ML17229A872: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/30/1998
| issue date = 09/30/1998
| title = Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr
| title = Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr
| author name = ROGERS J A, STALL J A
| author name = Rogers J, Stall J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULA'1YINFORMATION DISTRIBUTI SYSTEM(RIDS)ACCESSION NBR:981FACIL:50-335 St.50-389St.AUTH.NAMEROGERS,J.A.
{{#Wiki_filter:REGULA'1    Y INFORMATION    DISTRIBUTI       SYSTEM (RIDS)
STALL,J.A.RECIP.NAME 0140255DOC.DATE:
ACCESSION NBR:981 0140255            DOC.DATE: 98/09/30        NOTARIZED: NO              DOCKET  ¹ FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power &. Light Co.                        05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co.                         05000389 AUTH. NAME            AUTHOR AFFILIATION ROGERS,J.A.          Florida  Power &. Light Co.
98/09/30NOTARIZED:
STALL, J.A.           Florida  Power &. Light Co.
NOLuciePlant,Unit1,FloridaPower&.LightCo.LuciePlant,Unit2,FloridaPower&LightCo.AUTHORAFFILIATION FloridaPower&.LightCo.FloridaPower&.LightCo.RECIPIENT AFFILIATION DOCKET¹0500033505000389UN
RECIP.NAME            RECIPIENT AFFILIATION UN


==SUBJECT:==
==SUBJECT:==


Monthlyoperating reptsforSept1998forStLucieUnits1&2.With981009ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:RECIPIENT IDCODE/NAME PD2-3PDINTERNAL:
Monthly operating repts        for  Sept 1998    for St Lucie Units      1 &
ACRSLECENTZCOPIESLTTRENCL1'111111RECIPIENT IDCODE/NAME GLEAVES,W AEOD/SPD/RRAB OC/DBA/PAD COPIESLTTRENCL111111EXTERNAL:
2.With 981009    ltr.
LITCOBRYCE,JHNRCPDR1111NOAC11DNNOTETOALL"RIDS"RECIPIENTS PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
DISTRIBUTION CODE: IE24D          COPIES RECEIVED:LTR         ENCL        SIZE:
LTTR10ENCL10
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT            COPIES              RECIPIENT             COPIES ID  CODE/NAME         LTTR' ENCL        ID  CODE/NAME         LTTR ENCL PD2-3 PD                  1              GLEAVES,W                 1    1 INTERNAL: ACRS                        1      1      AEOD/SPD/RRAB             1    1 LE CENTZ                1      1      OC/DBA/PAD               1    1 1      1 EXTERNAL: LITCO BRYCE,J H              1      1      NOAC                      1    1 NRC PDR                  1      1 D
N NOTE TO ALL "RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                10  ENCL    10


FloridaPower&lightCompany.6501SouthOceanDrive,JensenBeach,FL34957October9,1998L-98-25410CFR50.36U.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, DC20555Re:St.LucieUnits1and2DocketNos.50-335and50-389Monthl0eratinReortPursuanttoTechnical Specification 6.9.1.6,andthe'guidance ofGenericLetter97-02,attachedaretheSeptember 1998Operating DataReport,SummaryofOperating Experience Report,andUnitShutdowns andPowerReductions forSt.LucieUnits1and2.Pleasecontactusshouldtherebeanyquestions regarding thisinformation.
Florida Power & light Company. 6501 South Ocean Drive, Jensen Beach, FL 34957 October 9, 1998 L-98-254 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:     St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, and the'guidance of Generic Letter 97-02, attached are the September 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Verytrulyyours,J.A.StallVicePresident St.LuciePlantJAS/sptAttachments cc:RegionalAdministrator, RegionII,USNRCSeniorResidentInspector, USNRC,St.LuciePlant98i0140255 980930PDRADQCK05000335RPDRanFPLGroupcompany DOCKETNOUNITNAMEDATE,COMPLETED BYTELEPHONE 50-335ST.LUCIEUNIT110/02/98J.A.ROGERS561/467/7296 REPORTING PERIOD:SEPTEMBER 19981.DesignElectrical Rating(Mwe-Net) 8302.MaximumDependable Capacity(Mwe-Net) 839MONTH-YTD-CUMULATIVE 3.NumberofHoursReactorCritical4.NumberofHoursGenerator OnLine5.UnitReserveShutdownHours6.NetElectrical Energy(MWH)7207200.06098336234.2149760.56184.5148124.70.00.05153816120038875 SUMMARYOFOPERATING EXPERIENCE DOCKETNO.:UNIT:DATE:COMPLETED BY:TELEPHONE:
Please contact us should there be any questions regarding this information.
50-335St.LuciePlOct.2,1998S.A.ROGERS (561)467-7296llEPORTMONTHSUnit1operatedatessentially fullpowerthroughSeptember 13.OnSeptember 14,theunitdownpowered toapproximately 60%duetofailureofthe1A1traveling screencausedbyaninfluxofjellyfish.
Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 98i0140255 980930 PDR      ADQCK    05000335 R                      PDR an FPL Group company
Theunitreturnedtofullpowerby0945onSeptember 15.Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothepoweroperatedreliefvalvesorthesafetyvalvesduringthereportperiod.
 
UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.:UNIT:DATE:COMPLETED BYTELEPHONE:
DOCKET NO              50- 335 UNIT NAME              ST. LUCIE UNIT 1 DATE,                  10/02/98 COMPLETED BY            J. A. ROGERS TELEPHONE              561/467/7296 REPORTING PERIOD:               SEPTEMBER 1998
50-335St.Lucie¹1Oct.2,1998J.A.ROGERS (561)467-729600NumberDate9-14-98Type1Duration(Hours)0.0Reason2MethodofShuttingDownReactor3Cause6Corrective ActiontoPreventRecurrence Unit1douT)poems toapproximately 60%popoverduetofailureofthe1A1tramlingscreencausedbyaninfluzofjellyfish.
: 1. Design Electrical Rating (Mwe-Net)         830
1FForcedSScheduled 2ReasonA-Equipment FailuretExplain)
: 2. Maximum Dependable Capacity (Mwe-Net)       839 MONTH  -YTD-   CUMULATIVE
B-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTrainingrLicenseExamination F-Administrative G-Operational ErrortExplain)
: 3. Number  of Hours  Reactor Critical        720    6234.2  149760.5
H-OthertExplain)
: 4. Number  of Hours  Generator On Line        720    6184.5  148124.7
Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other(Explain) 091501EPL DOCKETNOUNITNAMEDATECOMPLETED BYTELEPHONE 50-389ST.LUCIEUNIT210/02/98J.A.ROGERS561/467/7296 REPORTING PERIOD:SEPTEMBER 19981.DesignElectrical Rating(Mwe-Net) 8302.MaximumDependable Capacity(Mwe-Net)
: 5. Unit Reserve Shutdown Hours                0.0    0.0      0.0
S393.NumberofHoursReactorCritical4.NumberofHoursGenerator OnLine5.UnitReserveShutdownHours6.NetElectrical Energy(MWH)MONTH-YTD-CUMULATIVE 7206551113792.57206521.9112162.50.00.00.0608873552558491791978 SUMMARYOFOPERATING EXPERIENCE DOCKETNO.:UNIT:DATE:COMPLETED BY:TELEPHONE:
: 6. Net Electrical Energy (MWH)                609833  5153816  120038875
50-389St.Lucie82Oct.2,1998S.A.ROGERS (561)467-7296llEORYMONTHSUnit2operatedatessentially fullpowerfortheentiremonthofSeptember.
 
Inaccordance withtherequirements ofTechnical Specification 6.9.1.6,therewerenochallenges tothepoweroperatedreliefvalvesorthesafetyvalvesduringthereportperiod.
==SUMMARY==
UNITSHUTDOWNS ANDPOWERREDUCTIONS DOCKETNO.:UNIT:DATECOMPLETED BY:TELEPHONE:
OF OPERATING EXPERIENCE DOCKET NO.:           50-335 UNIT:                 St. Lucie Pl DATE:                 Oct. 2, 1998 COMPLETED BY:         S.A.ROGERS TELEPHONE:            (561) 467-7296 llEPORT      MONTHS Unit    1 operated  at essentially full power through September 13. On September 14, the unit downpowered to approximately 60% due to failure of the 1A1 traveling screen caused by an influx of jellyfish. The unit returned to full power by 0945 on September 15.
50-389St.Lucie02Oct.2,1998J.A.ROGERS (561)467-72960NumberDateType1Duration(Hours)Reason2MethodofShuttingDownReactor3CauseSCorrective ActiontoPreventRecurrence Unit2operatedatessentially fullpoorerfortheentiremonthofSeptember.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
FForcedSScheduled ReasonA-Equipment FailuretExplain)
 
B-Maintenance orTestC-Refueling D-Regulatory Restriction E-OperatorTraining&LicenseExamination F-Administrative G-Operational ErrortExplain)
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET      NO.:             50-335 UNIT:                       St. Lucie ¹1 DATE:                        Oct. 2, 1998 COMPLETED BY                J.A.ROGERS TELEPHONE:                    (561) 467-7296 0      0 Number        Date  Type  Duration Reason          Method  of                    Cause 6    Corrective 1    (Hours)          2        Shutting                              Action to Down                        Prevent Recurrence Reactor3 9-14-98            0.0 Unit 1 douT)poems to approximately 60% popover due to failure of the 1A1 tramling screen caused by an influz ofjellyfish.
H-Other(Explain)
1                      2 F Forced              Reason                                                Method S Scheduled            A - Equipment   Failure tExplain)                     1 - Manual B - Maintenance or Test                                2 - Manual Scram C -  Refueling                                         3 - Automatic Scram D - Regulatory Restriction                           4  Continued E - Operator Training r License Examination          5 - Load Reduction F - Administrative                                   9 - Other (Explain)
Method1-Manual2-ManualScram3-Automatic Scram4-Continued 5-LoadReduction 9-Other<Explain) 091581EN
G - Operational Error tExplain)
'%~*II,~'~SI}}
H - Other tExplain) 091501 EPL
 
DOCKET NO              50 - 389 UNIT NAME              ST. LUCIE UNIT 2 DATE                    10/02/98 COMPLETED BY            J. A. ROGERS TELEPHONE              561/467/7296 REPORTING PERIOD:               SEPTEMBER 1998
: 1. Design Electrical Rating (Mwe-Net)         830
: 2. Maximum Dependable Capacity (Mwe-Net)       S39 MONTH  -YTD-  CUMULATIVE
: 3. Number  of Hours Reactor Critical            720  6551      113792.5
: 4. Number  of Hours  Generator On Line        720  6521.9    112162.5
: 5. Unit Reserve Shutdown Hours                  0.0  0.0      0.0
: 6. Net Electrical Energy  (MWH)              608873 5525584  91791978
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.:         50-389 UNIT:                 St. Lucie 82 DATE:                 Oct. 2, 1998 COMPLETED BY:       S.A.ROGERS TELEPHONE:            (561) 467-7296 llE  ORY MONTHS Unit 2 operated at essentially full power for the entire month of September.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
 
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET      NO.:             50-389 UNIT:                         St. Lucie 02 DATE                          Oct. 2, 1998 COMPLETED BY:                J.A.ROGERS TELEPHONE:                    (561) 467-7296 0
Number        Date Type  Duration      Reason    Method  of                      Cause      S Corrective 1      (Hours)         2        Shutting                                Action to Down                          Prevent Recurrence Reactor3 Unit 2 operated at essentially full poorer for the entire month of September.
F Forced            Reason                                                Method
                          -                                                    1 - Manual S Scheduled          A
                          - MaintenanceFailure Equipment         tExplain) 2 - Manual Scram B
C - Refueling or Test                                  3 - Automatic Scram D - Regulatory Restriction                             4 - Continued E - Operator Training & License  Examination            5 - Load Reduction F - Administrative                                     9 - Other <Explain)
G - Operational Error tExplain)
H - Other (Explain) 091581 EN
 
        ~ *I I, ~
          ~
S I}}

Latest revision as of 13:17, 4 February 2020

Monthly Operating Repts for Sept 1998 for St Lucie Units 1 & 2.With 981009 Ltr
ML17229A872
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/30/1998
From: Rogers J, Stall J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-97-02, GL-97-2, L-98-254, NUDOCS 9810140255
Download: ML17229A872 (10)


Text

REGULA'1 Y INFORMATION DISTRIBUTI SYSTEM (RIDS)

ACCESSION NBR:981 0140255 DOC.DATE: 98/09/30 NOTARIZED: NO DOCKET ¹ FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power &. Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION ROGERS,J.A. Florida Power &. Light Co.

STALL, J.A. Florida Power &. Light Co.

RECIP.NAME RECIPIENT AFFILIATION UN

SUBJECT:

Monthly operating repts for Sept 1998 for St Lucie Units 1 &

2.With 981009 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR' ENCL ID CODE/NAME LTTR ENCL PD2-3 PD 1 GLEAVES,W 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 LE CENTZ 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECIPIENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Florida Power & light Company. 6501 South Ocean Drive, Jensen Beach, FL 34957 October 9, 1998 L-98-254 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Pursuant to Technical Specification 6.9.1.6, and the'guidance of Generic Letter 97-02, attached are the September 1998 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.

Please contact us should there be any questions regarding this information.

Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/spt Attachments cc: Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant 98i0140255 980930 PDR ADQCK 05000335 R PDR an FPL Group company

DOCKET NO 50- 335 UNIT NAME ST. LUCIE UNIT 1 DATE, 10/02/98 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: SEPTEMBER 1998

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) 839 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 720 6234.2 149760.5
4. Number of Hours Generator On Line 720 6184.5 148124.7
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 609833 5153816 120038875

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-335 UNIT: St. Lucie Pl DATE: Oct. 2, 1998 COMPLETED BY: S.A.ROGERS TELEPHONE: (561) 467-7296 llEPORT MONTHS Unit 1 operated at essentially full power through September 13. On September 14, the unit downpowered to approximately 60% due to failure of the 1A1 traveling screen caused by an influx of jellyfish. The unit returned to full power by 0945 on September 15.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-335 UNIT: St. Lucie ¹1 DATE: Oct. 2, 1998 COMPLETED BY J.A.ROGERS TELEPHONE: (561) 467-7296 0 0 Number Date Type Duration Reason Method of Cause 6 Corrective 1 (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 9-14-98 0.0 Unit 1 douT)poems to approximately 60% popover due to failure of the 1A1 tramling screen caused by an influz ofjellyfish.

1 2 F Forced Reason Method S Scheduled A - Equipment Failure tExplain) 1 - Manual B - Maintenance or Test 2 - Manual Scram C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 Continued E - Operator Training r License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain)

G - Operational Error tExplain)

H - Other tExplain) 091501 EPL

DOCKET NO 50 - 389 UNIT NAME ST. LUCIE UNIT 2 DATE 10/02/98 COMPLETED BY J. A. ROGERS TELEPHONE 561/467/7296 REPORTING PERIOD: SEPTEMBER 1998

1. Design Electrical Rating (Mwe-Net) 830
2. Maximum Dependable Capacity (Mwe-Net) S39 MONTH -YTD- CUMULATIVE
3. Number of Hours Reactor Critical 720 6551 113792.5
4. Number of Hours Generator On Line 720 6521.9 112162.5
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Energy (MWH) 608873 5525584 91791978

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.: 50-389 UNIT: St. Lucie 82 DATE: Oct. 2, 1998 COMPLETED BY: S.A.ROGERS TELEPHONE: (561) 467-7296 llE ORY MONTHS Unit 2 operated at essentially full power for the entire month of September.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-389 UNIT: St. Lucie 02 DATE Oct. 2, 1998 COMPLETED BY: J.A.ROGERS TELEPHONE: (561) 467-7296 0

Number Date Type Duration Reason Method of Cause S Corrective 1 (Hours) 2 Shutting Action to Down Prevent Recurrence Reactor3 Unit 2 operated at essentially full poorer for the entire month of September.

F Forced Reason Method

- 1 - Manual S Scheduled A

- MaintenanceFailure Equipment tExplain) 2 - Manual Scram B

C - Refueling or Test 3 - Automatic Scram D - Regulatory Restriction 4 - Continued E - Operator Training & License Examination 5 - Load Reduction F - Administrative 9 - Other <Explain)

G - Operational Error tExplain)

H - Other (Explain) 091581 EN

~ *I I, ~

~

S I