| issue date = 03/31/1999
| issue date = 03/31/1999
| title = Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr
| title = Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr
| author name = CENTER J F, COOPER D E, MINOR J W
| author name = Center J, Cooper D, Minor J
| author affiliation = AMERICAN ELECTRIC POWER CO., INC.
| author affiliation = AMERICAN ELECTRIC POWER CO., INC.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULAYINFORMATION DISTRIBUTI
{{#Wiki_filter:CATEGORY 1 REGULA      Y INFORMATION DISTRIBUTI .,SYSTEM (RIDS) 4 ACCESSION NBR:9904210320           DOC.DATE: 99/03/31 NOTARIZED: NO                      DOCKET  ¹ FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana                    M  05000316 AUTH.NAME,~           AUTHOR AFFILIATION MINOR,J.W.           American Electric Power Co., Inc.
.,SYSTEM(RIDS)4ACCESSION NBR:9904210320 DOC.DATE:
CENTER,J.F.           American Electric Power Co., Inc.
99/03/31NOTARIZED:
COOPER,D.E.           American Electric Power Co., Inc.
NOFACIL:50-316 DonaldC.CookNuclearPowerPlant,Unit2,IndianaMAUTH.NAME,~AUTHORAFFILIATION MINOR,J.W.
RECIP.NAME           RECIPIENT AFFILIATION
AmericanElectricPowerCo.,Inc.CENTER,J.F.
AmericanElectricPowerCo.,Inc.COOPER,D.E.
AmericanElectricPowerCo.,Inc.RECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000316


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforMar1999forDCCookNuclearPlantUnit2..With990408ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSXZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:RECIPIENT IDCODE/NAME LPD3-1PDINTERNAL:
Monthly operating rept for Mar 1999            for DC  Cook Nuclear Plant Unit 2..With 990408        ltr.
AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL:
DISTRIBUTION CODE: IE24D          COPIES RECEIVED:LTR         ENCL        SXZE:
LMITCOMARSHALLNRCPDRCOPIESLTTRENCL1111111111RECIPIENT IDCODE/NAME STANG,JFILECENTER01GN3NOACCOPIESLTTRENCL11111111DNOTETOALL"RIDS"RECIPIENTS:
TITLE: Monthly Operating Report (per Tech Specs)
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
NOTES:
LTTR9ENCL9
RECIPIENT           COPIES              RECIPIENT            COPIES ID  CODE/NAME          LTTR ENCL          ID CODE/NAME         LTTR ENCL LPD3-1  PD              1      1      STANG,J                  1    1 INTERNAL: AEOD/SPD/RRAB               1      1      FILE  CENTER    01        1    1 OC/DBA/PAD               1      1        GN3                      1    1 EXTERNAL: LMITCO MARSHALL            1      1      NOAC                      1    1 NRC PDR                    1      1 D
~J~~~AmericanElectric~rCxkQdeeP1ar>>OneCookRaceM1491066164655901U.S.NuclearRegulatory Commission ATTN:DocumentControlDeskWashington, D.C.20555April8,1999Gentlemen:
NOTE TO ALL "RIDS" RECIPIENTS:
Pursuanttotherequirements ofDonaldC.CookNuclearPlantUnit2Technical SpeciTication 6.9.1.8,theattachedMonthlyOperating ReportfortheMonthofMarch1999issubmitted.
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                9  ENCL      9
Sinerely..CooperPlantManagerljcAttachment NRCRegionIIINRCProjectManager-NRRNRCResidentInspector INPORecordsCenterANINuclearEngineering Department R.P.PowersA.C.BakkenIIID.F.Kunsemiller M.W.RencheckP.A.BarrettRegulatory Licensing ManagerD.H.MaiinW.H.SchalkD.G.TurnerG.JohnD.R.Hahn-Department ofHealthS.Hamming-Department ofLaborB.Lewis-McGraw-Hill Companies G.T.Gaffney-CantonD.W.Paul-Lancaster 99042i0320
 
'ir9033iPDRADOCK050003i6RPDRAEI':~Irrrericn's Erretg)'nrlrrer-N.R.C.OPERATING DATAREPORDOCKETNO.DATECOMPLETED BYTELEPHONE 50-316April7,1999JWMinor616-465-5901 OPERATING STATUS1.UnitName2.Reporting Period3.LicensedThermalPower(MWt)4.NamePlateRating(GrossMWe)5.DesignElectrical Rating(NetMWe)6.MaximumDependable Capacity(GROSSM7.MaximumDependable Capacity(NetMWe)D.C.CookUnit2Mar-99341111331090We)11001060Notes:8.IfChangesOccurinCapacityRatings(Itemsno.3through7)SinceLastReportGiveReasons:9.PowerLevelToWhichRestricted, IfAny(NetMWe):10.ReasonsForRestrictions, IfAny:11.HoursinReporting Period12.No.ofHrs.ReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator onLine15.UnitReserveShutdownHours16.GrossThermalEnergyGen.(MWH)17.GrossElectrical EnergyGen.(MWH)18.NetElectrical EnergyGen.(MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(MDCNet)22.UnitCapacityFactor(DERNet)23.UnitForcedOutageRateThisMonth744.00.00.00.00.00.00.00.00.00.00.00.0100.0Year-to-Date 2160.00.00.00.00.00.00.00.00.00.00.00.0100.0Cumulative 186240.0121771.00.0118153.40.0366007650.4 118584640.0 114257779.0 64.264.258.557.020.624.Shutdowns Scheduled overNextSixMonths(Type,Date,andDuration):
~ ~
None25.IfShutDownAtEndofReportPeriod,Estimated DateofStartup:TobeDetermined.
    ~ J~
26.UnitsinTestStatus(PriortoCommercial Operation):
American Electric CxkQdee      P1ar>>
INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION ForecastAchieved 50-316D.C.CookUnit2April7,1999JWMinor616-465-5901 AVERAGEDAILYPOWERLEVEL(MWe-Net)
                                          ~r One Cook Race M1 49106 61 64655901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 April 8, 1999 Gentlemen:
March1999DAY3/1/993/2/993/3/993/4/993/5/993/6/993/7/993/8/993/9/993/10/993/11/993/12/993/13/993/14/993/15/993/16/99AVERAGEDAILYPOWERLEVEL000000000000~0000DAY3/17/993/18/993/19/993/20/993/21/993/22/993/23/993/24/993/25/993/26/993/27/993/28/993/29/993/30/993/31/99AVERAGEDAILYPOWERLEVEL00000'000000000 DOCKETNO.UNITNAMEDATECOMPLETED BYTELEPHONE PAGE50-316D.C.CookUnit2April7,1999JFCenter616-697-5098 1of1MONTHLYOPERATING ACTIVITIES
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical SpeciTication 6.9.1.8, the attached Monthly Operating Report for the Month of March 1999 is submitted.
-March1999HIGHLIGHTS Theunitenteredthisreporting periodinMode5at0%RTP.Theunitexitedthisreporting periodinMode5at0%RTP.Therewerenochallenges tothepressurizer safetyvalvesorpoweroperatedreliefvalves.Grosselectrical generation forthemonthofMarchwas0MWh.DETAILS03/01/99Unitremainedshutdowntheentirereporting periodtoresolvedesignbasisquestions discovered duringtheNRCArchitect andEngineering (AE)Inspection.
Sine rely
AlltimeentriesareEasternStandardTime(EST).
                .. Cooper Plant Manager ljc Attachment NRC Region III NRC Project Manager NRR NRC Resident Inspector INPO Records Center ANI Nuclear Engineering Department R.P. Powers A.C. Bakken III D.F. Kunsemiller M.W. Rencheck P.A. Barrett Regulatory Licensing Manager D.H. Maiin W.H. Schalk D.G. Turner G.John D.R. Hahn Department of Health S. Hamming Department of Labor B. Lewis McGraw-Hill Companies G.T. Gaffney - Canton D.W. Paul - Lancaster 99042i0320 'ir9033i PDR  ADOCK 050003i6 R                            PDR AEI': ~I rrrericn's Erretg)'nrlrrer-
DOCKETNO.UNITNAMEDATECOMPLETED BYTELEPHONE PAGE50-316D.C.CookUnit2April7,1999JFCenter616-697-5098 1of1UNITSHUTDOWNS ANDPOWERREDUCTIONS
 
-March1999METHODOFSHUTTINGLICENSEEDURATIONDOWNEVENTSYSTEMCOMPONENT NO.DATETYPE'OURS REASONREACTORREPORTNO.CODECODECAUSEANDCORRECTIVE ACTIONTOPREVENTRECURRENCE 335010798F744.0N/AN/AN/ATheunitremainedshutdowntoresolvedesignbasisquestions discovered duringtheNRCArchitect and'Engineering (AE)Inspection.
N.R.C. OPERATING DATA REPOR DOCKET NO.             50-316 DATE                  April 7, 1999 COMPLETED BY          JW Minor TELEPHONE              616-465-5901 OPERATING STATUS                                                      Notes:
1TYPE:F:ForcedS:Scheduled 2REASON:A:Equipment Failure(Explain)
: 1. Unit Name                                  D. C. Cook Unit 2
B:Maintenance orTestC:Refueling D:Regulatory Restriction E:OperatorTrainingandLicenseExamination F:Administrative G:Operational Error(Explain)
: 2. Reporting Period                                      Mar-99
H:Other(Explain) 3METHOD:1:Manual2:ManualScram3:Automatic Scram4:Other(Explain) 4SYSTEM:ExhibitG-Instructions forpreparation ofdataentrysheetsforLicenseeEventReport(LER)File(NUREG0161)5COMPONENT:
: 3. Licensed Thermal Power (MWt)                           3411
ExhibitI:SameSource}}
: 4. Name Plate Rating (Gross MWe)                         1133
: 5. Design Electrical Rating (Net MWe)                     1090
: 6. Maximum Dependable Capacity (GROSS MWe)                1100
: 7. Maximum Dependable Capacity (Net MWe)                 1060
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net MWe):
: 10. Reasons For Restrictions, If Any:
This Month              Year-to-Date                  Cumulative
: 11. Hours in Reporting Period                    744.0                  2160.0                    186240.0
: 12. No. of Hrs. Reactor Was Critical                0.0                      0.0                    121771.0
: 13. Reactor Reserve Shutdown Hours                  0.0                      0.0                        0.0
: 14. Hours Generator on Line                        0.0                      0.0                    118153.4
: 15. Unit Reserve Shutdown Hours                    0.0                      0.0                        0.0
: 16. Gross Thermal Energy Gen. (MWH)                  0.0                      0.0                  366007650.4
: 17. Gross Electrical Energy Gen. (MWH)              0.0                      0.0                  118584640.0
: 18. Net Electrical Energy Gen. (MWH)                0.0                      0.0                  114257779.0
: 19. Unit Service Factor                            0.0                      0.0                      64.2
: 20. Unit Availability Factor                        0.0                      0.0                      64.2
: 21. Unit Capacity Factor (MDC Net)                  0.0                      0.0                      58.5
: 22. Unit Capacity Factor (DER Net)                  0.0                     0.0                       57.0
: 23. Unit Forced Outage Rate                        100.0                    100.0                      20.6
: 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast                Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION
 
50- 316 D.C. Cook Unit 2 April 7, 1999 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
March 1999 DAY    AVERAGE DAILY                        DAY  AVERAGE DAILY POWER LEVEL                                POWER LEVEL 3/1/99        0                            3/17/99          0 3/2/99        0                            3/18/99          0 3/3/99        0                            3/19/99          0 3/4/99        0                            3/20/99          0 3/5/99        0                            3/21/99          0 3/6/99                                      3/22/99 0
3/7/99        0                            3/23/99          0 3/8/99        0                            3/24/99          0 3/9/99        0                            3/25/99          0 3/10/99        0                            3/26/99          0 3/11/99        0                            3/27/99          0 3/12/99        0                            3/28/99          0 3/1 3/99      ~ 0                            3/29/99          0 3/14/99        0                            3/30/99          0 3/15/99        0                            3/31/99          0 3/1 6/99        0
 
DOCKET NO.               50 - 316 UNIT NAME                D.C. Cook Unit 2 DATE                      April 7, 1999 COMPLETED BY              JF Center TELEPHONE                616-697-5098 PAGE                      1 of1 MONTHLYOPERATING ACTIVITIES - March 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of March was 0 MWh.
DETAILS 03/01/99                              Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)
Inspection.
All time entries are Eastern Standard Time (EST).
 
DOCKET NO.             50- 316 UNIT NAME              D.C. Cook Unit 2 DATE                    April 7, 1999 COMPLETED BY            JF Center TELEPHONE                616-697-5098 PAGE                    1  of1 UNIT SHUTDOWNS AND POWER REDUCTIONS March 1999 METHOD OF SHUTTING      LICENSEE DURATION                    DOWN          EVENT        SYSTEM    COMPONENT                CAUSE AND CORRECTIVE ACTION NO. DATE  TYPE'OURS             REASON      REACTOR      REPORT NO. CODE      CODE                          TO PREVENT RECURRENCE 335    010798  F    744.0                                    N/A          N/A        N/A                The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and'Engineering (AE)
Inspection.
1 TYPE:         2 REASON:                              3 METHOD:                4 SYSTEM:                                     5 COMPONENT:
F: Forced        A: Equipment Failure (Explain)         1: Manual                Exhibit G - Instructions                      Exhibit I: Same Source S: Scheduled    B: Maintenance or Test                2: Manual Scram          for preparation of data C: Refueling                           3: Automatic Scram        entry sheets for Licensee D: Regulatory Restriction             4: Other (Explain)        Event Report (LER) File E: Operator Training and                                        (NUREG 0161)
License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)}}

Latest revision as of 02:13, 4 February 2020

Monthly Operating Rept for Mar 1999 for DC Cook Nuclear Plant Unit 2.With 990408 Ltr
ML17325B549
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 03/31/1999
From: Center J, Cooper D, Minor J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9904210320
Download: ML17325B549 (6)


Text

CATEGORY 1 REGULA Y INFORMATION DISTRIBUTI .,SYSTEM (RIDS) 4 ACCESSION NBR:9904210320 DOC.DATE: 99/03/31 NOTARIZED: NO DOCKET ¹ FACIL:50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME,~ AUTHOR AFFILIATION MINOR,J.W. American Electric Power Co., Inc.

CENTER,J.F. American Electric Power Co., Inc.

COOPER,D.E. American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Mar 1999 for DC Cook Nuclear Plant Unit 2..With 990408 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SXZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD3-1 PD 1 1 STANG,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 01 1 1 OC/DBA/PAD 1 1 GN3 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

~ ~

~ J~

American Electric CxkQdee P1ar>>

~r One Cook Race M1 49106 61 64655901 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 April 8, 1999 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 2 Technical SpeciTication 6.9.1.8, the attached Monthly Operating Report for the Month of March 1999 is submitted.

Sine rely

.. Cooper Plant Manager ljc Attachment NRC Region III NRC Project Manager NRR NRC Resident Inspector INPO Records Center ANI Nuclear Engineering Department R.P. Powers A.C. Bakken III D.F. Kunsemiller M.W. Rencheck P.A. Barrett Regulatory Licensing Manager D.H. Maiin W.H. Schalk D.G. Turner G.John D.R. Hahn Department of Health S. Hamming Department of Labor B. Lewis McGraw-Hill Companies G.T. Gaffney - Canton D.W. Paul - Lancaster 99042i0320 'ir9033i PDR ADOCK 050003i6 R PDR AEI': ~I rrrericn's Erretg)'nrlrrer-

N.R.C. OPERATING DATA REPOR DOCKET NO. 50-316 DATE April 7, 1999 COMPLETED BY JW Minor TELEPHONE 616-465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit 2
2. Reporting Period Mar-99
3. Licensed Thermal Power (MWt) 3411
4. Name Plate Rating (Gross MWe) 1133
5. Design Electrical Rating (Net MWe) 1090
6. Maximum Dependable Capacity (GROSS MWe) 1100
7. Maximum Dependable Capacity (Net MWe) 1060
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 744.0 2160.0 186240.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 121771.0
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator on Line 0.0 0.0 118153.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 366007650.4
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 118584640.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 114257779.0
19. Unit Service Factor 0.0 0.0 64.2
20. Unit Availability Factor 0.0 0.0 64.2
21. Unit Capacity Factor (MDC Net) 0.0 0.0 58.5
22. Unit Capacity Factor (DER Net) 0.0 0.0 57.0
23. Unit Forced Outage Rate 100.0 100.0 20.6
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

50- 316 D.C. Cook Unit 2 April 7, 1999 JW Minor 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

March 1999 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 3/1/99 0 3/17/99 0 3/2/99 0 3/18/99 0 3/3/99 0 3/19/99 0 3/4/99 0 3/20/99 0 3/5/99 0 3/21/99 0 3/6/99 3/22/99 0

3/7/99 0 3/23/99 0 3/8/99 0 3/24/99 0 3/9/99 0 3/25/99 0 3/10/99 0 3/26/99 0 3/11/99 0 3/27/99 0 3/12/99 0 3/28/99 0 3/1 3/99 ~ 0 3/29/99 0 3/14/99 0 3/30/99 0 3/15/99 0 3/31/99 0 3/1 6/99 0

DOCKET NO. 50 - 316 UNIT NAME D.C. Cook Unit 2 DATE April 7, 1999 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - March 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of March was 0 MWh.

DETAILS 03/01/99 Unit remained shutdown the entire reporting period to resolve design basis questions discovered during the NRC Architect and Engineering (AE)

Inspection.

All time entries are Eastern Standard Time (EST).

DOCKET NO. 50- 316 UNIT NAME D.C. Cook Unit 2 DATE April 7, 1999 COMPLETED BY JF Center TELEPHONE 616-697-5098 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS March 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE'OURS REASON REACTOR REPORT NO. CODE CODE TO PREVENT RECURRENCE 335 010798 F 744.0 N/A N/A N/A The unit remained shutdown to resolve design basis questions discovered during the NRC Architect and'Engineering (AE)

Inspection.

1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)