{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM
DISTRIBUTION
<<I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DEMONSTRATION
ESSION NBR:9008150281               DOC.DATE: 90/08/14   NOTARIZED: NO           DOCKET  N CIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee                 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee                 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee                 05000296 AUTH. NAME             AUTHOR   AFFILIATION MEDFORD,M.O.         Tennessee     Valley Authority RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document         Control Desk)
SYSTEM RECIPIENT ID CODE/NAME PD INTERNAL: ACRS AEOD/DE I I B DEDRO NRR SHANKMAN, S NRR/DOEA DIR'11 NRR/DRIS/DIR
 
NRR/PMAS/I
==SUBJECT:==
LRB12 0 REG FILE 02 COPIES LTTR ENCL 2.2 1 1 1 1 1 1 1 1 1'1 1 1 1 1 1 RECIPIENT ID CODE/NAME ROSS,T.AEOD AEOD/TPAD NRR MORISSEAU F D NRR/DLPQ/LPEB10
Submits revised response to violations noted in Insp Repts                         D 50-259/89-16,50-260/89-16 & 50-296/89-16.
NRR/DREP/PEPB9D
DISTRIBUTION CODE: IE01D TITLE: General      (50 COPIES RECEIVED:LTR   E ENCL Dkt)-Insp Rept/Notice of Vi6lation Response
NRR/DST/DIR
                                                                          /  SIZE:
8E2 NUDOCS-ABSTRACT
                                                                                                  /
OGC/HDS2" RGN2 FILE 01 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1'1 1 1 1 1 1 1<<I REGULATORY
NOTES:1 Copy each       to: B.Wilson,S. BLACK                                       05000259 1 Copy each     to: S.Black,B.WILSON                                       05000260 1 Copy each     to: S. Black,B.WILSON                                       05000296 D
INFORMATION
RECIPIENT              COPIES            RECIPIENT          COPIES              D ID  CODE/NAME            LTTR ENCL        ID CODE/NAME      LTTR ENCL PD                                        ROSS,T.                1    1 INTERNAL: ACRS                          2      2    AEOD                  1    1 IIB AEOD/DE                      1      1    AEOD/TPAD              1    1 DEDRO                        1      1    NRR MORISSEAU DF      1    1 NRR SHANKMAN,S                1      1    NRR/DLPQ/LPEB10        1    1 NRR/DOEA    DIR'11          1      1    NRR/DREP/PEPB9D        1    1  '
DISTRIBUTION
NRR/DRIS/DIR                  1'          NRR/DST/DIR 8E2            1 NRR/PMAS/I LRB12              1      1    NUDOCS-ABSTRACT        1    1 0                            1      1    OGC/HDS2"              1    1 REG  FILE        02          1      1    RGN2    FILE  01      1    1 EXTERNAL: LPDR                           1      1    NRC PDR                1   1 NSIC                          1     1 NOTES:                                    5     5 D
SYSTEM (RIDS)ESSION NBR:9008150281
D D
DOC.DATE: 90/08/14 NOTARIZED:
NOTE TO ALL "RIDS" RECIPIENTS:
NO CIL:50-259
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION
AL NUMBER OF COPIES REQUIRED: LTTR               2P   ENCL   29 sC
MEDFORD,M.O.
 
Tennessee Valley Authority RECIP.NAME
i IS
RECIPIENT AFFILIATION
 
Document Control Branch (Document Control Desk)SUBJECT: Submits revised response to violations
TENNESSEE VALLEY AUTHORITY
noted in Insp Repts 50-259/89-16,50-260/89-16
'e                                  . CHATTANOOGA. TENNESSEE 3740l 6N 38A   Lookout Place AUS     I4    >S80 U.S. Nuclear Regulatory Commission ATTN:   Document   Control Desk Washington, D.C.     20555, Gentlemen:
&50-296/89-16.
In the Matter of                                                         Docket Nos. 50-259 Tennessee  Valley Authority                                                            50-260 50-296 BROWNS FERRY NUCLEAR PLANT       (BFN) UNITS 1, 2, AND 3 NRC INSPECTION REPORT NOS. 50-259/89-16$   50-260/89-16$ 50-296/89-16 REVISION TO NOTICE OF VIOLATION RESPONSE
DISTRIBUTION
 
CODE: IE01D COPIES RECEIVED:LTR
==Reference:==
E ENCL/SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
Letter from M. 0. Medford to NRC dated           April 9, 1990, "BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND           3, NRC INSPECTION REPORT NOS. 50-259/89-16, 50-260/89-16, AND           50-296/89-16 RESPONSE TO NOTICE OF VIOLATION" TVA committed in the referenced letter to complete the following two commitments by August 15, 1990:         (1),Essential mechanical calculations performed by the contractor will be reviewed for errors "and the errors corrected. The errors will be evaluated for impact on calculation results and conclusions and (2) Area walkdowns will be completed.
of Vi6lation Response NOTES:1 Copy each to: B.Wilson,S.
This letter is provided to extend the completion date for these items.             The first commitment, correction of errors in mechanical calculations, will be completed by December 3, 1990. The errors in the subject calculations have been identified and the calculations are in the process of being corrected.
BLACK 1 Copy each to: S.Black,B.WILSON
The second commitment$     performance of area walkdowns,         will be completed by December 3, 1990 based     on the   current unit 2'restart schedule.         Current levels of maintenance and     modification activities in the plant make         it to perform the area walkdowns by August 15, 1990. The area walkdown procedure inappropriate has been drafted and is currently in the review and approval cycle.
1 Copy each to: S.Black,B.WILSON
081. 0281 PILI.IGW POP IJ ADQCK 0 iC)OI32. <'v                                                           ~grf PbI An Equal Opportunity Employer
DOCKET N 05000259 05000260 05000296 D/05000259 05000260 05000296 D D EXTERNAL: LPDR NSIC NOTES: 1 1 1 1 5 5 NRC PDR 1 1 D NOTE TO ALL"RIDS" RECIPIENTS:
 
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION
U.S. Nuclear Regulatory Commission                       AU814 teso The other commitments made in the referenced letter have been completed. The enclosure to this letter provides the revised commitment dates. If you have any questions, please telephone Patrick P. Carier at (205) 729-3566.
LISTS FOR DOCUMENTS YOU DON'T NEED!AL NUMBER OF COPIES REQUIRED: LTTR 2P ENCL 29 D D sC  
Very truly yours, TENNESSEE VALLEY AUTHORITY Mark O. Medford,'ice President Nuclear Technology and Licensing Enclosure cc (Enclosure):
i IS  
Ms. S. C. Black, Deputy Director Project Directorate 11-4 U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Thierry M. Ross, Project Manager U. S. Nuclear Regulatory Commission One White Flight, North 11555 Rockville Pike Rockville, Maryland 208 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
'e TENNESSEE VALLEY AUTHORITY.CHATTANOOGA.
 
TENNESSEE 3740l 6N 38A Lookout Place AUS I 4>S80 U.S.Nuclear Regulatory
Commission
ATTN: Document Control Desk Washington, D.C.20555, Gentlemen:
In the Matter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)-UNITS 1, 2, AND 3-NRC INSPECTION
REPORT NOS.50-259/89-16$
50-260/89-16$
50-296/89-16
-REVISION TO NOTICE OF VIOLATION RESPONSE Reference:
Letter from M.0.Medford to NRC dated April 9, 1990,"BROWNS FERRY NUCLEAR PLANT (BFN)-UNITS 1, 2, AND 3, NRC INSPECTION
REPORT NOS.50-259/89-16, 50-260/89-16, AND 50-296/89-16-
RESPONSE TO NOTICE OF VIOLATION" TVA committed in the referenced
letter to complete the following two commitments
by August 15, 1990: (1),Essential
mechanical
calculations
performed by the contractor
will be reviewed for errors"and the errors corrected.
The errors will be evaluated for impact on calculation
results and conclusions
and (2)Area walkdowns will be completed.
This letter is provided to extend the completion
date for these items.The first commitment, correction
of errors in mechanical
calculations, will be completed by December 3, 1990.The errors in the subject calculations
have been identified
and the calculations
are in the process of being corrected.
The second commitment$
performance
of area walkdowns, will be completed by December 3, 1990 based on the current unit 2'restart schedule.Current levels of maintenance
and modification
activities
in the plant make it inappropriate
to perform the area walkdowns by August 15, 1990.The area walkdown procedure has been drafted and is currently in the review and approval cycle.081.0281 PILI.IGW POP ADQCK 0 iC)OI32.<'v IJ PbI~grf An Equal Opportunity
Employer  
U.S.Nuclear Regulatory
Commission
AU814 teso The other commitments
made in the referenced
letter have been completed.
The enclosure to this letter provides the revised commitment
dates.If you have any questions, please telephone Patrick P.Carier at (205)729-3566.Very truly yours, TENNESSEE VALLEY AUTHORITY Mark O.Medford,'ice
President Nuclear Technology
and Licensing Enclosure cc (Enclosure):
Ms.S.C.Black, Deputy Director Project Directorate
11-4 U.S.Nuclear Regulatory
Commission
One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000
Thierry M.Ross, Project Manager U.S.Nuclear Regulatory
Commission
One White Flight, North 11555 Rockville Pike Rockville, Maryland 208 Mr.B.A.Wilson, Project Chief U.S.Nuclear Regulatory
Commission
Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323  
ENCLOSURE LIST OF COMMITMENTS
ENCLOSURE LIST OF COMMITMENTS
1.Essential mechanical
: 1. Essential mechanical calculations performed by the contractor will be reviewed for errors and the errors corrected. The errors will be ev'aluated for impact on calculation results and conclusions by December 3, 1990. (Violation A, example 1)
calculations
: 2. Area walkdowns will be completed by December 3, 1990 (Violation A, example 3: Violation B, examples 1, 2, and 7)}}
performed by the contractor
will be reviewed for errors and the errors corrected.
The errors will be ev'aluated
for impact on calculation
results and conclusions
by December 3, 1990.(Violation
A, example 1)2.Area walkdowns will be completed by December 3, 1990 (Violation
A, example 3: Violation B, examples 1, 2, and 7)
}}

Latest revision as of 15:45, 3 February 2020

Submits Revised Response to Violations Noted in Insp Repts 50-259/89-16,50-260/89-16 & 50-296/89-16.Extends Completion Dates for Commitments to 901203
ML18033B482
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/14/1990
From: Medford M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9008150281
Download: ML18033B482 (7)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM

<S80 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555, Gentlemen:

In the Matter of Docket Nos. 50-259 Tennessee Valley Authority 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 NRC INSPECTION REPORT NOS. 50-259/89-16$ 50-260/89-16$ 50-296/89-16 REVISION TO NOTICE OF VIOLATION RESPONSE

Reference:

Letter from M. 0. Medford to NRC dated April 9, 1990, "BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3, NRC INSPECTION REPORT NOS. 50-259/89-16, 50-260/89-16, AND 50-296/89-16 RESPONSE TO NOTICE OF VIOLATION" TVA committed in the referenced letter to complete the following two commitments by August 15, 1990: (1),Essential mechanical calculations performed by the contractor will be reviewed for errors "and the errors corrected. The errors will be evaluated for impact on calculation results and conclusions and (2) Area walkdowns will be completed.

This letter is provided to extend the completion date for these items. The first commitment, correction of errors in mechanical calculations, will be completed by December 3, 1990. The errors in the subject calculations have been identified and the calculations are in the process of being corrected.

The second commitment$ performance of area walkdowns, will be completed by December 3, 1990 based on the current unit 2'restart schedule. Current levels of maintenance and modification activities in the plant make it to perform the area walkdowns by August 15, 1990. The area walkdown procedure inappropriate has been drafted and is currently in the review and approval cycle.

081. 0281 PILI.IGW POP IJ ADQCK 0 iC)OI32. <'v ~grf PbI An Equal Opportunity Employer

U.S. Nuclear Regulatory Commission AU814 teso The other commitments made in the referenced letter have been completed. The enclosure to this letter provides the revised commitment dates. If you have any questions, please telephone Patrick P. Carier at (205) 729-3566.

Very truly yours, TENNESSEE VALLEY AUTHORITY Mark O. Medford,'ice President Nuclear Technology and Licensing Enclosure cc (Enclosure):

Ms. S. C. Black, Deputy Director Project Directorate 11-4 U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Maryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama 35609-2000 Thierry M. Ross, Project Manager U. S. Nuclear Regulatory Commission One White Flight, North 11555 Rockville Pike Rockville, Maryland 208 Mr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323

ENCLOSURE LIST OF COMMITMENTS

1. Essential mechanical calculations performed by the contractor will be reviewed for errors and the errors corrected. The errors will be ev'aluated for impact on calculation results and conclusions by December 3, 1990. (Violation A, example 1)
2. Area walkdowns will be completed by December 3, 1990 (Violation A, example 3: Violation B, examples 1, 2, and 7)