| issue date = 05/31/1999
| issue date = 05/31/1999
| title = Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr
| title = Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr
| author name = BAKKEN A C, MINOR J W
| author name = Bakken A, Minor J
| author affiliation = INDIANA MICHIGAN POWER CO.
| author affiliation = INDIANA MICHIGAN POWER CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULRYXNFORMATXON DISTRIBUT SYSTEM(RXDS)ACCESSION NBR:9906160247 DOC.DATE:
{{#Wiki_filter:REGUL    RY XNFORMATXON      DISTRIBUT       SYSTEM (RXDS)
99/05/31NOTARIZED:
ACCESSION NBR:9906160247           DOC.DATE: 99/05/31 NOTARIZED: NO                      DOCKET  ¹ FACXL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M                      05000315 AUTH.14AME           AUTHOR AFFXLXAT10N MIN5Q,J.V.
NOFACXL:50-315 DonaldC.CookNuclearPowerPlant,Unit1,IndianaMAUTH.14AME
                    'ndiana      Michigan Power Co.
.AUTHORAFFXLXAT10N MIN5Q,J.V.
BAKKEN,A.C.          Indiana Michigan Power Co.
'ndianaMichiganPowerCo.BAKKEN,A.C.
RECIP.NAME           RECIPIENT AFFILIATION
IndianaMichiganPowerCo.RECIP.NAME RECIPIENT AFFILIATION DOCKET¹05000315


==SUBJECT:==
==SUBJECT:==
Monthlyoperating reptforMay1999forDCP.With990609ltr.DISTRIBUTION CODE:IE24DCOPIESRECEIVED:LTR ENCLSIZE:TITLE:MonthlyOperating Report(perTechSpecs)NOTES:ERECIPIENT XDCODE/NAME LPD3-1PDINTERNAL:
Monthly operating rept        for  May 1999    for  DCP.With 990609      ltr.
AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL:
DISTRIBUTION CODE: IE24D          COPIES RECEIVED:LTR           ENCL        SIZE:
LMITCOMARSHALLNRCPDRCOPIESLTTRENCL1111111111RECIPIENT IDCODE/NAME STANG,JFILECENTER01RGN3NOACCOPIESLTTRENCL11111111D0~~f~fYIlC,'ENOTETOALL"RIDS"RECIPIENTS:
TITLE: Monthly Operating Report (per Tech Specs)
PLEASEHELPUSTOREDUCEWASTE.TOHAVEYOURNAMEORORGANIZATION REMOVEDFROMDISTRIBUTION LISTSORREDUCETHENUMBEROFCOPIESRECEIVEDBYYOUORYOURORGANIZATION, CONTACTTHEDOCUMENTCONTROLDESK(DCD)ONEXTENSION 415-2083TOTALNUMBEROFCOPIESREQUIRED:
NOTES:
LTTR9ENCL9 IndianaMichigancnecockRareMyon,M491066164655901NINOMiMNICNICQNPCWMU.S.NuclearRegulatory Commission Attn:DocumentControlDeskWashington, D.C.20555June9,1999Gentlemen:
E RECIPIENT            COPIES              RECIPIENT            COPIES XD CODE/NAME         LTTR ENCL          ID  CODE/NAME        LTTR ENCL LPD3-1 PD                  1    1      STANG, J                  1      1 INTERNAL: AEOD/SPD/RRAB               1    1      FILE  CENTER    01      1      1 OC/DBA/PAD                 1    1      RGN3                      1    1 EXTERNAL: LMITCO MARSHALL              1    1      NOAC                      1    1 NRC PDR                    1    1 D
Pursuanttotherequirements ofDonaldC.CookNuclearPlantUnit1Technical Specification 6.9.1.8,theattachedmonthlyoperating reportforMay1999issubmitted.
0 C,
Sincerely, A.C.Bakken,IIISiteVicePresident AB/drniAttachment c:ANINuclearEngineering Department INFORecordsCenterNRCProjectManager-NRRNRCRegionIIINRCResidentInspector P.A.BarrettG.T.Gaffney-CantonD.R.Hahn-Department ofHealthS.Hamming-Department ofLaborG.JohnD.F.Kunsemiller B.Lewis-McGraw-Hill Companies D.H.MalinT.P.NoonanD.W.Paul-Lancaster R.P.PowersRegulatory Licensing ManagerM.W.RencheckW.H.SchalkIID.G.Turner9906i60247 99053iPDRADQCK050003i5R'PDRAEI':An)ericn's EnclI'nrlner N.R.C.OPERATING DATAREPORTDOCKETNO.50-315DATE6/8/99COMPLETED BYJWMinorTELEPHONE 616465-5901 OPERATING STATUS1.UnitNameD.C.CookUnit12.Reporting Period3.LicensedThermalPower(MWt)4.NamePlateRating(GrossMWe)5.DesignElectrical Rating(NetMWe)6.MaximumDependable Capacity(GROSSMWe)7.MaximumDependable Capacity(NetMWe)May-99325011521020'0561000Notes:8.IfChangesOccurinCapacityRatings(Itemsno.3through7)SinceLastReportGiveReasons9.PowerLevelToWhichRestricted.
                                                                              ~~f
IfAny(NetMWe)10.ReasonsForRestrictions.
                                                                      ~f Y Il
11.HoursinReporting Period12.No.ofHrs.ReactorWasCritical13.ReactorReserveShutdownHours14.HoursGenerator onLine15.UnitReserveShutdownHours16.GrossTherm.EnergyGen.(MWH)17.GrossElect.EnergyGen.(MWH)18.NetElect.EnergyGen.(MWH)19.UnitServiceFactor20.UnitAvailability Factor21.UnitCapacityFactor(MDCNet)22.UnitCapacityFactor(DERNet)23.UnitForcedOutageRate24.Shutdowns Scheduled overNextSiThisMo.744.00.00.00.00.00.00.00.00.00.00.00.0100.0xMonths(Type,Date,andDuration):
                                                                                                    'E NOTE TO ALL "RIDS" RECIPIENTS:
Yr.toDate3624.00.00.00.00.00.00.00.00.00.00.00.0100.0Cumm.214008.0151285.3463.0148821.1321.0440194814.0 143013940.0 137597640.0 70.270.264.062.414.225.IfShutDownAtEndofReportPeriod,Est'dDateofStartup:26.UnitsinTestStatus(PriortoCommercial Operation):
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                9  ENCL    9
INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION ForecastAchieved II""Iilhr'iI AVERAGEDAILYPOWERLEVEL(MWe-Net)
 
DOCKETNO.50-315UNITONEDATE07-Jun-99 COMPLETED BYJWMinorTELEPHONE 616465-5901 MONTHMay-99DAYAVERAGEDAILYPOWERLEVELDAYAVERAGEDAILYPOWERLEVEL5/1/995/2/995/3/995/4/995/5/995/6/995/7/995/8/995/9/995/10/995/11/995/12/995/13/995/14/995/15/995/16/995/17/995/18/995/19/995/20/995/21/995/22/995/23/995/24/995/25/995/26/995/27/995/28/995/29/995/30/995/31/99  
Indiana Michigan cnecock Rare Myon, M491 06 616 465 5901 N
~~Jl'IctPI~4"IJ.H-'~)t, Its,e~L~1~ILCI+Lt44PPR'>CI
INOMiM NICNICQN PCWM U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 June 9, 1999 Gentlemen:
~.IKJI>w<i~lVl~w-l4,'~~"KII~~=wwlp,kf.sitIJaig1lgaI"QIPQ<~4wWyp,'.l'I,~~'V)It  
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.8, the attached monthly operating report for May 1999 is submitted.
%~DOCKETNO.UNITNAMEDATECOMPLETED BYTELEPHONE PAGE50-315D.C.CookUnit1June7,1999RGHeurich616-697-5049 1of1MONTHLYOPERATING ACTIVITIES
Sincerely, A. C. Bakken, III Site Vice President AB/drni Attachment c:         ANINuclear Engineering Department INFO Records Center NRC Project Manager NRR NRC Region III NRC Resident Inspector P. A. Barrett G. T. Gaffney- Canton D. R. Hahn Department of Health S. Hamming Department of Labor G. John D. F. Kunsemiller B. Lewis McGraw-Hill Companies D. H. Malin T. P. Noonan D. W. Paul Lancaster R. P. Powers Regulatory Licensing Manager M. W. Rencheck W. H. Schalk II D. G. Turner 9906i60247 99053i PDR  ADQCK 050003i5 R                      PDR AEI': An)ericn's Encl  I'nrlner
-May1999Theunitenteredthisreporting periodinMode5at0%RTP.Theunitexitedthisreporting periodinMode5at0%RTP.Therewerenochallenges tothepressurizer safetyvalvesorpoweroperatedreliefvalves.Grosselectrical generation forthemonthofMaywas0MWh.DE2dLG05/01/99TheReactorwasshutdown09/08/97toresolvedesignbasisquestions discovered duringtheNRCArchitect andEngineering (AE)Inspection.
 
'lltimesareinEasternStandardTime(EST).
N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE    6/8/99 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS
g~~IfIA1~tllqn)f''i3 DOCKETNO.UNITNAMEDATECOMPLETED BYTELEPHONE PAGE50-315D.C.CookUnit1June7,.1999RGHeurich616-697-5049 1of1UNITSHUTDOWNS ANDPOWERREDUCTIONS
: 1. Unit Name        D. C. Cook Unit 1                                        Notes:
-May1999DURATIONNO.DATETYPE'OURS METHODOFSHUTTINGLICENSEEDOWNEVENTSYSTEMCOMPONENT REASONREACTORREPORTNO.CODECODECAUSEANDCORRECTIVE ACTIONTOPREVENTRECURRENCE 333090897F744.097-01097-01197-01297-01397-01497-016N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/ATheunitwasshutdowntoresolvedesignbasisquestions discovered duringtheNRCArchitect andEngineering (AE)Inspection.
: 2. Reporting Period                                  May-99
~BE:F:ForcedS:Scheduled 2JKBSQH:A:Equipment Failure(Explain)
: 3. Licensed Thermal Power (MWt)                         3250
B:Maintenance orTestC:Refueling D:Regulatory Restriction E:OperatorTrainingandLicenseExamination F:Administrative G:Operational Error(Explain)
: 4. Name Plate Rating (Gross MWe)                       1152
H:Other(Explain) 3JdEIUQD:
: 5. Design Electrical Rating (Net MWe)                   1020
1:Manual2:ManualScram3:Automatic Scram4:Other(Explain)
: 6. Maximum Dependable Capacity (GROSS MWe)
~XSXEd:ExhibitG-Instructions forpreparation ofdataentrysheetsforLicenseeEventReport(LER)File(NUREG0161)ExhibitI:SameSource}}
                                                              '056
: 7. Maximum Dependable Capacity (Net MWe)                 1000
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
: 9. Power Level To Which Restricted. If Any (Net MWe)
: 10. Reasons For Restrictions.
This Mo.                   Yr. to Date                Cumm.
: 11. Hours in Reporting Period                            744.0                      3624.0            214008.0
: 12. No. of Hrs. Reactor Was Critical                      0.0                          0.0            151285.3
: 13. Reactor Reserve Shutdown Hours                        0.0                          0.0                463.0
: 14. Hours Generator on Line                                0.0                          0.0            148821.1
: 15. Unit Reserve Shutdown Hours                            0.0                          0.0                321.0
: 16. Gross Therm. Energy Gen. (MWH)                        0.0                          0.0          440194814.0
: 17. Gross Elect. Energy Gen. (MWH)                         0.0                          0.0          143013940.0
: 18. Net Elect. Energy Gen. (MWH)                          0.0                          0.0          137597640.0
: 19. Unit Service Factor                                    0.0                          0.0                  70.2
: 20. Unit Availability Factor                              0.0                          0.0                  70.2
: 21. Unit Capacity Factor (MDC Net)                        0.0                          0.0                64.0
: 22. Unit Capacity Factor (DER Net)                        0.0                         0.0                 62.4
: 23. Unit Forced Outage Rate                              100.0                        100.0                  14.2
: 24. Shutdowns Scheduled over Next Si x Months (Type, Date,and Duration):
: 25. If Shut Down At End of Report Period, Est'd Date of Startup:
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast                Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
 
I I
    " "I il hr
'iI
 
AVERAGE DAILYPOWER LEVEL (MWe-Net)
DOCKET NO. 50-315 UNIT          ONE DATE          07-Jun-99 COMPLETED BY  JW Minor TELEPHONE    616465-5901 MONTH    May-99 AVERAGE DAILY                          AVERAGE DAILY DAY    POWER LEVEL                DAY        POWER LEVEL 5/1/99                            5/17/99 5/2/99                            5/18/99 5/3/99                            5/19/99 5/4/99                            5/20/99 5/5/99                            5/21/99 5/6/99                            5/22/99 5/7/99                            5/23/99 5/8/99                            5/24/99 5/9/99                            5/25/99 5/10/99                            5/26/99 5/11/99                            5/27/99 5/12/99                            5/28/99 5/13/99                            5/29/99 5/14/99                            5/30/99 5/15/99                            5/31/99 5/16/99
 
                                                                                                                ~ ~
Jl
          'I                                                  c t
P I  ~4 "IJ.H-'~)t, Its,e             ~ L~ 1 ~
ILCI+L  t44PPR'>CI ~. IKJI>w< i           ~l Vl~w -l  4,   '~ ~   " K II ~ ~ = w w lp,k f.sit I Jaig1lga        I"Q IPQ <~4 wWy p,'.l 'I ,~~ 'V ) It
 
DOCKET NO.             50- 315 UNIT NAME              D.C. Cook Unit 1 DATE                  June 7, 1999
          % ~
COMPLETED BY            RG Heurich TELEPHONE              616-697-5049 PAGE                    1 of1 MONTHLYOPERATING ACTIVITIES - May 1999 The unit entered this reporting period in Mode 5 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of May was 0 MWh.
DE2dLG 05/01/99                              The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
'll  times are in Eastern Standard Time (EST).
 
                        ~
g f
~
I I
A 1
                  ~ t ll q
          )f''i n
3
 
DOCKET NO.               50-315 UNIT NAME                D.C. Cook Unit 1 DATE                    June 7,.1999 COMPLETED BY            RG Heurich TELEPHONE                616-697-5049 PAGE                    1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - May 1999 METHOD OF SHUTTING      LICENSEE DURATION                  DOWN          EVENT        SYSTEM    COMPONENT                CAUSE AND CORRECTIVE ACTION NO. DATE  TYPE'OURS             REASON    REACTOR      REPORT NO. CODE      CODE                        TO PREVENT RECURRENCE 333    090897  F      744.0                                    97-010        N/A        N/A                The unit was shutdown to resolve design 97-011        N/A        N/A                basis questions discovered during the NRC 97-012        N/A        N/A                Architect and Engineering (AE) Inspection.
97-013        N/A        N/A 97-014        N/A        N/A 97-016        N/A        N/A
~BE:             2JKBSQH:                              3JdEIUQD:                 ~XSXEd:
F: Forced        A: Equipment Failure (Explain)         1: Manual                Exhibit G - Instructions                      Exhibit I: Same Source S: Scheduled    B: Maintenance or Test                  2: Manual Scram          for preparation of data C: Refueling                           3: Automatic Scram        entry sheets for Licensee D: Regulatory Restriction               4: Other (Explain)        Event Report (LER) File E: Operator Training and                                          (NUREG 0161)
License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)}}

Latest revision as of 02:12, 4 February 2020

Monthly Operating Rept for May 1999 for Dcp.With 990609 Ltr
ML17326A006
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 05/31/1999
From: Bakken A, Minor J
INDIANA MICHIGAN POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9906160247
Download: ML17326A006 (9)


Text

REGUL RY XNFORMATXON DISTRIBUT SYSTEM (RXDS)

ACCESSION NBR:9906160247 DOC.DATE: 99/05/31 NOTARIZED: NO DOCKET ¹ FACXL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.14AME AUTHOR AFFXLXAT10N MIN5Q,J.V.

'ndiana Michigan Power Co.

BAKKEN,A.C. Indiana Michigan Power Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1999 for DCP.With 990609 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:

E RECIPIENT COPIES RECIPIENT COPIES XD CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LPD3-1 PD 1 1 STANG, J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 FILE CENTER 01 1 1 OC/DBA/PAD 1 1 RGN3 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

0 C,

~~f

~f Y Il

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL 9

Indiana Michigan cnecock Rare Myon, M491 06 616 465 5901 N

INOMiM NICNICQN PCWM U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 June 9, 1999 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.8, the attached monthly operating report for May 1999 is submitted.

Sincerely, A. C. Bakken, III Site Vice President AB/drni Attachment c: ANINuclear Engineering Department INFO Records Center NRC Project Manager NRR NRC Region III NRC Resident Inspector P. A. Barrett G. T. Gaffney- Canton D. R. Hahn Department of Health S. Hamming Department of Labor G. John D. F. Kunsemiller B. Lewis McGraw-Hill Companies D. H. Malin T. P. Noonan D. W. Paul Lancaster R. P. Powers Regulatory Licensing Manager M. W. Rencheck W. H. Schalk II D. G. Turner 9906i60247 99053i PDR ADQCK 050003i5 R PDR AEI': An)ericn's Encl I'nrlner

N.R.C. OPERATING DATA REPORT DOCKET NO. 50-315 DATE 6/8/99 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS

1. Unit Name D. C. Cook Unit 1 Notes:
2. Reporting Period May-99
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross MWe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe)

'056

7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons
9. Power Level To Which Restricted. If Any (Net MWe)
10. Reasons For Restrictions.

This Mo. Yr. to Date Cumm.

11. Hours in Reporting Period 744.0 3624.0 214008.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Therm. Energy Gen. (MWH) 0.0 0.0 440194814.0
17. Gross Elect. Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Elect. Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0 0.0 70.2
20. Unit Availability Factor 0.0 0.0 70.2
21. Unit Capacity Factor (MDC Net) 0.0 0.0 64.0
22. Unit Capacity Factor (DER Net) 0.0 0.0 62.4
23. Unit Forced Outage Rate 100.0 100.0 14.2
24. Shutdowns Scheduled over Next Si x Months (Type, Date,and Duration):
25. If Shut Down At End of Report Period, Est'd Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

I I

" "I il hr

'iI

AVERAGE DAILYPOWER LEVEL (MWe-Net)

DOCKET NO. 50-315 UNIT ONE DATE 07-Jun-99 COMPLETED BY JW Minor TELEPHONE 616465-5901 MONTH May-99 AVERAGE DAILY AVERAGE DAILY DAY POWER LEVEL DAY POWER LEVEL 5/1/99 5/17/99 5/2/99 5/18/99 5/3/99 5/19/99 5/4/99 5/20/99 5/5/99 5/21/99 5/6/99 5/22/99 5/7/99 5/23/99 5/8/99 5/24/99 5/9/99 5/25/99 5/10/99 5/26/99 5/11/99 5/27/99 5/12/99 5/28/99 5/13/99 5/29/99 5/14/99 5/30/99 5/15/99 5/31/99 5/16/99

~ ~

Jl

'I c t

P I ~4 "IJ.H-'~)t, Its,e ~ L~ 1 ~

ILCI+L t44PPR'>CI ~. IKJI>w< i ~l Vl~w -l 4, '~ ~ " K II ~ ~ = w w lp,k f.sit I Jaig1lga I"Q IPQ <~4 wWy p,'.l 'I ,~~ 'V ) It

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit 1 DATE June 7, 1999

% ~

COMPLETED BY RG Heurich TELEPHONE 616-697-5049 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - May 1999 The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of May was 0 MWh.

DE2dLG 05/01/99 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

'll times are in Eastern Standard Time (EST).

~

g f

~

I I

A 1

~ t ll q

)fi n

3

DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit 1 DATE June 7,.1999 COMPLETED BY RG Heurich TELEPHONE 616-697-5049 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - May 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE'OURS REASON REACTOR REPORT NO. CODE CODE TO PREVENT RECURRENCE 333 090897 F 744.0 97-010 N/A N/A The unit was shutdown to resolve design 97-011 N/A N/A basis questions discovered during the NRC 97-012 N/A N/A Architect and Engineering (AE) Inspection.97-013 N/A N/A 97-014 N/A N/A 97-016 N/A N/A

~BE: 2JKBSQH: 3JdEIUQD: ~XSXEd:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)