| issue date = 08/20/1990
| issue date = 08/20/1990
| title = Suppls Response to Violations Noted in Insp Repts 50-259/90-14,50-260/90-14 & 50-296/90-14.Corrective Actions: TVA Developed Corporate Level std,STD-10.1.15 Re Independent Verification
| title = Suppls Response to Violations Noted in Insp Repts 50-259/90-14,50-260/90-14 & 50-296/90-14.Corrective Actions: TVA Developed Corporate Level std,STD-10.1.15 Re Independent Verification
| author name = MEDFORD M O
| author name = Medford M
| author affiliation = TENNESSEE VALLEY AUTHORITY
| author affiliation = TENNESSEE VALLEY AUTHORITY
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000259/1990014]]


=Text=
=Text=
{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM           (RI DS )
DISTRIBUTION
CESSION NBR: 9008240083             DOC. DATE: 90/08/20   NOTARIZED: NO           DOCKET FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee                 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee                 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee                 05000296 AUTH. NAME             AUTHOR AFFILIATION MEDFORD,M.O.         Tennessee Valley Authority RECIP.NAME             RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DEMONSTRATION
 
SYSTEM REGULATORY
==SUBJECT:==
INFORMATION
Suppls response to violations noted in Insp Repts                                 D 50 259/90 14 I 50 260/90 14 6 50 296/90 14         ~
DISTRIBUTION
DISTRIBUTION CODE: IE01D           COPIES RECEIVED: LTR       ENCL       SIZE:
SYSTEM (RI DS)CESSION NBR: 9008240083
TITLE: General     (50 Dkt)-Insp Rept/Notice of Violation Response                   'I
DOC.DATE: 90/08/20 NOTARIZED:
                                                                                              /
NO FACIL:50-259
NOTES:1 Copy each       to: B.Wilson,S. BLACK                                      05000259 A
Browns Ferry Nuclear Power Station, Unit 1, Tennessee 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee AUTH.NAME AUTHOR AFFILIATION
1 Copy each     to: S.Black,B.WILSON                                       05000260 1 Copy each     to: S. Black,B.WILSON                                       05000296 RECIPIENT              COPIES            RECIPIENT          COPIES            D ID  CODE/NAME            LTTR ENCL      ID CODE/NAME       LTTR ENCL PD                           1    1      ROSS,T.                1      1 t
MEDFORD,M.O.
INTERNAL: ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DRIS/DIR NRR/PMAS/ILRB12 OE DIR
Tennessee Valley Authority RECIP.NAME
            -8&             02 2
RECIPIENT AFFILIATION
1 1
Document Control Branch (Document Control Desk)SUBJECT: Suppls response to violations
1 1
noted in Insp Repts 50 259/90 14 I 50 260/90 14 6 50 296/90 14~DISTRIBUTION
1 1
CODE: IE01D COPIES RECEIVED: LTR ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
1 1
of Violation Response NOTES:1 Copy each to: B.Wilson,S.
2 1
BLACK 1 Copy each to: S.Black,B.WILSON
1 1
1 Copy each to: S.Black,B.WILSON
1 1
DOCKET 05000259 05000260 05000296 D'I/05000259 A 05000260 05000296 RECIPIENT ID CODE/NAME PD INTERNAL: ACRS AEOD/DEIIB
1 1
DEDRO t NRR SHANKMAN,S
1 AEOD AEOD/TPAD NRR MORISSEAU I D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 SRGN2   FILE 01 1
NRR/DOEA DIR 11 NRR/DRIS/DIR
1 1
NRR/PMAS/ILRB12
1 1
OE DIR-8&02 EXTERNAL: LPDR NSIC NOTES: COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 5 5 RECIPIENT I D CODE/NAME ROSS,T.AEOD AEOD/TPAD NRR MORISSEAU I D NRR/DLPQ/LPEB10
1 1
NRR/DREP/PEPB9D
1 1
NRR/DST/DIR
1 1
8E2 NUDOCS-ABSTRACT
1 1
OGC/HDS2 SRGN2 FILE 01 NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 D D NOTE TO ALL"RIDS" RECIPIENTS:
1 1
PLEASE HELP US TO REDUCE iVASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT.20079)TO ELIMINATE YOUR NAME FROM DISTRIBUTION
1 1
LISTS FOR DOCUMENTS YOU DON'T NEED!TAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29 A D D
1 EXTERNAL: LPDR                          1     1     NRC PDR                1       1 NSIC                        1     1 NOTES:                                  5    5 D
TENNESSEE VALLEY AUTHORITY CHATTANOOGA.
A D
TENNESSEE 37401 6N 38A Lookout Place AUG 20 1990 U.S.Nuclear Regulatory
D NOTE TO ALL "RIDS" RECIPIENTS:
Commission
PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
ATTN: Document Control Desk Washington, D.C.20555 Gentlemen:
TAL NUMBER OF COPIES REQUIRED: LTTR               29   ENCL   29
In the I1atter of Tennessee Valley Authority Docket Nos.50-259 50-260 50-296 BROVilS FERRY NUCLEAR PLANT (BFN)-NRC IiNSPECTION
 
REPORT 50-259, 260, 296/90-14-SUPPLEi~lENTAL
TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 6N 38A   Lookout Place AUG     20     1990 U.S. Nuclear Regulatory Commission ATTN:     Document       Control Desk Washington, D.C.             20555 Gentlemen:
RESPONSE TO NOTICE OF VIOLATIOiN
In the I1atter of                                                                     Docket Nos. 50-259 Tennessee Valley Authority                                                                        50-260 50-296 BROVilS FERRY NUCLEAR PLANT (BFN) NRC IiNSPECTION REPORT 50-259,                         260, 296/90-14 SUPPLEi~lENTAL RESPONSE TO NOTICE OF VIOLATIOiN On June 14, 1990,         NRQ   issued the subject inspection report which cited             TVA with     a violation for failure to perform independent verification. In its response to the violation dated July 13, 1990, TVA noted it was evaluating the generic impact of this concern and committed to provide a supplemental response     by August 24, 1990.             This letter reports on the generic actions that TVA has taken to address independent verification. The enclosure provides a listing of commitments being made in this letter.
On June 14, 1990, NRQ issued the subject inspection
In order to stan.ardize independent verification activities TVA has developed a corporate level standard, STD-10.1.15, Independent Verification. This standard establishes requirements for determining when independent verification is required and for performing independent verification. This standard will be implemented at BFN by September 30, 1990, through a revision to Site Director Standard Practice (SDSP) 3.15, Independent Verification. BFNi procedures will be evaluated against the criteria in this revised SDSP during the two-year procedure review and change process.
report which cited TVA with a violation for failure to perform independent
In summary, TVA considers that the revision of SDSP 3.15 will establish consistent use of independent verification activities at BFN such that plant systems and components are controlled in a manner that supports safe and reliable operation.
verification.
Very   truly yours, TE&lESSEE VALLEY AUTHORITY i~Iark O. i~ledford, Vice resident Nuclear Technology and Licensing 0 Enclosure cc: See page
In its response to the violation dated July 13, 1990, TVA noted it was evaluating
      >1.10:=: >401.18 AQOC:K 2
the generic impact of this concern and committed to provide a supplemental
9C108'=0
response by August 24, 1990.This letter reports on the generic actions that TVA has taken to address independent
                                                                                                        ~ je/
verification.
                        'OP sit".
The enclosure provides a listing of commitments
I.J An Equal Opportunity Emptoyer I/I
being made in this letter.In order to stan.ardize
 
independent
0' U.S. Nuclear Regulatory Commission cc (Enclosure):
verification
Ns. S. C. Black, Deputy     Director Project Directorate II-4 U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Haryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama ,35609-2000 Thierry i'1. Ross, Project i'ianager U. S. Nuclear Regu1atory Commission One White Flint, North 11555 Rockville Pike Rockvi,lie, .'Iaryland 208 Hr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 51arietta Street, NW, Suite 2900 Atlanta, Georgia 30323
activities
 
TVA has developed a corporate level standard, STD-10.1.15, Independent
                                  'EilCLOSURE Site Director Standard Practice 3.15, Independent Verification, will be revised to implement corporate standard ONP 10.1.15, Independent Verification. This revision will be completed by September 30, 1990.}}
Verification.
This standard establishes
requirements
for determining
when independent
verification
is required and for performing
independent
verification.
This standard will be implemented
at BFN by September 30, 1990, through a revision to Site Director Standard Practice (SDSP)3.15, Independent
Verification.
BFNi procedures
will be evaluated against the criteria in this revised SDSP during the two-year procedure review and change process.In summary, TVA considers that the revision of SDSP 3.15 will establish consistent
use of independent
verification
activities
at BFN such that plant systems and components
are controlled
in a manner that supports safe and reliable operation.
Very truly yours, TE&lESSEE VALLEY AUTHORITY 0 9C108'=0'sit".Enclosure cc: See page 2>1.10:=:>401.18'OP AQOC:K I.J i~Iark O.i~ledford, Vice resident Nuclear Technology
and Licensing An Equal Opportunity
Emptoyer~je/I/I  
0'  
U.S.Nuclear Regulatory
Commission
cc (Enclosure):
Ns.S.C.Black, Deputy Director Project Directorate
II-4 U.S.Nuclear Regulatory
Commission
One White Flint, North 11555 Rockville Pike, Rockville, Haryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama ,35609-2000
Thierry i'1.Ross, Project i'ianager U.S.Nuclear Regu1atory
Commission
One White Flint, North 11555 Rockville Pike Rockvi,lie,.'Iaryland
208 Hr.B.A.Wilson, Project Chief U.S.Nuclear Regulatory
Commission
Region II 101 51arietta Street, NW, Suite 2900 Atlanta, Georgia 30323  
'EilCLOSURE
Site Director Standard Practice 3.15, Independent
Verification, will be revised to implement corporate standard ONP 10.1.15, Independent
Verification.
This revision will be completed by September 30, 1990.
}}

Latest revision as of 15:45, 3 February 2020

Suppls Response to Violations Noted in Insp Repts 50-259/90-14,50-260/90-14 & 50-296/90-14.Corrective Actions: TVA Developed Corporate Level std,STD-10.1.15 Re Independent Verification
ML18033B493
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 08/20/1990
From: Medford M
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9008240083
Download: ML18033B493 (5)


Text

ACCELERATED DISTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RI DS )

CESSION NBR: 9008240083 DOC. DATE: 90/08/20 NOTARIZED: NO DOCKET FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee 05000259 50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 05000260 50-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee 05000296 AUTH. NAME AUTHOR AFFILIATION MEDFORD,M.O. Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Suppls response to violations noted in Insp Repts D 50 259/90 14 I 50 260/90 14 6 50 296/90 14 ~

DISTRIBUTION CODE: IE01D COPIES RECEIVED: LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response 'I

/

NOTES:1 Copy each to: B.Wilson,S. BLACK 05000259 A

1 Copy each to: S.Black,B.WILSON 05000260 1 Copy each to: S. Black,B.WILSON 05000296 RECIPIENT COPIES RECIPIENT COPIES D ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD 1 1 ROSS,T. 1 1 t

INTERNAL: ACRS AEOD/DEIIB DEDRO NRR SHANKMAN,S NRR/DOEA DIR 11 NRR/DRIS/DIR NRR/PMAS/ILRB12 OE DIR

-8& 02 2

1 1

1 1

1 1

1 1

2 1

1 1

1 1

1 1

1 AEOD AEOD/TPAD NRR MORISSEAU I D NRR/DLPQ/LPEB10 NRR/DREP/PEPB9D NRR/DST/DIR 8E2 NUDOCS-ABSTRACT OGC/HDS2 SRGN2 FILE 01 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 NOTES: 5 5 D

A D

D NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TAL NUMBER OF COPIES REQUIRED: LTTR 29 ENCL 29

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 6N 38A Lookout Place AUG 20 1990 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

In the I1atter of Docket Nos. 50-259 Tennessee Valley Authority 50-260 50-296 BROVilS FERRY NUCLEAR PLANT (BFN) NRC IiNSPECTION REPORT 50-259, 260, 296/90-14 SUPPLEi~lENTAL RESPONSE TO NOTICE OF VIOLATIOiN On June 14, 1990, NRQ issued the subject inspection report which cited TVA with a violation for failure to perform independent verification. In its response to the violation dated July 13, 1990, TVA noted it was evaluating the generic impact of this concern and committed to provide a supplemental response by August 24, 1990. This letter reports on the generic actions that TVA has taken to address independent verification. The enclosure provides a listing of commitments being made in this letter.

In order to stan.ardize independent verification activities TVA has developed a corporate level standard, STD-10.1.15, Independent Verification. This standard establishes requirements for determining when independent verification is required and for performing independent verification. This standard will be implemented at BFN by September 30, 1990, through a revision to Site Director Standard Practice (SDSP) 3.15, Independent Verification. BFNi procedures will be evaluated against the criteria in this revised SDSP during the two-year procedure review and change process.

In summary, TVA considers that the revision of SDSP 3.15 will establish consistent use of independent verification activities at BFN such that plant systems and components are controlled in a manner that supports safe and reliable operation.

Very truly yours, TE&lESSEE VALLEY AUTHORITY i~Iark O. i~ledford, Vice resident Nuclear Technology and Licensing 0 Enclosure cc: See page

>1.10:=: >401.18 AQOC:K 2

9C108'=0

~ je/

'OP sit".

I.J An Equal Opportunity Emptoyer I/I

0' U.S. Nuclear Regulatory Commission cc (Enclosure):

Ns. S. C. Black, Deputy Director Project Directorate II-4 U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike, Rockville, Haryland 20852 NRC Resident Inspector Browns Ferry Nuclear Plant Route 12, Box 637 Athens, Alabama ,35609-2000 Thierry i'1. Ross, Project i'ianager U. S. Nuclear Regu1atory Commission One White Flint, North 11555 Rockville Pike Rockvi,lie, .'Iaryland 208 Hr. B. A. Wilson, Project Chief U.S. Nuclear Regulatory Commission Region II 101 51arietta Street, NW, Suite 2900 Atlanta, Georgia 30323

'EilCLOSURE Site Director Standard Practice 3.15, Independent Verification, will be revised to implement corporate standard ONP 10.1.15, Independent Verification. This revision will be completed by September 30, 1990.