ML19322E950: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:l
{{#Wiki_filter:l
  .
     .!                                                                          l  C
     .!                                                                          l  C
,      GULF STATES                  UTELITIES                  COMPANY AOST OFFICE Box 2951            *BEAUMCNT , TEXAS 77?C4 APEA CODE 713 8 3 8 E E, 3 .
,      GULF STATES                  UTELITIES                  COMPANY AOST OFFICE Box 2951            *BEAUMCNT , TEXAS 77?C4 APEA CODE 713 8 3 8 E E, 3 .
Line 29: Line 28:
The 5 month results are scheduled to be completed on March 10, 1980. We vill transmit those results to you as soon as we receive them.
The 5 month results are scheduled to be completed on March 10, 1980. We vill transmit those results to you as soon as we receive them.
Sincerely, J. G. Weigand
Sincerely, J. G. Weigand
[8 Vice President Operations and Technical Systems JGW/WJR/JEB/mb Enclosure
[8 Vice President Operations and Technical Systems JGW/WJR/JEB/mb Enclosure 8004040 3 70}}
.
8004040 3 70}}

Latest revision as of 03:43, 1 February 2020

Forwards 4-month Results of Pittsburgh Testing Lab Repts 800985 & 800986, Rept of Potential Alkali Reactivity,Astm C227 & C289. Results within Limits for 3 & 6 Month Test Durations
ML19322E950
Person / Time
Site: River Bend Entergy icon.png
Issue date: 02/22/1980
From: Weigand J
GULF STATES UTILITIES CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19322E951 List:
References
RBG-7276, NUDOCS 8004040370
Download: ML19322E950 (1)


Text

l

.! l C

, GULF STATES UTELITIES COMPANY AOST OFFICE Box 2951 *BEAUMCNT , TEXAS 77?C4 APEA CODE 713 8 3 8 E E, 3 .

February 22, 1980 RBG - 7276 File G9 5 Mr. Karl V. Seyfrit Director U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, TX 76011

Dear Mr. Seyfrit:

River Bend Station Unit 1 Docket No. 50 h58 As requested in your letter of December 13, 1979, enclosed are the four month results of the ASTM C-227 mortar bar test for lov alkali (job cement) with both fine and coarse aggregates.

The four month results, recorded as an average length change percent, are +0.02 and +0.01 for fine and coarse aggregates, res-pectively and are well within the acceptance limits of +0.05 for 3 month and +0.1 for 6 month test durations.

The 5 month results are scheduled to be completed on March 10, 1980. We vill transmit those results to you as soon as we receive them.

Sincerely, J. G. Weigand

[8 Vice President Operations and Technical Systems JGW/WJR/JEB/mb Enclosure 8004040 3 70