ML19351E978: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:. ,"
{{#Wiki_filter:. ,"
                                                                      ..,
9  GULF STATES                UTILITIES COMPANY P O S T O F FI C E 8 0 x 2 9 51 *OEAUMONI TEXAS 77704 AREA CODE ?t3 838 3943 October 3, 1980 RBG - 8660 File Nos. G15.4.1, G9.5 Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U.S. Nuclear Regulatory Cou"nission Region IV 600 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011
                                                                    %
9  GULF STATES                UTILITIES COMPANY
                                                                -
P O S T O F FI C E 8 0 x 2 9 51 *OEAUMONI TEXAS 77704 AREA CODE ?t3 838 3943 October 3, 1980 RBG - 8660 File Nos. G15.4.1, G9.5 Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U.S. Nuclear Regulatory Cou"nission Region IV 600 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011


==Dear Mr. Seidle:==
==Dear Mr. Seidle:==
Line 29: Line 25:
of the newly issued Regulatory Guide 1.58, Rev. 1, to this subject.
of the newly issued Regulatory Guide 1.58, Rev. 1, to this subject.
We trust that this information satisfactorily addresses'your ecocarns.
We trust that this information satisfactorily addresses'your ecocarns.
Sincerely,
Sincerely, E. Linn Draper, Vice President - Technology Attachments ELD /WJR/ mea 801219 0 h
                                          .  .'
E. Linn Draper, Vice President - Technology Attachments ELD /WJR/ mea 801219 0 h
                                                                                  .
                              .                                    .
                                                                          - .


z                      .
z                      .
         ~'
         ~'
    .. .
ATTACHMENT I
ATTACHMENT I
                 -ADDITIONAL INFORMATION FOR I&E REPORT NO. 50-458/80-05 ITEM B The Assistant Technicians, Technicians, and Trainees will perform tests in conjunction with a Level II or above. In this case, both will sign the Test Report as performing the test. The reports will then be reviewed and signed by a second Level II or above.
                 -ADDITIONAL INFORMATION FOR I&E REPORT NO. 50-458/80-05 ITEM B The Assistant Technicians, Technicians, and Trainees will perform tests in conjunction with a Level II or above. In this case, both will sign the Test Report as performing the test. The reports will then be reviewed and signed by a second Level II or above.
Line 47: Line 37:
i
i
;
;
                                                                                    .
O}}
O}}

Revision as of 22:42, 30 January 2020

Responds to NRC Request for Clarification of Item B of 800910 Ltr Re Tests Performed by Technical Personnel Under Supervision.Assistant Technicians Will Work W/Level II or Above Personnel
ML19351E978
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/03/1980
From: Draper E
GULF STATES UTILITIES CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19351E975 List:
References
RBG-8660, NUDOCS 8012190638
Download: ML19351E978 (2)


Text

. ,"

9 GULF STATES UTILITIES COMPANY P O S T O F FI C E 8 0 x 2 9 51 *OEAUMONI TEXAS 77704 AREA CODE ?t3 838 3943 October 3, 1980 RBG - 8660 File Nos. G15.4.1, G9.5 Mr. W. C. Seidle, Chief Reactor Construction & Engineering Support Branch U.S. Nuclear Regulatory Cou"nission Region IV 600 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Dear Mr. Seidle:

RIVER BEND STATION - UNIT 1 REFER TO: RIV DOCKET No. 50-458/RPT. 80-05 As per our recent conversation with your staf f, we are providing the attached clarification with regard to Item B of our response, dated September 10, 1980, to Inspection Report 80-05. . Presently, Gulf States is preparing a River Bend Project position on the applicability .

of the newly issued Regulatory Guide 1.58, Rev. 1, to this subject.

We trust that this information satisfactorily addresses'your ecocarns.

Sincerely, E. Linn Draper, Vice President - Technology Attachments ELD /WJR/ mea 801219 0 h

z .

~'

ATTACHMENT I

-ADDITIONAL INFORMATION FOR I&E REPORT NO. 50-458/80-05 ITEM B The Assistant Technicians, Technicians, and Trainees will perform tests in conjunction with a Level II or above. In this case, both will sign the Test Report as performing the test. The reports will then be reviewed and signed by a second Level II or above.

i Af ter a Technician, Assistant Technician,- or Trainee is trained under the JPG Program to perform a particular task, they may perform that task, initiate and sign the appropriate report-while under the supervision of a Level II or greater. The supervising Level II inspector will also sign the test report as responsible for the correct performance of the test. The report will be reviewed by a second Level II or III inspector.

i The above policy will be reflected in a Quality Control .

Instruction which is to be issued by November 1, 1980.

" Inspection Report" refers to the test reports.and Inspection Reports.

i

O