ML17229A830: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/31/1998
| issue date = 07/31/1998
| title = Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr
| title = Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr
| author name = ROGERS J A, STALL J A
| author name = Rogers J, Stall J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS), ACCE S S ION NBR: 9 8 FACIL:50-335 St+0-399 St AUTH.'AME ROGERS,J.A.
{{#Wiki_filter:CATEGORY 1 REGULA     Y INFORMATION     DISTRIBUTI       SYSTEM (RIDS)
STALL,J.A.
, ACCE S S ION NBR: 9 8 08180040       DOC.DATE: 98/07/31 NOTARIZED: NO                     DOCKET  ¹ FACIL:50-335 St        Lucie Plant, Unit 1, Florida Power 6 Light Co.                     05000335
RECIP.NAME 08180040 DOC.DATE: 98/07/31 NOTARIZED:
          +0-399 St      Lucie Plant, Unit 2, Florida Power 6 Light Co.                     05000389 AUTH .'AME            AUTHOR   AFFILIATION ROGERS,J.A.            Florida   Power 8 Light Co.
NO Lucie Plant, Unit 1, Florida Power 6 Light Co.Lucie Plant, Unit 2, Florida Power 6 Light Co.AUTHOR AFFILIATION Florida Power 8 Light Co.Florida Power 6 Light Co.RECIPIENT AFFILIATION DOCKET¹05000335 05000389
STALL,J.A.            Florida   Power 6 Light Co.
RECIP.NAME            RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Mont.ly op rating repts for July 1998 for St Lucie,Units 1&2.i980814 tr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR' ENCL 3 SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECIPIENT ID CODE/NAME PD2-3 PD COPIES RECIPIENT LTTR ENCL" ID CODE/NAME 1 1 GLEAVES,W COPIES LTTR ENCL'1 0 R INTERNAL: RGN2 1 1 1 1 1 1 AEOD/SPD/RRAB OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D 0 E N NOTE TO ALL"RIDS" RECIPIENTS:
Mont     .ly op rating repts for July 1998 for St Lucie,Units                 1 &
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 I g 1 I RPI Fforida Power 8c Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 August 14, 1998 L-98-207'0 CFR 50.36 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St.Lucie Units 1 and 2 Docket Nos.50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the July 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St.Lucie Units 1 and 2.Please contact us should there be any questions regarding this information.
: 2. i980814     tr.
Very truly yours,: J.A.Stall Vice President St.Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant~>)9808i80040
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR' TITLE: Monthly Operating Report (per Tech Specs)
'P8073i 0 PDR ADOCK 05000335 R-, P DR+an FPL Group company  
ENCL  3      SIZE:
,P I II DOCKET NO 50-335 UNIT NARK ST.LUCIE UNIT 1 DATE~08/07/98 COMPLETED BY J.A.ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: JULY 1998 1.Design Electrical Rating (Mwe-Net)830 2.Maximum Dependable Capacity (Mwe-Net)839 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Critical 4.Number of Hours Generator On Line 5.Unit Reserve Shutdown Hours 744 744 0.0 4770.2 4720.5 0.0 148296.5 146660.7 0.0 6.Net Electrical Energy (MWH)635591 3944661 118829720 0  
E NOTES:
RECIPIENT            COPIES              RECIPIENT             COPIES ID CODE/NAME           LTTR ENCL "       ID CODE/NAME           LTTR ENCL            0 PD2-3 PD                  1     1       GLEAVES,W 1
R INTERNAL:                               1     1       AEOD/SPD/RRAB             1    1 1      1      OC/DBA/PAD                 1     1 RGN2                      1     1 EXTERNAL: LITCO BRYCE,J H               1     1       NOAC                      1     1 NRC PDR                  1     1 D
0 E
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
 
I g
1 I
 
Fforida Power 8c Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 August 14, 1998 RPI                                                                                    L-98-207     '0 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:     St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the July 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Very truly yours,:
J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant                                                 ~>       )
0 PDR R         -,
9808i80040 'P8073i ADOCK  05000335 P DR+
an FPL Group company
 
  ,P I
II
 
DOCKET NO               50 - 335 UNIT NARK               ST. LUCIE UNIT 1 DATE         ~         08/07/98 COMPLETED BY           J. A. ROGERS TELEPHONE               561/467/7296 REPORTING PERIOD:               JULY 1998
: 1. Design Electrical Rating (Mwe-Net)     830
: 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH   -YTD-   CUMULATIVE
: 3. Number   of Hours Reactor Critical     744    4770.2  148296.5
: 4. Number   of Hours Generator On Line   744    4720.5  146660.7
: 5. Unit Reserve Shutdown Hours             0.0     0.0     0.0
: 6. Net Electrical Energy (MWH)             635591 3944661 118829720
 
0


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.:             50-335 UNIT:                  St. Lucie ¹1 DATE:                  Aug. 7, 1998 COMPLETED BY:          J.A.ROGERS TELEPHONE:              (561) 467-7296 REPORT MONTH ~Jul 1998 Unit 1 operated at essentially full power for the entire month of July.
50-335 St.Lucie¹1 Aug.7, 1998 J.A.ROGERS (561)467-7296 REPORT MONTH~Jul 1998 Unit 1 operated at essentially full power for the entire month of July.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT: DATE COMPLETED BY: TELEPHONE:
 
50-335 St.Lucie Nl Aug.7, 1998 J.A.ROGERS (561)467-7296 REPORT MONTH Jvlv1 998 Number Date Type 1 Duration (Hours)Reason 2 Method of Shutting Down Reactor3 Cause 6 Corrective Action to Prevent Recurrence Unit 1 operated at essentially full power for the entire month of July.F Forced S Scheduled 2 Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Reiueling D-Regulatory Restriction E-Operator Training r License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other (Explain)091581 8 pa DOCKET NO 50-389 UNIT NAME ST.LUCIE UNIT 2 DATE 08/07/98 COMPLETED BY J.A.ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: JULY 1998 1.Design Electrical Rating (Mwe-Net)830 2.Maximum Dependable Capacity (Mwe-Net)839 MONTH-YTD-CUMULATIVE 3.Number of Hours Reactor Critical 4.Number of Hours Generator On Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Energy (MWH)744 5087 744 5057.9 0.0 0.0 631261 4323279 112328.5 110698.5 0.0 90589672  
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET     NO.:             50-335 UNIT:                        St. Lucie Nl DATE                        Aug. 7, 1998 COMPLETED BY:                J.A.ROGERS TELEPHONE:                    (561) 467-7296 REPORT MONTH Jvlv1 998 Number       Date Type   Duration       Reason     Method   of                     Cause     6 Corrective 1    (Hours)        2        Shutting                                Action to Down                        Prevent Recurrence Reactor3 Unit 1 operated at essentially full power for the entire month of July.
2                                                    3 F Forced             Reason                                                Method S Scheduled         A - Equipment Failure (Explain)                       1 - Manual B - Maintenance or Test                               2 - Manual Scram C Reiueling                                           3  Automatic Scram D Regulatory Restriction                             4  Continued E - Operator Training r License Examination           5 - Load Reduction F
                          - Administrative                                     9  Other (Explain)
G H - Operational Error (Explain)
Other (Explain) 091581 8 pa
 
DOCKET NO               50 - 389 UNIT NAME               ST. LUCIE UNIT 2 DATE                   08/07/98 COMPLETED BY           J. A. ROGERS TELEPHONE               561/467/7296 REPORTING PERIOD:               JULY 1998
: 1. Design Electrical Rating (Mwe-Net)     830
: 2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH   -YTD-   CUMULATIVE
: 3. Number   of Hours Reactor Critical       744  5087      112328.5
: 4. Number   of Hours Generator On Line     744  5057.9    110698.5
: 5. Unit Reserve Shutdown Hours             0.0  0.0      0.0
: 6. Net Electrical Energy   (MWH)           631261 4323279   90589672


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.:         50-389 UNIT:                St. Lucie ¹2 DATE:                Aug. 7, 1998 COMPLETED BY:        J.A.ROGERS TELEPHONE:            (561) 467-7296 REPORT MONTH ~lul 199$
50-389 St.Lucie¹2 Aug.7, 1998 J.A.ROGERS (561)467-7296 REPORT MONTH~lul 199$Unit 2 operated at essentially full power for the entire month of July.In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
Unit 2 operated at essentially full power for the entire month of July.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: UNIT: DATE: COMPLETED BY'ELEPHONE:
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
50-389 St.Lucie$2 Aug.7, 1998 J.A.ROGERS (561)467-7296 REPORT MONTH J~ul 1998 Number Date Type 1 Duration (Hours)Reason 2 Method of Shutting Down Reactor3 Cause 6 Corrective Action to Prevent Recurrence Unit 2 operated at essentially full popover for the entire month of July.F Forced S Scheduled Reason A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 4 License Examination F-Administrative G-Operational Error tExplain)H-Other (Explain)Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Load Reduction 9-Other tExplain)0915SI IIL}}
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET       NO.:               50-389 UNIT:                            St. Lucie $2 DATE:                            Aug. 7, 1998 COMPLETED                        J.A.ROGERS BY'ELEPHONE:
(561) 467-7296 REPORT MONTH J~ul 1998 Number       Date Type   Duration Reason         Method   of                       Cause 6       Corrective 1      (Hours)        2        Shutting                                Action to Down                          Prevent Recurrence Reactor3 Unit 2 operated at essentially full popover for the entire month of July.
F Forced           Reason                                                 Method A - Equipment                                           1 - Manual S Scheduled
                        - MaintenanceFailure (Explain) 2 - Manual Scram B
C - Refueling or Test                                   3  Automatic Scram D - Regulatory Restriction                             4 - Continued E - Operator Training 4 License Examination           5 - Load Reduction F - Administrative                                     9 - Other tExplain)
G - Operational Error tExplain)
H - Other (Explain) 0915SI IIL}}

Latest revision as of 13:17, 4 February 2020

Monthly Operating Repts for July 1998 for St Lucie,Units 1 & 2.W/980814 Ltr
ML17229A830
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/31/1998
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-207, NUDOCS 9808180040
Download: ML17229A830 (11)


Text

CATEGORY 1 REGULA Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

, ACCE S S ION NBR: 9 8 08180040 DOC.DATE: 98/07/31 NOTARIZED: NO DOCKET ¹ FACIL:50-335 St Lucie Plant, Unit 1, Florida Power 6 Light Co. 05000335

+0-399 St Lucie Plant, Unit 2, Florida Power 6 Light Co. 05000389 AUTH .'AME AUTHOR AFFILIATION ROGERS,J.A. Florida Power 8 Light Co.

STALL,J.A. Florida Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Mont .ly op rating repts for July 1998 for St Lucie,Units 1 &

2. i980814 tr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR' TITLE: Monthly Operating Report (per Tech Specs)

ENCL 3 SIZE:

E NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL " ID CODE/NAME LTTR ENCL 0 PD2-3 PD 1 1 GLEAVES,W 1

R INTERNAL: 1 1 AEOD/SPD/RRAB 1 1 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I g

1 I

Fforida Power 8c Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 August 14, 1998 RPI L-98-207 '0 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the July 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours,:

J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant ~> )

0 PDR R -,

9808i80040 'P8073i ADOCK 05000335 P DR+

an FPL Group company

,P I

II

DOCKET NO 50 - 335 UNIT NARK ST. LUCIE UNIT 1 DATE ~ 08/07/98 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: JULY 1998

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 4770.2 148296.5
4. Number of Hours Generator On Line 744 4720.5 146660.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 635591 3944661 118829720

0

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: Aug. 7, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH ~Jul 1998 Unit 1 operated at essentially full power for the entire month of July.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie Nl DATE Aug. 7, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH Jvlv1 998 Number Date Type Duration Reason Method of Cause 6 Corrective 1 (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit 1 operated at essentially full power for the entire month of July.

2 3 F Forced Reason Method S Scheduled A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C Reiueling 3 Automatic Scram D Regulatory Restriction 4 Continued E - Operator Training r License Examination 5 - Load Reduction F

- Administrative 9 Other (Explain)

G H - Operational Error (Explain)

Other (Explain) 091581 8 pa

DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE 08/07/98 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: JULY 1998

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 744 5087 112328.5
4. Number of Hours Generator On Line 744 5057.9 110698.5
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 631261 4323279 90589672

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie ¹2 DATE: Aug. 7, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 REPORT MONTH ~lul 199$

Unit 2 operated at essentially full power for the entire month of July.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie $2 DATE: Aug. 7, 1998 COMPLETED J.A.ROGERS BY'ELEPHONE:

(561) 467-7296 REPORT MONTH J~ul 1998 Number Date Type Duration Reason Method of Cause 6 Corrective 1 (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit 2 operated at essentially full popover for the entire month of July.

F Forced Reason Method A - Equipment 1 - Manual S Scheduled

- MaintenanceFailure (Explain) 2 - Manual Scram B

C - Refueling or Test 3 Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training 4 License Examination 5 - Load Reduction F - Administrative 9 - Other tExplain)

G - Operational Error tExplain)

H - Other (Explain) 0915SI IIL