATED (MHH)GROSS ELECTRICAL ENERGY GENERATED (MHH)NET ELECTRICAL ENERGY GENERATED (MWH)UNIT SERVICE FACTOR UNIT AVAILABILITY FACTOR CAPACXTY FACTOR (USXNG MDC NET)CAPACXTY FACTOR (USING DER NET)UNXT FORCED OUTAGE RATE SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 10/18/91$REFUELING 63 DAYS 720 695o9 OiO 693'OoO 1838346 603120 570852 96+3 96i3 94i5 95o5 317 6551 6449.7''6425.4 OiO 16858756 5589500 5295173 98oi 98+1 96.3 97i4 1 i3 129527iO 99408.1 205.3 98529o7 39.3 254108810 83798140 79187915 76.1 76ii 75.7 74 i 7 4.2 25 i IF SHUT DOWN AT END OF REPORT PERIOD t ESTIMATED DATE OF STARTUP t
A RECIPXENT               COPIES            RECIPIENT          COPIES ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL            D PD2-2 LA                     3    3    PD2-2 PD                1    1 NORRIS,J                       1    1                                                D INTERNAL: ACRS                           10    10      AEOD/DOA                1    1 AEOD/DS P/TPAB                 1    1    NRg/J3LP    EB10      1    1 NRR/DOEA/OEAB                 1     1     R~.'"I LE     01      1     1 RGN2                          1     1 EXTERNAL    EG&G BRYCE E J ~ H            1     1     NRC PDR                1     1 NSIC                          1     1 D
D D
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WAFfE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR               24   ENCL   24


UNIT SHUTDOWNS AI'6)POWER REDUCTIONS DOCKET NO.50-3 5 UNIT NAME ST LUCIE UNIT 1 DATE OtlT Ql COMPLETED BY J.J.BREEN PELEPHOHE 544045L 5 0 REPORT MONTH SEPTEMBER 1 1 No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report System Code'omponent Code'ause&Corrective Action to-Prevent Recurrence 22 910913 0.0 B N/A HF Unit 1 downpowered for cleaning of the 1B1 waterbox.910918 910918 5.3 21.25 LER 9146 N/A IF CKTBRK XXXXXX Unit 1 automatically tripped due to operator error while synchronizing the MG Sets.Delays with the H2 Analyzer were experienced when Unit 1 attempted to increase power.F Forced S Scheduled Reasoa A-Equipment failure (cxphin)B-Maintcaanec or Test C-Refueling D-Regulatory estrictioa E-Operator Training dc license Examiaation F-Administrative G<<Operational Error (Expalin)H-Other (Explaia)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Getinued 5-Load Reduction 9-Other (Exphin)Edubit G-Instructions for Preparadon of Data Entry Sheets Liceasee Event Report (LER)File (NUREG-0161)
P.Q, Box, Ft. Pierce, FL 34954-0128 OCT    f3    SS1 L-91-269 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:    Document Control Desk Washington,          DC    20555 Gentlemen:
Ed'>it 1-Same Source P P  
Re:    St. Lucie Units          1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the September 1991 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.
Should you have any cpxestions on        this information, please contact us ~
Very  truly      yours, D. A. Sa        r Vice Pr s dent St. Luci Plant DAS:JJB:kw cc:    Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments DAS/PSL N534-91 9ii0240239 9'i05'30 PDR    ADQCK      05000335 R
PDR an FPL Group company
 
AVERAGE DAILY UNIT POWER DOCKET NO ~  50-335 COMPLETED BY
                                      ~11 J.J. Breen MONTH    SEPTEMBER    1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 9/  1/91          849 9/  2/91          847 9/  3/91          845 9/  4/91          845
                '/91 846 9/ 6/91          847 9/ 7/91          844 9/ 8/91          840 9/ 9/91          838 9/10/91          839 9/11/91          838 9/12/91          835 9/13/91          779 9/14/91          565 9/15/91          833 9/16/91          842 9/17/91          840 9/18/91            357 9/19/91            221 9/20/91            844 9/21/91            839 9/22/91          ,839 9/23/91            840 9/24/91            838 9/25/91            841 9/26/91            842 9/27/91            840 9/28/91            839 9/29/91            839 9/30/91            837
 
lN
  'k
 
4 OPERATING DATA REPORT
                                                                      'CT'J DQCj(ET NQ DATE COMr-LETED BY 50  335 J, J, 8 N9$
BREEN TELEPHONE        4<)7/468/4248 OPERATING STATUS UNIT NAME:  ST. LUCIE      UNIT  1
: 2. REPORTING PERIOD ) SEPTEMBER 1991
: 3. LXCENSED THERMAL POWER (MAT):                  2700
: 4. NAMFPLATE RATING ( GROSS MHE ):                  850 5i DESTGN El ECTRXC*L RATXNG (NET MHE):                830 6o MAXIMUM DEPENDABLE CAPACXTY <GROSS MME)l            872 7i MAXIMUM DEPENDABLE CAPACITY <NET MHE) !              839 8, XF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH              7)
SINCE LAST REPORT ~ GIVE REASONS:
9i    POWER LEVEL TO WHICH RESTRICTED~ IF ANY <NET MHE)
: 10.        REASONS FOR RESTRICTIONS    IF ANY l MONTHLY    -YTD-      CUMULATXVE
: 11.        HOURS IN REPORT PERIOD:                          720      6551          129527iO 12      ~  NUMBER OF HOURS REACTOR HAS CRITXCAL            695o9    6449.7'        99408.1 1 3 ~ REACTOR RESERVE SHUTDOWN HQURS                          OiO          '          205.3 14'5m HOURS GENERATOR ON-LXNE                          693'      6425.4          98529o7 UNXT RESERVE SHUTDOHN HOURS                        OoO        OiO            39.3 16'7      GROSS THERMAL ENERGY GENERATED (MHH)          1838346    16858756      254108810 t GROSS ELECTRICAL ENERGY GENERATED ( MHH)        603120    5589500        83798140
: 18. NET ELECTRICAL ENERGY GENERATED ( MWH )                570852    5295173        79187915 UNIT SERVICE FACTOR                              96+3        98oi            76.1 19'0'1'2+
UNIT AVAILABILITYFACTOR                          96i3        98+  1          76ii CAPACXTY FACTOR (USXNG MDC NET)                  94i5        96.3            75.7 CAPACXTY FACTOR (USING DER NET)                  95o5        97i4            74 i 7 231        UNXT FORCED OUTAGE RATE                            317        1 i3            4.2 24<        SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 10/18/91$ REFUELING 63 DAYS 25 i      IF SHUT DOWN AT END OF REPORT PERIOD t ESTIMATED DATE OF STARTUP t
 
UNIT SHUTDOWNS AI'6) POWER REDUCTIONS DOCKET NO.                         50-3 5 UNIT NAME                       ST LUCIE UNIT 1 DATE                               OtlT   Ql COMPLETED BY J. J. BREEN PELEPHOHE                     544045L 5 0 REPORT MONTH SEPTEMBER                             1     1 No.         Date Type Duration (Hours)
Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent   Code'ause                     & Corrective Action to Down Prevent Recurrence 22         910913       0.0           B                                     N/A       HF                     Unit 1 downpowered for cleaning of the   1B1 waterbox.
910918       5.3                                           LER 9146                     CKTBRK Unit 1 automatically tripped due to operator error while synchronizing the MG Sets.
910918      21.25                                                N/A        IF          XXXXXX  Delays with the H2 Analyzer were experienced when Unit 1 attempted to increase power.
F Forced                         Reasoa                                            Method                                  Edubit G - Instructions for S Scheduled                     A - Equipment failure (cxphin)                     1 - Manual                              Preparadon of Data Entry B - Maintcaanec or Test                           2 - Manual Scram                        Sheets Liceasee Event Report C - Refueling                                     3 - Automatic Scram                    (LER) File (NUREG-0161)
D - Regulatory estrictioa                         4 - Getinued E - Operator Training dc license Examiaation       5 - Load Reduction F - Administrative                                 9 - Other (Exphin)                      Ed'>it 1 - Same  Source G <<Operational Error (Expalin)
H - Other (Explaia)
 
P P


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET N00 50-335 UNIT St.Lucie 1 DATE.13 3 COMPLETED BY J.J.Breen TELEPHONE 407 468-4248 REPORT MONTH SEPTEMBER 1991 From September 13;1991, to September 14, 1991, Unit 1 downpowered for cleaning of the 1B1 waterbox.Upon completion of waterbox cleaning, Unit 1 increased power on September 15, 1991, and remained there until September 18, 1991.On September 18, 1991, an automatic reactor trip caused by operator error'occurred.
OF OPERATING EXPERIENCE DOCKET N00   50-335 UNIT St. Lucie     1 DATE   . 13 3 COMPLETED BY J.J. Breen TELEPHONE   407   468-4248 REPORT MONTH   SEPTEMBER     1991 From September 13; 1991,   to September 14, 1991, Unit 1   downpowered for cleaning of the     1B1 waterbox. Upon completion of waterbox cleaning, Unit 1     increased power on September 15, 1991, and remained there until September 18, 1991. On September 18, 1991, an automatic reactor trip caused by operator error'occurred. Improper synchronizing of the MG Sets was the root cause and this event will be reported in LER 91-06.       In an attempt to bring Unit 1 up in power, delays with the H2 Analyzer were experienced.         On September 20, 1991, Unit 1 was at full power and remained there for the rest of the month.
Improper synchronizing of the MG Sets was the root cause and this event will be reported in LER 91-06.In an attempt to bring Unit 1 up in power, delays with the H2 Analyzer were experienced.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
On September 20, 1991, Unit 1 was at full power and remained there for the rest of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
 
r 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO+50-389 COMPTETED BY Z.Z.Breen TELEPHONE 407 468-4248 MONTH SEPTEMBER 199 1 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)9/1/91 2/91 9/3/91 9/4/91 9/5/91 9/6/91, 9/7/91 9/8/91 9/9/91 9/le/91 9/ll/91 9/12/91 9/13/'9l 9/14/91 9/15/91 9/16/91 9/17/91 9/18/91 9/19/91 9/20/91 9/21/91 9/22/91 9/23/91 9/24/91 9/25/91 9/26/91 9/27/91 9/28/91 9/29/91 9/30/91 844 842 841 673 6e 652 840 840 , 842 856 853 854 853 855 8~854 852 853 855 853 850 852 835 849 855 857 856 855 855 854  
r4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO+ 50-389 COMPTETED BY Z.Z. Breen TELEPHONE 407   468-4248 MONTH   SEPTEMBER       199 1 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 9/ 1/91               844 2/91               842 9/ 3/91               841 9/ 4/91             673 9/ 5/91               6e 9/ 6/91,             652 9/ 7/91             840 9/ 8/91               840 9/ 9/91               842 9/le/91 856 9/ll/91               853 9/12/91               854 9/13/'9l             853 9/14/91               855 9/15/91               8~
*I OPERATING STATUS OPERATING DATA REF'.ORT DOCKET NO DATE COMPLETED BY J+Ji BREEN TELEPHONE 407/468/4248 UNIT NAME l ST.LUCIE UNIT 2 2+REPORTING PERXODlSEPTEMBER 1991 3.LICENSED THERMAL POHER (MAT'):~700 4.NAMEPLATE RATXNG<GROSS MME)+850 5.DESIGN Fl.FCTRICAL RATING (NET MME)o 830 6 MAXIMUM DEPENDABLE CAPACITY<GROSS MME)l 882 7.MAXIMUM DEPENDABLE CAPACITY (NET MHE)l 839 8.IF CHANGES OCCUR IN CAPACITY RATXNGS<ITEMS NUMBER 3 THROUGH 7)SINCE LAST REPORT~GXVE REASONS l'OWER LEVEL TO WHICH RESTRICTED~
9/16/91               854 9/17/91               852 9/18/91             853 9/19/91             855 9/20/91             853 9/21/91               850 9/22/91               852 9/23/91               835 9/24/91               849 9/25/91               855 9/26/91               857 9/27/91               856 9/28/91               855 9/29/91               855 9/30/91               854
IF ANY (NET MHE)10, REASONS FOR RESTRICTIONS IF ANY: MONTHLY;YTD-CUMULATIVE J 12'3+14'5 1 iho 171 18'9.20.21.22.23.24'J HOURS IN REPORT PERIOD: NUMBER OF HOURS REACTOR HAS CRITICAL REACTOR RESERVE SHUTDOHN HOURS HOURS GENERATOR ON-LXNE UNIT RESERVE SHUTDOHN HOURS GROSS THERMAL ENERGY GENERATED (MHH)GROSS ELECTRICAL ENERGY GENERATED (MWH)NET ELECTRICAL ENERGY GENERATED<MWH)UNIT SERVXCE FACTOR UNIT AVAILABILITY FACTOR CAPACITY FACTOR (USING MDC NET)CAPACITY FACTOR (USING, DER NET)" UNIT FORCED OUTAGE RATE SHUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 720 720.0 OoO 720+0 0.0 1902571 629200 596240 100+0 100.0 98.7 99.8 0+0 6551 6551oO 0.0 6551oO 0'0 17462005 5861130 5562055 100iO 10eiO 101i2 102'0.0 71424.0 61411>3 0.0 60395i3 0.0 158251086 52758050 49896158 84oh 84.6 84 84.9 5t3 25'F SHUT DOHN AT END OF REPORT PERIOD~ESTIMATED-'DATE OF ST*RTUP:  
 
~I'I UNIT SHUTDOWNS AND POWER REDUCTIONS DDDKBT ND.~6038 UNIT NAME ST LUCIE UNIT 2 DATE ICTUS$9>COMPLETED BY J.J.BREEN TBLBPHDNB 8404465-30 REPORT MONTH SEPTEMBER I I No.Date Type Duration (Hours)Reason'ethod of Shutting Down Reactor'icensee Event Report&#xb9;System Code'omponent Code'ause&Corrective Action to Prevent Recurrence 910904 0.0, B N/A HF XXXXXX Unit 2 downpowered for waterbox cleaning.F Forced S Scheduled Rcasoa A-Epupmeat failure (explain)B-Mainteaaace or Test C-Refueling D-RcguhLtoty strictioa E-Operator Trainiag ds Liceasc Exanunatioa F-Administtative G-Operational Ermr (Expalia)H-Other (Exphdn)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)Extuhit G-Instructions for Prcparatioa of Data Entry Sheets Licensee Event Rcport (LER)File (NUREG4161)
*I OPERATING DATA REF'.ORT DOCKET NO DATE COMPLETED BY     J+   Ji BREEN TELEPHONE       407/468/4248 OPERATING STATUS UNIT NAME l ST. LUCIE     UNIT 2 2+     REPORTING PERXODlSEPTEMBER 1991
Extuhit 1-Same Source 0 4  
: 3.     LICENSED THERMAL POHER (MAT'):                     ~700
: 4.     NAMEPLATE RATXNG <GROSS MME)+                       850
: 5.     DESIGN Fl.FCTRICAL RATING (NET MME) o               830 6       MAXIMUM DEPENDABLE CAPACITY <GROSS MME) l           882
: 7.     MAXIMUM DEPENDABLE CAPACITY (NET MHE) l             839
: 8.     IF CHANGES OCCUR IN CAPACITY RATXNGS <ITEMS NUMBER 3 THROUGH           7)
SINCE LAST REPORT ~ GXVE REASONS l LEVEL TO WHICH RESTRICTED~ IF ANY (NET MHE)
                                              'OWER 10, REASONS FOR RESTRICTIONS IF ANY:
MONTHLY;YTD-         CUMULATIVE J
HOURS IN REPORT PERIOD:                             720        6551            71424.0 12'3+
NUMBER OF HOURS REACTOR HAS CRITICAL               720.0      6551oO          61411>3 24'J REACTOR RESERVE SHUTDOHN HOURS                         OoO        0.0            0.0 14'5      HOURS GENERATOR ON-LXNE                             720+0      6551oO          60395i3 1    UNIT RESERVE SHUTDOHN HOURS                           0.0        0'0              0.0 iho      GROSS THERMAL ENERGY GENERATED (MHH)             1902571    17462005      158251086 171      GROSS ELECTRICAL ENERGY GENERATED (MWH)           629200    5861130        52758050 18        NET ELECTRICAL ENERGY GENERATED < MWH)             596240    5562055        49896158
    '9.
UNIT SERVXCE FACTOR                                 100+0      100iO            84oh
: 20.      UNIT AVAILABILITYFACTOR                            100.0      10eiO            84.6
: 21.      CAPACITY FACTOR ( USING MDC NET )                   98.7      101i2            84
: 22.      CAPACITY FACTOR (USING, DER NET) "
99.8       102'             84.9
: 23.       UNIT FORCED OUTAGE RATE                                0+0       0.0             5t3 SHUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 25'F         SHUT DOHN AT END OF REPORT PERIOD     ~ ESTIMATED -'DATE OF ST*RTUP:
 
  ~ I
'I
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DDDKBT ND.                   ~6038 UNIT NAME                     ST LUCIE UNIT 2 DATE                               ICTUS $ 9>
COMPLETED BY J. J. BREEN TBLBPHDNB                     8404465- 30 REPORT MONTH SEPTEMBER I                                 I No.         Date Type Duration (Hours)
Reason'ethod of Shutting Reactor'icensee   Event Report System Code'omponent   Code'ause                   & Corrective Action to Down                    &#xb9;                                          Prevent Recurrence 910904       0.0,         B                                     N/A       HF           XXXXXX Unit 2 downpowered for waterbox cleaning.
F Forced                         Rcasoa                                            Method                              Extuhit G - Instructions for S Scheduled                     A - Epupmeat failure (explain)                     1 - Manual                          Prcparatioa of Data Entry B - Mainteaaace or Test                           2 - Manual Scram                    Sheets Licensee Event Rcport C - Refueling                                     3 - Automatic Scram                  (LER) File (NUREG4161)
D - RcguhLtoty strictioa                           4 - Continued E - Operator Trainiag ds Liceasc Exanunatioa       5 - Load Reduction F - Administtative                                9 - Other (Explain)                 Extuhit 1 - Same Source G - Operational Ermr (Expalia)
H - Other (Exphdn)
 
0 4


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-389 UNIT St.Lucie 2 DATE 1 COMPLETED BY J.J.Breen TELEPHONE 407 468-4248 REPORT MONTH SEPTEMBER 1991 From September 4, 1991, to September 6, 1991, Unit 2 downpowered for waterbox cleaning.On September 6, 1991, Unit 2 increased power and remained at full power for the rest of the month.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the'PORVs or safety valves during the report period.}}
OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT St. Lucie     2 DATE             1 COMPLETED BY J.J. Breen TELEPHONE 407   468-4248 REPORT MONTH   SEPTEMBER   1991 From September 4, 1991, to September 6, 1991, Unit 2 downpowered for waterbox cleaning. On September 6, 1991, Unit 2 increased power and remained at full power for the rest of the month.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the 'PORVs or safety valves during the report period.}}

Latest revision as of 14:04, 4 February 2020

Monthly Operating Repts for Sept 1991 for St Lucie Units 1 & 2.W/911013 Ltr
ML17223B283
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/30/1991
From: Breen J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-269, NUDOCS 9110240239
Download: ML17223B283 (17)


Text

, ACCELERATED DIS UTION DEMONST TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9110240239 DOC.DATE: 91/09/30 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BREENIJ.J. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Sept 1991 for St Lucie Units 1 &

ltr. D 2.W/911013 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs) i ENCL L SIZE:

NOTES:

A RECIPXENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL D PD2-2 LA 3 3 PD2-2 PD 1 1 NORRIS,J 1 1 D INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 NRg/J3LP EB10 1 1 NRR/DOEA/OEAB 1 1 R~.'"I LE 01 1 1 RGN2 1 1 EXTERNAL EG&G BRYCE E J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 D

D D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WAFfE! CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

P.Q, Box, Ft. Pierce, FL 34954-0128 OCT f3 SS1 L-91-269 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the September 1991 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should you have any cpxestions on this information, please contact us ~

Very truly yours, D. A. Sa r Vice Pr s dent St. Luci Plant DAS:JJB:kw cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments DAS/PSL N534-91 9ii0240239 9'i05'30 PDR ADQCK 05000335 R

PDR an FPL Group company

AVERAGE DAILY UNIT POWER DOCKET NO ~ 50-335 COMPLETED BY

~11 J.J. Breen MONTH SEPTEMBER 1991 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 9/ 1/91 849 9/ 2/91 847 9/ 3/91 845 9/ 4/91 845

'/91 846 9/ 6/91 847 9/ 7/91 844 9/ 8/91 840 9/ 9/91 838 9/10/91 839 9/11/91 838 9/12/91 835 9/13/91 779 9/14/91 565 9/15/91 833 9/16/91 842 9/17/91 840 9/18/91 357 9/19/91 221 9/20/91 844 9/21/91 839 9/22/91 ,839 9/23/91 840 9/24/91 838 9/25/91 841 9/26/91 842 9/27/91 840 9/28/91 839 9/29/91 839 9/30/91 837

lN

'k

4 OPERATING DATA REPORT

'CT'J DQCj(ET NQ DATE COMr-LETED BY 50 335 J, J, 8 N9$

BREEN TELEPHONE 4<)7/468/4248 OPERATING STATUS UNIT NAME: ST. LUCIE UNIT 1

2. REPORTING PERIOD ) SEPTEMBER 1991
3. LXCENSED THERMAL POWER (MAT): 2700
4. NAMFPLATE RATING ( GROSS MHE ): 850 5i DESTGN El ECTRXC*L RATXNG (NET MHE): 830 6o MAXIMUM DEPENDABLE CAPACXTY <GROSS MME)l 872 7i MAXIMUM DEPENDABLE CAPACITY <NET MHE) ! 839 8, XF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT ~ GIVE REASONS:

9i POWER LEVEL TO WHICH RESTRICTED~ IF ANY <NET MHE)

10. REASONS FOR RESTRICTIONS IF ANY l MONTHLY -YTD- CUMULATXVE
11. HOURS IN REPORT PERIOD: 720 6551 129527iO 12 ~ NUMBER OF HOURS REACTOR HAS CRITXCAL 695o9 6449.7' 99408.1 1 3 ~ REACTOR RESERVE SHUTDOWN HQURS OiO ' 205.3 14'5m HOURS GENERATOR ON-LXNE 693' 6425.4 98529o7 UNXT RESERVE SHUTDOHN HOURS OoO OiO 39.3 16'7 GROSS THERMAL ENERGY GENERATED (MHH) 1838346 16858756 254108810 t GROSS ELECTRICAL ENERGY GENERATED ( MHH) 603120 5589500 83798140
18. NET ELECTRICAL ENERGY GENERATED ( MWH ) 570852 5295173 79187915 UNIT SERVICE FACTOR 96+3 98oi 76.1 19'0'1'2+

UNIT AVAILABILITYFACTOR 96i3 98+ 1 76ii CAPACXTY FACTOR (USXNG MDC NET) 94i5 96.3 75.7 CAPACXTY FACTOR (USING DER NET) 95o5 97i4 74 i 7 231 UNXT FORCED OUTAGE RATE 317 1 i3 4.2 24< SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 10/18/91$ REFUELING 63 DAYS 25 i IF SHUT DOWN AT END OF REPORT PERIOD t ESTIMATED DATE OF STARTUP t

UNIT SHUTDOWNS AI'6) POWER REDUCTIONS DOCKET NO. 50-3 5 UNIT NAME ST LUCIE UNIT 1 DATE OtlT Ql COMPLETED BY J. J. BREEN PELEPHOHE 544045L 5 0 REPORT MONTH SEPTEMBER 1 1 No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent Code'ause & Corrective Action to Down Prevent Recurrence 22 910913 0.0 B N/A HF Unit 1 downpowered for cleaning of the 1B1 waterbox.

910918 5.3 LER 9146 CKTBRK Unit 1 automatically tripped due to operator error while synchronizing the MG Sets.

910918 21.25 N/A IF XXXXXX Delays with the H2 Analyzer were experienced when Unit 1 attempted to increase power.

F Forced Reasoa Method Edubit G - Instructions for S Scheduled A - Equipment failure (cxphin) 1 - Manual Preparadon of Data Entry B - Maintcaanec or Test 2 - Manual Scram Sheets Liceasee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG-0161)

D - Regulatory estrictioa 4 - Getinued E - Operator Training dc license Examiaation 5 - Load Reduction F - Administrative 9 - Other (Exphin) Ed'>it 1 - Same Source G <<Operational Error (Expalin)

H - Other (Explaia)

P P

SUMMARY

OF OPERATING EXPERIENCE DOCKET N00 50-335 UNIT St. Lucie 1 DATE . 13 3 COMPLETED BY J.J. Breen TELEPHONE 407 468-4248 REPORT MONTH SEPTEMBER 1991 From September 13; 1991, to September 14, 1991, Unit 1 downpowered for cleaning of the 1B1 waterbox. Upon completion of waterbox cleaning, Unit 1 increased power on September 15, 1991, and remained there until September 18, 1991. On September 18, 1991, an automatic reactor trip caused by operator error'occurred. Improper synchronizing of the MG Sets was the root cause and this event will be reported in LER 91-06. In an attempt to bring Unit 1 up in power, delays with the H2 Analyzer were experienced. On September 20, 1991, Unit 1 was at full power and remained there for the rest of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

r4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO+ 50-389 COMPTETED BY Z.Z. Breen TELEPHONE 407 468-4248 MONTH SEPTEMBER 199 1 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 9/ 1/91 844 2/91 842 9/ 3/91 841 9/ 4/91 673 9/ 5/91 6e 9/ 6/91, 652 9/ 7/91 840 9/ 8/91 840 9/ 9/91 842 9/le/91 856 9/ll/91 853 9/12/91 854 9/13/'9l 853 9/14/91 855 9/15/91 8~

9/16/91 854 9/17/91 852 9/18/91 853 9/19/91 855 9/20/91 853 9/21/91 850 9/22/91 852 9/23/91 835 9/24/91 849 9/25/91 855 9/26/91 857 9/27/91 856 9/28/91 855 9/29/91 855 9/30/91 854

  • I OPERATING DATA REF'.ORT DOCKET NO DATE COMPLETED BY J+ Ji BREEN TELEPHONE 407/468/4248 OPERATING STATUS UNIT NAME l ST. LUCIE UNIT 2 2+ REPORTING PERXODlSEPTEMBER 1991
3. LICENSED THERMAL POHER (MAT'): ~700
4. NAMEPLATE RATXNG <GROSS MME)+ 850
5. DESIGN Fl.FCTRICAL RATING (NET MME) o 830 6 MAXIMUM DEPENDABLE CAPACITY <GROSS MME) l 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MHE) l 839
8. IF CHANGES OCCUR IN CAPACITY RATXNGS <ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT ~ GXVE REASONS l LEVEL TO WHICH RESTRICTED~ IF ANY (NET MHE)

'OWER 10, REASONS FOR RESTRICTIONS IF ANY:

MONTHLY;YTD- CUMULATIVE J

HOURS IN REPORT PERIOD: 720 6551 71424.0 12'3+

NUMBER OF HOURS REACTOR HAS CRITICAL 720.0 6551oO 61411>3 24'J REACTOR RESERVE SHUTDOHN HOURS OoO 0.0 0.0 14'5 HOURS GENERATOR ON-LXNE 720+0 6551oO 60395i3 1 UNIT RESERVE SHUTDOHN HOURS 0.0 0'0 0.0 iho GROSS THERMAL ENERGY GENERATED (MHH) 1902571 17462005 158251086 171 GROSS ELECTRICAL ENERGY GENERATED (MWH) 629200 5861130 52758050 18 NET ELECTRICAL ENERGY GENERATED < MWH) 596240 5562055 49896158

'9.

UNIT SERVXCE FACTOR 100+0 100iO 84oh

20. UNIT AVAILABILITYFACTOR 100.0 10eiO 84.6
21. CAPACITY FACTOR ( USING MDC NET ) 98.7 101i2 84
22. CAPACITY FACTOR (USING, DER NET) "

99.8 102' 84.9

23. UNIT FORCED OUTAGE RATE 0+0 0.0 5t3 SHUTDOHNS SCHEDULED OVER NEXT 6 MONTHS 25'F SHUT DOHN AT END OF REPORT PERIOD ~ ESTIMATED -'DATE OF ST*RTUP:

~ I

'I

UNIT SHUTDOWNS AND POWER REDUCTIONS DDDKBT ND. ~6038 UNIT NAME ST LUCIE UNIT 2 DATE ICTUS $ 9>

COMPLETED BY J. J. BREEN TBLBPHDNB 8404465- 30 REPORT MONTH SEPTEMBER I I No. Date Type Duration (Hours)

Reason'ethod of Shutting Reactor'icensee Event Report System Code'omponent Code'ause & Corrective Action to Down ¹ Prevent Recurrence 910904 0.0, B N/A HF XXXXXX Unit 2 downpowered for waterbox cleaning.

F Forced Rcasoa Method Extuhit G - Instructions for S Scheduled A - Epupmeat failure (explain) 1 - Manual Prcparatioa of Data Entry B - Mainteaaace or Test 2 - Manual Scram Sheets Licensee Event Rcport C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - RcguhLtoty strictioa 4 - Continued E - Operator Trainiag ds Liceasc Exanunatioa 5 - Load Reduction F - Administtative 9 - Other (Explain) Extuhit 1 - Same Source G - Operational Ermr (Expalia)

H - Other (Exphdn)

0 4

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT St. Lucie 2 DATE 1 COMPLETED BY J.J. Breen TELEPHONE 407 468-4248 REPORT MONTH SEPTEMBER 1991 From September 4, 1991, to September 6, 1991, Unit 2 downpowered for waterbox cleaning. On September 6, 1991, Unit 2 increased power and remained at full power for the rest of the month.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the 'PORVs or safety valves during the report period.