ML18227A408: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:NRC    fOBNI 195                                        U.S.,NVCLLAB I'ICGULATOBYCOMMISSION" OOCKETNU
                                                                                      'I
      ~I (2-7G)                                                                                          50-25( 251 FILE NUMBER 35 NRC DISTR l8UTION Fon          RT 60 DOC I(ET IE/IATERlAL                        MONTHLY REPORT TO:    USNRC                                    FROM: BLORDIA PWR 6 LIGHT CO.                OATE OF OOCUMFNT MIAMI, FLORDIA                            1/7/77 A.D. SCHMIDT                      OATL RECFIVEO 1/.g/77 QLETTER                CINOTORIZEO                PROP                    INPUT FORM          NUMBER OF COPIES RECEIVED DOR IGINAL        B UNC LASS IF I E 0 OCOPV DESCRIPTION LETTER TRANS THE FOLLOWING:                                  MO)THLY REPORT EOR      DECFIIBER 1976 PLANT & COMPONENT OPERABILITY &
AVAILABILITY, THIS      REPORT TO BE USED              IN PREPARING GRAY BOOK BY PLANS &
OPERATIONS'LANT TURKEY PT ~ //      1 3  6 4
                                                                              'ACKNOWLEDGED NAME ~
OKOT gggoy@
FOR ACTION/INFORMATION MIPC W    CYS I'OR ACT ON INTERNAL D ISTRI BUTION MC PDR
    'CDOMI D BRANCH CHIEF    L                ZIEMANN /LEAR PARRISH DIGGS EXTERNAL DISTRIBUTIOIV                                            CONTROL NUiVlBER I I IAMI  I'I..
NRC FORM 195 (2 7GI
 
P. O. IfOX 013100. MIAMI, FL 33101
                                        /y
                            ~lp  ~
J ~
FLORIDA POWEH        St LIGHT COMPANY C ~
IK ~ I g
    ~ ~
I          -
                      ~
January 7, 1977 P
                                            ~ ~~i~N gg f Office of          Management Information ~  Qe4~~>>              hi and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.                20555 Gentlemen:
Attached are the December, 1976 Operating Status Reports for Turkey Point Unit Nos..3 and 4 and St. Lucie Unit No. 1.
Very    truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc:    Mr. Norman C. Moseley Jack R. Newman, Esquire PEOPLE  . ~ . SERVING PCOf'LC
 
a r.,
u 1k II              '
Jj
              ~1 g ~,
I
        ~ '
 
APPENDS  B AVERAGE DAILY UNIT POWER LEVEL
          'I
              ~
I
                  ~
DOCKET NO. 50  250
                                                      -UNIT  Turkey Point Unit No.
DATE  Jan. 6  1977 COMPLETED BY    V. T. Chi son TELEPHONE    (305)  552-3830 MONTH  December,  19 7'6 DAY AVERAGE DAILY POWER LEVEL              DAY AVERAGE DAILY POWER LEVEL (NHe-Net)                                    (MWe-Net) 17 18 3                                          19 20 21 22 23 25 10                                          26 27 12                                          28 13                                            29 14                                            30 15                                            31 16
 
APPENDIX C OPERATING DATA REPO~
DOCKET NO,    50    250 UNIT Turkey    Point Unit No. 3 REPORT MONTH      December  1976                                                        DATE    Jan. 6, 1977 e
C'OMPLETED BY    V. T. Chilson TELEPHONE OPERATING STATUS 1,  REPORTING PERIOD:      0001 76 12 01 GROSS HOURS 'IN REPORTING PERIOD:                          744.0 THROUGH    4
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200.
Mlcl.DNPNDD. DAPADPPP (MNe-Nee):                            ~66 DESIGN ELECTRICAL RATING (MWe-Net):                            693
: 3. POWER  LEVEL TO WHICH RESTRICTED            (IP    ANY)        (MWe-iVet):          NONE 46  REASONS POR RESTRZCTIOAV      (IF ANY):.
THIS MONTH      YEAR TO DATE        CUMULATIVE 56  NiDiBERS OF HOURS REACTOR WAS          CRITICAL.....                    0 0        6  760.0          28 040.1
: 6. REACTOR RESERVE SHUTDOWN HOURS            ~ ~ ~ ~ ~ ~ .~.  ~ ..        0 0            64.2              67.4 7~  HOURS GENERATOR    OVA LINE. ~ ..............              ~ ..        0.0          6  669.1          27 039.1 80  UNIT RESERVE    SHUTDOWN HOURS ~    ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~      0.0              0.0              85.0
: 9. GROSS  THERMAL ENERGY GLVERATED            (MiiH)......                        14 417 328        51 729 588
: 10. GROSS  ELECTRICAL ENERGY GLVERATED              (i%H)...                0          4 555 215        16 570 451
: 11. NET ELECTRICAL ENERGY GENERATED              (MiiH)..... -          1 706          4 320 173        15 675 935
: 12. REACTOR SERVICE FACTOR.                                                0.0              77.0              78.5
: 13. REACTOR    AVAILABILITYFACTOR        ,,  ~ ...,,.....,                0.0              77.7              78.7
: 14. UiNIT SERVICE FACTOR                                                    0.0
: 15. UNIT AVAILABILITYFACTOR.        ~ ~ ~ eee  ~ ~ ~ ~ ~ ~ ~ ~ ~ 6 ~                        75.9              75.9
: 16. iLVIT CAPACITY PACZOR (Using          (MDC).....:...                                    73.8              66.8
: 17. UNIT CAPACITY FAC10R (Using Design MWe)...                              0 0              71.0              63.3
: 18. UNIT FORCED OUTAGE RATEe. ~ .      ~ .......... ...      ~            0 0              0.1                2.9
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPED DATED                          AVA DDURATION OF EACH)
: 20. ZP SHUTDOWN AT END OP REPORT PERIOD, ESTLM(ATED DATE OP STAR UP:                                Jan  16  1977
: 21. UNITS IiV TEST STATUS (PRIOR TO COMMERCIAL OPERATION):                                FORECAST      ACHIEVED INITIAL CRITICALITY ZNITIAL ELECTRICITY COMMERCIAL OPERATION
 
(1) REASON APPENDIX D                                DOCKET NO. 50  - 250 h:  EQUIPMENT FAILURE (EXPLAIN)
B:  MAINT. OR TEST UHIT SBUTD(MNS AND  POHER REDUCTIONS                    UNIT  NAME    Turkey Point Unit No. 3 C  REFUELING D:  RECULATORY RESTRICTION                                                                                            DATE          Jan. 6, 1977 E:  OPERATOR TRAINING AND LICENSE EXAMINATION                                                                                            COMPLETED BY  V. T. Chilson P:  ADMINISTRATIVE G:  OPERATIONAL ERROR (EXPLAIN)                                                                                      TELEPHONE      (305)  552-3B30 REPORT MONTH December    1976 H:  OTHER (EXPLAIN)
(2) METHOD 1: MANUAL                                                                                    METHOD OP 2:  MANUAL SCRAM                                  TYPE                                  SllUTTIHG  Dpi 3:  AUTOMATIC SCRAM                            P: FORCED    DURATION                    THE REACTOR OR 4:  OlliER (EX%LAIN)      NO. DATE        S  SCHEDULED    (BOURS)    REASON(1)    REDUCING PONER(2)              CORRECTIVE ACTIONS/CO:IHENTS 21    76-11-14                      744.0                                          Unit No. 3 removed from service for refueling, maintenance,  and inspections.    (Continued from previous month) . (Nuclear and Non-nuclear systems)
                                                                                                                                          ~,
 
==SUMMARY==
:  Unit  No. 3 removed from service for refueling, maintenance,    and inspections.    (Continued from previous month) 4 ~  o
 
0          APPENDIX B AVERAGE DAILY UNIT POWER LEVEL 50  251
              ~
g DOCKET NO.
I
                                                            .UNIT  Turkey. Point  Unit No. 4
                                                        - ~  DATE  Jan. 6, 1977 COMPLETED BY      >- T. Chilson TELEPHONE      (305)  552-3830 MONTH  December,      1976 DAY AVERAGE DAILY POWER LEVEL                  DAY AVERAGE DAILY POWER LEVEL (Mle-Net)                                          (Mfe-Ne t) 17              690 18              697 3              17                              19              689 521                                20              605
                    '83 21              683 6            689                                22              692 687                                                692 661                                                693 664                                25              695 10            69.6                              26            '92 690                                27              691 12            689                                28              693 684                                29              689 680.                              -30              688 14'5 687                                                690 16            687                                NOTE:      Average    daily power level greater than 666 Wih due  to cooler condenser cooling water.
 
APPENDIX C OPERATING DATA REPORT~
DOCKET            Np. 50  - 250 UNIT Turke        Point Unit No.
  ~ i  REPORT MONTH    December,  1976                                                                          Jan.
~
  ~
DATE            6  1977
                                                                                        'OUPLE  ED BY              V. T. Chilson OPERATING STATUS 1~  REPORTING  PERIOD'001        > 76> 12  i pl  GROSS      HOURS      IN REPORTING                            744.p 2400,76,12~31                                                              PERIOD'HRpUGH
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):
MAX.DEPEHO ~ CAPACITY ON -N              i):
DESIGN ELECTRICAL RATING (MWe"Net):                              693
: 3. POWER LEVEL  Tp WHICH RESTRICTED            (IP    ANY)        (MWe-Net):        NONE
: 4. REASONS FOR RESTRICTION        (IP AVl):
THIS    MONTH  YEAR TO DATE                  CUMULATIVE
: 5. NUMBERS OF HOURS REACTOR WAS            CRITICAL....            ~                              6    075.9        21 721.8
: 6. REACTOR RESERVE SHUTDOWN        HOURS............                  . 21.7                        21.7            138 ~ 8 le  HOURS GENERATOR ON    LINE.          ~      ~              ~          670il                  5    828.4        20 542.0
: 8. UNIT RESERVE  SHUTDOWN    HOURS.....        ~ .........                0.0                          0.0              0.0
: 9. GROSS THERMAL ENERGY GENERATED              (MWH).....,            1 453 037          ll 103 004                  41 751 640
: 10. GROSS ELECTRICAL ENERGY OK&RATED (MWH)...                              479 100                3 978 606          13 957 688
: 11. NET ELECTRICAL EJERGY GENERATED              (AH).....                455 502                3 771 836          13 230 466
: 12. REACTOR SERVICE FACTOR.                                                  96.5                        69.2              73 '
: 13. REACTOR  AVAILABILITYFACTOR...............                              99 '                        69.5              74.2
: 14. UNIT SERVICE FACTOR.  ~ ~ ~ ~ ~ ~ ~ to ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~                                    66. 4            69.8
: 15. UNIT AVAILABILITYFACTOR..................                                90.1                        66.4              69.8
: 16. UNIT CAPACITY FACTOR (Using (MDC)... ~ ~ ~                  ...          91 '                        64.5              68.2
: 17. UNIT CAPACITY FACTOR (Using Design MWe)...                              88 3                        62.0              64.8
: 18. UNIT FORCED OUTAGE    RATE...........'........                          - 0 5  .                      3.7              3.6
: 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS                      (TYPE, DATE, AND DURATION OF EACH):
Repair steam generator tube leak - Jan. 6, 1977 through Jan. 12, 1977.
Refueling, maintenance, and inspections - April 4, 1977 through May 22, 1977.
: 20. IF SHUTDOWiN  AT END OF REPORT PERIOD, ESTLQTED DATE OF STARTUP:
: 21. UNITS IN TEST STATUS (PRIOR Tp COMMERCIAL OPERATION):                                              PORECAST      ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
 
1 REASON APPENDIX D                              DOCKET NO. 50  - 251 A:  EQUIPMENT FAILURE (EXPIAIN)
B:  MAINT. OR TEST                                          UNIT SIIUTDOWNS AND POWER REDUCTIONS                UNIT NAHE      Turke    Point Unit No. 4 C:  REFUELING D:  REGULATORY RESTRICTION                                                                                      DATE          Jan. 6  1977 E    OPERATOR TRAINING AND LICENSE EXAHINATION                                                                                        COMPLETED BY  V. T. Chilson F    ADlIINISTRATIVE G:  OPERATIONAL ERROR (EXPLAIN)                                    REPORT MONTII December  1976                TELEPHONE      (305)    552-3830 H:  OTHER  (EXPLAIN)
(2) METHOD 1:  MAIiVAL                                                                                METHOD OF 2:  .MANUAL SCRAH                                  TYPE                                  SHUTTLNG DOWN 3:  AUTOHATIC SCRAM                            F: FORCF3)  DURATION                      THE REACTOR OR OTIIER (EXPLAIN)    NO.                S  SCHEDULED    (BOURS)    REASON(1)    REDUCING POWER(2)          CORRECTIVE ACTIONS/CRDIENTS 28    76-10-28                      69.4                                      Unit No. 4 was removed from service for steam gener-ator tube inspection program. (Continued from previous month)    (Nuclear system) 29    76-12-04                        3.2                                      Unit  No. 4  tripped  on steam generator No. 4 A high level during a transient condition caused by the loss of a vital instrument bus Fewer supply. (Nuclear system) 30    76-12-20                        1.3                                      Unit  No. 4  tripped during  a  transient condition cause by the  failure of  a component    in nuclear instrumen-tation  system channel N-41.      (Nuclear system)
 
==SUMMARY==
:  Unit No. 4 was returned to service on December 3, 1976 following completion of steam generator tube inspection program.
Unit operated at 100X R.P. during month except for outages on Dec. 4, 1976 and Dec. 20, 1976.
 
APPENDIX B AVERAGE DAILY UNIT POWER LEVEL I
I r5 ~
C DOCKET NO. 50  335
                                                    '.UNIT St. Luce.e Unzt No. 1 I
DATE  Jan. 6, 1977 COMPLETED BY    V. T. Chilson TELEPHONE    (305)  552-3830 MONTH  December DAY AVERAGE DAILY POWER LEVEL              DAY AVERAGE DAILY POWrR LEVEL (MWe-Net)                                    (MWe-Net) 18 3                                          19 20 21              370 22              377 23              376 24              374 25              380 10                                          26              374 27              371 12                                          28              378 13                                          '9              376 14                                          30              373 15                                          31              374 16
 
APPENDIX C OPERATING DATA REPORT DOCXET NO. 50  - 335 UNIT St ~ Lucio    Unit  No. 1 REPORT MONTH    December,  1976                                      J'ATE            Jan. 6, 1977 COMPLETED BY  V. T. Chilson
                                                                    \~
OPERATING STATUS                                                            TELEPHONE  (305)  552-3830
: 1. REPORTING PERIOD: 0001.76912,21 GROSS HOURS IN REPORTING PERIOD:                        264.0 THROUGH 24
: 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2560 MAl(.DEPEND. CAPACITY (MWe"Net):                      ~  802    Estimated)
DESIGN ELECTRZCAL RATING (MWe-Net):                      802
: 3. POWER LEVEL TO WHICH RESTRICTED        (IF  ANY)        (MWe-Net):            722
: 4. REASONS FOR RESTRICTION      (IF  AWa ):
    "Temporary 90X    restriction  pending reactor coolant flow analysis" THIS MONTH      YEAR TO DATE      CUMULATIVE 5~  NUAABERS OF HOURS REACTOR WAS      CRITICAL    ~ ~ ~ ~                        264.0              264.0
: 6. REAUTOR RESERVE SRUTDODE      EOIIIIS............                0.0
: 7. IIOURS OESEIIATOR OE  LTSE.......,....                      264.0
: 8. UNIT RESERVE    SHUTDOWN  HOURS...............            '        0            0.0                0.0
: 9. GROSS    THEPRlAL BARGY GE'.STERATED (MWH) ~ ~  ..  ~  .  ~  347 603          347 603            347 603
: 10. GROSS ELECTRZCAL FNERGY GERKRATED          (MWH)...          108 270          108 270            108 270
: 11. NET ELECTRICAL ENERGY GE:IERATED      (Ã%)  ~ ~ ~ ~ ~        98 975            98 975              98 975
: 12. REACTOR SERVICE FACTOR                                        100.0            100.0              100.0
: 13. REACTOR    AVAILABILITYFACTOR.............:.                  100.0            100.0              100.0
: 14. UNZT SERVICE    FACTOR............,....,...,.                100.0            100.0              100.0
: 15. 'UNIT AVAILABILITYFACTOR..............,...                    100.0            100.0              100.0 16  UNIT CAPACITY FACTOR (Using (MDC) . ~ ~ ~ . ~      .,        46.7            46.7                46.7
: 17. UNIT CAPACITY FACTOR (Using Design MWe)...                      46 7            46.7                46.7
                                              \
: 18. UNIT FORCED OUTAGE      RATE...................                  0.0              0.0                0.0
: 19. SHUTDOWANS SCHEDULED OVER      NEXT 6  MO~iS (TYPE,          DATE> AND DURATION OF EACH):
: 20. IF  SHUTDOWLN  AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):                          FORECAST      ACHIEVED INITIAL CRITICALITY                                                                49221 22, 1976 INITIAL ELECTRICITY                                                                ~EA    7  1976 CORAAERCIAL OPERATION                                                              D    . 21    1976 4
 
APPEtlDIX D                              DOCKET NO.                            I (1) REASON A:  EQUIPMENT FAILURE (EXPLAIN)                                                                                  UNIT            St. Lucie Unit o.
UNIT SHUTDOWNS AND POWER REDUCTIONS                          NAME                        1 B:  MAINT. OR TEST C:  REFUELING                                                                                                    DATE            Jan. 6, 1977 D:  REGULATORY RESTRICTION E:  OPERATOR TRAINING AIID                                                                                        CO'IPI ETED BY  V  T Chilson LICENSE EXAMINATION F:  ADttI H ISTRATIVE                                                                                            TELEPHONE        (305)  552-3830.
G:  OPERATIOtlAL ERROR (EXPLAIN)                                  REPORT MONTH December    1976 H:  OTHER    (FJ(PLAIN)
(2) tIETHOD 1: MANUAL                                                                                METHOD OF 2: .MANUAI SCRAM                                  TYPE                                SHUTTING DOWN 3: AUTOMATIC SCRAM                              F! FORCED    DURATION                  THE REACTOR OR OTHER (EXPLAIN)        NO. DATE      S: SCHEDULED    (HOURS)    REASON (1)    REDUCING POWER(2)            CORRECTIVE ACTIONS/COtDIENTS NONE
 
==SUMMARY==
: Unit No. 1 vas placed in commercial operation on  December 21, 1976,  at 12:01 a.m. Unit operated at approximately 50X R.P. through end of month.
 
4=}}

Latest revision as of 19:41, 2 February 2020

Attached December, 1976 Operating Status Reports for Turkey Point Unit Nos. 3 & 4 and St. Lucie Unit No. 1
ML18227A408
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/07/1977
From: Schmidt A
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
References
Download: ML18227A408 (15)


Text

NRC fOBNI 195 U.S.,NVCLLAB I'ICGULATOBYCOMMISSION" OOCKETNU

'I

~I (2-7G) 50-25( 251 FILE NUMBER 35 NRC DISTR l8UTION Fon RT 60 DOC I(ET IE/IATERlAL MONTHLY REPORT TO: USNRC FROM: BLORDIA PWR 6 LIGHT CO. OATE OF OOCUMFNT MIAMI, FLORDIA 1/7/77 A.D. SCHMIDT OATL RECFIVEO 1/.g/77 QLETTER CINOTORIZEO PROP INPUT FORM NUMBER OF COPIES RECEIVED DOR IGINAL B UNC LASS IF I E 0 OCOPV DESCRIPTION LETTER TRANS THE FOLLOWING: MO)THLY REPORT EOR DECFIIBER 1976 PLANT & COMPONENT OPERABILITY &

AVAILABILITY, THIS REPORT TO BE USED IN PREPARING GRAY BOOK BY PLANS &

OPERATIONS'LANT TURKEY PT ~ // 1 3 6 4

'ACKNOWLEDGED NAME ~

OKOT gggoy@

FOR ACTION/INFORMATION MIPC W CYS I'OR ACT ON INTERNAL D ISTRI BUTION MC PDR

'CDOMI D BRANCH CHIEF L ZIEMANN /LEAR PARRISH DIGGS EXTERNAL DISTRIBUTIOIV CONTROL NUiVlBER I I IAMI I'I..

NRC FORM 195 (2 7GI

P. O. IfOX 013100. MIAMI, FL 33101

/y

~lp ~

J ~

FLORIDA POWEH St LIGHT COMPANY C ~

IK ~ I g

~ ~

I -

~

January 7, 1977 P

~ ~~i~N gg f Office of Management Information ~ Qe4~~>> hi and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the December, 1976 Operating Status Reports for Turkey Point Unit Nos..3 and 4 and St. Lucie Unit No. 1.

Very truly yours, A. D. Schmidt Vice President Power Resources VTC/DDC cc: Mr. Norman C. Moseley Jack R. Newman, Esquire PEOPLE . ~ . SERVING PCOf'LC

a r.,

u 1k II '

Jj

~1 g ~,

I

~ '

APPENDS B AVERAGE DAILY UNIT POWER LEVEL

'I

~

I

~

DOCKET NO. 50 250

-UNIT Turkey Point Unit No.

DATE Jan. 6 1977 COMPLETED BY V. T. Chi son TELEPHONE (305) 552-3830 MONTH December, 19 7'6 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (NHe-Net) (MWe-Net) 17 18 3 19 20 21 22 23 25 10 26 27 12 28 13 29 14 30 15 31 16

APPENDIX C OPERATING DATA REPO~

DOCKET NO, 50 250 UNIT Turkey Point Unit No. 3 REPORT MONTH December 1976 DATE Jan. 6, 1977 e

C'OMPLETED BY V. T. Chilson TELEPHONE OPERATING STATUS 1, REPORTING PERIOD: 0001 76 12 01 GROSS HOURS 'IN REPORTING PERIOD: 744.0 THROUGH 4

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2200.

Mlcl.DNPNDD. DAPADPPP (MNe-Nee): ~66 DESIGN ELECTRICAL RATING (MWe-Net): 693

3. POWER LEVEL TO WHICH RESTRICTED (IP ANY) (MWe-iVet): NONE 46 REASONS POR RESTRZCTIOAV (IF ANY):.

THIS MONTH YEAR TO DATE CUMULATIVE 56 NiDiBERS OF HOURS REACTOR WAS CRITICAL..... 0 0 6 760.0 28 040.1

6. REACTOR RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ .~. ~ .. 0 0 64.2 67.4 7~ HOURS GENERATOR OVA LINE. ~ .............. ~ .. 0.0 6 669.1 27 039.1 80 UNIT RESERVE SHUTDOWN HOURS ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0.0 0.0 85.0
9. GROSS THERMAL ENERGY GLVERATED (MiiH)...... 14 417 328 51 729 588
10. GROSS ELECTRICAL ENERGY GLVERATED (i%H)... 0 4 555 215 16 570 451
11. NET ELECTRICAL ENERGY GENERATED (MiiH)..... - 1 706 4 320 173 15 675 935
12. REACTOR SERVICE FACTOR. 0.0 77.0 78.5
13. REACTOR AVAILABILITYFACTOR ,, ~ ...,,....., 0.0 77.7 78.7
14. UiNIT SERVICE FACTOR 0.0
15. UNIT AVAILABILITYFACTOR. ~ ~ ~ eee ~ ~ ~ ~ ~ ~ ~ ~ ~ 6 ~ 75.9 75.9
16. iLVIT CAPACITY PACZOR (Using (MDC).....:... 73.8 66.8
17. UNIT CAPACITY FAC10R (Using Design MWe)... 0 0 71.0 63.3
18. UNIT FORCED OUTAGE RATEe. ~ . ~ .......... ... ~ 0 0 0.1 2.9
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPED DATED AVA DDURATION OF EACH)
20. ZP SHUTDOWN AT END OP REPORT PERIOD, ESTLM(ATED DATE OP STAR UP: Jan 16 1977
21. UNITS IiV TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY ZNITIAL ELECTRICITY COMMERCIAL OPERATION

(1) REASON APPENDIX D DOCKET NO. 50 - 250 h: EQUIPMENT FAILURE (EXPLAIN)

B: MAINT. OR TEST UHIT SBUTD(MNS AND POHER REDUCTIONS UNIT NAME Turkey Point Unit No. 3 C REFUELING D: RECULATORY RESTRICTION DATE Jan. 6, 1977 E: OPERATOR TRAINING AND LICENSE EXAMINATION COMPLETED BY V. T. Chilson P: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) TELEPHONE (305) 552-3B30 REPORT MONTH December 1976 H: OTHER (EXPLAIN)

(2) METHOD 1: MANUAL METHOD OP 2: MANUAL SCRAM TYPE SllUTTIHG Dpi 3: AUTOMATIC SCRAM P: FORCED DURATION THE REACTOR OR 4: OlliER (EX%LAIN) NO. DATE S SCHEDULED (BOURS) REASON(1) REDUCING PONER(2) CORRECTIVE ACTIONS/CO:IHENTS 21 76-11-14 744.0 Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month) . (Nuclear and Non-nuclear systems)

~,

SUMMARY

Unit No. 3 removed from service for refueling, maintenance, and inspections. (Continued from previous month) 4 ~ o

0 APPENDIX B AVERAGE DAILY UNIT POWER LEVEL 50 251

~

g DOCKET NO.

I

.UNIT Turkey. Point Unit No. 4

- ~ DATE Jan. 6, 1977 COMPLETED BY >- T. Chilson TELEPHONE (305) 552-3830 MONTH December, 1976 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mle-Net) (Mfe-Ne t) 17 690 18 697 3 17 19 689 521 20 605

'83 21 683 6 689 22 692 687 692 661 693 664 25 695 10 69.6 26 '92 690 27 691 12 689 28 693 684 29 689 680. -30 688 14'5 687 690 16 687 NOTE: Average daily power level greater than 666 Wih due to cooler condenser cooling water.

APPENDIX C OPERATING DATA REPORT~

DOCKET Np. 50 - 250 UNIT Turke Point Unit No.

~ i REPORT MONTH December, 1976 Jan.

~

~

DATE 6 1977

'OUPLE ED BY V. T. Chilson OPERATING STATUS 1~ REPORTING PERIOD'001 > 76> 12 i pl GROSS HOURS IN REPORTING 744.p 2400,76,12~31 PERIOD'HRpUGH

2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):

MAX.DEPEHO ~ CAPACITY ON -N i):

DESIGN ELECTRICAL RATING (MWe"Net): 693

3. POWER LEVEL Tp WHICH RESTRICTED (IP ANY) (MWe-Net): NONE
4. REASONS FOR RESTRICTION (IP AVl):

THIS MONTH YEAR TO DATE CUMULATIVE

5. NUMBERS OF HOURS REACTOR WAS CRITICAL.... ~ 6 075.9 21 721.8
6. REACTOR RESERVE SHUTDOWN HOURS............ . 21.7 21.7 138 ~ 8 le HOURS GENERATOR ON LINE. ~ ~ ~ 670il 5 828.4 20 542.0
8. UNIT RESERVE SHUTDOWN HOURS..... ~ ......... 0.0 0.0 0.0
9. GROSS THERMAL ENERGY GENERATED (MWH)....., 1 453 037 ll 103 004 41 751 640
10. GROSS ELECTRICAL ENERGY OK&RATED (MWH)... 479 100 3 978 606 13 957 688
11. NET ELECTRICAL EJERGY GENERATED (AH)..... 455 502 3 771 836 13 230 466
12. REACTOR SERVICE FACTOR. 96.5 69.2 73 '
13. REACTOR AVAILABILITYFACTOR............... 99 ' 69.5 74.2
14. UNIT SERVICE FACTOR. ~ ~ ~ ~ ~ ~ ~ to ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 66. 4 69.8
15. UNIT AVAILABILITYFACTOR.................. 90.1 66.4 69.8
16. UNIT CAPACITY FACTOR (Using (MDC)... ~ ~ ~ ... 91 ' 64.5 68.2
17. UNIT CAPACITY FACTOR (Using Design MWe)... 88 3 62.0 64.8
18. UNIT FORCED OUTAGE RATE...........'........ - 0 5 . 3.7 3.6
19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Repair steam generator tube leak - Jan. 6, 1977 through Jan. 12, 1977.

Refueling, maintenance, and inspections - April 4, 1977 through May 22, 1977.

20. IF SHUTDOWiN AT END OF REPORT PERIOD, ESTLQTED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR Tp COMMERCIAL OPERATION): PORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

1 REASON APPENDIX D DOCKET NO. 50 - 251 A: EQUIPMENT FAILURE (EXPIAIN)

B: MAINT. OR TEST UNIT SIIUTDOWNS AND POWER REDUCTIONS UNIT NAHE Turke Point Unit No. 4 C: REFUELING D: REGULATORY RESTRICTION DATE Jan. 6 1977 E OPERATOR TRAINING AND LICENSE EXAHINATION COMPLETED BY V. T. Chilson F ADlIINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN) REPORT MONTII December 1976 TELEPHONE (305) 552-3830 H: OTHER (EXPLAIN)

(2) METHOD 1: MAIiVAL METHOD OF 2: .MANUAL SCRAH TYPE SHUTTLNG DOWN 3: AUTOHATIC SCRAM F: FORCF3) DURATION THE REACTOR OR OTIIER (EXPLAIN) NO. S SCHEDULED (BOURS) REASON(1) REDUCING POWER(2) CORRECTIVE ACTIONS/CRDIENTS 28 76-10-28 69.4 Unit No. 4 was removed from service for steam gener-ator tube inspection program. (Continued from previous month) (Nuclear system) 29 76-12-04 3.2 Unit No. 4 tripped on steam generator No. 4 A high level during a transient condition caused by the loss of a vital instrument bus Fewer supply. (Nuclear system) 30 76-12-20 1.3 Unit No. 4 tripped during a transient condition cause by the failure of a component in nuclear instrumen-tation system channel N-41. (Nuclear system)

SUMMARY

Unit No. 4 was returned to service on December 3, 1976 following completion of steam generator tube inspection program.

Unit operated at 100X R.P. during month except for outages on Dec. 4, 1976 and Dec. 20, 1976.

APPENDIX B AVERAGE DAILY UNIT POWER LEVEL I

I r5 ~

C DOCKET NO. 50 335

'.UNIT St. Luce.e Unzt No. 1 I

DATE Jan. 6, 1977 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3830 MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWrR LEVEL (MWe-Net) (MWe-Net) 18 3 19 20 21 370 22 377 23 376 24 374 25 380 10 26 374 27 371 12 28 378 13 '9 376 14 30 373 15 31 374 16

APPENDIX C OPERATING DATA REPORT DOCXET NO. 50 - 335 UNIT St ~ Lucio Unit No. 1 REPORT MONTH December, 1976 J'ATE Jan. 6, 1977 COMPLETED BY V. T. Chilson

\~

OPERATING STATUS TELEPHONE (305) 552-3830

1. REPORTING PERIOD: 0001.76912,21 GROSS HOURS IN REPORTING PERIOD: 264.0 THROUGH 24
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 2560 MAl(.DEPEND. CAPACITY (MWe"Net): ~ 802 Estimated)

DESIGN ELECTRZCAL RATING (MWe-Net): 802

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): 722
4. REASONS FOR RESTRICTION (IF AWa ):

"Temporary 90X restriction pending reactor coolant flow analysis" THIS MONTH YEAR TO DATE CUMULATIVE 5~ NUAABERS OF HOURS REACTOR WAS CRITICAL ~ ~ ~ ~ 264.0 264.0

6. REAUTOR RESERVE SRUTDODE EOIIIIS............ 0.0
7. IIOURS OESEIIATOR OE LTSE.......,.... 264.0
8. UNIT RESERVE SHUTDOWN HOURS............... ' 0 0.0 0.0
9. GROSS THEPRlAL BARGY GE'.STERATED (MWH) ~ ~ .. ~ . ~ 347 603 347 603 347 603
10. GROSS ELECTRZCAL FNERGY GERKRATED (MWH)... 108 270 108 270 108 270
11. NET ELECTRICAL ENERGY GE:IERATED (Ã%) ~ ~ ~ ~ ~ 98 975 98 975 98 975
12. REACTOR SERVICE FACTOR 100.0 100.0 100.0
13. REACTOR AVAILABILITYFACTOR.............:. 100.0 100.0 100.0
14. UNZT SERVICE FACTOR............,....,...,. 100.0 100.0 100.0
15. 'UNIT AVAILABILITYFACTOR..............,... 100.0 100.0 100.0 16 UNIT CAPACITY FACTOR (Using (MDC) . ~ ~ ~ . ~ ., 46.7 46.7 46.7
17. UNIT CAPACITY FACTOR (Using Design MWe)... 46 7 46.7 46.7

\

18. UNIT FORCED OUTAGE RATE................... 0.0 0.0 0.0
19. SHUTDOWANS SCHEDULED OVER NEXT 6 MO~iS (TYPE, DATE> AND DURATION OF EACH):
20. IF SHUTDOWLN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY 49221 22, 1976 INITIAL ELECTRICITY ~EA 7 1976 CORAAERCIAL OPERATION D . 21 1976 4

APPEtlDIX D DOCKET NO. I (1) REASON A: EQUIPMENT FAILURE (EXPLAIN) UNIT St. Lucie Unit o.

UNIT SHUTDOWNS AND POWER REDUCTIONS NAME 1 B: MAINT. OR TEST C: REFUELING DATE Jan. 6, 1977 D: REGULATORY RESTRICTION E: OPERATOR TRAINING AIID CO'IPI ETED BY V T Chilson LICENSE EXAMINATION F: ADttI H ISTRATIVE TELEPHONE (305) 552-3830.

G: OPERATIOtlAL ERROR (EXPLAIN) REPORT MONTH December 1976 H: OTHER (FJ(PLAIN)

(2) tIETHOD 1: MANUAL METHOD OF 2: .MANUAI SCRAM TYPE SHUTTING DOWN 3: AUTOMATIC SCRAM F! FORCED DURATION THE REACTOR OR OTHER (EXPLAIN) NO. DATE S: SCHEDULED (HOURS) REASON (1) REDUCING POWER(2) CORRECTIVE ACTIONS/COtDIENTS NONE

SUMMARY

Unit No. 1 vas placed in commercial operation on December 21, 1976, at 12:01 a.m. Unit operated at approximately 50X R.P. through end of month.

4=