ML18139A484: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:I
{{#Wiki_filter:I VIRGINIA ELECTRIC .A.ND PoWE;R COMPANY RrcHMOND,VIRGXNIA 23261 July 30, 1980 Mr. Harold R. Denton, Director                                Serial No. 640 Office of Nuclear Reactor Regulation                          NO/SPS:smv Attention: Mr*. Stephen A. Varga, Chief                        Docket Nos. 50-280 Operating Reactors Branch No. 1                          50-281 Division of Licensing                        License Nos. DPR-32 U. S. Nuclear Regulatory Commission                                        ~ DPR-37 Washington, D. C. 20555
                                                                '
VIRGINIA ELECTRIC .A.ND PoWE;R COMPANY RrcHMOND,VIRGXNIA 23261 July 30, 1980 Mr. Harold R. Denton, Director                                Serial No. 640 Office of Nuclear Reactor Regulation                          NO/SPS:smv Attention: Mr*. Stephen A. Varga, Chief                        Docket Nos. 50-280 Operating Reactors Branch No. 1                          50-281 Division of Licensing                        License Nos. DPR-32 U. S. Nuclear Regulatory Commission                                        ~ DPR-37 Washington, D. C. 20555


==Dear Mr. Denton:==
==Dear Mr. Denton:==

Latest revision as of 00:24, 3 February 2020

Forwards Info Re marked-up Radiological Ets,In Response to NRC 800604 Ltr.Requests Meeting to Resolve Significant Problems Concerning Installed Equipment & Station Procedures.Draft Offsite Dose Calculation Manual Encl
ML18139A484
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/30/1980
From: Ferguson J
Virginia Power (Virginia Electric & Power Co)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18139A485 List:
References
NUDOCS 8007310354
Download: ML18139A484 (1)


Text

I VIRGINIA ELECTRIC .A.ND PoWE;R COMPANY RrcHMOND,VIRGXNIA 23261 July 30, 1980 Mr. Harold R. Denton, Director Serial No. 640 Office of Nuclear Reactor Regulation NO/SPS:smv Attention: Mr*. Stephen A. Varga, Chief Docket Nos. 50-280 Operating Reactors Branch No. 1 50-281 Division of Licensing License Nos. DPR-32 U. S. Nuclear Regulatory Commission ~ DPR-37 Washington, D. C. 20555

Dear Mr. Denton:

We have reviewed your letter dated June 4, 1980 and the comments which were attached. Enclosure 1 to this letter contains our response to those comments.

As you will see, a number of the specific changes suggested in your comments and in the marked-up copy of our proposed Technical Specifications represent significant problems with respect to currently installed equipment and exist-ing station procedures at Surry. While we are aware that many changes will be necessary in order to provide specifications which adequately implement the guidance of Appendix I to 10CFR Part 50 and other related regulations, we also feel that a number of the modifications which have been requested are both impractical and inappropriate for Surry Power Station.

A meeting with the NRC Staff would be most helpful in resolving the problems which have been identified and in providing clarification where differences in interpretation may exist. We request that such a meeting be arranged at a place and time of mutual convenience.

As requested in your letter, we are at this time submitting for review, the Draft Offsite Dose Calculation Manual (ODCM) for Surry Power Station, attached as Enclosure 2. The submission of a Process Control Program (PCP) is con-sidered inappropriate at this time since vendor selection and equipment procurement to perform solidification of radioactive wet wastes has not yet been completed. Prior to operation of a system for solidification, a PCP will be submitted for review.

If you have any questions, please do not hesitate to contact us.

,~

Very truly yours, J. H. Ferguson Executive Vice President - Power JHF/smv: SBl cc: Mr. James P. O'Reilly, Director Office of Inspection & Enforcement Region II Atlanta, Georgia 30303 8.f),.0._.7. 3:1 O °3 S "f