ML17228A953: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/30/1994
| issue date = 11/30/1994
| title = Monthly Operating Repts for Nov 1994 for Saint Lucie Units 1 & 2.W/941209 Ltr
| title = Monthly Operating Repts for Nov 1994 for Saint Lucie Units 1 & 2.W/941209 Ltr
| author name = SAGER D A, WHITE C D
| author name = Sager D, White C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 13
| page count = 13
}}
}}
=Text=
{{#Wiki_filter:PRIORI EY ACCELERATED RIDS PROCESSING) 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9412220102                  DOC.DATE:    94/11/30      NOTARIZED: NO        DOCKET  N FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power                          & Light  Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power                        & Light  Co. 05000389 AUTH. NAME              AUTHOR AFFILIATION WHITE,C.D.              Florida      Power & Light Co.
SAGER,D.A.              Florida        Power & Light Co.
RECIP.NAME              RECIPIENT AFFILIATION
==SUBJECT:==
Monthly operating repts              for  Nov 1994      for Saint Lucie Units .1
              &  2.W/941209      ltr.
DISTRIBUTION CODE: IE24D              - COPIES RECEIVED:LTR              ENCL      SIZE:
TITLE: Monthly Operating Report, (per Tech Specs)
NOTES:
RECIPIENT                COPIES                RECIPIENT          COPIES ID CODE/NAME              LTTR ENCL          ID    CODE/NAME      LTTR ENCL PD2-2 PD                          1    1        NORRIS,J                1    1 INTERNAL: ACRS                              10    10        AEOD/SPD/RRAB          1    1
        ~i RR/DOPS/OECB FCE C~NTER      01            1 1
1 1
NRR/DISP/PIPB RGN2 1
1 1
1 EXTERNAL    LITCO BRYCE i J H                1    1        NOAC                    1    1 NRC PDR                          1    1 RECIPIENT'TS:
iNOTE TO ALL"RIDS" PLEASE HELP US TO REDUCE iVASTE! COYTACT'I'IIE DOCL'XIEYTCONTROL DESK, ROO!iI Pl-37 <EXT. 504- 033 ) TO ELIXflbiATE'iOUR iAiILPROil DIS'I RIBUTION LISTS I:OR DOCL!'i!Ei'I'S YOU DOi    "I'l:I:.D!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                        20    ENCL  20
~
Florida Powor 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128
            ~
r                                  December 9I 1994                              L-94-308 10 CFR 50.36 PPII U. S.      Nuclear Regulatory Commission Attn:      Document Control Desk*
Washington,            DC 20555 Re:      St. Lucie Units      1  and  2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the November, 1994, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.
Should there be any questions on                  this information, please contact us  ~
Very      truly    yours, 486 D. A.          er Vice          sident St. L          e Plant DAS/CDW cc:      Stewart D. Ebneter, Regional Administrator, Region Senior Resident'Inspector, USNRC, St. Lucie Plant II, USNRC Attachments 9412220i02 'P4ii30 PDR      ADQCK    05000335 PDR an FPL Group cYmp'hrlf
I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO      50-335 UNIT.          St. Lucie g1 DATE          12/09/94 COMPLETED BY:  C. D. White TELEPHONE:    (407) 468-4248 MONTH  NOVEMBER  1994 DAY        AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 11/02/94              -4 11/03/94              -4 11/04/94              -3 11/05/94              -3 11/06/94              -3 11/07/94              -3 11/08/94              -3 11/09/94              -3 11/10/94              -3 11/11/94              -4 11/12/94              -4 11/13/94              -3 11/14/94              -3 11/15/94              -3 11/16/94              -3 11/17/94              -3 11/18/94              -3 11/19/94              -3 11/2'0/94              -4 11/21/94              -4 11/22/94              -3 11/23/94              -4 11/24/94              -4 11/25/94              -4 11/26/94              -8 11/27/94              -26 11/28/94              -30 11/29/94              -29 11/30/94              -34
OPERATING DATA REPORT DOCKET NO            50  335 DATE                12/09/94 COMPLETED BY    C. D. WHITE TELEPHONE      407/468/4248 OPERATING STATUS
: l. UNIT NAME:  ST. LUCIE      UNIT 1
: 2. REPORTING PERIOD: NOVEMBER 1994
: 3. LICENSED THERMAL POWER (MWT):                  2700
: 4. NAMEPLATE RATING  (GROSS MWE):                  850
: 5. DESIGN ELECTRICAL  RATING (NET MWE):            830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):        872
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):          839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
9                    I POWER LEVEL TO WH CH RESTRI CTED i I F ANY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY    -YTD-    CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                          720      8016        157296.0
: 12. NUMBER OF HOURS REACTOR WAS CRITICAL              41 '    7049.7      122579.8
: 13. REACTOR RESERVE SHUTDOWN HOURS                      0.0        0.0        205.3
: 14. HOURS GENERATOR ON-LXNE                            0.0    6864.9      121219.7
: 15. UNIT RESERVE SHUTDOWN HOURS                        0.0        0.0          39.3
: 16. GROSS THERMAL ENERGY GENERATED (MWH)                    0 18104409    313869710
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)                0  5920270    103533560
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)            -5045    5594915      97853277
: 19. UNXT SERVICE FACTOR                                0.0      85.6          77.1
: 20. UNXT AVAILABILITYFACTOR                            0.0      85.6          77.1
: 21. CAPACXTY FACTOR (USING MDC NET)                    0.0      83.2          76.4
: 22. CAPACITY FACTOR (USXNG DER NET)                    0.0      84.1          75.8
: 23. UNIT FORCED OUTAGE RATE                            0.0        4.3            4.0 24 'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 13 REFUELING OUTAGE BEGAN OCTOBER    27, 1994.
: 25. IF SHUT  DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:      12/1/94
                                                                                                                                                          ~ ~
UNIT SHl3TDOWNS AND POWER REDUCTIONS DOCKET NO.:                    50-335 UNIT NAME:                    ST LUCIE UNIT I DATE:                          12/09/94 COMPLETED BY:                  C. D. WHITE TELEPHONE:                      (407) 468-4248 REPORT MONTH N VEMBER I                            4 No.        Date  Type Duration    Reason~      Method of          Licensee    System Code'omponent                          Cause    & Corrective (Hours)                    Shutting        Event Report                    Codes                        Action to Down                &#xb9;                                                Prevent Recurrence Reactor 21        941027        0.0                                          N/A          RC          FUELXX  Unit 1 remained  off line for Cycle refueling.
F Forced                        Reason                                        Method                                    Exhibit G - Insuuctions for S Scheduled                      A - EAtuipment failure (explain)              1 - Manual                                Preparation of Data Entry B - Maintenance or Test                        2 - Manual Scram                          Shccts Licensee Event Report C - Refueling                                  3 - Automatic Scram                      (LER) File (NUREG41 6 1)
D - Regulatory restriction                    4 - Continued E - Operator Training dc License Examination  5 - Load Reduction F - Administrative                              9 - Other (Explain)                      Exhibit  I - Same Source G - Operational Error (Explain)
H - Other (Explain)
==SUMMARY==
Op OPERATING EXPERIENCE DOCKET N00 ~    50-335 UNIT:          St. Lucie  g1 DATE:          12/09/94 COMPLETED BY:  C. D. White TELEPHONE:      (407) 468-4248 REPORT MONTH  NOVEMBER  1994 Unit 1 remained  off line during the month of November  for its Cycle 13 Refueling Outage.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
      \ ~
)~(
~ I
AVERAGE DAILY UNIT POWER LEVEL DOCKET  NO.:  50-389 UNIT          St. Lucie g2 DATE~          12/09/94 COMPLETED BY:  C. D. White TELEPHONE:    (407) 468-4248 MONTH  NOVEMBER  1994 DAY      AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94            841 11/02/94            840 11/03/94            839 11/04/94            841 11/05/94            842 11/06/94            840 11/07/94            840 11/08/94            841 11/09/94            841 11/10/94            841 11/11/94            839 11/12/94            839 11/13/94            842 11/14/94            843 11/15/94            843 11/16/94            841 11/17/94            841 11/18/94            845 11/19/94            844 11/20/94            844 11/21/94            843 11/22/94            843 11/23/94            842 11/24/94            845 11/25/94            837 11/26/94            843 11/27/94            838 11/28/94            837 11/29/94            831 11/30/94            831
1 4 ~
OPERATING DATA REPORT DOCKET NO          50 - 389 DATE                12/09/94 COMPLETED BY    CD  D. WHITE TELEPHONE      407/468/4248 OPERATING STATUS
: 1. UNIT NAME:  ST. LUCIE    UNIT 2
: 2. REPORTING PERIOD: NOVEMBER 1994
: 3. LICENSED THERMAL POWER (MWT):                  2700
: 4. NAMEPLATE RATING (GROSS MWE):                  850
: 5. DESIGN ELECTRXCAL RATING (NET MWE):            830
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):        882
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):          839
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRXCTED, IF ANY (NET  MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
MONTHLY  -YTD-    CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                        720      8016          99193.0 12 'UMBER  OF HOURS REACTOR WAS CRITICAL            720.0    6360.1        83523.7
: 13. REACTOR RESERVE SHUTDOWN HOURS                    0.0        0.0            0.0
: 14. HOURS GENERATOR ON-LXNE                        720.0    6227.7        82123.0
: 15. UNIT RESERVE SHUTDOWN HOURS                      0.0        0.0            0.0
: 16. GROSS THERMAL ENERGY GENERATED (MWH)          1943676  16289454      213250379
: 17. GROSS ELECTRICAL ENERGY GENERATED (MWH)        638300  5304650      70814200
: 18. NET ELECTRICAL ENERGY GENERATED (MWH)          605226  4999317      66900488
: 19. UNIT SERVICE FACTOR                            100.0      77.7          82.8
: 20. UNIT AVAILABXLITYFACTOR                        100.0      77.7          82.8
: 21. CAPACITY FACTOR (USING MDC NET)                100.2      74.3          81.3
: 22. CAPACITY FACTOR (USING DER NET)                101.3      75.1          81.7
: 23. UNIT FORCED OUTAGE RATE                          0.0        2.6            7.0
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25  IF SHUT DOWN AT END OF REPORT PER IOD ~    I EST MATED DATE OF STARTUP
UNIT SHt JTDOWNS AZK) POWER REDUCTIONS DOCKET NO.:                  50-389              r UNIT NAME:                  ST LUCIE UNIT 2 DATE:                        12/09/94 COMPLETED BY:                C. D. WHITE-TELEPHONE:                    (407) 468-4248 REPORT MONTH N VEMBER I                          4 No.        Date Type Duration    Reason        Method of          Licensee    System Code'omponent                          Cause    & Corrective (Hours)                    Shutting      Event Report                    Codes                        Action to Down                                                                Prevent Recurrence Reactor Unit 2 operated at essentially full power during the entire month  of November.
F Forced                        Reason                                      Method                                    Exhibit G - Instructions for S Scheduled                    A - Equipment failure (explain)              1 - Manual                                Preparation of Data Entry B - Maintenance or Test                      2 - Manual Scram                          Sheets Liccnscc Event Report C - Rcfucling                                3 - Automatic Scram                      (LER) File (NUREG4161)
D - Regulatory restriction                  4 - Continued E - Operator Training A License Examination  5 - Load Reduction F - Administrative                          9 - Other (Explain)                      Exhibit 1 - Same Source G - Operational Error (Explain)
H - Other (Explain)
==SUMMARY==
OP OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT:        St. Lucie  g2 DATE:        12/09/94 COMPLETED BY: C. D. White TELEPHONE      (407) 468-4248 REPORT MONTH  NOVEMBER  1994 Unit 2 operated at essentially full power during the entire month of November.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.}}

Latest revision as of 13:33, 4 February 2020

Monthly Operating Repts for Nov 1994 for Saint Lucie Units 1 & 2.W/941209 Ltr
ML17228A953
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/30/1994
From: Sager D, Charlotte White
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-308, NUDOCS 9412220102
Download: ML17228A953 (13)


Text

PRIORI EY ACCELERATED RIDS PROCESSING) 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9412220102 DOC.DATE: 94/11/30 NOTARIZED: NO DOCKET N FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION WHITE,C.D. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Nov 1994 for Saint Lucie Units .1

& 2.W/941209 ltr.

DISTRIBUTION CODE: IE24D - COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report, (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/SPD/RRAB 1 1

~i RR/DOPS/OECB FCE C~NTER 01 1 1

1 1

NRR/DISP/PIPB RGN2 1

1 1

1 EXTERNAL LITCO BRYCE i J H 1 1 NOAC 1 1 NRC PDR 1 1 RECIPIENT'TS:

iNOTE TO ALL"RIDS" PLEASE HELP US TO REDUCE iVASTE! COYTACT'I'IIE DOCL'XIEYTCONTROL DESK, ROO!iI Pl-37 <EXT. 504- 033 ) TO ELIXflbiATE'iOUR iAiILPROil DIS'I RIBUTION LISTS I:OR DOCL!'i!Ei'I'S YOU DOi "I'l:I:.D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

~

Florida Powor 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128

~

r December 9I 1994 L-94-308 10 CFR 50.36 PPII U. S. Nuclear Regulatory Commission Attn: Document Control Desk*

Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the November, 1994, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us ~

Very truly yours, 486 D. A. er Vice sident St. L e Plant DAS/CDW cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident'Inspector, USNRC, St. Lucie Plant II, USNRC Attachments 9412220i02 'P4ii30 PDR ADQCK 05000335 PDR an FPL Group cYmp'hrlf

I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-335 UNIT. St. Lucie g1 DATE 12/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 MONTH NOVEMBER 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 11/02/94 -4 11/03/94 -4 11/04/94 -3 11/05/94 -3 11/06/94 -3 11/07/94 -3 11/08/94 -3 11/09/94 -3 11/10/94 -3 11/11/94 -4 11/12/94 -4 11/13/94 -3 11/14/94 -3 11/15/94 -3 11/16/94 -3 11/17/94 -3 11/18/94 -3 11/19/94 -3 11/2'0/94 -4 11/21/94 -4 11/22/94 -3 11/23/94 -4 11/24/94 -4 11/25/94 -4 11/26/94 -8 11/27/94 -26 11/28/94 -30 11/29/94 -29 11/30/94 -34

OPERATING DATA REPORT DOCKET NO 50 335 DATE 12/09/94 COMPLETED BY C. D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

l. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: NOVEMBER 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9 I POWER LEVEL TO WH CH RESTRI CTED i I F ANY (NET MWE)

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 8016 157296.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 41 ' 7049.7 122579.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
14. HOURS GENERATOR ON-LXNE 0.0 6864.9 121219.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 39.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 18104409 313869710
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 5920270 103533560
18. NET ELECTRICAL ENERGY GENERATED (MWH) -5045 5594915 97853277
19. UNXT SERVICE FACTOR 0.0 85.6 77.1
20. UNXT AVAILABILITYFACTOR 0.0 85.6 77.1
21. CAPACXTY FACTOR (USING MDC NET) 0.0 83.2 76.4
22. CAPACITY FACTOR (USXNG DER NET) 0.0 84.1 75.8
23. UNIT FORCED OUTAGE RATE 0.0 4.3 4.0 24 'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 13 REFUELING OUTAGE BEGAN OCTOBER 27, 1994.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/1/94

~ ~

UNIT SHl3TDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: 12/09/94 COMPLETED BY: C. D. WHITE TELEPHONE: (407) 468-4248 REPORT MONTH N VEMBER I 4 No. Date Type Duration Reason~ Method of Licensee System Code'omponent Cause & Corrective (Hours) Shutting Event Report Codes Action to Down ¹ Prevent Recurrence Reactor 21 941027 0.0 N/A RC FUELXX Unit 1 remained off line for Cycle refueling.

F Forced Reason Method Exhibit G - Insuuctions for S Scheduled A - EAtuipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Shccts Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG41 6 1)

D - Regulatory restriction 4 - Continued E - Operator Training dc License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

Op OPERATING EXPERIENCE DOCKET N00 ~ 50-335 UNIT: St. Lucie g1 DATE: 12/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 REPORT MONTH NOVEMBER 1994 Unit 1 remained off line during the month of November for its Cycle 13 Refueling Outage.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

\ ~

)~(

~ I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT St. Lucie g2 DATE~ 12/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 MONTH NOVEMBER 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 841 11/02/94 840 11/03/94 839 11/04/94 841 11/05/94 842 11/06/94 840 11/07/94 840 11/08/94 841 11/09/94 841 11/10/94 841 11/11/94 839 11/12/94 839 11/13/94 842 11/14/94 843 11/15/94 843 11/16/94 841 11/17/94 841 11/18/94 845 11/19/94 844 11/20/94 844 11/21/94 843 11/22/94 843 11/23/94 842 11/24/94 845 11/25/94 837 11/26/94 843 11/27/94 838 11/28/94 837 11/29/94 831 11/30/94 831

1 4 ~

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 12/09/94 COMPLETED BY CD D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: NOVEMBER 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRXCAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRXCTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 8016 99193.0 12 'UMBER OF HOURS REACTOR WAS CRITICAL 720.0 6360.1 83523.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LXNE 720.0 6227.7 82123.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1943676 16289454 213250379
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 638300 5304650 70814200
18. NET ELECTRICAL ENERGY GENERATED (MWH) 605226 4999317 66900488
19. UNIT SERVICE FACTOR 100.0 77.7 82.8
20. UNIT AVAILABXLITYFACTOR 100.0 77.7 82.8
21. CAPACITY FACTOR (USING MDC NET) 100.2 74.3 81.3
22. CAPACITY FACTOR (USING DER NET) 101.3 75.1 81.7
23. UNIT FORCED OUTAGE RATE 0.0 2.6 7.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25 IF SHUT DOWN AT END OF REPORT PER IOD ~ I EST MATED DATE OF STARTUP

UNIT SHt JTDOWNS AZK) POWER REDUCTIONS DOCKET NO.: 50-389 r UNIT NAME: ST LUCIE UNIT 2 DATE: 12/09/94 COMPLETED BY: C. D. WHITE-TELEPHONE: (407) 468-4248 REPORT MONTH N VEMBER I 4 No. Date Type Duration Reason Method of Licensee System Code'omponent Cause & Corrective (Hours) Shutting Event Report Codes Action to Down Prevent Recurrence Reactor Unit 2 operated at essentially full power during the entire month of November.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Liccnscc Event Report C - Rcfucling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training A License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT: St. Lucie g2 DATE: 12/09/94 COMPLETED BY: C. D. White TELEPHONE (407) 468-4248 REPORT MONTH NOVEMBER 1994 Unit 2 operated at essentially full power during the entire month of November.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.