ML19254F951: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:,
{{#Wiki_filter:,
c;o 4 9
c;o 4 9 70 5 PCO                                                  VIRGINIA ELECTRIC AND PO/.[R COVFA'4Y
                                  -
70 5 PCO                                                  VIRGINIA ELECTRIC AND PO/.[R COVFA'4Y
(    ;.<
(    ;.<
                                         ^
                                         ^
Line 29: Line 27:
This is our final response to thi        bulletin. Should you require further infomation on this matter, please, ontact thig office.
This is our final response to thi        bulletin. Should you require further infomation on this matter, please, ontact thig office.
                                 <        V    ',rul  y      ,
                                 <        V    ',rul  y      ,
                                                                                '
                                                ,                .,
c                /6W-C. B rown , 'J r.
c                /6W-C. B rown , 'J r.
                                                                                  '
Sen      ice resident - Power t tion Engineer ng and Construct'o cc: Mr. Victor Stello, Director Office of Inspection & Enforc      nt Mr. Harold R. Denton , Direct 6r Office of Nuclear Reactor Regulation D O//eb 7 91119 o f / 4                      13453'N}}
Sen      ice resident - Power t tion Engineer ng and Construct'o cc: Mr. Victor Stello, Director Office of Inspection & Enforc      nt Mr. Harold R. Denton , Direct 6r Office of Nuclear Reactor Regulation D O//eb 7 91119 o f / 4                      13453'N}}

Latest revision as of 00:52, 2 February 2020

Responds to IE Bulletin 79-23, Potential Failure of Emergency Diesel Generator Field Exciter Transformer. Manufacturer Assures That Exitation Power Transformer Will Be Connected to Generator Leads Using floating-wye Form
ML19254F951
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/26/1979
From: Brown S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Oreilly S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-23, NUDOCS 7911190514
Download: ML19254F951 (1)


Text

,

c;o 4 9 70 5 PCO VIRGINIA ELECTRIC AND PO/.[R COVFA'4Y

(  ;.<

^

  • Ib October 26, 1979 Mr. James P. O'Reilly, Director Serial No. 863 Office of Inspection & Enforcement PSE&C/WLT:lga U.S. Nuclear Regulatory Comission Region II 101 Marietta Street, Suite 3100 Docket Nos. 50-404 Atlanta, Georgia 30303 50-405

Dear Mr. O'Reilly:

We have reviewed I.E. Bulletin 79-23 with regards to the Emergency Diesel Generators presently on order for North Anna Units 3 and 4. The equip-ment manufacturer, Colt Industries, has infomed us that the excitation power transfomer is to be connected to the generator leads utilizing a floating-wye primary winding configuration. Therefore, no circulating hamonic currents of the type discussed in I.E. Bulletin 79-23 can flow in this transfomer. Steps will be taken to insure that this transfomer primary winding is never grounded.

This is our final response to thi bulletin. Should you require further infomation on this matter, please, ontact thig office.

< V ',rul y ,

c /6W-C. B rown , 'J r.

Sen ice resident - Power t tion Engineer ng and Construct'o cc: Mr. Victor Stello, Director Office of Inspection & Enforc nt Mr. Harold R. Denton , Direct 6r Office of Nuclear Reactor Regulation D O//eb 7 91119 o f / 4 13453'N