In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.


    '
       \ ~
       \ ~
)~(
)~(

Latest revision as of 13:33, 4 February 2020

Monthly Operating Repts for Nov 1994 for Saint Lucie Units 1 & 2.W/941209 Ltr
ML17228A953
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/30/1994
From: Sager D, Charlotte White
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-94-308, NUDOCS 9412220102
Download: ML17228A953 (13)


Text

PRIORI EY ACCELERATED RIDS PROCESSING) 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9412220102 DOC.DATE: 94/11/30 NOTARIZED: NO DOCKET N FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION WHITE,C.D. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating repts for Nov 1994 for Saint Lucie Units .1

& 2.W/941209 ltr.

DISTRIBUTION CODE: IE24D - COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report, (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: ACRS 10 10 AEOD/SPD/RRAB 1 1

~i RR/DOPS/OECB FCE C~NTER 01 1 1

1 1

NRR/DISP/PIPB RGN2 1

1 1

1 EXTERNAL LITCO BRYCE i J H 1 1 NOAC 1 1 NRC PDR 1 1 RECIPIENT'TS:

iNOTE TO ALL"RIDS" PLEASE HELP US TO REDUCE iVASTE! COYTACT'I'IIE DOCL'XIEYTCONTROL DESK, ROO!iI Pl-37 <EXT. 504- 033 ) TO ELIXflbiATE'iOUR iAiILPROil DIS'I RIBUTION LISTS I:OR DOCL!'i!Ei'I'S YOU DOi "I'l:I:.D!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20

~

Florida Powor 5 Light Company, P.O. Box 128, Fort Pierce, FL 34954-0128

~

r December 9I 1994 L-94-308 10 CFR 50.36 PPII U. S. Nuclear Regulatory Commission Attn: Document Control Desk*

Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the November, 1994, Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should there be any questions on this information, please contact us ~

Very truly yours, 486 D. A. er Vice sident St. L e Plant DAS/CDW cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident'Inspector, USNRC, St. Lucie Plant II, USNRC Attachments 9412220i02 'P4ii30 PDR ADQCK 05000335 PDR an FPL Group cYmp'hrlf

I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-335 UNIT. St. Lucie g1 DATE 12/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 MONTH NOVEMBER 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 11/02/94 -4 11/03/94 -4 11/04/94 -3 11/05/94 -3 11/06/94 -3 11/07/94 -3 11/08/94 -3 11/09/94 -3 11/10/94 -3 11/11/94 -4 11/12/94 -4 11/13/94 -3 11/14/94 -3 11/15/94 -3 11/16/94 -3 11/17/94 -3 11/18/94 -3 11/19/94 -3 11/2'0/94 -4 11/21/94 -4 11/22/94 -3 11/23/94 -4 11/24/94 -4 11/25/94 -4 11/26/94 -8 11/27/94 -26 11/28/94 -30 11/29/94 -29 11/30/94 -34

OPERATING DATA REPORT DOCKET NO 50 335 DATE 12/09/94 COMPLETED BY C. D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

l. UNIT NAME: ST. LUCIE UNIT 1
2. REPORTING PERIOD: NOVEMBER 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRICAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 872
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (XTEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9 I POWER LEVEL TO WH CH RESTRI CTED i I F ANY (NET MWE)

10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 8016 157296.0
12. NUMBER OF HOURS REACTOR WAS CRITICAL 41 ' 7049.7 122579.8
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 205.3
14. HOURS GENERATOR ON-LXNE 0.0 6864.9 121219.7
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 39.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 0 18104409 313869710
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 0 5920270 103533560
18. NET ELECTRICAL ENERGY GENERATED (MWH) -5045 5594915 97853277
19. UNXT SERVICE FACTOR 0.0 85.6 77.1
20. UNXT AVAILABILITYFACTOR 0.0 85.6 77.1
21. CAPACXTY FACTOR (USING MDC NET) 0.0 83.2 76.4
22. CAPACITY FACTOR (USXNG DER NET) 0.0 84.1 75.8
23. UNIT FORCED OUTAGE RATE 0.0 4.3 4.0 24 'HUTDOWNS SCHEDULED OVER NEXT 6 MONTHS CYCLE 13 REFUELING OUTAGE BEGAN OCTOBER 27, 1994.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/1/94

~ ~

UNIT SHl3TDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT NAME: ST LUCIE UNIT I DATE: 12/09/94 COMPLETED BY: C. D. WHITE TELEPHONE: (407) 468-4248 REPORT MONTH N VEMBER I 4 No. Date Type Duration Reason~ Method of Licensee System Code'omponent Cause & Corrective (Hours) Shutting Event Report Codes Action to Down ¹ Prevent Recurrence Reactor 21 941027 0.0 N/A RC FUELXX Unit 1 remained off line for Cycle refueling.

F Forced Reason Method Exhibit G - Insuuctions for S Scheduled A - EAtuipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Shccts Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG41 6 1)

D - Regulatory restriction 4 - Continued E - Operator Training dc License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit I - Same Source G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

Op OPERATING EXPERIENCE DOCKET N00 ~ 50-335 UNIT: St. Lucie g1 DATE: 12/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 REPORT MONTH NOVEMBER 1994 Unit 1 remained off line during the month of November for its Cycle 13 Refueling Outage.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

\ ~

)~(

~ I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 50-389 UNIT St. Lucie g2 DATE~ 12/09/94 COMPLETED BY: C. D. White TELEPHONE: (407) 468-4248 MONTH NOVEMBER 1994 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 11/01/94 841 11/02/94 840 11/03/94 839 11/04/94 841 11/05/94 842 11/06/94 840 11/07/94 840 11/08/94 841 11/09/94 841 11/10/94 841 11/11/94 839 11/12/94 839 11/13/94 842 11/14/94 843 11/15/94 843 11/16/94 841 11/17/94 841 11/18/94 845 11/19/94 844 11/20/94 844 11/21/94 843 11/22/94 843 11/23/94 842 11/24/94 845 11/25/94 837 11/26/94 843 11/27/94 838 11/28/94 837 11/29/94 831 11/30/94 831

1 4 ~

OPERATING DATA REPORT DOCKET NO 50 - 389 DATE 12/09/94 COMPLETED BY CD D. WHITE TELEPHONE 407/468/4248 OPERATING STATUS

1. UNIT NAME: ST. LUCIE UNIT 2
2. REPORTING PERIOD: NOVEMBER 1994
3. LICENSED THERMAL POWER (MWT): 2700
4. NAMEPLATE RATING (GROSS MWE): 850
5. DESIGN ELECTRXCAL RATING (NET MWE): 830
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 882
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 839
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)

SINCE LAST REPORT, GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRXCTED, IF ANY (NET MWE)
10. REASONS FOR RESTRICTIONS, IF ANY:

MONTHLY -YTD- CUMULATIVE

11. HOURS IN REPORT PERIOD: 720 8016 99193.0 12 'UMBER OF HOURS REACTOR WAS CRITICAL 720.0 6360.1 83523.7
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LXNE 720.0 6227.7 82123.0
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 1943676 16289454 213250379
17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 638300 5304650 70814200
18. NET ELECTRICAL ENERGY GENERATED (MWH) 605226 4999317 66900488
19. UNIT SERVICE FACTOR 100.0 77.7 82.8
20. UNIT AVAILABXLITYFACTOR 100.0 77.7 82.8
21. CAPACITY FACTOR (USING MDC NET) 100.2 74.3 81.3
22. CAPACITY FACTOR (USING DER NET) 101.3 75.1 81.7
23. UNIT FORCED OUTAGE RATE 0.0 2.6 7.0
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS 25 IF SHUT DOWN AT END OF REPORT PER IOD ~ I EST MATED DATE OF STARTUP

UNIT SHt JTDOWNS AZK) POWER REDUCTIONS DOCKET NO.: 50-389 r UNIT NAME: ST LUCIE UNIT 2 DATE: 12/09/94 COMPLETED BY: C. D. WHITE-TELEPHONE: (407) 468-4248 REPORT MONTH N VEMBER I 4 No. Date Type Duration Reason Method of Licensee System Code'omponent Cause & Corrective (Hours) Shutting Event Report Codes Action to Down Prevent Recurrence Reactor Unit 2 operated at essentially full power during the entire month of November.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Liccnscc Event Report C - Rcfucling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training A License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

OP OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT: St. Lucie g2 DATE: 12/09/94 COMPLETED BY: C. D. White TELEPHONE (407) 468-4248 REPORT MONTH NOVEMBER 1994 Unit 2 operated at essentially full power during the entire month of November.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.