Line 3: Line 3:
| issue date = 04/30/1999
| issue date = 04/30/1999
| title = Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr
| title = Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr
| author name = COOPER D E, GORA P J, MINOR J W
| author name = Cooper D, Gora P, Minor J
| author affiliation = AMERICAN ELECTRIC POWER CO., INC.
| author affiliation = AMERICAN ELECTRIC POWER CO., INC.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:1 If I~~CATEGORY 1 REGULA Y INFORMATION DISTRIBUTIOh SYSTEM (RIDS)ACCESSION NBR:9905200145 DOC.DATE: 99/04/30 NOTARIZED:
{{#Wiki_filter:1 CATEGORY 1 If ~ I
NO DOCKET FACIL:50-315 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH.NAME AUTHOR AFFILIATION MINOR,J.W.
      ~                     REGULA     Y INFORMATION     DISTRIBUTIOh SYSTEM (RIDS)
American Electric Power Co., Inc.GORA,P.J.'
ACCESSION NBR:9905200145           DOC.DATE: 99/04/30       NOTARIZED: NO               DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana                     M 05000315 AUTH. NAME           AUTHOR AFFILIATION MINOR,J.W.           American   Electric   Power Co.,   Inc.
American Electric Power Co.;Inc.COOPER,D.E.
GORA,P.J.'           American   Electric   Power Co.;   Inc.
American Electric Power Co., Inc.RECIP.NAME RECIPIENT AFFILIATION
COOPER,D.E.           American   Electric   Power Co.,   Inc.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating r'ept for Apr 1999 for DC Cook Nuclear Plant, Unit 1.With 990508 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES: E RECIPIENT, ID CODE/NAME LPD3-1 PD INTERNAL: AEOD/SPD/RRAB OC/DBA/PAD EXTERNAL: LMITCO MARSHALL NRC PDR/COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME STANG,J RGN3 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 0 D~M'E NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating r'ept for Apr 1999 for           DC Cook Nuclear Plant, Unit 1.With 990508 ltr.
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEZVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL' t
DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR         ENCL       SIZE:
American Electric P~Cook wudeer Rer>>One Cook Pboe etdynen,M149106 6164656901 I'.S.Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.20555 May 8, 1999 Gentlemen:
TITLE: Monthly Operating Report (per Tech Specs)
Pursuant to the requirements of Donald C.Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.8, the attached Monthly Operating Report for the Month of April 1999 is submitted.
E NOTES:
Since ly.E.Cooper Plant Manager If fjc Attachment NRC Region III NRC Project Manager-NRR NRC Resident Inspector INPO Records Center ANI Nuclear Engineering Department R.P.Powers A.C.Bakken III D.F.Kunsemiller M.W.Rencheck P.A.Barrett Regulatory Licensing Manager D.H.Malin W.H.Schalk D.G.Turner G.John D,R.,Hahn-Department of Health'S;Hamming-Department of Labor B;Lewis-McGraw-Hill Companies G.T.Gaffney-Canton D.W.Paul-Lancaster 9905200i45 990430 PDR ADQCK 05000$i5 R'DR AEPr~trnerica's
                                                    /
&rerpy I'arlrrer'-
RECIPIENT,           COPIES              RECIPIENT            COPIES ID CODE/NAME          LTTR ENCL        ID CODE/NAME         LTTR ENCL                  0 LPD3-1   PD               1      1      STANG,J                  1      1 INTERNAL: AEOD/SPD/RRAB               1      1                                1      1 OC/DBA/PAD               1      1      RGN3                      1      1 EXTERNAL: LMITCO MARSHALL             1       1     NOAC                      1       1 NRC PDR                  1       1 D
0 N.R.C.OPERATING DATA REPORT DOCKET NO.50-315 DATE May 7, 1999 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS 1.Unit Name 2.Reporting Period 3.Licensed Thermal Power (MWt)4.Name Plate Rating (Gross Mwe)5.Design Electrical Rating (Net MWe)6.Maximum Dependable Capacity (GROSS M 7.Maximum Dependable Capacity (Net MWe)D.C.Cook Unit1 Apr-99 3250 1152 1020 We)1056 1000 Notes: 8.If Changes Occur in Capacity Ratings (Items no.3 through 7)Since Last Report Give Reasons: 9.Power Level To Which Restricted, If Any (Net Mwe): 10.Reasons For Restrictions, If Any: 11.Hours in Reporting Period 12.No.of Hrs.Reactor Was Critical 13.Reactor Reserve Shutdown Hours 14.Hours Generator on Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Gen.(MWH)17.Gross Electrical Energy Gen.(MWH)18.Net Electrical Energy Gen.(MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (MDC Net)22.Unit Capacity Factor (DER Net)23.Unit Forced Outage Rate This Month 720.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Year-to-Date 2880.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 100.0 Cumulative 213264.0 151285.3 463.0 148821.1 321.0 440194814.0 143013940.0 137597640.0 70.4 70.4 64.2 62.6 13.8 24.Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
                                                                                                        ~
None 25.If Shut Down At End of Report Period, Estimated Date of Startup: To be Determined.
M
26.Units in Test Status (Prior to Commercial Operation):
                                                                                                              'E NOTE TO ALL "RIDS" RECIPIENTS:
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Forecast Achieved DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE 50-315 D.C.Cook Unit1 May 7, 1999 JW Minor 616-465-5901 AVERAGE DAILY POWER LEVEL (MWe-Net)April 1999 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 4/1/99 4/2/99 4/3/99 4/4/99 4/5/99 4/6/99 4/7/99 4/8/99 4/9/99 4/10/99 4/11/99 4/12/99 4/13/99 4/14/99 4/15/99 4/16/99 4/17/99 4/18/99 4/19/99 4/20/99 4/21/99 4/22/99 4/23/99 4/24/99 4/25/99 4/26/99 4/27/99 4/28/99 4/29/99 4/30/99
PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEZVED BY YOU OR YOUR ORGANIZATION, CONTACT THE LISTS DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               9   ENCL'
~~0 DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C.Cook Unit 1 May 7, 1999 PJ Gora 616-697-5765 1 of1 MONTHLY OPERATING ACTIVITIES
 
-April 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0%RTP.The unit exited this reporting period in Mode 5 at 0%RTP.There were no challenges to the pressurizer safety valves or power operated relief valves.Gross electrical generation for the month of April was 0 MWh.DETAILS'4/01/99 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE)Inspection.
t American Electric Cook wudeer Rer>>
'll times are in Eastern Standard Time (EST).
P~
DOCKET NO.UNIT NAME DATE COMPLETED BY TELEPHONE PAGE 50-315 D.C.Cook Unit1 May 7, 1999 PJ Gora 616497-5765 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS
One Cook Pboe etdynen,M149106 6164656901 I'.S.
-April 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT NO.DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO.CODE4 CODE5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE 333 090897 F 720.0 F 97-010 97-011 97-012 97-013 97-014 97-016 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A The unit was shutdown to resolve design basis questions discovered during the NRC Architect and Engineering (AE)Inspection.
Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 May 8, 1999 Gentlemen:
1 TYPE: F: Forced S: Scheduled 2 REASON: A: Equipment Failure (Explain)B: Maintenance or Test C: Refueling D: Regulatory Restriction E: Operator Training and License Examination F: Administrative G: Operational Error (Explain)H: Other (Explain)3 METHOD: 1: Manual 2: Manual Scram 3: Automatic Scram 4: Other (Explain)4 SYSTEM: Exhibit G-Instructions for preparation of data entry sheets for Licensee Event Report (LER)File (NUREG 0161)5 COMPONENT:
Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.8, the attached Monthly Operating Report for the Month of April 1999 is submitted.
Exhibit I: Same Source 0 11',,<<4!~}}
Since       ly
      .E. Cooper Plant Manager If fjc Attachment NRC Region III NRC Project Manager NRR NRC Resident Inspector INPO Records Center ANI Nuclear Engineering Department R.P. Powers A.C. Bakken III D.F. Kunsemiller M.W. Rencheck P.A. Barrett Regulatory Licensing Manager D.H. Malin W.H. Schalk D.G. Turner G. John D,R.,Hahn Department of Health S; Hamming Department of Labor B; Lewis McGraw-Hill Companies G.T. Gaffney - Canton D.W. Paul - Lancaster PDR R          'DR 9905200i45 990430 ADQCK         05000$ i5 AEPr~trnerica's &rerpy I'arlrrer'-
 
N.R.C. OPERATING DATA REPORT 0
DOCKET NO.             50 - 315 DATE                   May 7, 1999 COMPLETED BY           JW Minor TELEPHONE             616465-5901 OPERATING STATUS                                                     Notes:
: 1. Unit Name                                   D. C. Cook Unit1
: 2. Reporting Period                                     Apr-99
: 3. Licensed Thermal Power (MWt)                         3250
: 4. Name Plate Rating (Gross Mwe)                         1152
: 5. Design Electrical Rating (Net MWe)                   1020
: 6. Maximum Dependable Capacity (GROSS MWe)              1056
: 7. Maximum Dependable Capacity (Net MWe)                 1000
: 8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
: 9. Power Level To Which Restricted, If Any (Net Mwe):
: 10. Reasons For Restrictions, If Any:
This Month              Year-to-Date              Cumulative
: 11. Hours in Reporting Period                     720.0                  2880.0                  213264.0
: 12. No. of Hrs. Reactor Was Critical                 0.0                      0.0                  151285.3
: 13. Reactor Reserve Shutdown Hours                   0.0                      0.0                    463.0
: 14. Hours Generator on Line                         0.0                      0.0                  148821.1
: 15. Unit Reserve Shutdown Hours                     0.0                      0.0                    321.0
: 16. Gross Thermal Energy Gen. (MWH)                 0.0                      0.0                440194814.0
: 17. Gross Electrical Energy Gen. (MWH)               0.0                      0.0                143013940.0
: 18. Net Electrical Energy Gen. (MWH)                 0.0                      0.0                137597640.0
: 19. Unit Service Factor                             0.0                      0.0                      70.4
: 20. Unit Availability Factor                         0.0                      0.0                      70.4
: 21. Unit Capacity Factor (MDC Net)                   0.0                      0.0                      64.2
: 22. Unit Capacity Factor (DER Net)                   0.0                      0.0                      62.6
: 23. Unit Forced Outage Rate                       100.0                     100.0                     13.8
: 24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):
None
: 25. If Shut Down At End of Report Period, Estimated Date of Startup:
To be Determined.
: 26. Units in Test Status (Prior to Commercial Operation):
Forecast                Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION
 
DOCKET NO. 50- 315 UNIT NAME      D.C. Cook Unit1 DATE          May 7, 1999 COMPLETED BY  JW Minor TELEPHONE      616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)
April 1999 DAY  AVERAGE DAILY                        DAY    AVERAGE DAILY POWER LEVEL                                POWER LEVEL 4/1/99                                    4/17/99 4/2/99                                    4/18/99 4/3/99                                    4/19/99 4/4/99                                    4/20/99 4/5/99                                    4/21/99 4/6/99                                    4/22/99 4/7/99                                    4/23/99 4/8/99                                    4/24/99 4/9/99                                    4/25/99 4/10/99                                    4/26/99 4/11/99                                    4/27/99 4/12/99                                    4/28/99 4/13/99                                    4/29/99 4/14/99                                    4/30/99 4/15/99 4/16/99
 
~ ~
0 DOCKET NO.            50 - 315 UNIT NAME              D.C. Cook Unit 1 DATE                    May 7, 1999 COMPLETED BY            PJ Gora TELEPHONE              616-697-5765 PAGE                    1 of1 MONTHLYOPERATING ACTIVITIES - April 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.
The unit exited this reporting period in Mode 5 at 0% RTP.
There were no challenges to the pressurizer safety valves or power operated relief valves.
Gross electrical generation for the month of April was 0 MWh.
DETAILS
          '4/01/99 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.
'll  times are in Eastern Standard Time (EST).
 
DOCKET NO.               50-315 UNIT NAME               D.C. Cook Unit1 DATE                    May 7, 1999 COMPLETED BY            PJ Gora TELEPHONE                616497-5765 PAGE                    1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - April 1999 METHOD OF SHUTTING      LICENSEE DURATION                    DOWN          EVENT        SYSTEM    COMPONENT                CAUSE AND CORRECTIVE ACTION NO.     DATE TYPE1    HOURS          REASON2    REACTOR3      REPORT NO. CODE4      CODE5                        TO PREVENT RECURRENCE 333    090897  F      720.0            F                      97-010        N/A        N/A                The unit was shutdown to resolve design 97-011        N/A        N/A                basis questions discovered during the NRC 97-012        N/A        N/A                Architect and Engineering (AE) Inspection.
97-013        N/A        N/A 97-014        N/A        N/A 97-016        N/A        N/A 1 TYPE:            2 REASON:                              3  METHOD:                4 SYSTEM:                                    5 COMPONENT:
F: Forced          A: Equipment Failure (Explain)          1: Manual                Exhibit G - Instructions                      Exhibit I: Same Source S: Scheduled        B: Maintenance or Test                2:  Manual Scram          for preparation of data C: Refueling                          3:  Automatic Scram        entry sheets for Licensee D: Regulatory Restriction              4: Other (Explain)        Event Report (LER) File E: Operator Training and                                          (NUREG 0161)
License Examination F: Administrative G: Operational Error (Explain)
H: Other (Explain)
 
0 11
  <<4!~}}

Latest revision as of 00:29, 4 February 2020

Monthly Operating Rept for Apr 1999 for DC Cook Nuclear Plant,Unit 1.With 990508 Ltr
ML17335A530
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 04/30/1999
From: Cooper D, Gora P, Minor J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9905200145
Download: ML17335A530 (8)


Text

1 CATEGORY 1 If ~ I

~ REGULA Y INFORMATION DISTRIBUTIOh SYSTEM (RIDS)

ACCESSION NBR:9905200145 DOC.DATE: 99/04/30 NOTARIZED: NO DOCKET FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 AUTH. NAME AUTHOR AFFILIATION MINOR,J.W. American Electric Power Co., Inc.

GORA,P.J.' American Electric Power Co.; Inc.

COOPER,D.E. American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating r'ept for Apr 1999 for DC Cook Nuclear Plant, Unit 1.With 990508 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

E NOTES:

/

RECIPIENT, COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 LPD3-1 PD 1 1 STANG,J 1 1 INTERNAL: AEOD/SPD/RRAB 1 1 1 1 OC/DBA/PAD 1 1 RGN3 1 1 EXTERNAL: LMITCO MARSHALL 1 1 NOAC 1 1 NRC PDR 1 1 D

~

M

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.'TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION OR REDUCE THE NUMBER OF COPIES RECEZVED BY YOU OR YOUR ORGANIZATION, CONTACT THE LISTS DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 9 ENCL'

t American Electric Cook wudeer Rer>>

P~

One Cook Pboe etdynen,M149106 6164656901 I'.S.

Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 May 8, 1999 Gentlemen:

Pursuant to the requirements of Donald C. Cook Nuclear Plant Unit 1 Technical Specification 6.9.1.8, the attached Monthly Operating Report for the Month of April 1999 is submitted.

Since ly

.E. Cooper Plant Manager If fjc Attachment NRC Region III NRC Project Manager NRR NRC Resident Inspector INPO Records Center ANI Nuclear Engineering Department R.P. Powers A.C. Bakken III D.F. Kunsemiller M.W. Rencheck P.A. Barrett Regulatory Licensing Manager D.H. Malin W.H. Schalk D.G. Turner G. John D,R.,Hahn Department of Health S; Hamming Department of Labor B; Lewis McGraw-Hill Companies G.T. Gaffney - Canton D.W. Paul - Lancaster PDR R 'DR 9905200i45 990430 ADQCK 05000$ i5 AEPr~trnerica's &rerpy I'arlrrer'-

N.R.C. OPERATING DATA REPORT 0

DOCKET NO. 50 - 315 DATE May 7, 1999 COMPLETED BY JW Minor TELEPHONE 616465-5901 OPERATING STATUS Notes:

1. Unit Name D. C. Cook Unit1
2. Reporting Period Apr-99
3. Licensed Thermal Power (MWt) 3250
4. Name Plate Rating (Gross Mwe) 1152
5. Design Electrical Rating (Net MWe) 1020
6. Maximum Dependable Capacity (GROSS MWe) 1056
7. Maximum Dependable Capacity (Net MWe) 1000
8. If Changes Occur in Capacity Ratings (Items no. 3 through 7) Since Last Report Give Reasons:
9. Power Level To Which Restricted, If Any (Net Mwe):
10. Reasons For Restrictions, If Any:

This Month Year-to-Date Cumulative

11. Hours in Reporting Period 720.0 2880.0 213264.0
12. No. of Hrs. Reactor Was Critical 0.0 0.0 151285.3
13. Reactor Reserve Shutdown Hours 0.0 0.0 463.0
14. Hours Generator on Line 0.0 0.0 148821.1
15. Unit Reserve Shutdown Hours 0.0 0.0 321.0
16. Gross Thermal Energy Gen. (MWH) 0.0 0.0 440194814.0
17. Gross Electrical Energy Gen. (MWH) 0.0 0.0 143013940.0
18. Net Electrical Energy Gen. (MWH) 0.0 0.0 137597640.0
19. Unit Service Factor 0.0 0.0 70.4
20. Unit Availability Factor 0.0 0.0 70.4
21. Unit Capacity Factor (MDC Net) 0.0 0.0 64.2
22. Unit Capacity Factor (DER Net) 0.0 0.0 62.6
23. Unit Forced Outage Rate 100.0 100.0 13.8
24. Shutdowns Scheduled over Next Six Months (Type, Date, and Duration):

None

25. If Shut Down At End of Report Period, Estimated Date of Startup:

To be Determined.

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

DOCKET NO. 50- 315 UNIT NAME D.C. Cook Unit1 DATE May 7, 1999 COMPLETED BY JW Minor TELEPHONE 616-465-5901 AVERAGE DAILYPOWER LEVEL (MWe-Net)

April 1999 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL 4/1/99 4/17/99 4/2/99 4/18/99 4/3/99 4/19/99 4/4/99 4/20/99 4/5/99 4/21/99 4/6/99 4/22/99 4/7/99 4/23/99 4/8/99 4/24/99 4/9/99 4/25/99 4/10/99 4/26/99 4/11/99 4/27/99 4/12/99 4/28/99 4/13/99 4/29/99 4/14/99 4/30/99 4/15/99 4/16/99

~ ~

0 DOCKET NO. 50 - 315 UNIT NAME D.C. Cook Unit 1 DATE May 7, 1999 COMPLETED BY PJ Gora TELEPHONE 616-697-5765 PAGE 1 of1 MONTHLYOPERATING ACTIVITIES - April 1999 HIGHLIGHTS The unit entered this reporting period in Mode 5 at 0% RTP.

The unit exited this reporting period in Mode 5 at 0% RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of April was 0 MWh.

DETAILS

'4/01/99 The Reactor was shutdown 09/08/97 to resolve design basis questions discovered during the NRC Architect and Engineering (AE) Inspection.

'll times are in Eastern Standard Time (EST).

DOCKET NO. 50-315 UNIT NAME D.C. Cook Unit1 DATE May 7, 1999 COMPLETED BY PJ Gora TELEPHONE 616497-5765 PAGE 1 of1 UNIT SHUTDOWNS AND POWER REDUCTIONS - April 1999 METHOD OF SHUTTING LICENSEE DURATION DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION NO. DATE TYPE1 HOURS REASON2 REACTOR3 REPORT NO. CODE4 CODE5 TO PREVENT RECURRENCE 333 090897 F 720.0 F 97-010 N/A N/A The unit was shutdown to resolve design 97-011 N/A N/A basis questions discovered during the NRC 97-012 N/A N/A Architect and Engineering (AE) Inspection.97-013 N/A N/A 97-014 N/A N/A 97-016 N/A N/A 1 TYPE: 2 REASON: 3 METHOD: 4 SYSTEM: 5 COMPONENT:

F: Forced A: Equipment Failure (Explain) 1: Manual Exhibit G - Instructions Exhibit I: Same Source S: Scheduled B: Maintenance or Test 2: Manual Scram for preparation of data C: Refueling 3: Automatic Scram entry sheets for Licensee D: Regulatory Restriction 4: Other (Explain) Event Report (LER) File E: Operator Training and (NUREG 0161)

License Examination F: Administrative G: Operational Error (Explain)

H: Other (Explain)

0 11

<<4!~