Line 2: Line 2:
| number = ML15222A834
| number = ML15222A834
| issue date = 08/10/2015
| issue date = 08/10/2015
| title = Ir 05000336/2015002, 05000423/2015002 and Independent Spent Fuel Storage Installation Report 07200047/2015001; 04/01/2015 - 06/30/2015; Millstone Power Station, Units 2 and 3; Routine Integrated Inspection Report
| title = IR 05000336/2015002, 05000423/2015002 and Independent Spent Fuel Storage Installation Report 07200047/2015001; 04/01/2015 - 06/30/2015; Millstone Power Station, Units 2 and 3; Routine Integrated Inspection Report
| author name = McKinley R R
| author name = Mckinley R
| author affiliation = NRC/RGN-I/DRP/PB5
| author affiliation = NRC/RGN-I/DRP/PB5
| addressee name = Heacock D
| addressee name = Heacock D
Line 9: Line 9:
| docket = 05000336, 05000423
| docket = 05000336, 05000423
| license number = DPR-065, NPF-049
| license number = DPR-065, NPF-049
| contact person = McKinley R R
| contact person = McKinley R
| document report number = IR 2015002
| document report number = IR 2015002
| document type = Inspection Report, Letter
| document type = Inspection Report, Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter: August 10, 2015 Mr. David Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711
{{#Wiki_filter: UNITED STATES NUCLEAR REGULATORY COMMISSION


SUBJECT: MILLSTONE POWER STATION - INTEGRATED INSPECTION REPORT 05000336/2015002 AND 05000423/2015002 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07200047/2015001
==REGION I==
2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 August 10, 2015 Mr. David Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711 SUBJECT: MILLSTONE POWER STATION - INTEGRATED INSPECTION REPORT 05000336/2015002 AND 05000423/2015002 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07200047/2015001


==Dear Mr. Heacock:==
==Dear Mr. Heacock:==
On June 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Millstone Power Station, Units 2 and 3. The enclosed inspection report documents the inspection results, which were discussed on July 27, 2015, with Mr. John Daugherty, Site Vice President, and other members of your staff. The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations and with the conditions of your license.
On June 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Millstone Power Station, Units 2 and 3. The enclosed inspection report documents the inspection results, which were discussed on July 27, 2015, with Mr. John Daugherty, Site Vice President, and other members of your staff.
 
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.


The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection, no violations of NRC requirements were identified. In accordance with Title10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Based on the results of this inspection, no violations of NRC requirements were identified.


Sincerely,/RA/ Raymond R. McKinley, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49  
In accordance with Title10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
Sincerely,
/RA/
Raymond R. McKinley, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49


===Enclosure:===
===Enclosure:===
Inspection Report 05000336/2015002 and 05000423/2015002  
Inspection Report 05000336/2015002 and 05000423/2015002 w/Attachment: Supplementary Information


===w/Attachment:===
REGION I==
Supplementary Information
Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 Report Nos. 05000336/2015002 and 05000423/2015002 Licensee: Dominion Nuclear Connecticut, Inc. (Dominion)
Facility: Millstone Power Station, Units 2 and 3 Location: P.O. Box 128 Waterford, CT 06385 Dates: April 1 through June 30, 2015 Inspectors: J. Ambrosini, Sr. Resident Inspector, Division of Reactor Projects (DRP)
B. Haagensen, Resident Inspector, DRP L. McKown, Resident Inspector, DRP J. Richmond, Senior Reactor Inspector, Division of Reactor Safety (DRS)
H. Anagnostopoulos, Health Physicist, DRS D. Kern, Senior Reactor Inspector, DRS O. Masnyk Bailey, Health Physicist, Division of Nuclear Materials Safety (DNMS)
B. Bollinger, Health Physicist (training status), DNMS Approved By: Raymond R. McKinley, Chief Reactor Projects Branch 5 Division of Reactor Projects Enclosure


cc w/encl: Distribution via ListServ
=SUMMARY=
Inspection Report 05000336/2015002, 05000423/2015002; 04/01/2015 - 06/30/2015; Millstone


=SUMMARY=
Power Station (Millstone), Units 2 and 3; Routine Integrated Inspection Report.
Inspection Report 05000336/2015002, 05000423/2015002; 04/01/2015 - 06/30/2015; Millstone Power Station (Millstone), Units 2 and 3; Routine Integrated Inspection Report.


This report covered a three-month period of inspection by resident inspectors and announced inspections performed by regional inspectors. No findings of significance were identified. The significance of most findings is indicated by their color (i.e., greater than Green, or Green,
This report covered a three-month period of inspection by resident inspectors and announced inspections performed by regional inspectors. No findings of significance were identified. The significance of most findings is indicated by their color (i.e., greater than Green, or Green,
White, Yellow, Red) and determined using Inspection Manual Chapter (IMC) 0609, "Significance Determination Process (SDP)," dated April 29, 2015. Cross-cutting aspects are determined using IMC 0310, "Aspects Within the Cross-Cutting Areas," dated December, 4, 2014. All violations of NRC requirements are dispositioned in accordance with the NRC's Enforcement Policy, dated July 9, 2013. The NRC's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," Revision 5.
White, Yellow, Red) and determined using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP), dated April 29, 2015. Cross-cutting aspects are determined using IMC 0310, Aspects Within the Cross-Cutting Areas, dated December, 4, 2014. All violations of NRC requirements are dispositioned in accordance with the NRCs Enforcement Policy, dated July 9, 2013. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.
 
=REPORT DETAILS=


4
===Summary of Plant Status===


=REPORT DETAILS=
Millstone Unit 2 and 3 began the inspection period operating at 100 percent power. On April 1, Unit 2 reduced power to approximately 70 percent power and Unit 3 reduced power to approximately 85 percent power in advance of planned maintenance on the 371 offsite power line. Both units returned to 100 percent power on April 4. On April 21, Unit 3 reduced power to approximately 67 percent in advance of planned maintenance on the 371 offsite power line.
Summary of Plant Status  Millstone Unit 2 and 3 began the inspection period operating at 100 percent power. On April 1, Unit 2 reduced power to approximately 70 percent power and Unit 3 reduced power to approximately 85 percent power in advance of planned maintenance on the 371 offsite power line. Both units returned to 100 percent power on April 4. On April 21, Unit 3 reduced power to approximately 67 percent in advance of planned maintenance on the 371 offsite power line. Unit 3 returned to 100 percent power on April 29. Both units remained at or near 100 percent power for the remainder of the inspection period.
 
Unit 3 returned to 100 percent power on April 29. Both units remained at or near 100 percent power for the remainder of the inspection period.


==REACTOR SAFETY==
==REACTOR SAFETY==
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity  
Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity
{{a|1R01}}
{{a|1R01}}
==1R01 Adverse Weather Protection==
==1R01 Adverse Weather Protection==
{{IP sample|IP=IP 71111.01|count=1}}
{{IP sample|IP=IP 71111.01|count=1}}
Line 58: Line 72:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed a review of plant features and procedures for the operation and continued availability of the offsite and alternate AC power system to evaluate readiness of the systems prior to seasonal high grid loading. The inspectors reviewed Dominion's procedures affecting these areas and the communications protocols between the transmission system operator and Dominion. This review focused on changes to the established program and material condition of the offsite and alternate AC power equipment. The inspectors assessed whether Dominion established and implemented appropriate procedures and protocols to monitor and maintain availability and reliability of both the offsite AC power system and the onsite alternate AC power system. The inspectors evaluated the material condition of the associated equipment by interviewing the responsible system manager, reviewing condition reports (CRs) and open work orders, and walking down portions of the offsite and AC power systems.
The inspectors performed a review of plant features and procedures for the operation and continued availability of the offsite and alternate AC power system to evaluate readiness of the systems prior to seasonal high grid loading. The inspectors reviewed Dominions procedures affecting these areas and the communications protocols between the transmission system operator and Dominion. This review focused on changes to the established program and material condition of the offsite and alternate AC power equipment. The inspectors assessed whether Dominion established and implemented appropriate procedures and protocols to monitor and maintain availability and reliability of both the offsite AC power system and the onsite alternate AC power system. The inspectors evaluated the material condition of the associated equipment by interviewing the responsible system manager, reviewing condition reports (CRs) and open work orders, and walking down portions of the offsite and AC power systems.


Documents reviewed for each section of the inspection report are listed in the Attachment.
Documents reviewed for each section of the inspection report are listed in the
.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R04}}
==1R04 Equipment Alignment==


{{a|1R04}}
Partial System Walkdowns (71111.04 - 3 samples)
==1R04 Equipment Alignment    Partial System Walkdowns==
{{IP sample|IP=IP 71111.04|count=3}}


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed partial walkdowns of the following systems:  
The inspectors performed partial walkdowns of the following systems:
 
Unit 2 Facility 2 of high pressure safety injection (HPSI) during facility 1 surveillance testing on June 30 Unit 3 B quench spray system (QSS) during A QSS Quarterly Surveillance on May 7 C component cooling pump train following restoration of B component cooling pump train following B pump motor replacement on May 8 The inspectors selected these systems based on their risk-significance relative to the reactor safety cornerstones at the time they were inspected. The inspectors reviewed applicable operating procedures, system diagrams, the Updated Final Safety Analysis Review (UFSAR), technical specifications (TS), work orders, CRs, and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have impacted system performance of their intended safety functions. The inspectors also performed field walkdowns of accessible portions of the systems to verify system components and support equipment were aligned correctly and were operable.
Unit 2   Facility 2 of high pressure safety injection (HPSI) during facility 1 surveillance testing on June 30 Unit 3   'B' quench spray system (QSS) during 'A' QSS Quarterly Surveillance on May 7 'C' component cooling pump train following restoration of 'B' component cooling pump train following 'B' pump motor replacement on May 8 The inspectors selected these systems based on their risk-significance relative to the reactor safety cornerstones at the time they were inspected. The inspectors reviewed applicable operating procedures, system diagrams, the Updated Final Safety Analysis Review (UFSAR), technical specifications (TS), work orders, CRs, and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have impacted system performance of their intended safety functions. The inspectors also performed field walkdowns of accessible portions of the systems to verify system components and support equipment were aligned correctly and were operable.


The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no deficiencies. The inspectors also reviewed whether Dominion staff had properly identified equipment issues and entered them into the corrective action program (CAP) for resolution with the appropriate significance characterization.
The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no deficiencies. The inspectors also reviewed whether Dominion staff had properly identified equipment issues and entered them into the corrective action program (CAP) for resolution with the appropriate significance characterization.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1R05}}
{{a|1R05}}
==1R05 Fire Protection==
==1R05 Fire Protection==


Line 87: Line 99:
The inspectors conducted tours of the areas listed below to assess the material condition and operational status of fire protection features. The inspectors verified that Dominion controlled combustible materials and ignition sources in accordance with administrative procedures. The inspectors verified that fire protection and suppression equipment was available for use as specified in the area pre-fire plan, and passive fire barriers were maintained in good material condition. The inspectors also verified that station personnel implemented compensatory measures for out of service, degraded, or inoperable fire protection equipment, as applicable, in accordance with procedures.
The inspectors conducted tours of the areas listed below to assess the material condition and operational status of fire protection features. The inspectors verified that Dominion controlled combustible materials and ignition sources in accordance with administrative procedures. The inspectors verified that fire protection and suppression equipment was available for use as specified in the area pre-fire plan, and passive fire barriers were maintained in good material condition. The inspectors also verified that station personnel implemented compensatory measures for out of service, degraded, or inoperable fire protection equipment, as applicable, in accordance with procedures.


Unit 2   Hydrogen Tank Farm Fire Area Y-10 and above ground emergency diesel generator (EDG) Fuel Oil Storage Tank Fire Area Y-12 on April 24   Auxiliary Building 480 Volt Motor Control Center B51 and B61 Fire Area 2A13 on May 4 Spent Fuel Pool (SFP) and Fuel Handling Area 2A-14 on May 15 Unit 3   Turbine Building, Basement Floor Area, TB-2, Zone A & B following Trouble Common Troubles Annunciator on May 20
Unit 2 Hydrogen Tank Farm Fire Area Y-10 and above ground emergency diesel generator (EDG) Fuel Oil Storage Tank Fire Area Y-12 on April 24 Auxiliary Building 480 Volt Motor Control Center B51 and B61 Fire Area 2A13 on May 4 Spent Fuel Pool (SFP) and Fuel Handling Area 2A-14 on May 15 Unit 3 Turbine Building, Basement Floor Area, TB-2, Zone A & B following Trouble Common Troubles Annunciator on May 20


====b. Findings====
====b. Findings====
Line 96: Line 108:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors observed a fire brigade drill scenario conducted on June 18 that involved a fire at the Unit 2 hydrogen seal oil skid. The inspectors evaluated the readiness of the plant fire brigade to fight fires. The inspectors verified that Dominion personnel identified deficiencies, openly discussed them in a self-critical manner during the critique, and took appropriate corrective actions as required. The inspectors evaluated specific attributes as follows:   Proper wearing of turnout gear and self-contained breathing apparatus Proper use and layout of fire hoses Employment of appropriate fire-fighting techniques Sufficient fire-fighting equipment brought to the scene Effectiveness of command and control Search for victims and propagation of the fire into other plant areas Smoke removal operations Utilization of pre-planned strategies Adherence to the pre-planned drill scenario Drill objectives met The inspectors also evaluated the fire brigade's actions to determine whether these actions were in accordance with Dominion's fire-fighting strategies.
The inspectors observed a fire brigade drill scenario conducted on June 18 that involved a fire at the Unit 2 hydrogen seal oil skid. The inspectors evaluated the readiness of the plant fire brigade to fight fires. The inspectors verified that Dominion personnel identified deficiencies, openly discussed them in a self-critical manner during the critique, and took appropriate corrective actions as required. The inspectors evaluated specific attributes as follows:
Proper wearing of turnout gear and self-contained breathing apparatus Proper use and layout of fire hoses Employment of appropriate fire-fighting techniques Sufficient fire-fighting equipment brought to the scene Effectiveness of command and control Search for victims and propagation of the fire into other plant areas Smoke removal operations Utilization of pre-planned strategies Adherence to the pre-planned drill scenario Drill objectives met The inspectors also evaluated the fire brigades actions to determine whether these actions were in accordance with Dominions fire-fighting strategies.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.


{{a|1R06}}
{{a|1R06}}
==1R06 Flood Protection Measures==
==1R06 Flood Protection Measures==
{{IP sample|IP=IP 71111.06|count=1}}
{{IP sample|IP=IP 71111.06|count=1}}
Line 112: Line 125:
No findings were identified.
No findings were identified.


{{a|1R11}}
{{a|1R11}}
==1R11 Licensed Operator Requalification Program==
==1R11 Licensed Operator Requalification Program==
{{IP sample|IP=IP 71111.11Q|count=5}}
{{IP sample|IP=IP 71111.11Q|count=5}}
Line 119: Line 132:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors observed a Unit 3 licensed operator simulator drill on April 1 which included a hostile action based scenario resulting in a plant shutdown and cooldown complicated by a loss of the turbine driven auxiliary feedwater pump, 'B' service water pump, 'D' circulating water pump, and both primary grade water storage tanks. The inspectors evaluated operator performance during the simulated event and verified completion of risk significant operator actions, including the use of abnormal and emergency operating procedures. The inspectors assessed the clarity and effectiveness of communications, implementation of actions in response to alarms and degrading plant conditions, and the oversight and direction provided by the control room supervisor. The inspectors verified the accuracy and timeliness of the emergency classification made by the shift manager and the TS action statements entered by the shift technical advisor. Additionally, the inspectors assessed the ability of the crew and training staff to identify and document crew performance problems.
The inspectors observed a Unit 3 licensed operator simulator drill on April 1 which included a hostile action based scenario resulting in a plant shutdown and cooldown complicated by a loss of the turbine driven auxiliary feedwater pump, B service water pump, D circulating water pump, and both primary grade water storage tanks. The inspectors evaluated operator performance during the simulated event and verified completion of risk significant operator actions, including the use of abnormal and emergency operating procedures. The inspectors assessed the clarity and effectiveness of communications, implementation of actions in response to alarms and degrading plant conditions, and the oversight and direction provided by the control room supervisor. The inspectors verified the accuracy and timeliness of the emergency classification made by the shift manager and the TS action statements entered by the shift technical advisor.


The inspectors observed Unit 2 licensed operator simulator training on May 27, which included failures of feedwater heaters, nuclear instruments, pressurizer level control, and a station blackout coincident with a loss of coolant accident inside containment. The inspectors evaluated operator performance during the simulated event and verified completion of risk significant operator actions, including the use of abnormal and emergency operating procedures. The inspectors assessed the clarity and effectiveness of communications, implementation of actions in response to alarms and degrading plant conditions, and the oversight and direction provided by the control room supervisor. The inspectors verified the accuracy and timeliness of the emergency classification made by the shift manager and the TS action statements entered by the shift technical advisor. Additionally, the inspectors assessed the ability of the crew and training staff to identify and document crew performance problems.
Additionally, the inspectors assessed the ability of the crew and training staff to identify and document crew performance problems.
 
The inspectors observed Unit 2 licensed operator simulator training on May 27, which included failures of feedwater heaters, nuclear instruments, pressurizer level control, and a station blackout coincident with a loss of coolant accident inside containment. The inspectors evaluated operator performance during the simulated event and verified completion of risk significant operator actions, including the use of abnormal and emergency operating procedures. The inspectors assessed the clarity and effectiveness of communications, implementation of actions in response to alarms and degrading plant conditions, and the oversight and direction provided by the control room supervisor. The inspectors verified the accuracy and timeliness of the emergency classification made by the shift manager and the TS action statements entered by the shift technical advisor.
 
Additionally, the inspectors assessed the ability of the crew and training staff to identify and document crew performance problems.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.


===.2 Quarterly Review of Licensed Operator Performance in the Main Control Room (3 samples)===
===.2 Quarterly Review of Licensed Operator Performance in the Main Control Room===
 
      (3 samples)


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors observed the operators at Unit 2 conduct a power reduction to 90 percent power on May 29 to perform turbine control valve testing. The inspectors observed focus briefings and other control room communications to verify that activities were performed in accordance with procedures and that evolutions were controlled and coordinated in accordance with operations department standards and expectations.
The inspectors observed the operators at Unit 2 conduct a power reduction to 90 percent power on May 29 to perform turbine control valve testing. The inspectors observed focus briefings and other control room communications to verify that activities were performed in accordance with procedures and that evolutions were controlled and coordinated in accordance with operations department standards and expectations.


The inspectors observed Unit 3 operators secure the 'A' motor driven main feedwater pump and start the turbine driven main feedwater pump to make repairs on the motor driven pump on April 1. The inspectors observed briefings to verify that the briefings met the criteria specified in Dominion's Operations Section Expectations Handbook. Additionally, the inspectors observed performance to verify that procedure use, crew communications, and coordination of activities between work groups similarly met established expectations and standards.
The inspectors observed Unit 3 operators secure the A motor driven main feedwater pump and start the turbine driven main feedwater pump to make repairs on the motor driven pump on April 1. The inspectors observed briefings to verify that the briefings met the criteria specified in Dominions Operations Section Expectations Handbook.
 
Additionally, the inspectors observed performance to verify that procedure use, crew communications, and coordination of activities between work groups similarly met established expectations and standards.


The inspectors observed performance of a downpower to 66 percent power at Unit 3 on April 21 to meet station electrical output requirements associated with removal of the severe line outage detection system and the performance of offsite electrical grid maintenance. The inspectors observed focus briefings and other control room communications to verify that activities were performed in accordance with procedures and that evolutions were controlled and coordinated in accordance with operations department standards and expectations.
The inspectors observed performance of a downpower to 66 percent power at Unit 3 on April 21 to meet station electrical output requirements associated with removal of the severe line outage detection system and the performance of offsite electrical grid maintenance. The inspectors observed focus briefings and other control room communications to verify that activities were performed in accordance with procedures and that evolutions were controlled and coordinated in accordance with operations department standards and expectations.
Line 138: Line 159:
No findings were identified.
No findings were identified.


{{a|1R12}}
{{a|1R12}}
==1R12 Maintenance Effectiveness==
==1R12 Maintenance Effectiveness==
{{IP sample|IP=IP 71111.12Q|count=1}}
{{IP sample|IP=IP 71111.12Q|count=1}}


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the Unit 2 circulating water system on June 16 to assess the effectiveness of maintenance activities on structure, system, or component (SSC) performance and reliability. The inspectors reviewed system health reports, CAP documents, maintenance work orders, and maintenance rule basis documents to ensure that Dominion was identifying and properly evaluating performance problems within the scope of the maintenance rule. For each sample selected, the inspectors verified that the SSC was properly scoped into the maintenance rule in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.65 and verified that the (a)(2) performance criteria established by Dominion staff was reasonable. As applicable, for SSCs classified as (a)(1), the inspectors assessed the adequacy of goals and corrective actions to return these SSCs to (a)(2). Additionally, the inspectors ensured that Dominion staff was identifying and addressing common cause failures that occurred within and across maintenance rule system boundaries.
The inspectors reviewed the Unit 2 circulating water system on June 16 to assess the effectiveness of maintenance activities on structure, system, or component (SSC)performance and reliability. The inspectors reviewed system health reports, CAP documents, maintenance work orders, and maintenance rule basis documents to ensure that Dominion was identifying and properly evaluating performance problems within the scope of the maintenance rule. For each sample selected, the inspectors verified that the SSC was properly scoped into the maintenance rule in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.65 and verified that the (a)(2) performance criteria established by Dominion staff was reasonable. As applicable, for SSCs classified as (a)(1), the inspectors assessed the adequacy of goals and corrective actions to return these SSCs to (a)(2). Additionally, the inspectors ensured that Dominion staff was identifying and addressing common cause failures that occurred within and across maintenance rule system boundaries.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.


{{a|1R13}}
{{a|1R13}}
==1R13 Maintenance Risk Assessments and Emergent Work Control==
==1R13 Maintenance Risk Assessments and Emergent Work Control==
{{IP sample|IP=IP 71111.13|count=5}}
{{IP sample|IP=IP 71111.13|count=5}}


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed station evaluation and management of plant risk for the maintenance and emergent work activities listed below to verify that Dominion performed the appropriate risk assessments prior to removing equipment for work. The inspectors selected these activities based on potential risk significance relative to the reactor safety cornerstones. As applicable for each activity, the inspectors verified that Dominion personnel performed risk assessments as required by 10 CFR 50.65(a) (4) and that the assessments were accurate and complete. When Dominion performed emergent work, the inspectors verified that operations personnel promptly assessed and managed plant risk. The inspectors reviewed the scope of maintenance work and discussed the results of the assessment with the station's probabilistic risk analyst to verify plant conditions were consistent with the risk assessment. The inspectors also reviewed the TS requirements and inspected portions of redundant safety systems, when applicable, to verify risk analysis assumptions were valid and applicable requirements were met.
The inspectors reviewed station evaluation and management of plant risk for the maintenance and emergent work activities listed below to verify that Dominion performed the appropriate risk assessments prior to removing equipment for work. The inspectors selected these activities based on potential risk significance relative to the reactor safety cornerstones. As applicable for each activity, the inspectors verified that Dominion personnel performed risk assessments as required by 10 CFR 50.65(a)
: (4) and that the assessments were accurate and complete. When Dominion performed emergent work, the inspectors verified that operations personnel promptly assessed and managed plant risk. The inspectors reviewed the scope of maintenance work and discussed the results of the assessment with the stations probabilistic risk analyst to verify plant conditions were consistent with the risk assessment. The inspectors also reviewed the TS requirements and inspected portions of redundant safety systems, when applicable, to verify risk analysis assumptions were valid and applicable requirements were met.


Unit 2   Planned Yellow Risk for SP 2604BO, HPSI Pump in-service testing (IST) on April 21 and SP 2402M Automatic Auxiliary Feedwater Initiation Test on April 22 Execution of Risk Plan for Switchyard Scheduled Work Activities concurrent with 'B' EDG troubleshooting on June 1 Elevated Procedurally Controlled Risk during Auto Auxiliary Feedwater Initiation Logic Testing on June 15 Unit 3   Execution of risk plan associated with 'B' EDG two year maintenance overhaul on May 27 Emergent risk associated with a balloon discovered in reserve station service transformer 'A' disconnect on May 29
Unit 2 Planned Yellow Risk for SP 2604BO, HPSI Pump in-service testing (IST) on April 21 and SP 2402M Automatic Auxiliary Feedwater Initiation Test on April 22 Execution of Risk Plan for Switchyard Scheduled Work Activities concurrent with B EDG troubleshooting on June 1 Elevated Procedurally Controlled Risk during Auto Auxiliary Feedwater Initiation Logic Testing on June 15 Unit 3 Execution of risk plan associated with B EDG two year maintenance overhaul on May 27 Emergent risk associated with a balloon discovered in reserve station service transformer A disconnect on May 29


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.


{{a|1R15}}
{{a|1R15}}
==1R15 Operability Determinations and Functionality Assessments==
==1R15 Operability Determinations and Functionality Assessments==
{{IP sample|IP=IP 71111.15|count=9}}
{{IP sample|IP=IP 71111.15|count=9}}


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed operability determinations for the following degraded or non-conforming conditions:  
The inspectors reviewed operability determinations for the following degraded or non-conforming conditions:
 
Unit 2 CR576963, C reactor building closed cooling water pump oil leakage on April 17 CR576783, Bus 24 short circuit analysis on April 20 CR578991, Use of non-quality assurance material in vital switchgear cooler, M2A/C-2 on May 11 CR579859, 2-FW-86 operability determination for containment leakage on May 19 Unit 3 ETE-MP-2013-1234, Revision 2, service life of 3SWP*AOV39B, B EDG service water heat exchanger outlet valve on April 9 CR579049, QSS train A seismic restraint bolt/nut thread engagement on May 12 CR581001, impact of condensation on leak detection per OD 000607 at leakage mitigation device on service water pump to recirculation spray system D heat exchanger piping on May 27 CR582398, safety injection cooling water B train service water pipe wall thinning on June 16 CR582952 B EDG rocker arm pre-lubrication oil pump control power fuse failure on June 24 The inspectors selected these issues based on the risk significance of the associated components and systems. The inspectors evaluated the technical adequacy of the operability determinations to assess whether TS operability was properly justified and the subject component or system remained available such that no unrecognized increase in risk occurred. The inspectors compared the operability and design criteria in the appropriate sections of the TS and UFSAR to Dominions evaluations to determine whether the components or systems were operable. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled by Dominion. The inspectors determined, where appropriate, compliance with bounding limitations associated with the evaluations.
Unit 2   CR576963, 'C' reactor building closed cooling water pump oil leakage on April 17 CR576783, Bus 24 short circuit analysis on April 20   CR578991, Use of non-quality assurance material in vital switchgear cooler, M2A/C-2 on May 11 CR579859, 2-FW-86 operability determination for containment leakage on May 19 Unit 3   ETE-MP-2013-1234, Revision 2, service life of 3SWP*AOV39B, 'B' EDG service water heat exchanger outlet valve on April 9 CR579049, QSS train 'A' seismic restraint bolt/nut thread engagement on May 12 CR581001, impact of condensation on leak detection per OD 000607 at leakage mitigation device on service water pump to recirculation spray system 'D' heat exchanger piping on May 27 CR582398, safety injection cooling water 'B' train service water pipe wall thinning on June 16 CR582952 'B' EDG rocker arm pre-lubrication oil pump control power fuse failure on June 24 The inspectors selected these issues based on the risk significance of the associated components and systems. The inspectors evaluated the technical adequacy of the operability determinations to assess whether TS operability was properly justified and the subject component or system remained available such that no unrecognized increase in risk occurred. The inspectors compared the operability and design criteria in the appropriate sections of the TS and UFSAR to Dominion's evaluations to determine whether the components or systems were operable. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled by Dominion. The inspectors determined, where appropriate, compliance with bounding limitations associated with the evaluations.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.


{{a|1R18}}
{{a|1R18}}
==1R18 Plant Modifications==
==1R18 Plant Modifications==
{{IP sample|IP=IP 71111.18|count=3}}
{{IP sample|IP=IP 71111.18|count=3}}
Line 179: Line 200:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the Unit 3 temporary modification TCC-MP-2015-004, "Temporary Installation of a Coated Valve Body for Restoration of Emergency Diesel Generator Service Water Throttle Valve," on June 4 to determine whether the modifications affected the safety functions of systems that are important to safety. The inspectors reviewed 10 CFR 50.59 documentation and post-modification testing results, and conducted field walkdowns of the modifications to verify that the temporary modifications did not degrade the design bases, licensing bases, and performance capability of the affected systems.
The inspectors reviewed the Unit 3 temporary modification TCC-MP-2015-004, Temporary Installation of a Coated Valve Body for Restoration of Emergency Diesel Generator Service Water Throttle Valve, on June 4 to determine whether the modifications affected the safety functions of systems that are important to safety. The inspectors reviewed 10 CFR 50.59 documentation and post-modification testing results, and conducted field walkdowns of the modifications to verify that the temporary modifications did not degrade the design bases, licensing bases, and performance capability of the affected systems.


===.2 Permanent Modifications (2 samples)===
===.2 Permanent Modifications (2 samples)===
Line 189: Line 210:
No findings were identified.
No findings were identified.


{{a|1R19}}
{{a|1R19}}
==1R19 Post-Maintenance Testing==
==1R19 Post-Maintenance Testing==
{{IP sample|IP=IP 71111.19|count=7}}
{{IP sample|IP=IP 71111.19|count=7}}
Line 196: Line 217:
The inspectors reviewed the post-maintenance testing (PMT) for the maintenance activities listed below to verify that procedures and test activities ensured system operability and functional capability. The inspectors reviewed the test procedure to verify that the procedure adequately tested the safety functions that may have been affected by the maintenance activity, that the acceptance criteria in the procedure was consistent with the information in the applicable licensing basis and/or design basis documents, and that the procedure had been properly reviewed and approved. The inspectors also witnessed the test or reviewed test data to verify that the test results adequately demonstrated restoration of the affected safety functions.
The inspectors reviewed the post-maintenance testing (PMT) for the maintenance activities listed below to verify that procedures and test activities ensured system operability and functional capability. The inspectors reviewed the test procedure to verify that the procedure adequately tested the safety functions that may have been affected by the maintenance activity, that the acceptance criteria in the procedure was consistent with the information in the applicable licensing basis and/or design basis documents, and that the procedure had been properly reviewed and approved. The inspectors also witnessed the test or reviewed test data to verify that the test results adequately demonstrated restoration of the affected safety functions.


Unit 2   PMT following 'C' circulating water pump and variable frequency drive repairs on April 21 PMT for replacement of reactor protection system (RPS) trip unit TU-A-5 on May 8   PMT following repairs to containment spray recirculation line check valve 2-CS-6A on June 12 Unit 3   PMT for 'B' service water strainer four year overhaul on May 1 PMT for auxiliary building supplementary leak collection and release system 'B' train fan following surveillance failure on May 21 PMT following two year overhaul of 'B' EDG on May 29 PMT following repair of turbine driven auxiliary feedwater trip throttle valve linkage to mechanical turbine trip mechanism loose interference fitting on June 15
Unit 2 PMT following C circulating water pump and variable frequency drive repairs on April 21 PMT for replacement of reactor protection system (RPS) trip unit TU-A-5 on May 8 PMT following repairs to containment spray recirculation line check valve 2-CS-6A on June 12 Unit 3 PMT for B service water strainer four year overhaul on May 1 PMT for auxiliary building supplementary leak collection and release system 'B' train fan following surveillance failure on May 21 PMT following two year overhaul of B EDG on May 29 PMT following repair of turbine driven auxiliary feedwater trip throttle valve linkage to mechanical turbine trip mechanism loose interference fitting on June 15


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.


{{a|1R22}}
{{a|1R22}}
==1R22 Surveillance Testing==
==1R22 Surveillance Testing==
{{IP sample|IP=IP 71111.22|count=7}}
{{IP sample|IP=IP 71111.22|count=7}}
Line 207: Line 228:
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors observed performance of surveillance tests and/or reviewed test data of selected risk-significant SSCs to assess whether test results satisfied TS, the UFSAR, and Dominion procedure requirements. The inspectors verified that test acceptance criteria were clear, tests demonstrated operational readiness and were consistent with design documentation, test instrumentation had current calibrations and the range and accuracy for the application, tests were performed as written, and applicable test prerequisites were satisfied. Upon test completion, the inspectors considered whether the test results supported that equipment was capable of performing the required safety functions. The inspectors reviewed the following surveillance tests:
The inspectors observed performance of surveillance tests and/or reviewed test data of selected risk-significant SSCs to assess whether test results satisfied TS, the UFSAR, and Dominion procedure requirements. The inspectors verified that test acceptance criteria were clear, tests demonstrated operational readiness and were consistent with design documentation, test instrumentation had current calibrations and the range and accuracy for the application, tests were performed as written, and applicable test prerequisites were satisfied. Upon test completion, the inspectors considered whether the test results supported that equipment was capable of performing the required safety functions. The inspectors reviewed the following surveillance tests:
Unit 2   SP 2401D, Reactor Protective System Matrix Testing on April 9 SP 2604BO, 'C' HPSI Pump IST on April 21 SP 2604AO, 'B' HPSI Pump IST on June 9 Unit 3   SP 3626.9, Control Building Air Conditioning Booster Pump, 3SWP*P2B, Operational Readiness Test on April 22 SP 3609.1, Quench Spray Pump 3QSS*P3A Operational Readiness Test on May 7 SP 3646A.2, Emergency Diesel Generator B Operability Test on May 29 SP 3622.3, Turbine Driven Auxiliary Feedwater Pump Operational Readiness and Quarterly IST Group B Pump Test on June 15
Unit 2 SP 2401D, Reactor Protective System Matrix Testing on April 9 SP 2604BO, 'C' HPSI Pump IST on April 21 SP 2604AO, B HPSI Pump IST on June 9 Unit 3 SP 3626.9, Control Building Air Conditioning Booster Pump, 3SWP*P2B, Operational Readiness Test on April 22 SP 3609.1, Quench Spray Pump 3QSS*P3A Operational Readiness Test on May 7 SP 3646A.2, Emergency Diesel Generator B Operability Test on May 29 SP 3622.3, Turbine Driven Auxiliary Feedwater Pump Operational Readiness and Quarterly IST Group B Pump Test on June 15


====b. Findings====
====b. Findings====
No findings were identified. Cornerstone: Emergency Preparedness  
No findings were identified.
 
===Cornerstone: Emergency Preparedness===
 
{{a|1EP6}}
{{a|1EP6}}
==1EP6 Drill Evaluation==
==1EP6 Drill Evaluation==
Line 218: Line 242:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors evaluated the conduct of a Unit 2 off-year exercise on June 17 to identify any weaknesses and deficiencies in the classification, notification, and protective action recommendation development activities. The inspectors observed emergency response operations in the simulator, operations support center, and emergency operations facility to determine whether the event classification, notifications, and protective action recommendations were performed in accordance with procedures. The inspectors also attended the station drill critique to compare inspector observations with those identified by Dominion staff in order to evaluate Dominion's critique and to verify whether the Dominion staff was properly identifying weaknesses and entering them into the CAP.
The inspectors evaluated the conduct of a Unit 2 off-year exercise on June 17 to identify any weaknesses and deficiencies in the classification, notification, and protective action recommendation development activities. The inspectors observed emergency response operations in the simulator, operations support center, and emergency operations facility to determine whether the event classification, notifications, and protective action recommendations were performed in accordance with procedures. The inspectors also attended the station drill critique to compare inspector observations with those identified by Dominion staff in order to evaluate Dominions critique and to verify whether the Dominion staff was properly identifying weaknesses and entering them into the CAP.


====b. Findings====
====b. Findings====
Line 225: Line 249:
==RADIATION SAFETY==
==RADIATION SAFETY==


===Cornerstone:===
===Cornerstone: Public and Occupational Safety===
Public and Occupational Safety
{{a|2RS6}}
{{a|2RS6}}
==2RS6 Radioactive Gaseous and Liquid Effluent Treatment==
==2RS6 Radioactive Gaseous and Liquid Effluent Treatment==
Line 232: Line 255:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed Dominion's actions in response to an increasing trend seen in the Unit 2 stack gaseous radiation monitor (RM-8132B) before and during activities related to loading spent fuel into a dry shielded canister (DSC)-21 in the Unit 2 SFP. The trend began on or about May 10, 2015.
The inspectors reviewed Dominions actions in response to an increasing trend seen in the Unit 2 stack gaseous radiation monitor (RM-8132B) before and during activities related to loading spent fuel into a dry shielded canister (DSC)-21 in the Unit 2 SFP.
 
The trend began on or about May 10, 2015.


Walk-downs and Observations The inspectors walked down the Unit 2 RM-8132B and the associated Unit 2 SFP exhaust gaseous radiation monitor (RM-8145B). The inspectors observed the Unit 2 SFP ventilation configuration and the equipment used to remove moisture from the DSC.
Walk-downs and Observations The inspectors walked down the Unit 2 RM-8132B and the associated Unit 2 SFP exhaust gaseous radiation monitor (RM-8145B). The inspectors observed the Unit 2 SFP ventilation configuration and the equipment used to remove moisture from the DSC.


The inspectors reviewed a RM08132B troubleshooting report and associated calibration check. The inspectors evaluated process computer traces for the RM-8132B and RM-8145B monitors for multiple time periods related to the event. The inspectors attended two facility safety review committee meetings that were convened in response to the event.
The inspectors reviewed a RM08132B troubleshooting report and associated calibration check. The inspectors evaluated process computer traces for the RM-8132B and RM-8145B monitors for multiple time periods related to the event. The inspectors attended two facility safety review committee meetings that were convened in response to the event.


Sampling and Analyses The inspectors reviewed the results of Chemistry department compensatory sampling during the period when RM-8132B was declared non-functional. The inspectors reviewed the results of gamma spectroscopy analysis of a gas sample from DSC-21, confirming the presence of Krypton 85 (Kr-85). The inspectors reviewed Dominion's calculation of the public radiation exposure impact due to the release of Kr-85 gas during blow-down operations of DSC-21.
Sampling and Analyses The inspectors reviewed the results of Chemistry department compensatory sampling during the period when RM-8132B was declared non-functional. The inspectors reviewed the results of gamma spectroscopy analysis of a gas sample from DSC-21, confirming the presence of Krypton 85 (Kr-85). The inspectors reviewed Dominions calculation of the public radiation exposure impact due to the release of Kr-85 gas during blow-down operations of DSC-21.


Problem Identification and Resolution The inspectors evaluated Dominion's CRs associated with the event, and a subsequent Prompt Issue Review Team Report.
Problem Identification and Resolution The inspectors evaluated Dominions CRs associated with the event, and a subsequent Prompt Issue Review Team Report.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.


{{a|2RS7}}
{{a|2RS7}}
==2RS7 Radiological Environmental Monitoring Program (REMP)==
==2RS7 Radiological Environmental Monitoring Program (REMP)==
{{IP sample|IP=IP 71124.07|count=1}}
{{IP sample|IP=IP 71124.07|count=1}}
Line 253: Line 278:


=====Inspection Planning=====
=====Inspection Planning=====
The inspectors reviewed: the Millstone 2013 and 2014 annual radiological environmental and effluent monitoring reports; REMP program audits; ODCM changes; land use census; and inter-laboratory comparison program results.
The inspectors reviewed: the Millstone 2013 and 2014 annual radiological environmental and effluent monitoring reports; REMP program audits; ODCM changes; land use census; and inter-laboratory comparison program results.


Onsite Inspection The inspectors reviewed and/or observed the following items:   Sample collection, monitoring, and dose measurement stations (e.g., thermoluminescent dosimeter, air monitoring, vegetation, milk) Calibration and maintenance records for air sample and dosimetry measurement equipment Environmental sampling of the effluent release pathways specified in the ODCM Meteorological tower and meteorological data readouts Meteorological instrument operability status and calibration results Missed and/or anomalous environmental samples identified, resolved, and reported in the annual radioactive environmental monitoring report Positive environmental sample assessment results The groundwater monitoring program as it applies to selected potential leaking SSCs 10 CFR 50.75(g) records of leaks, spills, and remediation since the previous inspection Changes to the ODCM due to changes to the land use census, long-term meteorological conditions, and/or modifications to the environmental sample stations Environmental sample laboratory analysis results and measurement detection sensitivities Results of the laboratory quality control program audit and the inter-and intra-laboratory comparison program results Identification and Resolution of Problems The inspectors evaluated whether problems associated with the REMP were identified at an appropriate threshold and properly addressed in Dominion's CAP.
Onsite Inspection The inspectors reviewed and/or observed the following items:
Sample collection, monitoring, and dose measurement stations (e.g., thermoluminescent dosimeter, air monitoring, vegetation, milk)
Calibration and maintenance records for air sample and dosimetry measurement equipment Environmental sampling of the effluent release pathways specified in the ODCM Meteorological tower and meteorological data readouts Meteorological instrument operability status and calibration results Missed and/or anomalous environmental samples identified, resolved, and reported in the annual radioactive environmental monitoring report Positive environmental sample assessment results The groundwater monitoring program as it applies to selected potential leaking SSCs 10 CFR 50.75(g) records of leaks, spills, and remediation since the previous inspection Changes to the ODCM due to changes to the land use census, long-term meteorological conditions, and/or modifications to the environmental sample stations Environmental sample laboratory analysis results and measurement detection sensitivities Results of the laboratory quality control program audit and the inter-and intra-laboratory comparison program results Identification and Resolution of Problems The inspectors evaluated whether problems associated with the REMP were identified at an appropriate threshold and properly addressed in Dominions CAP.


====b. Findings====
====b. Findings====
Line 265: Line 291:
==4OA1 Performance Indicator Verification==
==4OA1 Performance Indicator Verification==
{{IP sample|IP=IP 71151}}
{{IP sample|IP=IP 71151}}
===.1 Unplanned Scrams, Unplanned Power Changes, and Unplanned Scrams with Complications (6 samples)===
===.1 Unplanned Scrams, Unplanned Power Changes, and Unplanned Scrams with===
 
===Complications (6 samples)===


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed Dominion's submittals for the following Initiating Events Cornerstone performance indicators for the period April 1, 2014, through March 30, 2015.
The inspectors reviewed Dominions submittals for the following Initiating Events Cornerstone performance indicators for the period April 1, 2014, through March 30, 2015.


Unit 2   Unplanned Scrams per 7000 Critical Hours Unplanned Scrams with Complications Unplanned Transients per 7000 Critical Hours Unit 3   Unplanned Scrams per 7000 Critical Hours Unplanned Scrams with Complications Unplanned Transients per 7000 Critical Hours To determine the accuracy of the performance indicator data reported during those periods, inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7. The inspectors reviewed Dominion's operator narrative logs, maintenance planning schedules, CRs, event reports, and NRC integrated inspection reports to validate the accuracy of the submittals.
Unit 2 Unplanned Scrams per 7000 Critical Hours Unplanned Scrams with Complications Unplanned Transients per 7000 Critical Hours Unit 3 Unplanned Scrams per 7000 Critical Hours Unplanned Scrams with Complications Unplanned Transients per 7000 Critical Hours To determine the accuracy of the performance indicator data reported during those periods, inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7.
 
The inspectors reviewed Dominions operator narrative logs, maintenance planning schedules, CRs, event reports, and NRC integrated inspection reports to validate the accuracy of the submittals.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.


{{a|4OA2}}
{{a|4OA2}}
==4OA2 Problem Identification and Resolution==
==4OA2 Problem Identification and Resolution==
{{IP sample|IP=IP 71152|count=5}}
{{IP sample|IP=IP 71152|count=5}}
Line 282: Line 312:


====a. Inspection Scope====
====a. Inspection Scope====
As required by Inspection Procedure 71152, "Problem Identification and Resolution," the inspectors routinely reviewed issues during baseline inspection activities and plant status reviews to verify that Dominion entered issues into their CAP at an appropriate threshold, gave adequate attention to timely corrective actions, and identified and addressed adverse trends. In order to assist with the identification of repetitive equipment failures and specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the CAP.
As required by Inspection Procedure 71152, Problem Identification and Resolution, the inspectors routinely reviewed issues during baseline inspection activities and plant status reviews to verify that Dominion entered issues into their CAP at an appropriate threshold, gave adequate attention to timely corrective actions, and identified and addressed adverse trends. In order to assist with the identification of repetitive equipment failures and specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the CAP.


====b. Findings====
====b. Findings====
Line 290: Line 320:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed a semi-annual review of site issues, as required by Inspection Procedure 71152, "Problem Identification and Resolution," to identify trends that might indicate the existence of more significant safety issues. In this review, the inspectors included repetitive or closely-related issues that may have been documented by Dominion outside of the CAP, such as trend reports, performance indicators, major equipment problem lists, system health reports, maintenance rule assessments, and maintenance or CAP backlogs. The inspectors also reviewed Dominion's CAP database for the first and second quarters of 2015 to assess CRs written in various subject areas (equipment problems, human performance issues, etc.), as well as individual issues identified during the NRCs daily CR review (Section 4OA2.1). The inspectors reviewed the Dominion quarterly CAP trend report for the fourth quarter of 2014 and the first quarter of 2015, conducted under PI-AA-200-2001, "Trending," to verify that Dominion's personnel were appropriately evaluating and trending adverse conditions in accordance with applicable procedures.
The inspectors performed a semi-annual review of site issues, as required by Inspection Procedure 71152, Problem Identification and Resolution, to identify trends that might indicate the existence of more significant safety issues. In this review, the inspectors included repetitive or closely-related issues that may have been documented by Dominion outside of the CAP, such as trend reports, performance indicators, major equipment problem lists, system health reports, maintenance rule assessments, and maintenance or CAP backlogs. The inspectors also reviewed Dominions CAP database for the first and second quarters of 2015 to assess CRs written in various subject areas (equipment problems, human performance issues, etc.), as well as individual issues identified during the NRCs daily CR review (Section 4OA2.1). The inspectors reviewed the Dominion quarterly CAP trend report for the fourth quarter of 2014 and the first quarter of 2015, conducted under PI-AA-200-2001, Trending, to verify that Dominions personnel were appropriately evaluating and trending adverse conditions in accordance with applicable procedures.


====b. Findings and Observations====
====b. Findings and Observations====
Line 296: Line 326:


The inspectors noted an increase in the number of times components reached minimum wall thickness prior to the expected end of service life. Examples include the Unit 2 copper nickel pipe wall thinning in the West 480V switchgear cooler discharge piping (CR 569509), Unit 3 safety injection cooling water wall thinning (CR 580145, 582398, 582456), Unit 3 wall thinning in the service water to the charging pump coolers (supply -
The inspectors noted an increase in the number of times components reached minimum wall thickness prior to the expected end of service life. Examples include the Unit 2 copper nickel pipe wall thinning in the West 480V switchgear cooler discharge piping (CR 569509), Unit 3 safety injection cooling water wall thinning (CR 580145, 582398, 582456), Unit 3 wall thinning in the service water to the charging pump coolers (supply -
CR 560387; discharge - CR 583128), and Unit 3 aluminum bronze de-alloying of the EDG service water heat exchanger outlet valve (CR 576166). While no individual issue challenged the operability of a safety system beyond its allowed outage time, collectively they point to a potential weakness in Dominion's corrosion monitoring programs.
CR 560387; discharge - CR 583128), and Unit 3 aluminum bronze de-alloying of the EDG service water heat exchanger outlet valve (CR 576166). While no individual issue challenged the operability of a safety system beyond its allowed outage time, collectively they point to a potential weakness in Dominions corrosion monitoring programs.


Dominion assessed each issue individually and initiated apparent cause evaluation (ACE) 019955 to evaluate for potential organizational and programmatic shortfalls.
Dominion assessed each issue individually and initiated apparent cause evaluation (ACE) 019955 to evaluate for potential organizational and programmatic shortfalls.


===.3 Annual Sample:===
===.3 Annual Sample: Review of RPS Module Failures===
Review of RPS Module Failures


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed an in-depth review of Dominion's evaluations and corrective actions associated with multiple CRs which documented test and in-service failures of Combustion Engineering RPS modules. The affected modules included bistable trip modules and core protection calculator modules which performed analog signal processing and logic system functions. The inspectors assessed Dominion's problem identification threshold, problem analysis, extent of condition reviews, compensatory actions, and the prioritization and timeliness of corrective actions to determine whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue and whether the planned or completed corrective actions were appropriate. The inspectors compared the actions taken to the requirements of Dominion's CAP and 10 CFR 50, Appendix B. The inspectors interviewed engineering and maintenance personnel to assess the effectiveness of the implemented corrective actions, the reasonableness of the planned corrective actions, and to evaluate the extent of any on-going problems. In addition, the inspectors reviewed the Millstone module repair process and selected circuit card test results.
The inspectors performed an in-depth review of Dominion's evaluations and corrective actions associated with multiple CRs which documented test and in-service failures of Combustion Engineering RPS modules. The affected modules included bistable trip modules and core protection calculator modules which performed analog signal processing and logic system functions.
 
The inspectors assessed Dominion's problem identification threshold, problem analysis, extent of condition reviews, compensatory actions, and the prioritization and timeliness of corrective actions to determine whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue and whether the planned or completed corrective actions were appropriate. The inspectors compared the actions taken to the requirements of Dominion's CAP and 10 CFR 50, Appendix B. The inspectors interviewed engineering and maintenance personnel to assess the effectiveness of the implemented corrective actions, the reasonableness of the planned corrective actions, and to evaluate the extent of any on-going problems.
 
In addition, the inspectors reviewed the Millstone module repair process and selected circuit card test results.


====b. Findings and Observations====
====b. Findings and Observations====
No findings were identified.
No findings were identified.


Dominion's review of recent Unit 2 RPS module failures identified the likely cause as end-of-service-life (e.g., age-related component failure). Dominion's near term corrective action for each module failure was replacement with a tested spare module. The inspectors noted that Dominion was in the process of procuring engineered replacement modules from a qualified third party vendor, with a corrective action plan to replace the most susceptible modules. As a compensatory correction measure, Dominion upgraded its Millstone electronic module repair facility by the addition of an automated circuit board tester and enhanced its module burn-in capability. In addition, the inspectors noted recent improvements in rework instruction details regarding post repair test acceptance criteria. The inspectors' review of selected maintenance and test records did not identify any additional issues. The inspectors determined that Dominion's recent actions to resolve apparent age-related failures were reasonable. However, the inspectors concluded that the timeliness of Dominion's longer term procurement strategy might pose a challenge to the Millstone electronic module repair facility's ability to maintain an adequate supply of spare modules.
Dominion's review of recent Unit 2 RPS module failures identified the likely cause as end-of-service-life (e.g., age-related component failure). Dominion's near term corrective action for each module failure was replacement with a tested spare module.
 
The inspectors noted that Dominion was in the process of procuring engineered replacement modules from a qualified third party vendor, with a corrective action plan to replace the most susceptible modules. As a compensatory correction measure, Dominion upgraded its Millstone electronic module repair facility by the addition of an automated circuit board tester and enhanced its module burn-in capability. In addition, the inspectors noted recent improvements in rework instruction details regarding post repair test acceptance criteria. The inspectors review of selected maintenance and test records did not identify any additional issues. The inspectors determined that Dominion's recent actions to resolve apparent age-related failures were reasonable.


===.4 Annual Sample: Unit 2 'B' Power Operated Relief Valve (PORV) Leakage===
However, the inspectors concluded that the timeliness of Dominion's longer term procurement strategy might pose a challenge to the Millstone electronic module repair facility's ability to maintain an adequate supply of spare modules.
 
===.4 Annual Sample: Unit 2 B Power Operated Relief Valve (PORV) Leakage===


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed an in-depth review of Dominion's corrective actions associated with CRs 548491, 548974, and 549797 which were generated to document leakage identified from the Unit 2 PORV coming out of the spring 2014 outage (2R22).
The inspectors performed an in-depth review of Dominions corrective actions associated with CRs 548491, 548974, and 549797 which were generated to document leakage identified from the Unit 2 PORV coming out of the spring 2014 outage (2R22).


The inspectors assessed Dominion's problem identification threshold, cause analyses, extent of condition reviews, compensatory actions, and the prioritization and timeliness of Dominion's corrective actions to determine whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue and whether the planned or completed corrective actions were appropriate. The inspectors compared the actions taken to the requirements of Dominion's CAP and 10 CFR 50, Appendix B and assessed the effectiveness of the implemented corrective actions.
The inspectors assessed Dominions problem identification threshold, cause analyses, extent of condition reviews, compensatory actions, and the prioritization and timeliness of Dominions corrective actions to determine whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue and whether the planned or completed corrective actions were appropriate. The inspectors compared the actions taken to the requirements of Dominions CAP and 10 CFR 50, Appendix B and assessed the effectiveness of the implemented corrective actions.


====b. Findings and Observations====
====b. Findings and Observations====
Line 325: Line 362:
On May 11, 2014, Dominion wrote CR 548491 (significance level 3) to document elevated tail pipe temperature on the B PORV, indicative of potential leakage. Unit 2 was still in the 2R22 outage at the time (Mode 5), so Dominion cycled the PORV to try and reseat the valve. Temperatures appeared to stabilize, so Dominion changed modes and continued monitoring tail pipe temperatures. On May 14, Dominion noticed another temperature rise and documented this in CR 548974 (significance level 3). On May 27, Dominion developed an operational decision making guide (ODM 000329) in CR 549797 to determine when the leakage increased to the point where the PORV block valve would again have to be closed. On October 16, 2014, Dominion closed the block valve (2-RC-405) in accordance with ODM 000329.
On May 11, 2014, Dominion wrote CR 548491 (significance level 3) to document elevated tail pipe temperature on the B PORV, indicative of potential leakage. Unit 2 was still in the 2R22 outage at the time (Mode 5), so Dominion cycled the PORV to try and reseat the valve. Temperatures appeared to stabilize, so Dominion changed modes and continued monitoring tail pipe temperatures. On May 14, Dominion noticed another temperature rise and documented this in CR 548974 (significance level 3). On May 27, Dominion developed an operational decision making guide (ODM 000329) in CR 549797 to determine when the leakage increased to the point where the PORV block valve would again have to be closed. On October 16, 2014, Dominion closed the block valve (2-RC-405) in accordance with ODM 000329.


At this point, the CRs from the 2R22 leakage were all linked back to ACE 019355, generated to evaluate the cause of the 2R21 leakage. Dominion did not make any changes to the ACE to consider adding additional actions or performing additional causal analysis even though apparent cause AC-1 was changed during 2R22. There is an effectiveness review for ACE 019355, due in December 2015 following 2R23. The effectiveness review is based upon the recurrence of Unit 2 PORV seat leakage during 2R22 startup, Cycle 23, and 2R23 and the resultant impact to the plant.
At this point, the CRs from the 2R22 leakage were all linked back to ACE 019355, generated to evaluate the cause of the 2R21 leakage. Dominion did not make any changes to the ACE to consider adding additional actions or performing additional causal analysis even though apparent cause AC-1 was changed during 2R22. There is an effectiveness review for ACE 019355, due in December 2015 following 2R23. The effectiveness review is based upon the recurrence of Unit 2 PORV seat leakage during


Dominion is tracking work order 53102730091 to repair the leaking PORV in 2R23 (October 2015), but this work order is a contingency work order from 2R22, and still has open holds before it is ready to be worked. Additionally, there is a request for engineering assistance to change the design of the PORVs in 2R24 (2017) that is still in the early planning stages. Without a completed causal analysis to explain the 2R22 leakage, it is unsure if the design change is necessary or sufficient to solve the problem. After discussions with the inspectors, Dominion generated CR 581395 to evaluate the equipment issues causing leakage and determine appropriate corrective actions as well as CR 581392 to review the CAP issues that resulted in a missed causal evaluation.
{{a|2R22}}
==2R22 startup, Cycle 23, and 2R23 and the resultant impact to the plant.==
 
Dominion is tracking work order 53102730091 to repair the leaking PORV in 2R23 (October 2015), but this work order is a contingency work order from 2R22, and still has open holds before it is ready to be worked. Additionally, there is a request for engineering assistance to change the design of the PORVs in 2R24 (2017) that is still in the early planning stages. Without a completed causal analysis to explain the 2R22 leakage, it is unsure if the design change is necessary or sufficient to solve the problem.
 
After discussions with the inspectors, Dominion generated CR 581395 to evaluate the equipment issues causing leakage and determine appropriate corrective actions as well as CR 581392 to review the CAP issues that resulted in a missed causal evaluation.


===.5 Annual Sample: Unit 3 Residual Heat Removal Heat Exchanger Boric Acid Leakage===
===.5 Annual Sample: Unit 3 Residual Heat Removal Heat Exchanger Boric Acid Leakage===


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed an in-depth review of Dominion's corrective actions associated with CRs, evaluations, and corrective actions generated from 1985 through 2015 to identify and mitigate persistent boric acid wetting observed at both residual heat removal system (RHS) heat exchanger bottom head flanges varying from a few drops per minute to a steady stream.
The inspectors performed an in-depth review of Dominions corrective actions associated with CRs, evaluations, and corrective actions generated from 1985 through 2015 to identify and mitigate persistent boric acid wetting observed at both residual heat removal system (RHS) heat exchanger bottom head flanges varying from a few drops per minute to a steady stream.


The inspectors assessed Dominion's problem identification threshold, causal analyses, extent of condition reviews, compensatory actions, and the prioritization and timeliness of Dominion's corrective actions to determine whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue and whether the planned or completed corrective actions were appropriate. The inspectors compared the actions taken to the requirements of Dominion's CAP and 10 CFR 50, Appendix B and assessed the effectiveness of the implemented corrective actions.
The inspectors assessed Dominions problem identification threshold, causal analyses, extent of condition reviews, compensatory actions, and the prioritization and timeliness of Dominions corrective actions to determine whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue and whether the planned or completed corrective actions were appropriate. The inspectors compared the actions taken to the requirements of Dominions CAP and 10 CFR 50, Appendix B and assessed the effectiveness of the implemented corrective actions.


====b. Findings and Observations====
====b. Findings and Observations====
Line 341: Line 383:
On September 23, 1985, the licensee first identified a condition adverse to quality associated with boric acid leakage at bottom head flange connections at both of the Millstone Unit 3 Residual Heat Removal System Heat Exchangers (3RHS*E1A and 3RHS*E1B) in AWO M3-85-29817. The licensee generated corrective actions to repair leaking gaskets at these flanged locations (M3-85-37453). However in 1989, the licensee implemented preventive maintenance activities to periodically inspect the joint for leakage and cancelled corrective maintenance on the gaskets (M3-89-03347 and M3-90-05582).
On September 23, 1985, the licensee first identified a condition adverse to quality associated with boric acid leakage at bottom head flange connections at both of the Millstone Unit 3 Residual Heat Removal System Heat Exchangers (3RHS*E1A and 3RHS*E1B) in AWO M3-85-29817. The licensee generated corrective actions to repair leaking gaskets at these flanged locations (M3-85-37453). However in 1989, the licensee implemented preventive maintenance activities to periodically inspect the joint for leakage and cancelled corrective maintenance on the gaskets (M3-89-03347 and M3-90-05582).


The purpose of RHS is to support unit cool down and provide the low pressure safety injection emergency core cooling system source from the refueling water storage tank. When supporting cool down, the system is placed into service at reactor coolant temperatures and pressures at or below 350°F and 375 psig. The RHS heat exchangers are vertically oriented U-tube heat exchangers located outside of containment in the Engineered Safety Features building. The bottom head flange is a series of two mating interfaces surrounded by carbon steel bolting. The first mating interface is carbon steel to carbon steel between the upper shell material and the tube sheet sealing in the reactor plant component cooling water on the heat exchanger shell side. The second mating interface is stainless steel to stainless steel between the tube sheet and the bottom head bowl sealing in the borated reactor coolant system inventory on the tube side. A divider plate separates the inlet and outlet regions of the bottom head. From 1985 through present day, persistent boric acid wetting has been observed at both RHS heat exchanger bottom head flanges varying from a few drops per minute to a steady stream. Greater leakage (steady stream) is observed at elevated reactor coolant system temperatures above 200°F when the system is placed into service during reactor cooldown.
The purpose of RHS is to support unit cool down and provide the low pressure safety injection emergency core cooling system source from the refueling water storage tank.
 
When supporting cool down, the system is placed into service at reactor coolant temperatures and pressures at or below 350°F and 375 psig. The RHS heat exchangers are vertically oriented U-tube heat exchangers located outside of containment in the Engineered Safety Features building. The bottom head flange is a series of two mating interfaces surrounded by carbon steel bolting. The first mating interface is carbon steel to carbon steel between the upper shell material and the tube sheet sealing in the reactor plant component cooling water on the heat exchanger shell side. The second mating interface is stainless steel to stainless steel between the tube sheet and the bottom head bowl sealing in the borated reactor coolant system inventory on the tube side. A divider plate separates the inlet and outlet regions of the bottom head. From 1985 through present day, persistent boric acid wetting has been observed at both RHS heat exchanger bottom head flanges varying from a few drops per minute to a steady stream. Greater leakage (steady stream) is observed at elevated reactor coolant system temperatures above 200°F when the system is placed into service during reactor cooldown.


As the leakage continued into 1996, the licensee performed a causal evaluation of the susceptibility of the carbon steel bolting to boric acid wastage (ACR M3-96-0391). This resulted in a four year preventive maintenance to remove and evaluate a sample of five bolts. Evaluation of bolts in 1996 found minor general corrosion but no boric acid wastage at the sample locations. The inspectors found upon review of the remaining preventive maintenance activities only one instance where the bolts were replaced due to degradation on the 'B' heat exchanger in 2005. Dominion determined the cause of the degradation to be general corrosion not boric acid damage. In 2014, during 3R16, Dominion replaced 33 of 44 bolts on the 'A' RHS heat exchanger finding no indication of thread degradation.
As the leakage continued into 1996, the licensee performed a causal evaluation of the susceptibility of the carbon steel bolting to boric acid wastage (ACR M3-96-0391). This resulted in a four year preventive maintenance to remove and evaluate a sample of five bolts. Evaluation of bolts in 1996 found minor general corrosion but no boric acid wastage at the sample locations. The inspectors found upon review of the remaining preventive maintenance activities only one instance where the bolts were replaced due to degradation on the B heat exchanger in 2005. Dominion determined the cause of the degradation to be general corrosion not boric acid damage. In 2014, during 3R16, Dominion replaced 33 of 44 bolts on the A RHS heat exchanger finding no indication of thread degradation.


In 2004, CR-04-01858, Dominion identified that previous reviews had not assessed the adequacy of the design of the joint against the service conditions. Dominion found that the high temperatures and pressures experienced during RHS operation can cause significant deflection of the tube sheet resulting in loads in excess of flange preload. In consultation of the original equipment manufacturer, Dominion chose to raise bolting preload by more than 100 percent. Since raising bolting preload in 2004 and again in 2014, the leak rate has reduced; however, persistent boric acid wetting through steady stream leakage continues to be observed at both safety-related heat exchangers when in standby and in service.
In 2004, CR-04-01858, Dominion identified that previous reviews had not assessed the adequacy of the design of the joint against the service conditions. Dominion found that the high temperatures and pressures experienced during RHS operation can cause significant deflection of the tube sheet resulting in loads in excess of flange preload. In consultation of the original equipment manufacturer, Dominion chose to raise bolting preload by more than 100 percent. Since raising bolting preload in 2004 and again in 2014, the leak rate has reduced; however, persistent boric acid wetting through steady stream leakage continues to be observed at both safety-related heat exchangers when in standby and in service.


Inspectors found that since 2000, more than 30 CRs have been generated documenting discolored boric acid leakage and residue at the RHS heat exchanger flanges. The inspectors also discovered that since 2001 discolored brown and black crystalized and liquid boric acid wastage has been observed at the heat exchanger indicating lost material without associated boric degradation of the flange bolting. In August 2008, Dominion created work orders to repair the leaking heat exchanger flanges at the next opportunity during refueling outage 3R12 in fall 2008. In a 2009 CR, having not performed corrective maintenance during 3R12, Dominion identified that "the most important corrosion issue with this leakage is not the bolting which is being managed by the removal and inspections but the corrosion damage to the outer diameter of tube sheet and shell flanges which are carbon steel.Dominion closed this CR to future repair under the work orders generated in 2008 which were scheduled for execution during the next outage.
Inspectors found that since 2000, more than 30 CRs have been generated documenting discolored boric acid leakage and residue at the RHS heat exchanger flanges. The inspectors also discovered that since 2001 discolored brown and black crystalized and liquid boric acid wastage has been observed at the heat exchanger indicating lost material without associated boric degradation of the flange bolting. In August 2008, Dominion created work orders to repair the leaking heat exchanger flanges at the next opportunity during refueling outage 3R12 in fall 2008. In a 2009 CR, having not performed corrective maintenance during 3R12, Dominion identified that the most important corrosion issue with this leakage is not the bolting which is being managed by the removal and inspections but the corrosion damage to the outer diameter of tube sheet and shell flanges which are carbon steel. Dominion closed this CR to future repair under the work orders generated in 2008 which were scheduled for execution during the next outage.
 
Inspectors discovered that in spite of multiple tracking systems, including the CAP, boric acid program health reports, engineering technical evaluations, and plant health issues lists, Dominion has not corrected conditions adverse to quality associated with persistent boric acid leakage at bottom head flanges of both unit 3 RHS heat exchangers in a timely manner. Inspectors determined that Dominion has successively moved repair of each heat exchanger to the next opportunity from refueling 3R12 in 2008 through 3R16 in 2014. Dominion has scheduled repair of the B RHS heat exchanger for refuel outage


Inspectors discovered that in spite of multiple tracking systems, including the CAP, boric acid program health reports, engineering technical evaluations, and plant health issues lists, Dominion has not corrected conditions adverse to quality associated with persistent boric acid leakage at bottom head flanges of both unit 3 RHS heat exchangers in a timely manner. Inspectors determined that Dominion has successively moved repair of each heat exchanger to the 'next opportunity' from refueling 3R12 in 2008 through 3R16 in 2014. Dominion has scheduled repair of the 'B' RHS heat exchanger for refuel outage 3R17 in 2016 and 'A' for 3R18 in 2017.
{{a|3R17}}
==3R17 in 2016 and A for 3R18 in 2017.==


The inspectors identified a performance deficiency against 10 CFR 50, Appendix B, Criterion XVI associated with Dominion's failure to correct conditions adverse to quality associated with the Unit 3 RHS heat exchangers in a timely manner. However, this performance deficiency is not considered more than minor as if left uncorrected, the condition does not have the potential to lead to a more significant safety concern provided it is monitored and restored in accordance with Dominion analyses, programs, and work control plans.
The inspectors identified a performance deficiency against 10 CFR 50, Appendix B, Criterion XVI associated with Dominions failure to correct conditions adverse to quality associated with the Unit 3 RHS heat exchangers in a timely manner. However, this performance deficiency is not considered more than minor as if left uncorrected, the condition does not have the potential to lead to a more significant safety concern provided it is monitored and restored in accordance with Dominion analyses, programs, and work control plans.


===.6 Annual Sample:===
===.6 Annual Sample: Component Tagging and Mispositioning Performance Issues===
Component Tagging and Mispositioning Performance Issues


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors performed an in-depth review of Dominion's causal analysis, trend reviews, and corrective actions associated with a group of component tagging and mispositioning deficiencies. Specifically, over the period September 2014 to January 2015, station personnel experienced an increased number of tagging errors and component mispositionings which either challenged personal safety or resulted in unplanned TS limiting conditions for operation (LCO) entries. The majority of the errors were associated with maintenance or operational activities during the fall 2014 Unit 3 refueling outage. In each case, upon discovery, immediate corrective action promptly restored appropriate component tagging and configuration control. Station personnel entered each issue into the CAP individually for evaluation and corrective action.
The inspectors performed an in-depth review of Dominions causal analysis, trend reviews, and corrective actions associated with a group of component tagging and mispositioning deficiencies. Specifically, over the period September 2014 to January 2015, station personnel experienced an increased number of tagging errors and component mispositionings which either challenged personal safety or resulted in unplanned TS limiting conditions for operation (LCO) entries. The majority of the errors were associated with maintenance or operational activities during the fall 2014 Unit 3 refueling outage. In each case, upon discovery, immediate corrective action promptly restored appropriate component tagging and configuration control. Station personnel entered each issue into the CAP individually for evaluation and corrective action.


Additionally, Dominion staff performed a common cause evaluation CR 567121 and common cause assessment (CCA) 000328 to identify and resolve the underlying causes.
Additionally, Dominion staff performed a common cause evaluation CR 567121 and common cause assessment (CCA) 000328 to identify and resolve the underlying causes.


The inspectors screened the CR database for the period of January 2012 to April 2015 to identify tagging and component mispositioning-related performance trends. The inspectors selected 10 CRs, 7 ACEs, and CCA 000328 for detailed review. The inspectors independently reviewed tagging and configuration control procedures, tagging and mispositioning event station performance indicators, training lesson plans, and selected records. Additionally, the inspectors interviewed station personnel to assess current practices and programs for equipment tagging and component configuration control. The inspectors discussed tagging lessons-learned and associated plans for the upcoming 2015 Unit 2 refueling outage with the Operations manager, the Nuclear Oversight manager, and the Operations Human Performance Coordinator. The inspectors also observed in-plant operator training activities focused on independent verification of component positioning and tagging. The inspectors assessed Dominion's problem identification threshold, documentation of the issues, causal analyses, extent-of-condition reviews, compensatory actions, and the prioritization and timeliness of corrective actions to evaluate whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue. The inspectors also assessed whether Dominion had identified associated lessons learned and communicated the results to appropriate staff. The inspectors compared the actions taken to the requirements of Dominion's CAP and 10 CFR Part 50, Appendix B.
The inspectors screened the CR database for the period of January 2012 to April 2015 to identify tagging and component mispositioning-related performance trends. The inspectors selected 10 CRs, 7 ACEs, and CCA 000328 for detailed review. The inspectors independently reviewed tagging and configuration control procedures, tagging and mispositioning event station performance indicators, training lesson plans, and selected records. Additionally, the inspectors interviewed station personnel to assess current practices and programs for equipment tagging and component configuration control. The inspectors discussed tagging lessons-learned and associated plans for the upcoming 2015 Unit 2 refueling outage with the Operations manager, the Nuclear Oversight manager, and the Operations Human Performance Coordinator. The inspectors also observed in-plant operator training activities focused on independent verification of component positioning and tagging. The inspectors assessed Dominions problem identification threshold, documentation of the issues, causal analyses, extent-of-condition reviews, compensatory actions, and the prioritization and timeliness of corrective actions to evaluate whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue. The inspectors also assessed whether Dominion had identified associated lessons learned and communicated the results to appropriate staff. The inspectors compared the actions taken to the requirements of Dominions CAP and 10 CFR Part 50, Appendix B.


====b. Findings and Observations====
====b. Findings and Observations====
No findings were identified. The inspectors noted that no one was injured due to these errors and no TS LCO allowed outage times were exceeded. Notwithstanding, Dominion staff determined that relaxed adherence to the Operations Department Human Performance (OPS HU) Excellence Plan was the underlying cause of the increased number of tagging and mispositioning events. Specifically, during the 2014 Unit 3 refueling outage, operators did not consistently perform supervisor field observations, peer coaching, briefs, task previews, peer checking of decisions, and use human error prevention tools as specified in the plan. Extent-of-condition reviews noted that similar performance deficiencies were observed in 2014 among maintenance staff (CR 561783). Specifically, second-line supervisors seldom mentored and coached to develop first-line supervisors. First-line supervisors did not consistently enforce high standards and behaviors for performing important maintenance activities.
No findings were identified.
 
The inspectors noted that no one was injured due to these errors and no TS LCO allowed outage times were exceeded. Notwithstanding, Dominion staff determined that relaxed adherence to the Operations Department Human Performance (OPS HU)
Excellence Plan was the underlying cause of the increased number of tagging and mispositioning events. Specifically, during the 2014 Unit 3 refueling outage, operators did not consistently perform supervisor field observations, peer coaching, briefs, task previews, peer checking of decisions, and use human error prevention tools as specified in the plan. Extent-of-condition reviews noted that similar performance deficiencies were observed in 2014 among maintenance staff (CR 561783). Specifically, second-line supervisors seldom mentored and coached to develop first-line supervisors. First-line supervisors did not consistently enforce high standards and behaviors for performing important maintenance activities.


Based on staff interviews, the inspectors determined that relaxation of the OPS HU Excellence Plan was not intended or directed. The operations and maintenance activity workload significantly increased during the refueling outage. Faced with the increased workload, plant staff reallocated their time to perceived priorities. Operators and supervisors rationalized that in some instances the priority of implementing elements of the OPS HU Excellence Plan, including field supervision and use of human performance observations, did not warrant performance. Similar decision making continued for several months following completion of the refueling outage until addressed by Operations management.
Based on staff interviews, the inspectors determined that relaxation of the OPS HU Excellence Plan was not intended or directed. The operations and maintenance activity workload significantly increased during the refueling outage. Faced with the increased workload, plant staff reallocated their time to perceived priorities. Operators and supervisors rationalized that in some instances the priority of implementing elements of the OPS HU Excellence Plan, including field supervision and use of human performance observations, did not warrant performance. Similar decision making continued for several months following completion of the refueling outage until addressed by Operations management.


Corrective actions to improve tagging and component configuration control included the following:
Corrective actions to improve tagging and component configuration control included the following:
The OPS HU Excellence Plan was revised to more fully emphasize engaged senior reactor operator (SRO) field supervision, enhanced crew performance monitoring, and improved availability of human performance tools such as the shift work list. Each individual SRO acknowledged and approved the OPS HU Excellence Plan in writing. Operations management emphasized lessons-learned and specific elements of the OPS HU Excellence Plan during Operations department training. Training department staff developed and facilitated dynamic learning training activities such as an Independent Verification module for plant equipment operators and a Tagging module for maintenance staff. Tagging and Independent Verification were highlighted on both the Operations and Maintenance Department Self-Evaluation Matrices as performance gaps or performance improvement focus areas. Department management evaluates Department Self-Evaluation Matrix focus areas monthly. Tagging was identified as a key focus area for operations staff to explore for best-practices during benchmarking visits to other nuclear sites. The inspectors determined that Dominion staff adequately evaluated the tagging and component mispositioning issues, identified reasonable primary and contributing causes, established and implemented adequate corrective actions, and effectively communicated the results to plant staff. However, during staff interviews the inspectors observed that the Operations Department Human Performance Coordinator was assigned several competing duties (department human performance coordinator, site check operator, and on-shift outage SRO) for the Fall 2015 Unit 3 refueling outage. The inspectors noted this could challenge his effectiveness at championing consistent implementation of the OPS HU Excellence Plan. The inspectors discussed this observation with the Operations manager, who said he intended to assign a different operator to the Operations Human Performance Coordinator role prior to the refueling outage.
The OPS HU Excellence Plan was revised to more fully emphasize engaged senior reactor operator (SRO) field supervision, enhanced crew performance monitoring, and improved availability of human performance tools such as the shift work list.
 
Each individual SRO acknowledged and approved the OPS HU Excellence Plan in writing.
 
Operations management emphasized lessons-learned and specific elements of the OPS HU Excellence Plan during Operations department training.
 
Training department staff developed and facilitated dynamic learning training activities such as an Independent Verification module for plant equipment operators and a Tagging module for maintenance staff.
 
Tagging and Independent Verification were highlighted on both the Operations and Maintenance Department Self-Evaluation Matrices as performance gaps or performance improvement focus areas. Department management evaluates Department Self-Evaluation Matrix focus areas monthly.
 
Tagging was identified as a key focus area for operations staff to explore for best-practices during benchmarking visits to other nuclear sites.
 
The inspectors determined that Dominion staff adequately evaluated the tagging and component mispositioning issues, identified reasonable primary and contributing causes, established and implemented adequate corrective actions, and effectively communicated the results to plant staff. However, during staff interviews the inspectors observed that the Operations Department Human Performance Coordinator was assigned several competing duties (department human performance coordinator, site check operator, and on-shift outage SRO) for the Fall 2015 Unit 3 refueling outage. The inspectors noted this could challenge his effectiveness at championing consistent implementation of the OPS HU Excellence Plan. The inspectors discussed this observation with the Operations manager, who said he intended to assign a different operator to the Operations Human Performance Coordinator role prior to the refueling outage.
 
Corrective actions, implemented since December 2014, had not been in place for sufficient duration for the inspectors to fully assess their effectiveness. Notwithstanding, the inspectors review of station performance indicators, the corrective action database, and the shift operating logs indicated a reduced rate of tagging and mispositioning events from February to May 2015. Furthermore, action to perform an effectiveness review of tagging and mispositioning corrective actions is scheduled for late 2015.


Corrective actions, implemented since December 2014, had not been in place for sufficient duration for the inspectors to fully assess their effectiveness. Notwithstanding, the inspectors review of station performance indicators, the corrective action database, and the shift operating logs indicated a reduced rate of tagging and mispositioning events from February to May 2015. Furthermore, action to perform an effectiveness review of tagging and mispositioning corrective actions is scheduled for late 2015.
{{a|4OA5}}
{{a|4OA5}}
==4OA5 Other Activities==
==4OA5 Other Activities==
Line 386: Line 448:


====a. Inspection Scope====
====a. Inspection Scope====
On May 4-8, 2015, the inspectors observed and evaluated Dominion's loading of DSC-20, the second canister to be loaded during their Independent Spent Fuel Storage Installation (ISFSI) dry cask campaign. The inspectors reviewed Dominion's activities associated with the loading of DSC-21. The inspectors also reviewed Dominion's activities related to long-term operation and monitoring of the ISFSI. The inspectors verified compliance with the Certificate of Compliance (CoC), TS, regulations, and station procedures.
On May 4-8, 2015, the inspectors observed and evaluated Dominions loading of DSC-20, the second canister to be loaded during their Independent Spent Fuel Storage Installation (ISFSI) dry cask campaign. The inspectors reviewed Dominions activities associated with the loading of DSC-21. The inspectors also reviewed Dominions activities related to long-term operation and monitoring of the ISFSI. The inspectors verified compliance with the Certificate of Compliance (CoC), TS, regulations, and station procedures.


The inspectors observed the heavy load movement of the transfer cask (TC) and the empty DSC to the SFP and loading of fuel assemblies into DSC-20. The inspectors also observed DSC processing operations including: installation of the DSC inner top cover, removal of the annulus seal, installation of the automated welding system, welding, non-destructive weld examinations, draining, vacuum drying, helium backfill, and surveying. The inspectors observed the down-ending of the TC/DSC, movement of the TC/DSC to the ISFSI pad, and alignment of the TC/DSC with the horizontal storage module (HSM) for insertion. During performance of these activities, the inspectors verified that procedure use, communication, and coordination of ISFSI activities met Dominion's established standards and requirements.
The inspectors observed the heavy load movement of the transfer cask (TC) and the empty DSC to the SFP and loading of fuel assemblies into DSC-20. The inspectors also observed DSC processing operations including: installation of the DSC inner top cover, removal of the annulus seal, installation of the automated welding system, welding, non-destructive weld examinations, draining, vacuum drying, helium backfill, and surveying.


The inspectors reviewed Dominion's program associated with fuel characterization and selection for storage. The inspectors reviewed the fuel selection package for the first and second casks loaded during the current campaign, including alternate fuel assemblies, to verify that Dominion was loading fuel in accordance with the CoC, TS, and procedures. The inspectors reviewed recordings made of the fuel assemblies loaded into the first and second DSC's to ensure the loading was in accordance with Dominion's loading plan.
The inspectors observed the down-ending of the TC/DSC, movement of the TC/DSC to the ISFSI pad, and alignment of the TC/DSC with the horizontal storage module (HSM)for insertion. During performance of these activities, the inspectors verified that procedure use, communication, and coordination of ISFSI activities met Dominions established standards and requirements.


The inspectors observed radiation protection technicians as they provided job coverage for the cask loading workers. The inspectors reviewed survey data maps and radiological records from the DSC loading to confirm that radiation survey levels measured were within limits specified by the TS and consistent with values specified in the final safety analysis report. The inspectors performed a walk-down of the heavy haul path and toured the ISFSI pad to assess the material condition of the pad and the HSMs. The inspectors also verified that transient combustibles were not being stored on the ISFSI pad or in the vicinity of the HSMs. The inspectors also confirmed that transient combustible material entry onto the ISFSI pad was controlled in accordance with procedures.
The inspectors reviewed Dominions program associated with fuel characterization and selection for storage. The inspectors reviewed the fuel selection package for the first and second casks loaded during the current campaign, including alternate fuel assemblies, to verify that Dominion was loading fuel in accordance with the CoC, TS, and procedures. The inspectors reviewed recordings made of the fuel assemblies loaded into the first and second DSCs to ensure the loading was in accordance with Dominions loading plan.


On May 12, 2015, during processing of the third canister (DSC-21) of the ISFSI dry cask campaign, Dominion received local radiation alarms and experienced elevated readings on their Unit 2 stack gaseous radiation monitor (RM-8132B) during preparation of vacuum drying operations (CR 579441 and 579522). In response to the alarms, Millstone terminated processing activities and placed the DSC in a safe condition (backfilling the DSC with helium). Dominion personnel investigated the issue and upon completion of their review, DSC processing operations resumed on May 28, 2015, and the DSC was subsequently transported and placed into a HSM. Additional information is contained in Section
The inspectors observed radiation protection technicians as they provided job coverage for the cask loading workers. The inspectors reviewed survey data maps and radiological records from the DSC loading to confirm that radiation survey levels measured were within limits specified by the TS and consistent with values specified in the final safety analysis report.
{{a|2RS6}}
 
==2RS6 of this report.==
The inspectors performed a walk-down of the heavy haul path and toured the ISFSI pad to assess the material condition of the pad and the HSMs. The inspectors also verified that transient combustibles were not being stored on the ISFSI pad or in the vicinity of the HSMs. The inspectors also confirmed that transient combustible material entry onto the ISFSI pad was controlled in accordance with procedures.
 
On May 12, 2015, during processing of the third canister (DSC-21) of the ISFSI dry cask campaign, Dominion received local radiation alarms and experienced elevated readings on their Unit 2 stack gaseous radiation monitor (RM-8132B) during preparation of vacuum drying operations (CR 579441 and 579522). In response to the alarms, Millstone terminated processing activities and placed the DSC in a safe condition (backfilling the DSC with helium). Dominion personnel investigated the issue and upon completion of their review, DSC processing operations resumed on May 28, 2015, and the DSC was subsequently transported and placed into a HSM. Additional information is contained in Section 2RS6 of this report.


The inspectors with assistance from technical experts from the NRC's Office of Nuclear Materials Safety and Safeguards reviewed engineering evaluation, ETE-NAF-2015-0070, "Post Loading Fuel Selection and Clad Storage Re-Assessment for NUHOMS Canister MPS32PT-L125-A224-HZ02," and the results of gamma spectroscopy analysis of a gas and water sample from DSC-21. Prior to the DSC being placed on the ISFSI pad, the inspectors verified that DSC- 21 met the requirements of the CoC, TS, regulations, and site procedures. The inspectors also confirmed that Millstone's characterization of the condition of the spent fuel in the DSC met NRC Interim Staff Guidance-1, "Classifying the Condition of Spent Nuclear Fuel for Interim Storage and Transportation Based on Function."
The inspectors with assistance from technical experts from the NRCs Office of Nuclear Materials Safety and Safeguards reviewed engineering evaluation, ETE-NAF-2015-0070, Post Loading Fuel Selection and Clad Storage Re-Assessment for NUHOMS Canister MPS32PT-L125-A224-HZ02, and the results of gamma spectroscopy analysis of a gas and water sample from DSC-21. Prior to the DSC being placed on the ISFSI pad, the inspectors verified that DSC- 21 met the requirements of the CoC, TS, regulations, and site procedures. The inspectors also confirmed that Millstones characterization of the condition of the spent fuel in the DSC met NRC Interim Staff Guidance-1, Classifying the Condition of Spent Nuclear Fuel for Interim Storage and Transportation Based on Function.


The inspectors reviewed corrective action reports and the associated follow-up actions that were generated since Dominion's last loading campaign to ensure that issues were entered into the CAP, prioritized, and evaluated commensurate with their safety significance.
The inspectors reviewed corrective action reports and the associated follow-up actions that were generated since Dominions last loading campaign to ensure that issues were entered into the CAP, prioritized, and evaluated commensurate with their safety significance.


====b. Findings====
====b. Findings====
No findings were identified.  
No findings were identified.
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Meetings, Including Exit==
==4OA6 Meetings, Including Exit==
On July 27, 2015, the inspectors presented the inspection results to Mr. John Daugherty, Site Vice President, and other members of the Millstone staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.
On July 27, 2015, the inspectors presented the inspection results to Mr. John Daugherty, Site Vice President, and other members of the Millstone staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.


Line 415: Line 480:


===Licensee Personnel===
===Licensee Personnel===
M. Adams Plant Manager  
M. Adams           Plant Manager
: [[contact::L. Armstrong   Director]], Performance Recovery
: [[contact::L. Armstrong       Director]], Performance Recovery
J. Ashburn Unit 2 Shift Manager  
J. Ashburn         Unit 2 Shift Manager
: [[contact::R. Ashey Senior Nuclear Instructor G. Baker Unit 2 Senior Reactor Operator/Unit Supervisor S. Baker   Engineering Consultant]], BDB  
R. Ashey           Senior Nuclear Instructor
: [[contact::B. Bartron Supervisor]], Licensing
G. Baker           Unit 2 Senior Reactor Operator/Unit Supervisor
T. Berger Unit 3 Shift Manager
: [[contact::S. Baker           Engineering Consultant]], BDB
D. Blakeney Director Safety and Licensing A. Bonamarte Unit 2 Control Operator B. Bowen Supervisor Health Physics
: [[contact::B. Bartron         Supervisor]], Licensing
D. Brown Supervisor Nuclear Operations Support
T. Berger         Unit 3 Shift Manager
J. Brown Unit 2 Shift Manager  
D. Blakeney       Director Safety and Licensing
: [[contact::W. Browning  Licensing Specialist D. Bucheit   Manager]], BDB and Cyber Security K. Carberry Maintenance Engineer
A. Bonamarte       Unit 2 Control Operator
R. Castillo Emergency Preparedness Specialist / Communications Controller  
B. Bowen           Supervisor Health Physics
: [[contact::W. Chestnut Supervisor]], Nuclear Shift Operations Unit 2  
D. Brown           Supervisor Nuclear Operations Support
: [[contact::F. Cietek Nuclear Engineer]], PRA  
J. Brown           Unit 2 Shift Manager
: [[contact::T. Cleary Licensing Engineer G. Closius Licensing Specialist W. Cote Senior Instructor]], Nuclear Operation  
W. Browning        Licensing Specialist
: [[contact::L. Crone Supervisor]], Nuclear Chemistry  
: [[contact::D. Bucheit         Manager]], BDB and Cyber Security
: [[contact::J. Curling Manager]], Protection Services
K. Carberry       Maintenance Engineer
G. D'Auria  Nuclear Chemistry Supervisor D. Daugherty Nuclear Engineer III G. Decker Environmental Lab Technician
R. Castillo       Emergency Preparedness Specialist / Communications Controller
D. Dodson Engineering Supervisor
: [[contact::W. Chestnut       Supervisor]], Nuclear Shift Operations Unit 2
J. Dorosky Health Physicist III
: [[contact::F. Cietek         Nuclear Engineer]], PRA
E. Dundon   System Engineer  
T. Cleary         Licensing Engineer
: [[contact::B. Ekenrode Unit 2 Plant Equipment Operator B. Ferguson Unit 2 Shift Manager M. Finnegan Supervisor]], Health Physics, ISFSI
G. Closius         Licensing Specialist
P. Fizgerald Unit 2 Control Operator (Under Instruction)
: [[contact::W. Cote           Senior Instructor]], Nuclear Operation
S. Franzcek   Security Shift Supervisor  
: [[contact::L. Crone           Supervisor]], Nuclear Chemistry
: [[contact::A. Gharakhanian Nuclear Engineer III C. Flory Supervisor]], Nuclear Chemistry M. Fortner Unit 3 Emergency Communicator
: [[contact::J. Curling         Manager]], Protection Services
M. Furiosi Senior Nuclear Instructor
G. DAuria        Nuclear Chemistry Supervisor
M. Gagnon Unit 2 Balance of Plant Operator
D. Daugherty       Nuclear Engineer III
J. Glaub REMP Sample Technician  
G. Decker         Environmental Lab Technician
: [[contact::J. Go   Unit 3 Senior Reactor Operator/Station Duty Officer M. Goebeli Unit 2 Shift Technical Advisor W. Gorman Supervisor]], Instrumentation & Control  
D. Dodson         Engineering Supervisor
: [[contact::M. Greaney Supervisor]], Nuclear Maintenance  
J. Dorosky         Health Physicist III
: [[contact::J. Grogan Supervisor]], Nuclear Training
E. Dundon         System Engineer
K. Hajnal Unit 3 Shift Technical Advisor W. Harreslon Unit 3 Unit Supervisor
B. Ekenrode       Unit 2 Plant Equipment Operator
B. Hayes Nuclear Oversight Engineering Specialist J. Hoagland Unit 2 Unit Supervisor R. Hoffmann Instrument and Control Supervisor
B. Ferguson       Unit 2 Shift Manager
C. Houska I&C Technician
: [[contact::M. Finnegan       Supervisor]], Health Physics, ISFSI
J. Huff   Unit 2 Unit Supervisor/WCSRO
P. Fizgerald       Unit 2 Control Operator (Under Instruction)
T. Ickes Program Engineer  
S. Franzcek       Security Shift Supervisor
: [[contact::R. Kastner Unit 2 Unit Supervisor/STA D. Landers Supervisor]], Environmental Laboratory R. Kasuga Nuclear Engineer III  
A. Gharakhanian    Nuclear Engineer III
: [[contact::J. Laine   Manager]], Radiation Protection/Chemistry  
: [[contact::C. Flory           Supervisor]], Nuclear Chemistry
: [[contact::J. Langan Manager]], Nuclear Oversight  
M. Fortner         Unit 3 Emergency Communicator
: [[contact::M. Letterich Unit 2 Control Operator D. Lowell System Engineer D. MacNeil   Supervisor]], Nuclear Engineering
M. Furiosi         Senior Nuclear Instructor
: [[contact::G. Marshall Manager]], Outage and Planning
M. Gagnon         Unit 2 Balance of Plant Operator
: [[contact::H. McKinney Supervisor]], Operations Support
J. Glaub           REMP Sample Technician
M. McLay Electrical Supervisor S. Minogue   Unit 2 Control Operator (Test Coordinator) M. Morrissette Unit 2 Control Operator
J. Go             Unit 3 Senior Reactor Operator/Station Duty Officer
R. Parrette Unit 2 Operations Advisor
M. Goebeli         Unit 2 Shift Technical Advisor
T. Perkins Operations Unit Supervisor  
: [[contact::W. Gorman         Supervisor]], Instrumentation & Control
: [[contact::B. Pinkowicz Senior Instructor]], Nuclear Operations
: [[contact::M. Greaney         Supervisor]], Nuclear Maintenance
T. Quinley Nuclear Technical Specialist III D. Reed Shift Manager J. Rein   Emergency Preparedness Specialist  
: [[contact::J. Grogan         Supervisor]], Nuclear Training
: [[contact::J. Rigatti Manager]], Nuclear Site Engineering
 
M. Roche Senior Nuclear Chemistry Technician  
K. Hajnal     Unit 3 Shift Technical Advisor
: [[contact::P. Russell  Shift Manger L. Salyards Licensing]], Nuclear Technology Specialist R. Schmidt Unit 3 Reactor Operator
W. Harreslon   Unit 3 Unit Supervisor
P. Scott Shift Manager
B. Hayes       Nuclear Oversight Engineering Specialist
J. Hoagland   Unit 2 Unit Supervisor
R. Hoffmann   Instrument and Control Supervisor
C. Houska     I&C Technician
J. Huff       Unit 2 Unit Supervisor/WCSRO
T. Ickes       Program Engineer
R. Kastner     Unit 2 Unit Supervisor/STA
: [[contact::D. Landers     Supervisor]], Environmental Laboratory
R. Kasuga     Nuclear Engineer III
: [[contact::J. Laine       Manager]], Radiation Protection/Chemistry
: [[contact::J. Langan     Manager]], Nuclear Oversight
M. Letterich   Unit 2 Control Operator
D. Lowell     System Engineer
: [[contact::D. MacNeil     Supervisor]], Nuclear Engineering
: [[contact::G. Marshall   Manager]], Outage and Planning
: [[contact::H. McKinney   Supervisor]], Operations Support
M. McLay       Electrical Supervisor
S. Minogue     Unit 2 Control Operator (Test Coordinator)
M. Morrissette Unit 2 Control Operator
R. Parrette   Unit 2 Operations Advisor
T. Perkins     Operations Unit Supervisor
: [[contact::B. Pinkowicz   Senior Instructor]], Nuclear Operations
T. Quinley     Nuclear Technical Specialist III
D. Reed       Shift Manager
J. Rein       Emergency Preparedness Specialist
: [[contact::J. Rigatti     Manager]], Nuclear Site Engineering
M. Roche       Senior Nuclear Chemistry Technician
P. Russell    Shift Manger
: [[contact::L. Salyards   Licensing]], Nuclear Technology Specialist
R. Schmidt     Unit 3 Reactor Operator
P. Scott       Shift Manager
R. Schonenberg Program Engineer
R. Schonenberg Program Engineer
J. Shaffer Chemistry Technician  
J. Shaffer     Chemistry Technician
: [[contact::D. Smith Manager]], Emergency Preparedness  
: [[contact::D. Smith       Manager]], Emergency Preparedness
: [[contact::S. Smith Manager]], Nuclear Operations A. Stachowiak  Unit 2 Control Operator
: [[contact::S. Smith       Manager]], Nuclear Operations
S. Stanley Director of Engineering  
A. Stachowiak  Unit 2 Control Operator
: [[contact::J. Stoddard Supervisor]], Nuclear Shift Operations Unit 3  
S. Stanley     Director of Engineering
: [[contact::S. Torf  Nuclear Engineer S. Turowski Supervisor]], Health Physics Technical Services K. Truesdale Senior Nuclear Instructor  
: [[contact::J. Stoddard   Supervisor]], Nuclear Shift Operations Unit 3
: [[contact::C. Vournazos IT Specialist]], Meteorological Data
S. Torf        Nuclear Engineer
M. Watson Unit 2 Unit Supervisor
: [[contact::S. Turowski   Supervisor]], Health Physics Technical Services
M. Wise Unit 2 Senior Reactor Operator
K. Truesdale   Senior Nuclear Instructor
K. Wood Unit 3 Control Operator/BOP W. Woolery Unit 2 Shift Manager C. Wooten Maintenance Department Human Performance Coordinator  
: [[contact::C. Vournazos   IT Specialist]], Meteorological Data
M. Watson     Unit 2 Unit Supervisor
M. Wise       Unit 2 Senior Reactor Operator
K. Wood       Unit 3 Control Operator/BOP
W. Woolery     Unit 2 Shift Manager
C. Wooten     Maintenance Department Human Performance Coordinator
Others
: [[contact::M. Firsik]], Connecticut DEEP
: [[contact::D. Galloway]], Connecticut DEEP
: [[contact::J. Semancik]], Director, Bureau of Air Management, Connecticut DEEP


Others 
==LIST OF ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED==
: [[contact::M. Firsik]], Connecticut DEEP
: [[contact::D. Galloway]], Connecticut DEEP
: [[contact::J. Semancik]], Director, Bureau of Air Management, Connecticut DEEP


==LIST OF ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED==
None
None  


==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
==Section 1R01: Adverse Weather Protection==
===Procedures===
: SP 2665, Building Flood Gate Inspections, Revision 005-05
: COP 200.8, Response to ISO New England/Convex Notifications and Alerts, Revision 005-01
: AOP 2557, Emergency Generation Reduction, Revision 007-01
: AOP 2575, Rapid Downpower, Revision 004-11
: AOP 3575, Rapid Downpower, Revision 020 C
: OP 200.6, Storms and Other Hazardous Phenomena (Preparation and Recovery), Revision 003-01 and Revision 003-02
: AOP 2560, Storms, High Winds and High Tides, Revision 010-17 and Revision 012-00
: AOP 2560 Attachment 6, Response to a Local Intense Precipitation (LIP) Event, Rev. 012-00
: AOP 2560 Attachment 7, Response to Tsunami Warning, Rev. 012-00
: AOP 2565, Loss of Service Water, Rev. 004-05
: AOP 2565, Loss of Service Water, Rev. 004-05 (*Draft Change)
: AOP 3560, Loss of Service Water, Rev. 009-00
: AOP 3569, Severe Weather Conditions, Revision 020
: C
: OP 200.16, Beyond Design Basis Operator Aids, Rev. 000 Dominion
: HRP-N, Hurricane Response Plan (Nuclear), Rev. 12
: EOP 25
: FSG-16, Alternate Service Water Supply, Rev. 0 (Draft)
: EOP 35
: FSG-16, Alternate Service Water Supply, Rev 0 (Draft)
: MP 2601E, Unit 2 Flood Gates Installation and Removal, Rev. 000-01 
===Miscellaneous===
: ETE-CEP-2012-003, Design and Licensing Basis Review of Millstone Seismic and Flooding Requirements Related to the March 12
: NRC 50.54(f) Request for Information 1Q2015 System health report - U2 EDG and fuel oil
: 1Q2015 System health report - U3 EDG and fuel oil
===Condition Reports===
: 541855
: 370288
: 548459
: 536556
: 570724
: 571759
: 576113
: 576569
: 576827
: 576828
: 577950
: 578913
: 578974
: 579004
: 581747
: 582665
: 2664
: 582002
==Section 1R04: Equipment Alignment==
===Procedures===
: OP 3330A-003, Reactor Plant Component Cooling Water Train A, Revision 010-00
: OP 3330A-016, Reactor Plant Component Cooling Water Train B, Revision 007-00
: OP 3309, Quench Spray, Revision 013-09
: OP 2308, High Pressure Safety Injection System, Revision 012-02
: OP 2308-002, HPSI System Valve Alignment, Facility 2, Revision 000-05
: OP 2307-004, Common ECCS Suction Header Valve Alignment, Facility 2, Revision 000-02 
===Condition Reports===
: 579048
: 579049
===Miscellaneous===
: 25212-26921, P&ID Reactor Plant Component Cooling Water, Sheet 1, Revision 32
: 212-26915, Sheet 1, P&ID Quench Spray and Hydrogen Recombiners, Revision 37
: 203-26015, Sheet 2, P&ID High Pressure Safety Injection, Revision 047
: EE 14 - E16, Dominion Flooding Hazard Reevaluation Report for Millstone Power Station Units 2 and 3, Rev. 1
: ISO New England Inc. 2015
: RTMKTS.0120.0010, Procedure: Implement Operations during Abnormal Conditions, Rev. 21
: SO-15-016 SO-15-013
==Section 1R05: Fire Protection==
===Procedures===
: AOP 2579A, Fire Procedure for Hot Standby Appendix R Fire area R-1, Revision 010-06
===Miscellaneous===
: CM-AA-FPA-100, Fire Protection/Appendix R (Fire Safe Shutdown) Program, Revision 10
: U2-24-FPP-FHA, Millstone Unit 2 Fire Hazards Analysis, Revision 12
: U2-24-FFS, Millstone Unit 2 Firefighting Strategies
: BAP-01 480V, Revision 000-00 U3-24-FFS, Millstone Unit 3 Fire Fighting Strategies, Revision 0
===Condition Reports===
: 582652
: 2667
: 580036
==Section 1R06: Flood Protection Measures==
===Procedures===
: C
: EN 104I, Condition Monitoring of Structures, Revision 008-01
===Condition Reports===
: 389423
: 472437
: 510695
: 580419
: 1002855 
===Work Orders===
: 53102530745 53102770075 
===Miscellaneous===
: DCN
: MP3-14-01023, Cable Vault (Manhole) Water Level Monitoring, Millstone Unit 3, Revision 0
==Section 1R11: Licensed Operator Requalification Program==
===Procedures===
: AOP 2575, Rapid Downpower, Revision 04-11
: AOP 2585, Immediate Operator Actions, Revision 001-01
: C
: OP 200.3, Response to Medical Emergency, Revision 004-00
: CPE 15403, CPE SBO with Subsequent LOCA, Revision 2
: EOP 2525, Standard Post Trip Actions, Revision 026-01
: EOP 2528, Loss of Offsite Power/Loss of Forced Circulation, Revision
: EOP 2530, Station Blackout, Revision 012-00
: EOP 2540, Functional Recovery, Revision 24-00
: OP-AA-1300, Quarantine, Revision 001
: OP 2204, Load Changes, Revision 026-01
: OP 3321, Main Feedwater, Revisions 019-06 and 019-07
: OP 3204, At Power Operation, Revision 019-02
: OP 3319A, Condensate System, Revision 019-06
: SP 2651N, Main Control Valve Operability Test, Revision 005-03
: SP 2651N-001, Main Control Valve Operability Test, Revision 003-01
: SP 2651L, Main Stop Valve Operability Testing, Revision 004-01
: SP 2651M, Control Intercept Valve Operability Testing, Revision 004-02
: SP 2651N, Main Control Valve Operability Testing, Revision 005-03
: SP 31002, Plant Calorimetric, Revision 013-04
: C
: OP 200.2, Response to Security Events, Revision 5
: EOP 35 E-0, Reactor Trip and Safety Injection, Revision 29
: EOP 35 E-0.1, Reactor Trip Response, Revision 026-02
: OP 3208, plant Cooldown, Revision 022-09
: EPI-FAP01, Control Room Emergency Operations, Revision 006-00
: EPI-FAP06, Classification and PARs, Revision 010-00
: EPI-FAP07, Notifications and Communications, Revision 022-00 
===Condition Reports===
: 573431
: 573644
: 567876
: 581016
: 581019 
===Miscellaneous===
: Reactivity plan for main feedwater pump swap, dated March 13, 2015
==Section 1R12: Maintenance Effectiveness==
===Procedures===
: ER-AA-MRL-100, Implementing Maintenance Rule, Revision 8
: ER-AA-MRL-10, Maintenance Rule Program, Revision 6
: PI-AA-200, Corrective Action, Revision 24
===Condition Reports===
: 575488
: 582366
: 544517
: 545471
: 545647 
===Miscellaneous===
: 1Q2015 System health report 2325A, 2325B, 2327 - Circulating water, waterbox priming, and screenwash
==Section 1R13: Maintenance Risk Assessments and Emergent Work Control==
===Procedures===
: SP 2604BO, HPSI Pump In-Service Testing
: 1750 psia Facility 2, Revision 001-02
: SP 2402M, Functional test of Steam Generator Level and Auto-Aux. Feedwater Initiation Logic, Revision 010-03
: SP 2402M, Functional Test of Steam Generator Level and Auto-Aux. Feedwater Initiation Logic, Revision 010-03
: OP-AA-600, Protected Equipment, Revision 4
: OP-MP-601, Protected Equipment, Revision 17
: WM-AA-301, Operational Risk Assessment, Revision 11 
===Condition Reports===
: 580817*
: 580474 
===Miscellaneous===
: EOOS Online Operators Risk Evaluation for April 21 and 22, 2015 EOOS Online Operators Risk Evaluation for May 27, 2015
: EOOS Online Operators Risk Evaluation for May 29, 2015
: EOOS Online Operators Risk Evaluation for June 1, 2015
: EOOS Online Operators Risk Evaluation for June 15, 2015
: 203-26015 Sheets 1 and 2, High Pressure Safety Injection Pumps, Revisions 45 and 46
==Section 1R15: Operability Evaluations==
===Procedures===
: OP-AA-102, Operability Determinations, Revision 13
: SP 2613L, Generator Slow Start Operability Test, Revision 005-09
===Condition Reports===
: 576166
: 432587
: 549936
: 562773
: 576783
: 579859
: 579049
: 566507
: 578477
: 581001*
: 582952
: 582996*
: 580145
: 582398
: Maintenance Orders/Work Orders
: WO 53102820931
: WO 53102794425
: WO 53102718223 
===Miscellaneous===
: ETE-CME-2014-1034 Rev. 0
: ETE-MP-2013-1234 Rev. 0
: ETE-MP-2013-1234 Rev. 2
: Product Data Sheet P-400U Rev 3.4
: Product Data Sheet P-2000U Rev 2.3 Product Data Sheet P-TG Rev 2 Product Data Sheet P-4000UF Rev 2.2
: Product Data Sheet P-2000UF Rev 2.1
: Tech Spec 3.6.3.1 Containment Isolation Valves Tech Spec Bases 3.6.3, Containment Systems TRM Table 3.6-1, Containment Isolation Valve List LBDCR 2-17-02 Dominion Letter Serial B18696 dated August 14, 2002 Subject: Containment Systems Dominion Letter SER B18851 dated April 7, 2003 Subject Response to Request for Additional Information on LBDCR 2-17-02 NRC letter date July 25, 2003 Subject Millstone power Station, Unit No. 2 - Issuance of Amendment RE: Containment Systems
: EQR 253-01, Revision 4
: IEE 10000032473
: Purchase Order
: 4500185780, Certificate of Compliance/Conformance
: ER-95-0058, Engineering Record Correspondence, Resolution of
: ACR 00453, Bolt/Nut Thread Engagement Operability Determination
: 000607, Revision 2
: DC
: MP2-12-01172, "Millstone Unit 2 BDB Flex Mechanical Connections for RCS Injection." Drawing No. 1201172-M-25203-20150, Rev. 0, Sheet 1082, "BDB Piping from FLEX Pump Discharge Hose Connection to Safety Injection Piping 3"-CCA-7 and 3"-CCD-7," Attachment 1. Drawing No. 25203-26017, Instrument Location, Revision 21
: Drawing No. 1201172-M-25203-11107, Auxiliary Building Plan at Elevation 14'-6"," Attachment 2, Revision 0
: EQR 191-01, Rev. 2, "Equipment Qualification record, Secondary Safety Relief Valve Flow Sensor."
: NUC-189, Rev. 6, "MP2 EEQ Radiation Dose Zone Specifications," April 2000.
: NUC-183, Rev. 3, "MP2-EEQ Accident Radiation Doses from Pipes and Other Volumes," August 1998. UR(B)-345, Rev. 0, "Pipe Dose Rate Formula," February 1983.
: ETE-MP-2015-1054, Revision 0
: 212-39241, Sheet 169, Electrical Schematic Engine Control 3EGS*EGB, Revision F
: MPS-3 FSAR, Section 3.6 Protection against Dynamic Effects Associated with the Postulated Ruptures of Piping, Revision 21.2 M3-EV-05-0001, Revision 0
==Section 1R18: Plant Modifications==
===Procedures===
: OP 3314A, Auxiliary Building Heating, Ventilation, and Air Conditioning, Revision 023-13 
===Condition Reports===
: 579765
: 581577
: 581436
: 580966
: 580784
: 581731
: Maintenance Orders/Work Orders 53102716223
: 53102645807
: 53102510100
: 53M30700795 53102396534
: 53102645807
: 53102820931
: 53102788334
: 53102633524 
===Miscellaneous===
: ETE-MP-2015-1059, Revision 0 DCN
: MP3-13-01206, MCC Starter Replacement Project QA Starters, Revision 005
: TCC-MP-2015-004, Temporary Installation of a Coated Valve Body for Restoration of 3SWP*AOV38B, Revision 0
==Section 1R19: Post-Maintenance Testing==
===Procedures===
: OP 2325A, Circulating Water System, revision 032-03
: OP 2327, Screen Wash System, Revision 012-05
: SP 2402PA, Channel "A" SPEC 200 Safety Parameters Functional Test, Revision 007
: SP 2401D, RPS Matrix Relay Logic and Trip Path Relay Test, Revision 014
: SP 3622.3, Auxiliary Feedwater Pump 3 FWA*P2 Operational Readiness Test, Revision 017-28
: SP 3622.3-001, Auxiliary Feedwater Pump 3FWA*P2 IST Group B Pump Test, Revision 014-14
: SP 3614A.1-002, Auxiliary Building Filter System Train B Operability Test, Revision 009-01
: MP 3720CD, Slow Speed Start and Run-In of EDG Following Maintenance, Revision 009-06
===Condition Reports===
: 576267
: 576940
: 577018
: 577254
: 577292
: 578252
: 578361
: 578263
: 578401
: 578370
: 579085
: 581891
: 581911
: 582297
: 580230
: 581048
: 580983
: 580987
: 580949
: 580938
: 580795
: 580705
: Maintenance Orders/Work Orders 53102765513
: 53102834352
: 53102836648
: 53102837093
: 53102736325
: 53102441818
: 53102853029
: 53102757692
: 53102796031
: 53102389816 
===Miscellaneous===
: P&ID 25203-26008 Sheet 1, "Circulating Water"
: ETE-MP-2015-1046
: CA 302374
: 212-29736, Sheet 15, Trip System Diagram, Revision 0
: MA-AA-103 Attachment 2, Troubleshooting Plan for Backflow in Unit 2 ECCS,
: CR581911
: DWG 25203-29193 Sheet 11, Trip Unit Bin Assembly Perspective, Revision 011
: DWG 25203-29193 Sheet 6, Trip Unit Bin Assembly Perspective, Revision 011
: 212-26948, P&ID Reactor Plant Ventilation, Revision 42
==Section 1R22: Surveillance Testing==
===Procedures===
: SP 2401D, RPS Matrix Logic and Trip Path Relay Test, Revision 014-04
: SP 2604BO, HPSI Pump In-Service Testing
: 1750 psia Facility 2, Revision 001-02
: SP 2604BO-001, HPSI Pump and Check Valve IST, Revision 001-01
: SP 3609.1, Quench Spray Pump 3QSS*P3A Operational Readiness Test, Revision 011-05
: SP 3622.3, Auxiliary Feedwater Pump 3 FWA*P2 Operational Readiness Test, Revision 017-28
: SP 3622.3-001, Auxiliary Feedwater Pump 3FWA*P2 IST Group B Pump Test, Revision 014-14
: SP 2604AO, HPSI Pump In-service Testing,
: 1,750 psia, Facility 1, Revision 001-02
: SP 2604A0-002, 'B' HPSI Pump and Check Valve IST, Facility 1, Revision 001-01
: SP 3646A.2, Emergency Diesel Generator B Operability Test, Revision 019-07
: SP 3626.9, Control Building Air Conditioning Booster Pump, 3SWP*P2B, Operational Readiness Tests, Revision 007-02
===Condition Reports===
: 580845
: 581891
: 581911
: 582013
: 577481
: 577476
: 577628
: 579048*
: 579049* 
===Miscellaneous===
: High Risk Contingency Plan Actions for Unit 2 RPS Matrix Logic and Trip Path Relay Test ICW
: SP 2401D, dated 3/18/15 25203-26015 Sheets 1 and 2, High Pressure Safety Injection Pumps, Revisions 45 and 46
: WO 53102789445
: WO 53102749823 Dwg 25203-26015 Sheet 1, High Pressure Safety Injection System, Revision 45 Dwg 25203-26015 Sheet 2, L. P. Safety Injection System, Revision 47
: WO 53102805246
==Section 1EP6: Drill Evaluation==
===Miscellaneous===
: Drill information book for U2 off-year exercise MJUN15EX Millstone Power Station Unit 3 Training Drill MAPR15TD
: C
: OP 200.2, Response to Security Events, Revision 005
: EOP 35 E-0, Reactor Trip and Safety Injection, Revision 29
: EOP 35 E-0.1, Reactor Trip Response, Revision 026-02
: OP 3208, plant Cooldown, Revision 022-09
: EPI-FAP01, Control Room Emergency Operations, Revision 006-00
: EPI-FAP06, Classification and PARs, Revision 010-00
: EPI-FAP07, Notifications and Communications, Revision 022-00 
===Condition Reports===
: 575886
: 576096
: 577424
: 577426
: 577427
: 577428
: 582604
: 582607
: 2608
: 582686
: 582688
==Section 2RS6: Radioactive Gaseous and Liquid Effluent Treatment==
===Procedures===
: C
: OP 302.5, Revision 003, "Vacuum Drying System Operations (ISFSI)", DRAFT 
===Documents===
: CR579441
: CR579522
: CR580206
: Facility Safety Review Committee summary report, dated 5/19/2015
: Operations log entries related to DSC operations on Unit-2, 5/14/2015 to 5/22/2015
: Process computer plots for
: RM-8132B and
: RM-8145B, count-rate vs time Prompt Issue Review Team Report, "MPS Unit 2 Dry Shielded Canister 21 Concerns", dated 5/21/2015 Radiation Protection Analysis or Calculation Sheet, "Curies Release and Offsite Dose from MP2 ISFSI Campaign, No. 15-07, dated 5/18/2015 Standing order, (Unit 2)
: SO-15-013, (Unit 3)
: SO-15-011, "Assessing plant impact for out of service effluent radiation monitors" Troubleshooting Sheet for
: CR579441,
: RM-8132B, dated 5/13/2015 (includes calibration documentation)
==Section 2RS7: Radiological Environmental Monitoring Program==
===Procedures===
: C
: CP 806.4, "Groundwater Protection Program Sampling", Revision 000-02
: ENV 2003, "Aquatic Sampling for Radiological Environmental Monitoring Program (REMP)", Revision 001-02
: MP-22-REC-BAP01, "Radiological Effluent Monitoring and Offsite Dose Calculation Manual", Revision 027-01
: MP-CHEM-14-016, "Groundwater Protection Program - 4th Quarter 2014 and
: CP 806.4 Assessments", dated 12/31/2014
: MP-CHEM-15-003, "Groundwater Protection Program - 1st Quarter 2015 Results/Activities", dated 4/20/2015
: MP-CHEM-15-07, Evaluation of Five Year Average Meteorological ParametersMP-22-REM-PRG, "Radiological Environmental Monitoring Program", Revision 000-02
: MP-28-MET-FAP00.1, "Meteorological Data Inspection and Processing", Revision 000-03
: MP-28-MET-PRG, "Meteorological Monitoring", Revision 004-01
: REMP 1.1, "Environmental Collection Schedule", Revision 000-04
: REMP 1.2, "Radiological Environmental Monitoring Program Sampling and Analysis",
: Revision 000-04 REMP 2.1, "Sample Identification and Transmittal to the Contractor for Analysis",
: Revision 000-01 REMP 2.2, "Environmental TLD Collection and Distribution", Revision 001-00
: REMP 2.3, "Airborne Particulate and Iodine Sampling", Revision 003-01
: REMP 2.4, "Soil Sampling", Revision 001-00
: REMP 2.5, "Milk Sampling", Revision 001-01 REMP 2.6, "Terrestrial Biota Sampling", Revision 000-01 REMP 2.7, "Water Sampling", Revision 002-00
: RP-AA-502, "Groundwater Protection Program", Revision 5
: TBE-2007, "Gamma Emitting Radioisotope Analysis", Revision 7
: TBE-2010, "Tritium and Carbon-14 Analysis by Liquid Scintillation", Revision 4
: TBE-2012, "Radioiodine in Various Matrices", Revision 7
: TBE-3001, "Calibration and Control of Gamma-Ray Spectrometers", Revision 6
: TBE-3003, "Calibration and Control of Alpha and Beta Counters", Revision 4
: TBE-3004, "Calibration and Control of Liquid Scintillation Counters", Revision 5
: TBE-4005, "Quality Control Samples - Blanks, Spikes and Duplicates", Revision 5
: TBE-4018, "Instrument Setup, Maintenance, and Calibration", Revision 4 
===Documents===
: 14-188, Dominion Nuclear Connecticut Millstone Power Station Units 1, 2, and 3, 2013 Annual Radiological Environmental Operating Report 15-193, Dominion Nuclear Connecticut Millstone Power Station Units 1, 2, and 3, 2014 Annual Radiological Environmental Operating Report 14-189, Dominion Nuclear Connecticut Millstone Power Station Units 1, 2, and 3, 2013 Radioactive Effluent Release Report 15-194, Dominion Nuclear Connecticut Millstone Power Station Units 1, 2, and 3, 2014 Radioactive Effluent Release Report Annual Quality Assurance Report - 2013, Teledyne Brown Engineering Environmental Services, Knoxville Laboratory Annual Quality Assurance Report - 2014, Teledyne Brown Engineering Environmental Services, Knoxville Laboratory Assessment of the Environmental Dosimetry Company, Stanford Dosimetry, LLC, dated 12/30/2014 Audit, Dominion Nuclear Oversight, Audit 13-11, "Offsite Dose Calculation Manual, Radiological environmental Monitoring Program, Environmental Protection Plan", dated 1/9/2014 Audit, FPL/NextEra Energy Nuclear Oversight, Environmental Dosimetry Company, dated 12/4/2014 Audit, NUPIC #23484, Teledyne Brown Engineering Environmental Services, Knoxville TN, dated 10/15/2013 Land Use Census Data, 2013 Land Use Census Data, 2014 Quality Assurance Status Report, Annual, Environmental Dosimetry Company, 2014
: Quality System Manual, Environmental Dosimetry Company, Revision 3
: REMODCM Change Request #14-01
: RER-14-1, Revision 0, Basis for Changes to the REMODCM Revision 27-00, dated 3/10/14 
===Condition Reports===
: 568335
: 569925
: 570929
: 572363
: 572477
: 572848
: 575227
: 576078 
===Work Orders===
: 53102465964 for the back-up MET tower
: 53102493836 for the MET tower
: 53102539152 for the back-up MET tower
: 53102539617 for the MET tower
: 53102604757 for the MET tower
: 53102629112 for the MET tower 53102650234 for the MET tower 53102650836 for the back-up MET tower
: 53102651493 for the MET tower
: 53102674631 for the MET tower
==Section 4OA1: Performance Indicator Verification==
: PI submittals 2Q2014-1Q2015 Nuclear Energy Institute Document 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7
: LER 2014-006, Millstone Power Station Dual Unit Reactor Trip in Loss of Offsite Power
: LER 2014-007, Completion of Plant Shutdown Required by Technical Specifications
==Section 4OA2: Problem Identification and Resolution==
===Procedures===
: SP 2402BR, Pressurizer Pressure Rack Calibration, Revision 000-01
: PI-AA-200-2001, Trending, Revision 6
: P1-AA-200, Corrective Action, Revision 25
: SP 2601G, PORV Stroke Time IST, Revision 002-02
: OP-AA-200, Equipment Clearance, Revision 21
: OP-AA-1500, Operational Configuration Control, Revision 11
: OP-AA-2000, Tagging Administration, Revision 7
: PI-AA-100-1000, Performance Indicators, Revision 4
===Condition Reports===
: 555019
: 563658
: 564993
: 565129
: 569043
: 571495
: 571719
: 572530
: 2534
: 572847
: 575687
: 575749
: 576269*
: 569509
: 580145
: 582398
: 576166
: 499792
: 581392
: 581395
: 442835
: 549797
: 574360
: 526708
: 538196
: 541436
: 547651
: 547691
: 557607
: 561725
: 561738
: 562346
: 565920
: 567121
: 567380
: 568741
: 569520
: 570688
: 571238
: 582126*
: 581980*
: 319920
: 389025
: 443195
: 557062
: M3-85-29817
: M3-85-37453
: M3-89-03347
: M3-90-05582
: ACR M3-96-0391
: CR-01-00934
: CA-01001012-03
: CR-04-01858
: CR-08-08586
: CR-08-08072 
===Work Orders===
: 53102497220
: 53102769036
: 53102769046
: 53102769297 53102771694
: 53102771696
: 53102803523
: 53M30808274 
: 53M30808005
: 53M30807427
: 53M30602186
: 53M30604004
: 53M30208735
: 53M30505562
: 53M30504926
: 53M30203953 53M30204105
: 53M39615239
: 53102804984
: 53102576476
===Drawings===
: 25203-29193, Sht. 1, Unit 2 RPS Functional Diagram, Revision 10
: 22-34868, Unit 2 RPS Bistable Trip Unit Schematic, Revision 0 
===Miscellaneous===
: MP-SPECMP-DS-IC-0022, Unit 2 Design Specification for RPS Bistable Trip Units, Auxiliary Trip Units, and Test Cable Assemblies, Revision 0 MRE017757 
: MRE017960 MRE018127
: 2-RPS2406-1.00, Unit 2 RPS Maintenance Rule Basis Document, dated 9/8/08 ACE019892, RPS Digital Voltmeter Readings in Question Apparent Cause Evaluation, dated 3/30/15 ESOMS Entry, Unit 2 RPS Ungrounded Signal Verification, dated 2/25/15
: Unit 2 Reactor Protection System Health Report, 4th Quarter 2014
: Unit 2 RPS Health Report Presentation to Plant Health Committee, dated 12/3/14
: Millstone Station Corrective Action Program Trend Report 4Q2014 Millstone Station Corrective Action Program Trend Report 1Q2015
: MP2-13-01138, MP2 PORV Parts Upgrade (2-RC-402, -404)
: Millstone Projects Plant Health Subcommittee Update Meeting presentation, dated May 25, 2015 Unit 2 Reactor Coolant System Health Report 4Q2014 Millstone Power Station Nuclear Oversight Assessment No. 14-035-M, Unit 3 R16 Outage Assessment-Operations, dated January 5, 2015 Millstone Power Station Nuclear Oversight Assessment No. 13-41-M, 3R15 Safety Tagging, dated August 16, 2013 Training Lesson Plan Tagging-002, Prepare a Clearance, Revision 0 Training Lesson Plan Tagging-003, Approve and Authorize a Clearance, Revision 0 Training Lesson Plan Tagging-004, Hang a Clearance, Revision 0
: Training Lesson Plan Tagging-005-IC, Tagout Holder Acceptance of Tagout (Instrumentation), Revision 0 Training Lesson Plan Tagging-005-M, Tagout Holder Acceptance of Tagout (Mechanical), Revision 0 Plant Health Issues List Item 4319, Boric Acid Program, Replace RHR HX Gaskets, Long Term Active BA Leak, December 18, 2012 M3-EV-05-0016, Code Case N-566 Interim Evaluation of 3RHS*E1A/B Tube Sheet Flange Bolting, Revision 0 through 3
: ETE-CME-2013-1011, Code Case N-566 Interim Evaluation of 3RHS*E1A/B Tube Sheet Flange Bolting, Revision 0
==Section 4OA5: Other Activities==


===Calculations===
: MPS Neutron Correction Factors Calc.
: RP-07-05 MPS Neutron Correction Factors Calc.
: RP-07-10
: SF-0007, Qualification of NUHOMS HD Algorithm for the 14x14 Assemblies at Millstone Power Station, Revision 0
: RP-AA-151 No. 15-06 Shallow Dose Equivalent (SDE) Calculations for Kr-85 Exposure During Unit 2 ISFSI Operations for Cask 21
: RP-AA-151 No. 15-07 Curies Released and Offsite Dose from MP2 ISFSI Campaign
: RP-AA-151 No. 15-08 Total Curies Released During MP2 ISFSI Campaign
: RP-15-06 SDE Calculation for Kr-85 Exposure Calculation No. SF0002 Kr-85 Inventory in Fuel Assemblies with Ziecalloy-4 Cladding 
===Condition Reports===
: 576651
: 578752
: 578818
: 578894
: 579070*
: 579522
: 579441
: 578658
: 578469
: 576380
: 557089
: 550905 
===Miscellaneous===
: 5/12/2015 ISFSI Log
: AP-2-15-01, ALARA Review Evaluation, RWP No.
: 2150086
: DSC-019 dose surveys
: DSC-020 dose surveys
: ETE-NAF-2015-0037, NUHOMS Canister MP532PT-L125-A224-HZ020 ISFSI Fuel and Insert Certification, Canister Loading Map, and Supplemental Data Package, Revision 0 Fuel Handling Report M2-OP-2015-008, Load
: DSC-19 to
: HSM-019 Fuel Handling Report M2-OP-2015-009, Load
: DSC-20 to
: HSM-020 STID #06-008, Neutron Characterization and Measurement Evaluation at the Millstone Unit 2 Containment, February 2007 Millstone Power Station Independent Spent Fuel Storage Installation 72.212 Report
: ETE-NAF-2010-004 dated 3/2015 U2 Outside Rounds Surveillance Forms, Revision 40 OE27797
: OE27331
: FSRC Summary with revised
: COP 302 5 Package
: PI-AA-300-3000 MPS Unit 2 Dry Shielded Canister 21 Concerns
: PIR 77-225 & NNECO Letter SN
: MP-2-732 TE M2-EV-090-0003
: H81 visual exam
: AREVA_57-TR-FS04-58-00_2004SippingResults
: H81 chart from WO53102184831 Sipping 2009
: Tech Eval M2-EV-04-0014 Rev 3 A004_Grid1_WestFace A004_Grid1_NorthFace_closeup2
: A004_Grid1_NorthFace_closeup1
: A004_Grid1_NorthFace_closeup
: A004_Grid1_NorthFace EPRI Report
: 1019107, "Fuel Reliability Monitoring and Failure Evaluation Handbook (2020), Revision 2," November 2010
: DSC-21 Liquid Sample
: MP2 SFP Samples 5-18-15 and 4-27-15 
===Procedures===
: C
: OP 302.1, DSC Insertion into HSM (ISFSI), Revision 002-01 
: C
: OP 302.1, DSC Insertion into HSM (ISFSI), Revision 002-02
: C
: OP 302.3, TT Prime Mover Pre-Op Inspection (ISFSI), Revision 000-01
: C
: OP 302.4, Transfer Trailer Operations (ISFSI), Revision 002-03
: C
: OP 302.5, Vacuum Drying System Operations (ISFSI), Revision 001-07
: DNES-AA-NAF-NSF-4001, ISFSI Fuel Certification Requirements and References, Revision 0
: ETE-NAF-2015-0038 (DSC 21) pre-load
: ETE-NAF-2015-0070 (DSC 21) post-load (2)
: ETE-NAF-2015-0070 (DSC 21) post-load (1)
: ETE-NAF-2012-0145 Rev 0
: ETE-NAF-2015-0070 Rev 1 including attachments
: MP 2786, Unit 2 Spent Fuel Pool Cask Crane Inspection, Revision 001-00
: MP-PROC-OPS-C
: OP 302.5 Revision 003.00
: MP-PROC-OPS-C
: OP 302.5, Revision 001.07
: NF-AA-NSF-401, ISFSI Fuel Selection and Certification, Revision 14
: NF-MP-SNM-101-1001, Restrictions on Fuel Assembly Use, Movement, and Storage, Revision 2
: OP-2209H, Dry Shielded Canister Loading (ISFSI), Revision 002-05
: PCI
: GQP-9.2, High Temperature Liquid Penetrant Examination and Acceptance Standards For Welds RPM 1.3.10 Determining Estimated Neutron Dose, Revision 7 
: RPM 2.5.9 Dry Shielded Canister (DSC) Surveys ISFSI, Revision 003
: SFST
: ISG-1, Rev.2
: SFST
: ISG-11, Rev.3
: SFST
: ISG-9, Rev.1 SFST
: ISG-5, Rev.1 OE27331
: OE27797
: VPROC
: ENG 04-2-010, Closure Welding of Transnuclear NUHOMS Dry Shielded Canisters at Millstone Station, Revision 004-00 VPOC
: ENG 04-2-012, High Temperature Liquid Penetrant Examination and Acceptance Standards for Welds Base Materials and Cladding, Revision 005-00 VPROC
: ENG 04-2-013, Visual Examination of Welds, Revision 005-00
: VPROC
: ENG 04-2-014, Helium Mass Spectrometer Leak Test Procedure Dry Storage Container, Revision 004-00 VPROC
: ENG 04-2-016, Welding Procedure Specification 8
: MC-GTAW, Revision 006-00 VPROC
: ENG 04-2-017, General Welding Standard 1 ASME Applications (ISFSI), Revision 004-00 VPROC
: ENG 04-2-018, Welding Control Procedure 3
: WCP-3 Weld material Control, Revision 005-00 VPROC ENG04-2-020, Control of Measuring and Test Equipment, Revision 004-00
==LIST OF ACRONYMS==
: [[AC]] [[alternating current]]
: [[ACE]] [[apparent cause evaluation]]
: [[CAP]] [[corrective action program]]
CCA  common cause assessment
CFR  Code of Federal Regulations
CoC  Certificate of Compliance
: [[CR]] [[condition report]]
: [[DNMS]] [[Division of Nuclear Materials Safety]]
: [[DRP]] [[Division of Reactor Projects]]
: [[DRS]] [[Division of Reactor Safety]]
: [[DSC]] [[dry shielded canister]]
: [[EDG]] [[emergency diesel generator]]
: [[HPSI]] [[high pressure safety injection]]
: [[HSM]] [[horizontal storage module]]
: [[IMC]] [[Inspection Manual Chapter]]
: [[ISFSI]] [[Independent Spent Fuel Storage Installation]]
: [[IST]] [[in-service test]]
: [[LCO]] [[limiting condition for operation]]
: [[NRC]] [[Nuclear Regulatory Commission]]
: [[ODCM]] [[Offsite Dose Calculation Manual]]
: [[OPS]] [[]]
: [[HU]] [[operations department human performance]]
: [[PMT]] [[post-maintenance test(ing)]]
: [[PORV]] [[power operated relief valve]]
: [[QSS]] [[quench spray system]]
: [[REMP]] [[Radiological Environmental Monitoring Program]]
: [[RHS]] [[residual heat removal system]]
: [[RPS]] [[reactor protection system]]
: [[SFP]] [[spent fuel pool]]
: [[SRO]] [[senior reactor operator]]
: [[SSC]] [[structure, system, or component]]
: [[TC]] [[transfer cask]]
: [[TS]] [[technical specifications]]
: [[UFSAR]] [[Updated Final Safety Analysis Report WANO  World Association of Nuclear Operators]]
}}
}}

Latest revision as of 02:53, 20 December 2019

IR 05000336/2015002, 05000423/2015002 and Independent Spent Fuel Storage Installation Report 07200047/2015001; 04/01/2015 - 06/30/2015; Millstone Power Station, Units 2 and 3; Routine Integrated Inspection Report
ML15222A834
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 08/10/2015
From: Raymond Mckinley
NRC/RGN-I/DRP/PB5
To: Heacock D
Dominion Resources
McKinley R
References
IR 2015002
Download: ML15222A834 (44)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION I

2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 August 10, 2015 Mr. David Heacock President and Chief Nuclear Officer Dominion Resources 5000 Dominion Boulevard Glen Allen, VA 23060-6711 SUBJECT: MILLSTONE POWER STATION - INTEGRATED INSPECTION REPORT 05000336/2015002 AND 05000423/2015002 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION REPORT 07200047/2015001

Dear Mr. Heacock:

On June 30, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Millstone Power Station, Units 2 and 3. The enclosed inspection report documents the inspection results, which were discussed on July 27, 2015, with Mr. John Daugherty, Site Vice President, and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no violations of NRC requirements were identified.

In accordance with Title10 of the Code of Federal Regulations (CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Raymond R. McKinley, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49

Enclosure:

Inspection Report 05000336/2015002 and 05000423/2015002 w/Attachment: Supplementary Information

REGION I==

Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 Report Nos. 05000336/2015002 and 05000423/2015002 Licensee: Dominion Nuclear Connecticut, Inc. (Dominion)

Facility: Millstone Power Station, Units 2 and 3 Location: P.O. Box 128 Waterford, CT 06385 Dates: April 1 through June 30, 2015 Inspectors: J. Ambrosini, Sr. Resident Inspector, Division of Reactor Projects (DRP)

B. Haagensen, Resident Inspector, DRP L. McKown, Resident Inspector, DRP J. Richmond, Senior Reactor Inspector, Division of Reactor Safety (DRS)

H. Anagnostopoulos, Health Physicist, DRS D. Kern, Senior Reactor Inspector, DRS O. Masnyk Bailey, Health Physicist, Division of Nuclear Materials Safety (DNMS)

B. Bollinger, Health Physicist (training status), DNMS Approved By: Raymond R. McKinley, Chief Reactor Projects Branch 5 Division of Reactor Projects Enclosure

SUMMARY

Inspection Report 05000336/2015002, 05000423/2015002; 04/01/2015 - 06/30/2015; Millstone

Power Station (Millstone), Units 2 and 3; Routine Integrated Inspection Report.

This report covered a three-month period of inspection by resident inspectors and announced inspections performed by regional inspectors. No findings of significance were identified. The significance of most findings is indicated by their color (i.e., greater than Green, or Green,

White, Yellow, Red) and determined using Inspection Manual Chapter (IMC) 0609, Significance Determination Process (SDP), dated April 29, 2015. Cross-cutting aspects are determined using IMC 0310, Aspects Within the Cross-Cutting Areas, dated December, 4, 2014. All violations of NRC requirements are dispositioned in accordance with the NRCs Enforcement Policy, dated July 9, 2013. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 5.

REPORT DETAILS

Summary of Plant Status

Millstone Unit 2 and 3 began the inspection period operating at 100 percent power. On April 1, Unit 2 reduced power to approximately 70 percent power and Unit 3 reduced power to approximately 85 percent power in advance of planned maintenance on the 371 offsite power line. Both units returned to 100 percent power on April 4. On April 21, Unit 3 reduced power to approximately 67 percent in advance of planned maintenance on the 371 offsite power line.

Unit 3 returned to 100 percent power on April 29. Both units remained at or near 100 percent power for the remainder of the inspection period.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R01 Adverse Weather Protection

Summer Readiness of Offsite and Alternate Alternating Current (AC) Power Systems

a. Inspection Scope

The inspectors performed a review of plant features and procedures for the operation and continued availability of the offsite and alternate AC power system to evaluate readiness of the systems prior to seasonal high grid loading. The inspectors reviewed Dominions procedures affecting these areas and the communications protocols between the transmission system operator and Dominion. This review focused on changes to the established program and material condition of the offsite and alternate AC power equipment. The inspectors assessed whether Dominion established and implemented appropriate procedures and protocols to monitor and maintain availability and reliability of both the offsite AC power system and the onsite alternate AC power system. The inspectors evaluated the material condition of the associated equipment by interviewing the responsible system manager, reviewing condition reports (CRs) and open work orders, and walking down portions of the offsite and AC power systems.

Documents reviewed for each section of the inspection report are listed in the

.

b. Findings

No findings were identified.

1R04 Equipment Alignment

Partial System Walkdowns (71111.04 - 3 samples)

a. Inspection Scope

The inspectors performed partial walkdowns of the following systems:

Unit 2 Facility 2 of high pressure safety injection (HPSI) during facility 1 surveillance testing on June 30 Unit 3 B quench spray system (QSS) during A QSS Quarterly Surveillance on May 7 C component cooling pump train following restoration of B component cooling pump train following B pump motor replacement on May 8 The inspectors selected these systems based on their risk-significance relative to the reactor safety cornerstones at the time they were inspected. The inspectors reviewed applicable operating procedures, system diagrams, the Updated Final Safety Analysis Review (UFSAR), technical specifications (TS), work orders, CRs, and the impact of ongoing work activities on redundant trains of equipment in order to identify conditions that could have impacted system performance of their intended safety functions. The inspectors also performed field walkdowns of accessible portions of the systems to verify system components and support equipment were aligned correctly and were operable.

The inspectors examined the material condition of the components and observed operating parameters of equipment to verify that there were no deficiencies. The inspectors also reviewed whether Dominion staff had properly identified equipment issues and entered them into the corrective action program (CAP) for resolution with the appropriate significance characterization.

b. Findings

No findings were identified.

1R05 Fire Protection

.1 Resident Inspector Quarterly Walkdowns

a. Inspection Scope

The inspectors conducted tours of the areas listed below to assess the material condition and operational status of fire protection features. The inspectors verified that Dominion controlled combustible materials and ignition sources in accordance with administrative procedures. The inspectors verified that fire protection and suppression equipment was available for use as specified in the area pre-fire plan, and passive fire barriers were maintained in good material condition. The inspectors also verified that station personnel implemented compensatory measures for out of service, degraded, or inoperable fire protection equipment, as applicable, in accordance with procedures.

Unit 2 Hydrogen Tank Farm Fire Area Y-10 and above ground emergency diesel generator (EDG) Fuel Oil Storage Tank Fire Area Y-12 on April 24 Auxiliary Building 480 Volt Motor Control Center B51 and B61 Fire Area 2A13 on May 4 Spent Fuel Pool (SFP) and Fuel Handling Area 2A-14 on May 15 Unit 3 Turbine Building, Basement Floor Area, TB-2, Zone A & B following Trouble Common Troubles Annunciator on May 20

b. Findings

No findings were identified.

.2 Fire Protection - Drill Observation

a. Inspection Scope

The inspectors observed a fire brigade drill scenario conducted on June 18 that involved a fire at the Unit 2 hydrogen seal oil skid. The inspectors evaluated the readiness of the plant fire brigade to fight fires. The inspectors verified that Dominion personnel identified deficiencies, openly discussed them in a self-critical manner during the critique, and took appropriate corrective actions as required. The inspectors evaluated specific attributes as follows:

Proper wearing of turnout gear and self-contained breathing apparatus Proper use and layout of fire hoses Employment of appropriate fire-fighting techniques Sufficient fire-fighting equipment brought to the scene Effectiveness of command and control Search for victims and propagation of the fire into other plant areas Smoke removal operations Utilization of pre-planned strategies Adherence to the pre-planned drill scenario Drill objectives met The inspectors also evaluated the fire brigades actions to determine whether these actions were in accordance with Dominions fire-fighting strategies.

b. Findings

No findings were identified.

1R06 Flood Protection Measures

Annual Review of Cables Located in Underground Bunkers/Manholes

a. Inspection Scope

The inspectors conducted an inspection of underground bunkers/manholes subject to flooding that contain cables whose failure could affect risk-significant equipment. The inspectors performed walkdowns of risk-significant areas, including structures and underground cables located in manholes M33EMH*1A and M2MANHOLE 1, to verify that the cables were not submerged in water, that cables and/or splices appeared intact, and to observe the condition of cable support structures. For those cables found submerged in water, the inspectors verified that Dominion had conducted an operability evaluation for the cables and were implementing appropriate corrective actions.

b. Findings

No findings were identified.

1R11 Licensed Operator Requalification Program

.1 Quarterly Review of Licensed Operator Requalification Testing and Training (2 samples)

a. Inspection Scope

The inspectors observed a Unit 3 licensed operator simulator drill on April 1 which included a hostile action based scenario resulting in a plant shutdown and cooldown complicated by a loss of the turbine driven auxiliary feedwater pump, B service water pump, D circulating water pump, and both primary grade water storage tanks. The inspectors evaluated operator performance during the simulated event and verified completion of risk significant operator actions, including the use of abnormal and emergency operating procedures. The inspectors assessed the clarity and effectiveness of communications, implementation of actions in response to alarms and degrading plant conditions, and the oversight and direction provided by the control room supervisor. The inspectors verified the accuracy and timeliness of the emergency classification made by the shift manager and the TS action statements entered by the shift technical advisor.

Additionally, the inspectors assessed the ability of the crew and training staff to identify and document crew performance problems.

The inspectors observed Unit 2 licensed operator simulator training on May 27, which included failures of feedwater heaters, nuclear instruments, pressurizer level control, and a station blackout coincident with a loss of coolant accident inside containment. The inspectors evaluated operator performance during the simulated event and verified completion of risk significant operator actions, including the use of abnormal and emergency operating procedures. The inspectors assessed the clarity and effectiveness of communications, implementation of actions in response to alarms and degrading plant conditions, and the oversight and direction provided by the control room supervisor. The inspectors verified the accuracy and timeliness of the emergency classification made by the shift manager and the TS action statements entered by the shift technical advisor.

Additionally, the inspectors assessed the ability of the crew and training staff to identify and document crew performance problems.

b. Findings

No findings were identified.

.2 Quarterly Review of Licensed Operator Performance in the Main Control Room

(3 samples)

a. Inspection Scope

The inspectors observed the operators at Unit 2 conduct a power reduction to 90 percent power on May 29 to perform turbine control valve testing. The inspectors observed focus briefings and other control room communications to verify that activities were performed in accordance with procedures and that evolutions were controlled and coordinated in accordance with operations department standards and expectations.

The inspectors observed Unit 3 operators secure the A motor driven main feedwater pump and start the turbine driven main feedwater pump to make repairs on the motor driven pump on April 1. The inspectors observed briefings to verify that the briefings met the criteria specified in Dominions Operations Section Expectations Handbook.

Additionally, the inspectors observed performance to verify that procedure use, crew communications, and coordination of activities between work groups similarly met established expectations and standards.

The inspectors observed performance of a downpower to 66 percent power at Unit 3 on April 21 to meet station electrical output requirements associated with removal of the severe line outage detection system and the performance of offsite electrical grid maintenance. The inspectors observed focus briefings and other control room communications to verify that activities were performed in accordance with procedures and that evolutions were controlled and coordinated in accordance with operations department standards and expectations.

b. Findings

No findings were identified.

1R12 Maintenance Effectiveness

a. Inspection Scope

The inspectors reviewed the Unit 2 circulating water system on June 16 to assess the effectiveness of maintenance activities on structure, system, or component (SSC)performance and reliability. The inspectors reviewed system health reports, CAP documents, maintenance work orders, and maintenance rule basis documents to ensure that Dominion was identifying and properly evaluating performance problems within the scope of the maintenance rule. For each sample selected, the inspectors verified that the SSC was properly scoped into the maintenance rule in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.65 and verified that the (a)(2) performance criteria established by Dominion staff was reasonable. As applicable, for SSCs classified as (a)(1), the inspectors assessed the adequacy of goals and corrective actions to return these SSCs to (a)(2). Additionally, the inspectors ensured that Dominion staff was identifying and addressing common cause failures that occurred within and across maintenance rule system boundaries.

b. Findings

No findings were identified.

1R13 Maintenance Risk Assessments and Emergent Work Control

a. Inspection Scope

The inspectors reviewed station evaluation and management of plant risk for the maintenance and emergent work activities listed below to verify that Dominion performed the appropriate risk assessments prior to removing equipment for work. The inspectors selected these activities based on potential risk significance relative to the reactor safety cornerstones. As applicable for each activity, the inspectors verified that Dominion personnel performed risk assessments as required by 10 CFR 50.65(a)

(4) and that the assessments were accurate and complete. When Dominion performed emergent work, the inspectors verified that operations personnel promptly assessed and managed plant risk. The inspectors reviewed the scope of maintenance work and discussed the results of the assessment with the stations probabilistic risk analyst to verify plant conditions were consistent with the risk assessment. The inspectors also reviewed the TS requirements and inspected portions of redundant safety systems, when applicable, to verify risk analysis assumptions were valid and applicable requirements were met.

Unit 2 Planned Yellow Risk for SP 2604BO, HPSI Pump in-service testing (IST) on April 21 and SP 2402M Automatic Auxiliary Feedwater Initiation Test on April 22 Execution of Risk Plan for Switchyard Scheduled Work Activities concurrent with B EDG troubleshooting on June 1 Elevated Procedurally Controlled Risk during Auto Auxiliary Feedwater Initiation Logic Testing on June 15 Unit 3 Execution of risk plan associated with B EDG two year maintenance overhaul on May 27 Emergent risk associated with a balloon discovered in reserve station service transformer A disconnect on May 29

b. Findings

No findings were identified.

1R15 Operability Determinations and Functionality Assessments

a. Inspection Scope

The inspectors reviewed operability determinations for the following degraded or non-conforming conditions:

Unit 2 CR576963, C reactor building closed cooling water pump oil leakage on April 17 CR576783, Bus 24 short circuit analysis on April 20 CR578991, Use of non-quality assurance material in vital switchgear cooler, M2A/C-2 on May 11 CR579859, 2-FW-86 operability determination for containment leakage on May 19 Unit 3 ETE-MP-2013-1234, Revision 2, service life of 3SWP*AOV39B, B EDG service water heat exchanger outlet valve on April 9 CR579049, QSS train A seismic restraint bolt/nut thread engagement on May 12 CR581001, impact of condensation on leak detection per OD 000607 at leakage mitigation device on service water pump to recirculation spray system D heat exchanger piping on May 27 CR582398, safety injection cooling water B train service water pipe wall thinning on June 16 CR582952 B EDG rocker arm pre-lubrication oil pump control power fuse failure on June 24 The inspectors selected these issues based on the risk significance of the associated components and systems. The inspectors evaluated the technical adequacy of the operability determinations to assess whether TS operability was properly justified and the subject component or system remained available such that no unrecognized increase in risk occurred. The inspectors compared the operability and design criteria in the appropriate sections of the TS and UFSAR to Dominions evaluations to determine whether the components or systems were operable. Where compensatory measures were required to maintain operability, the inspectors determined whether the measures in place would function as intended and were properly controlled by Dominion. The inspectors determined, where appropriate, compliance with bounding limitations associated with the evaluations.

b. Findings

No findings were identified.

1R18 Plant Modifications

.1 Temporary Modifications (1 sample)

a. Inspection Scope

The inspectors reviewed the Unit 3 temporary modification TCC-MP-2015-004, Temporary Installation of a Coated Valve Body for Restoration of Emergency Diesel Generator Service Water Throttle Valve, on June 4 to determine whether the modifications affected the safety functions of systems that are important to safety. The inspectors reviewed 10 CFR 50.59 documentation and post-modification testing results, and conducted field walkdowns of the modifications to verify that the temporary modifications did not degrade the design bases, licensing bases, and performance capability of the affected systems.

.2 Permanent Modifications (2 samples)

a. Inspection Scope

The inspectors evaluated a modification to fuse blocks in the Unit 3 EDG control circuit due to a vendor change in part specification evaluated in accordance with ETE-MP-2015-1059 on May 20. Additionally, inspectors reviewed a modification to the Charging and Component Cooling Water area supply fan motor control center starting wiring implemented by DCN MP3-13-01206 on June 3. The inspectors verified that the design bases, licensing bases, and performance capability of the affected systems were not degraded by the modification. In addition, the inspectors reviewed modification documents associated with the upgrade and design change, including vendor technical manuals, electrical schematics and control logic diagrams, and component electrical response characteristic charts.

b. Findings

No findings were identified.

1R19 Post-Maintenance Testing

a. Inspection Scope

The inspectors reviewed the post-maintenance testing (PMT) for the maintenance activities listed below to verify that procedures and test activities ensured system operability and functional capability. The inspectors reviewed the test procedure to verify that the procedure adequately tested the safety functions that may have been affected by the maintenance activity, that the acceptance criteria in the procedure was consistent with the information in the applicable licensing basis and/or design basis documents, and that the procedure had been properly reviewed and approved. The inspectors also witnessed the test or reviewed test data to verify that the test results adequately demonstrated restoration of the affected safety functions.

Unit 2 PMT following C circulating water pump and variable frequency drive repairs on April 21 PMT for replacement of reactor protection system (RPS) trip unit TU-A-5 on May 8 PMT following repairs to containment spray recirculation line check valve 2-CS-6A on June 12 Unit 3 PMT for B service water strainer four year overhaul on May 1 PMT for auxiliary building supplementary leak collection and release system 'B' train fan following surveillance failure on May 21 PMT following two year overhaul of B EDG on May 29 PMT following repair of turbine driven auxiliary feedwater trip throttle valve linkage to mechanical turbine trip mechanism loose interference fitting on June 15

b. Findings

No findings were identified.

1R22 Surveillance Testing

a. Inspection Scope

The inspectors observed performance of surveillance tests and/or reviewed test data of selected risk-significant SSCs to assess whether test results satisfied TS, the UFSAR, and Dominion procedure requirements. The inspectors verified that test acceptance criteria were clear, tests demonstrated operational readiness and were consistent with design documentation, test instrumentation had current calibrations and the range and accuracy for the application, tests were performed as written, and applicable test prerequisites were satisfied. Upon test completion, the inspectors considered whether the test results supported that equipment was capable of performing the required safety functions. The inspectors reviewed the following surveillance tests:

Unit 2 SP 2401D, Reactor Protective System Matrix Testing on April 9 SP 2604BO, 'C' HPSI Pump IST on April 21 SP 2604AO, B HPSI Pump IST on June 9 Unit 3 SP 3626.9, Control Building Air Conditioning Booster Pump, 3SWP*P2B, Operational Readiness Test on April 22 SP 3609.1, Quench Spray Pump 3QSS*P3A Operational Readiness Test on May 7 SP 3646A.2, Emergency Diesel Generator B Operability Test on May 29 SP 3622.3, Turbine Driven Auxiliary Feedwater Pump Operational Readiness and Quarterly IST Group B Pump Test on June 15

b. Findings

No findings were identified.

Cornerstone: Emergency Preparedness

1EP6 Drill Evaluation

.1 Emergency Preparedness Drill Observation

a. Inspection Scope

The inspectors evaluated the conduct of a Unit 2 off-year exercise on June 17 to identify any weaknesses and deficiencies in the classification, notification, and protective action recommendation development activities. The inspectors observed emergency response operations in the simulator, operations support center, and emergency operations facility to determine whether the event classification, notifications, and protective action recommendations were performed in accordance with procedures. The inspectors also attended the station drill critique to compare inspector observations with those identified by Dominion staff in order to evaluate Dominions critique and to verify whether the Dominion staff was properly identifying weaknesses and entering them into the CAP.

b. Findings

No findings were identified.

RADIATION SAFETY

Cornerstone: Public and Occupational Safety

2RS6 Radioactive Gaseous and Liquid Effluent Treatment

a. Inspection Scope

The inspectors reviewed Dominions actions in response to an increasing trend seen in the Unit 2 stack gaseous radiation monitor (RM-8132B) before and during activities related to loading spent fuel into a dry shielded canister (DSC)-21 in the Unit 2 SFP.

The trend began on or about May 10, 2015.

Walk-downs and Observations The inspectors walked down the Unit 2 RM-8132B and the associated Unit 2 SFP exhaust gaseous radiation monitor (RM-8145B). The inspectors observed the Unit 2 SFP ventilation configuration and the equipment used to remove moisture from the DSC.

The inspectors reviewed a RM08132B troubleshooting report and associated calibration check. The inspectors evaluated process computer traces for the RM-8132B and RM-8145B monitors for multiple time periods related to the event. The inspectors attended two facility safety review committee meetings that were convened in response to the event.

Sampling and Analyses The inspectors reviewed the results of Chemistry department compensatory sampling during the period when RM-8132B was declared non-functional. The inspectors reviewed the results of gamma spectroscopy analysis of a gas sample from DSC-21, confirming the presence of Krypton 85 (Kr-85). The inspectors reviewed Dominions calculation of the public radiation exposure impact due to the release of Kr-85 gas during blow-down operations of DSC-21.

Problem Identification and Resolution The inspectors evaluated Dominions CRs associated with the event, and a subsequent Prompt Issue Review Team Report.

b. Findings

No findings were identified.

2RS7 Radiological Environmental Monitoring Program (REMP)

a. Inspection Scope

The inspectors reviewed the REMP to validate the effectiveness of the radioactive gaseous and liquid effluent release program. The inspectors used the requirements in 10 CFR 20; 40 CFR 190; 10 CFR 50, Appendix I; TSs; Offsite Dose Calculation Manual (ODCM); and procedures required by TSs as criteria for determining compliance.

Inspection Planning

The inspectors reviewed: the Millstone 2013 and 2014 annual radiological environmental and effluent monitoring reports; REMP program audits; ODCM changes; land use census; and inter-laboratory comparison program results.

Onsite Inspection The inspectors reviewed and/or observed the following items:

Sample collection, monitoring, and dose measurement stations (e.g., thermoluminescent dosimeter, air monitoring, vegetation, milk)

Calibration and maintenance records for air sample and dosimetry measurement equipment Environmental sampling of the effluent release pathways specified in the ODCM Meteorological tower and meteorological data readouts Meteorological instrument operability status and calibration results Missed and/or anomalous environmental samples identified, resolved, and reported in the annual radioactive environmental monitoring report Positive environmental sample assessment results The groundwater monitoring program as it applies to selected potential leaking SSCs 10 CFR 50.75(g) records of leaks, spills, and remediation since the previous inspection Changes to the ODCM due to changes to the land use census, long-term meteorological conditions, and/or modifications to the environmental sample stations Environmental sample laboratory analysis results and measurement detection sensitivities Results of the laboratory quality control program audit and the inter-and intra-laboratory comparison program results Identification and Resolution of Problems The inspectors evaluated whether problems associated with the REMP were identified at an appropriate threshold and properly addressed in Dominions CAP.

b. Findings

No findings were identified.

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

.1 Unplanned Scrams, Unplanned Power Changes, and Unplanned Scrams with

Complications (6 samples)

a. Inspection Scope

The inspectors reviewed Dominions submittals for the following Initiating Events Cornerstone performance indicators for the period April 1, 2014, through March 30, 2015.

Unit 2 Unplanned Scrams per 7000 Critical Hours Unplanned Scrams with Complications Unplanned Transients per 7000 Critical Hours Unit 3 Unplanned Scrams per 7000 Critical Hours Unplanned Scrams with Complications Unplanned Transients per 7000 Critical Hours To determine the accuracy of the performance indicator data reported during those periods, inspectors used definitions and guidance contained in Nuclear Energy Institute Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7.

The inspectors reviewed Dominions operator narrative logs, maintenance planning schedules, CRs, event reports, and NRC integrated inspection reports to validate the accuracy of the submittals.

b. Findings

No findings were identified.

4OA2 Problem Identification and Resolution

.1 Routine Review of Problem Identification and Resolution Activities

a. Inspection Scope

As required by Inspection Procedure 71152, Problem Identification and Resolution, the inspectors routinely reviewed issues during baseline inspection activities and plant status reviews to verify that Dominion entered issues into their CAP at an appropriate threshold, gave adequate attention to timely corrective actions, and identified and addressed adverse trends. In order to assist with the identification of repetitive equipment failures and specific human performance issues for follow-up, the inspectors performed a daily screening of items entered into the CAP.

b. Findings

No findings were identified.

.2 Semi-Annual Trend Review

a. Inspection Scope

The inspectors performed a semi-annual review of site issues, as required by Inspection Procedure 71152, Problem Identification and Resolution, to identify trends that might indicate the existence of more significant safety issues. In this review, the inspectors included repetitive or closely-related issues that may have been documented by Dominion outside of the CAP, such as trend reports, performance indicators, major equipment problem lists, system health reports, maintenance rule assessments, and maintenance or CAP backlogs. The inspectors also reviewed Dominions CAP database for the first and second quarters of 2015 to assess CRs written in various subject areas (equipment problems, human performance issues, etc.), as well as individual issues identified during the NRCs daily CR review (Section 4OA2.1). The inspectors reviewed the Dominion quarterly CAP trend report for the fourth quarter of 2014 and the first quarter of 2015, conducted under PI-AA-200-2001, Trending, to verify that Dominions personnel were appropriately evaluating and trending adverse conditions in accordance with applicable procedures.

b. Findings and Observations

No findings were identified.

The inspectors noted an increase in the number of times components reached minimum wall thickness prior to the expected end of service life. Examples include the Unit 2 copper nickel pipe wall thinning in the West 480V switchgear cooler discharge piping (CR 569509), Unit 3 safety injection cooling water wall thinning (CR 580145, 582398, 582456), Unit 3 wall thinning in the service water to the charging pump coolers (supply -

CR 560387; discharge - CR 583128), and Unit 3 aluminum bronze de-alloying of the EDG service water heat exchanger outlet valve (CR 576166). While no individual issue challenged the operability of a safety system beyond its allowed outage time, collectively they point to a potential weakness in Dominions corrosion monitoring programs.

Dominion assessed each issue individually and initiated apparent cause evaluation (ACE) 019955 to evaluate for potential organizational and programmatic shortfalls.

.3 Annual Sample: Review of RPS Module Failures

a. Inspection Scope

The inspectors performed an in-depth review of Dominion's evaluations and corrective actions associated with multiple CRs which documented test and in-service failures of Combustion Engineering RPS modules. The affected modules included bistable trip modules and core protection calculator modules which performed analog signal processing and logic system functions.

The inspectors assessed Dominion's problem identification threshold, problem analysis, extent of condition reviews, compensatory actions, and the prioritization and timeliness of corrective actions to determine whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue and whether the planned or completed corrective actions were appropriate. The inspectors compared the actions taken to the requirements of Dominion's CAP and 10 CFR 50, Appendix B. The inspectors interviewed engineering and maintenance personnel to assess the effectiveness of the implemented corrective actions, the reasonableness of the planned corrective actions, and to evaluate the extent of any on-going problems.

In addition, the inspectors reviewed the Millstone module repair process and selected circuit card test results.

b. Findings and Observations

No findings were identified.

Dominion's review of recent Unit 2 RPS module failures identified the likely cause as end-of-service-life (e.g., age-related component failure). Dominion's near term corrective action for each module failure was replacement with a tested spare module.

The inspectors noted that Dominion was in the process of procuring engineered replacement modules from a qualified third party vendor, with a corrective action plan to replace the most susceptible modules. As a compensatory correction measure, Dominion upgraded its Millstone electronic module repair facility by the addition of an automated circuit board tester and enhanced its module burn-in capability. In addition, the inspectors noted recent improvements in rework instruction details regarding post repair test acceptance criteria. The inspectors review of selected maintenance and test records did not identify any additional issues. The inspectors determined that Dominion's recent actions to resolve apparent age-related failures were reasonable.

However, the inspectors concluded that the timeliness of Dominion's longer term procurement strategy might pose a challenge to the Millstone electronic module repair facility's ability to maintain an adequate supply of spare modules.

.4 Annual Sample: Unit 2 B Power Operated Relief Valve (PORV) Leakage

a. Inspection Scope

The inspectors performed an in-depth review of Dominions corrective actions associated with CRs 548491, 548974, and 549797 which were generated to document leakage identified from the Unit 2 PORV coming out of the spring 2014 outage (2R22).

The inspectors assessed Dominions problem identification threshold, cause analyses, extent of condition reviews, compensatory actions, and the prioritization and timeliness of Dominions corrective actions to determine whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue and whether the planned or completed corrective actions were appropriate. The inspectors compared the actions taken to the requirements of Dominions CAP and 10 CFR 50, Appendix B and assessed the effectiveness of the implemented corrective actions.

b. Findings and Observations

No findings were identified.

In 2R21 (October 2012), Dominion made two attempts to overhaul and fix seat leakage from the 2-RC-404 (B PORV). Despite the efforts, the valve continued to leak after startup from the outage and Dominion closed the PORV block valve (2-RC-405) in accordance with guidance developed in an operational decision making document in December 2012 due to the continued leakage. Dominion generated CR 499792 (significance level 2) to document the leakage and initiated ACE 019355 to determine the cause and corrective actions. Dominion determined the apparent cause (AC-1) of the leakage was due to unmatched trim (mismatched valve seat/disc). Valve components are typically replaced as a matched set to ensure proper fit up within the manufactured tolerances. During the PORV overhaul in October 2012, Dominion identified an indication on the new seat ring and did not use the ring, resulting in the mismatched parts. Dominion implemented corrective action under work order 53102580984, a design change (MP2-13-01138, MP2 PORV Parts Upgrade) in 2R22 on May 2, 2014, which ensured that a matched set was installed.

On May 11, 2014, Dominion wrote CR 548491 (significance level 3) to document elevated tail pipe temperature on the B PORV, indicative of potential leakage. Unit 2 was still in the 2R22 outage at the time (Mode 5), so Dominion cycled the PORV to try and reseat the valve. Temperatures appeared to stabilize, so Dominion changed modes and continued monitoring tail pipe temperatures. On May 14, Dominion noticed another temperature rise and documented this in CR 548974 (significance level 3). On May 27, Dominion developed an operational decision making guide (ODM 000329) in CR 549797 to determine when the leakage increased to the point where the PORV block valve would again have to be closed. On October 16, 2014, Dominion closed the block valve (2-RC-405) in accordance with ODM 000329.

At this point, the CRs from the 2R22 leakage were all linked back to ACE 019355, generated to evaluate the cause of the 2R21 leakage. Dominion did not make any changes to the ACE to consider adding additional actions or performing additional causal analysis even though apparent cause AC-1 was changed during 2R22. There is an effectiveness review for ACE 019355, due in December 2015 following 2R23. The effectiveness review is based upon the recurrence of Unit 2 PORV seat leakage during

2R22 startup, Cycle 23, and 2R23 and the resultant impact to the plant.

Dominion is tracking work order 53102730091 to repair the leaking PORV in 2R23 (October 2015), but this work order is a contingency work order from 2R22, and still has open holds before it is ready to be worked. Additionally, there is a request for engineering assistance to change the design of the PORVs in 2R24 (2017) that is still in the early planning stages. Without a completed causal analysis to explain the 2R22 leakage, it is unsure if the design change is necessary or sufficient to solve the problem.

After discussions with the inspectors, Dominion generated CR 581395 to evaluate the equipment issues causing leakage and determine appropriate corrective actions as well as CR 581392 to review the CAP issues that resulted in a missed causal evaluation.

.5 Annual Sample: Unit 3 Residual Heat Removal Heat Exchanger Boric Acid Leakage

a. Inspection Scope

The inspectors performed an in-depth review of Dominions corrective actions associated with CRs, evaluations, and corrective actions generated from 1985 through 2015 to identify and mitigate persistent boric acid wetting observed at both residual heat removal system (RHS) heat exchanger bottom head flanges varying from a few drops per minute to a steady stream.

The inspectors assessed Dominions problem identification threshold, causal analyses, extent of condition reviews, compensatory actions, and the prioritization and timeliness of Dominions corrective actions to determine whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue and whether the planned or completed corrective actions were appropriate. The inspectors compared the actions taken to the requirements of Dominions CAP and 10 CFR 50, Appendix B and assessed the effectiveness of the implemented corrective actions.

b. Findings and Observations

No findings were identified.

On September 23, 1985, the licensee first identified a condition adverse to quality associated with boric acid leakage at bottom head flange connections at both of the Millstone Unit 3 Residual Heat Removal System Heat Exchangers (3RHS*E1A and 3RHS*E1B) in AWO M3-85-29817. The licensee generated corrective actions to repair leaking gaskets at these flanged locations (M3-85-37453). However in 1989, the licensee implemented preventive maintenance activities to periodically inspect the joint for leakage and cancelled corrective maintenance on the gaskets (M3-89-03347 and M3-90-05582).

The purpose of RHS is to support unit cool down and provide the low pressure safety injection emergency core cooling system source from the refueling water storage tank.

When supporting cool down, the system is placed into service at reactor coolant temperatures and pressures at or below 350°F and 375 psig. The RHS heat exchangers are vertically oriented U-tube heat exchangers located outside of containment in the Engineered Safety Features building. The bottom head flange is a series of two mating interfaces surrounded by carbon steel bolting. The first mating interface is carbon steel to carbon steel between the upper shell material and the tube sheet sealing in the reactor plant component cooling water on the heat exchanger shell side. The second mating interface is stainless steel to stainless steel between the tube sheet and the bottom head bowl sealing in the borated reactor coolant system inventory on the tube side. A divider plate separates the inlet and outlet regions of the bottom head. From 1985 through present day, persistent boric acid wetting has been observed at both RHS heat exchanger bottom head flanges varying from a few drops per minute to a steady stream. Greater leakage (steady stream) is observed at elevated reactor coolant system temperatures above 200°F when the system is placed into service during reactor cooldown.

As the leakage continued into 1996, the licensee performed a causal evaluation of the susceptibility of the carbon steel bolting to boric acid wastage (ACR M3-96-0391). This resulted in a four year preventive maintenance to remove and evaluate a sample of five bolts. Evaluation of bolts in 1996 found minor general corrosion but no boric acid wastage at the sample locations. The inspectors found upon review of the remaining preventive maintenance activities only one instance where the bolts were replaced due to degradation on the B heat exchanger in 2005. Dominion determined the cause of the degradation to be general corrosion not boric acid damage. In 2014, during 3R16, Dominion replaced 33 of 44 bolts on the A RHS heat exchanger finding no indication of thread degradation.

In 2004, CR-04-01858, Dominion identified that previous reviews had not assessed the adequacy of the design of the joint against the service conditions. Dominion found that the high temperatures and pressures experienced during RHS operation can cause significant deflection of the tube sheet resulting in loads in excess of flange preload. In consultation of the original equipment manufacturer, Dominion chose to raise bolting preload by more than 100 percent. Since raising bolting preload in 2004 and again in 2014, the leak rate has reduced; however, persistent boric acid wetting through steady stream leakage continues to be observed at both safety-related heat exchangers when in standby and in service.

Inspectors found that since 2000, more than 30 CRs have been generated documenting discolored boric acid leakage and residue at the RHS heat exchanger flanges. The inspectors also discovered that since 2001 discolored brown and black crystalized and liquid boric acid wastage has been observed at the heat exchanger indicating lost material without associated boric degradation of the flange bolting. In August 2008, Dominion created work orders to repair the leaking heat exchanger flanges at the next opportunity during refueling outage 3R12 in fall 2008. In a 2009 CR, having not performed corrective maintenance during 3R12, Dominion identified that the most important corrosion issue with this leakage is not the bolting which is being managed by the removal and inspections but the corrosion damage to the outer diameter of tube sheet and shell flanges which are carbon steel. Dominion closed this CR to future repair under the work orders generated in 2008 which were scheduled for execution during the next outage.

Inspectors discovered that in spite of multiple tracking systems, including the CAP, boric acid program health reports, engineering technical evaluations, and plant health issues lists, Dominion has not corrected conditions adverse to quality associated with persistent boric acid leakage at bottom head flanges of both unit 3 RHS heat exchangers in a timely manner. Inspectors determined that Dominion has successively moved repair of each heat exchanger to the next opportunity from refueling 3R12 in 2008 through 3R16 in 2014. Dominion has scheduled repair of the B RHS heat exchanger for refuel outage

3R17 in 2016 and A for 3R18 in 2017.

The inspectors identified a performance deficiency against 10 CFR 50, Appendix B, Criterion XVI associated with Dominions failure to correct conditions adverse to quality associated with the Unit 3 RHS heat exchangers in a timely manner. However, this performance deficiency is not considered more than minor as if left uncorrected, the condition does not have the potential to lead to a more significant safety concern provided it is monitored and restored in accordance with Dominion analyses, programs, and work control plans.

.6 Annual Sample: Component Tagging and Mispositioning Performance Issues

a. Inspection Scope

The inspectors performed an in-depth review of Dominions causal analysis, trend reviews, and corrective actions associated with a group of component tagging and mispositioning deficiencies. Specifically, over the period September 2014 to January 2015, station personnel experienced an increased number of tagging errors and component mispositionings which either challenged personal safety or resulted in unplanned TS limiting conditions for operation (LCO) entries. The majority of the errors were associated with maintenance or operational activities during the fall 2014 Unit 3 refueling outage. In each case, upon discovery, immediate corrective action promptly restored appropriate component tagging and configuration control. Station personnel entered each issue into the CAP individually for evaluation and corrective action.

Additionally, Dominion staff performed a common cause evaluation CR 567121 and common cause assessment (CCA) 000328 to identify and resolve the underlying causes.

The inspectors screened the CR database for the period of January 2012 to April 2015 to identify tagging and component mispositioning-related performance trends. The inspectors selected 10 CRs, 7 ACEs, and CCA 000328 for detailed review. The inspectors independently reviewed tagging and configuration control procedures, tagging and mispositioning event station performance indicators, training lesson plans, and selected records. Additionally, the inspectors interviewed station personnel to assess current practices and programs for equipment tagging and component configuration control. The inspectors discussed tagging lessons-learned and associated plans for the upcoming 2015 Unit 2 refueling outage with the Operations manager, the Nuclear Oversight manager, and the Operations Human Performance Coordinator. The inspectors also observed in-plant operator training activities focused on independent verification of component positioning and tagging. The inspectors assessed Dominions problem identification threshold, documentation of the issues, causal analyses, extent-of-condition reviews, compensatory actions, and the prioritization and timeliness of corrective actions to evaluate whether Dominion was appropriately identifying, characterizing, and correcting problems associated with this issue. The inspectors also assessed whether Dominion had identified associated lessons learned and communicated the results to appropriate staff. The inspectors compared the actions taken to the requirements of Dominions CAP and 10 CFR Part 50, Appendix B.

b. Findings and Observations

No findings were identified.

The inspectors noted that no one was injured due to these errors and no TS LCO allowed outage times were exceeded. Notwithstanding, Dominion staff determined that relaxed adherence to the Operations Department Human Performance (OPS HU)

Excellence Plan was the underlying cause of the increased number of tagging and mispositioning events. Specifically, during the 2014 Unit 3 refueling outage, operators did not consistently perform supervisor field observations, peer coaching, briefs, task previews, peer checking of decisions, and use human error prevention tools as specified in the plan. Extent-of-condition reviews noted that similar performance deficiencies were observed in 2014 among maintenance staff (CR 561783). Specifically, second-line supervisors seldom mentored and coached to develop first-line supervisors. First-line supervisors did not consistently enforce high standards and behaviors for performing important maintenance activities.

Based on staff interviews, the inspectors determined that relaxation of the OPS HU Excellence Plan was not intended or directed. The operations and maintenance activity workload significantly increased during the refueling outage. Faced with the increased workload, plant staff reallocated their time to perceived priorities. Operators and supervisors rationalized that in some instances the priority of implementing elements of the OPS HU Excellence Plan, including field supervision and use of human performance observations, did not warrant performance. Similar decision making continued for several months following completion of the refueling outage until addressed by Operations management.

Corrective actions to improve tagging and component configuration control included the following:

The OPS HU Excellence Plan was revised to more fully emphasize engaged senior reactor operator (SRO) field supervision, enhanced crew performance monitoring, and improved availability of human performance tools such as the shift work list.

Each individual SRO acknowledged and approved the OPS HU Excellence Plan in writing.

Operations management emphasized lessons-learned and specific elements of the OPS HU Excellence Plan during Operations department training.

Training department staff developed and facilitated dynamic learning training activities such as an Independent Verification module for plant equipment operators and a Tagging module for maintenance staff.

Tagging and Independent Verification were highlighted on both the Operations and Maintenance Department Self-Evaluation Matrices as performance gaps or performance improvement focus areas. Department management evaluates Department Self-Evaluation Matrix focus areas monthly.

Tagging was identified as a key focus area for operations staff to explore for best-practices during benchmarking visits to other nuclear sites.

The inspectors determined that Dominion staff adequately evaluated the tagging and component mispositioning issues, identified reasonable primary and contributing causes, established and implemented adequate corrective actions, and effectively communicated the results to plant staff. However, during staff interviews the inspectors observed that the Operations Department Human Performance Coordinator was assigned several competing duties (department human performance coordinator, site check operator, and on-shift outage SRO) for the Fall 2015 Unit 3 refueling outage. The inspectors noted this could challenge his effectiveness at championing consistent implementation of the OPS HU Excellence Plan. The inspectors discussed this observation with the Operations manager, who said he intended to assign a different operator to the Operations Human Performance Coordinator role prior to the refueling outage.

Corrective actions, implemented since December 2014, had not been in place for sufficient duration for the inspectors to fully assess their effectiveness. Notwithstanding, the inspectors review of station performance indicators, the corrective action database, and the shift operating logs indicated a reduced rate of tagging and mispositioning events from February to May 2015. Furthermore, action to perform an effectiveness review of tagging and mispositioning corrective actions is scheduled for late 2015.

4OA5 Other Activities

.1 Institute of Nuclear Power Operations Report Review

a. Inspection Scope

The inspectors reviewed the final report for the World Association of Nuclear Operators (WANO) peer review of Millstone conducted in August 2014. The inspectors evaluated these reports to ensure that NRC perspectives of Dominion performance were consistent with any issues identified during the assessments. The inspectors also reviewed these reports to determine whether WANO identified any significant safety issues that required further NRC follow-up.

b. Findings

No findings were identified.

.2 Operation of an ISFSI at Operating Plants (60855 and 60855.1)

a. Inspection Scope

On May 4-8, 2015, the inspectors observed and evaluated Dominions loading of DSC-20, the second canister to be loaded during their Independent Spent Fuel Storage Installation (ISFSI) dry cask campaign. The inspectors reviewed Dominions activities associated with the loading of DSC-21. The inspectors also reviewed Dominions activities related to long-term operation and monitoring of the ISFSI. The inspectors verified compliance with the Certificate of Compliance (CoC), TS, regulations, and station procedures.

The inspectors observed the heavy load movement of the transfer cask (TC) and the empty DSC to the SFP and loading of fuel assemblies into DSC-20. The inspectors also observed DSC processing operations including: installation of the DSC inner top cover, removal of the annulus seal, installation of the automated welding system, welding, non-destructive weld examinations, draining, vacuum drying, helium backfill, and surveying.

The inspectors observed the down-ending of the TC/DSC, movement of the TC/DSC to the ISFSI pad, and alignment of the TC/DSC with the horizontal storage module (HSM)for insertion. During performance of these activities, the inspectors verified that procedure use, communication, and coordination of ISFSI activities met Dominions established standards and requirements.

The inspectors reviewed Dominions program associated with fuel characterization and selection for storage. The inspectors reviewed the fuel selection package for the first and second casks loaded during the current campaign, including alternate fuel assemblies, to verify that Dominion was loading fuel in accordance with the CoC, TS, and procedures. The inspectors reviewed recordings made of the fuel assemblies loaded into the first and second DSCs to ensure the loading was in accordance with Dominions loading plan.

The inspectors observed radiation protection technicians as they provided job coverage for the cask loading workers. The inspectors reviewed survey data maps and radiological records from the DSC loading to confirm that radiation survey levels measured were within limits specified by the TS and consistent with values specified in the final safety analysis report.

The inspectors performed a walk-down of the heavy haul path and toured the ISFSI pad to assess the material condition of the pad and the HSMs. The inspectors also verified that transient combustibles were not being stored on the ISFSI pad or in the vicinity of the HSMs. The inspectors also confirmed that transient combustible material entry onto the ISFSI pad was controlled in accordance with procedures.

On May 12, 2015, during processing of the third canister (DSC-21) of the ISFSI dry cask campaign, Dominion received local radiation alarms and experienced elevated readings on their Unit 2 stack gaseous radiation monitor (RM-8132B) during preparation of vacuum drying operations (CR 579441 and 579522). In response to the alarms, Millstone terminated processing activities and placed the DSC in a safe condition (backfilling the DSC with helium). Dominion personnel investigated the issue and upon completion of their review, DSC processing operations resumed on May 28, 2015, and the DSC was subsequently transported and placed into a HSM. Additional information is contained in Section 2RS6 of this report.

The inspectors with assistance from technical experts from the NRCs Office of Nuclear Materials Safety and Safeguards reviewed engineering evaluation, ETE-NAF-2015-0070, Post Loading Fuel Selection and Clad Storage Re-Assessment for NUHOMS Canister MPS32PT-L125-A224-HZ02, and the results of gamma spectroscopy analysis of a gas and water sample from DSC-21. Prior to the DSC being placed on the ISFSI pad, the inspectors verified that DSC- 21 met the requirements of the CoC, TS, regulations, and site procedures. The inspectors also confirmed that Millstones characterization of the condition of the spent fuel in the DSC met NRC Interim Staff Guidance-1, Classifying the Condition of Spent Nuclear Fuel for Interim Storage and Transportation Based on Function.

The inspectors reviewed corrective action reports and the associated follow-up actions that were generated since Dominions last loading campaign to ensure that issues were entered into the CAP, prioritized, and evaluated commensurate with their safety significance.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

On July 27, 2015, the inspectors presented the inspection results to Mr. John Daugherty, Site Vice President, and other members of the Millstone staff. The inspectors verified that no proprietary information was retained by the inspectors or documented in this report.

ATTACHMENT:

SUPPLEMENTARY INFORMATION

KEY POINTS OF CONTACT

Licensee Personnel

M. Adams Plant Manager

L. Armstrong Director, Performance Recovery

J. Ashburn Unit 2 Shift Manager

R. Ashey Senior Nuclear Instructor

G. Baker Unit 2 Senior Reactor Operator/Unit Supervisor

S. Baker Engineering Consultant, BDB
B. Bartron Supervisor, Licensing

T. Berger Unit 3 Shift Manager

D. Blakeney Director Safety and Licensing

A. Bonamarte Unit 2 Control Operator

B. Bowen Supervisor Health Physics

D. Brown Supervisor Nuclear Operations Support

J. Brown Unit 2 Shift Manager

W. Browning Licensing Specialist

D. Bucheit Manager, BDB and Cyber Security

K. Carberry Maintenance Engineer

R. Castillo Emergency Preparedness Specialist / Communications Controller

W. Chestnut Supervisor, Nuclear Shift Operations Unit 2
F. Cietek Nuclear Engineer, PRA

T. Cleary Licensing Engineer

G. Closius Licensing Specialist

W. Cote Senior Instructor, Nuclear Operation
L. Crone Supervisor, Nuclear Chemistry
J. Curling Manager, Protection Services

G. DAuria Nuclear Chemistry Supervisor

D. Daugherty Nuclear Engineer III

G. Decker Environmental Lab Technician

D. Dodson Engineering Supervisor

J. Dorosky Health Physicist III

E. Dundon System Engineer

B. Ekenrode Unit 2 Plant Equipment Operator

B. Ferguson Unit 2 Shift Manager

M. Finnegan Supervisor, Health Physics, ISFSI

P. Fizgerald Unit 2 Control Operator (Under Instruction)

S. Franzcek Security Shift Supervisor

A. Gharakhanian Nuclear Engineer III

C. Flory Supervisor, Nuclear Chemistry

M. Fortner Unit 3 Emergency Communicator

M. Furiosi Senior Nuclear Instructor

M. Gagnon Unit 2 Balance of Plant Operator

J. Glaub REMP Sample Technician

J. Go Unit 3 Senior Reactor Operator/Station Duty Officer

M. Goebeli Unit 2 Shift Technical Advisor

W. Gorman Supervisor, Instrumentation & Control
M. Greaney Supervisor, Nuclear Maintenance
J. Grogan Supervisor, Nuclear Training

K. Hajnal Unit 3 Shift Technical Advisor

W. Harreslon Unit 3 Unit Supervisor

B. Hayes Nuclear Oversight Engineering Specialist

J. Hoagland Unit 2 Unit Supervisor

R. Hoffmann Instrument and Control Supervisor

C. Houska I&C Technician

J. Huff Unit 2 Unit Supervisor/WCSRO

T. Ickes Program Engineer

R. Kastner Unit 2 Unit Supervisor/STA

D. Landers Supervisor, Environmental Laboratory

R. Kasuga Nuclear Engineer III

J. Laine Manager, Radiation Protection/Chemistry
J. Langan Manager, Nuclear Oversight

M. Letterich Unit 2 Control Operator

D. Lowell System Engineer

D. MacNeil Supervisor, Nuclear Engineering
G. Marshall Manager, Outage and Planning
H. McKinney Supervisor, Operations Support

M. McLay Electrical Supervisor

S. Minogue Unit 2 Control Operator (Test Coordinator)

M. Morrissette Unit 2 Control Operator

R. Parrette Unit 2 Operations Advisor

T. Perkins Operations Unit Supervisor

B. Pinkowicz Senior Instructor, Nuclear Operations

T. Quinley Nuclear Technical Specialist III

D. Reed Shift Manager

J. Rein Emergency Preparedness Specialist

J. Rigatti Manager, Nuclear Site Engineering

M. Roche Senior Nuclear Chemistry Technician

P. Russell Shift Manger

L. Salyards Licensing, Nuclear Technology Specialist

R. Schmidt Unit 3 Reactor Operator

P. Scott Shift Manager

R. Schonenberg Program Engineer

J. Shaffer Chemistry Technician

D. Smith Manager, Emergency Preparedness
S. Smith Manager, Nuclear Operations

A. Stachowiak Unit 2 Control Operator

S. Stanley Director of Engineering

J. Stoddard Supervisor, Nuclear Shift Operations Unit 3

S. Torf Nuclear Engineer

S. Turowski Supervisor, Health Physics Technical Services

K. Truesdale Senior Nuclear Instructor

C. Vournazos IT Specialist, Meteorological Data

M. Watson Unit 2 Unit Supervisor

M. Wise Unit 2 Senior Reactor Operator

K. Wood Unit 3 Control Operator/BOP

W. Woolery Unit 2 Shift Manager

C. Wooten Maintenance Department Human Performance Coordinator

Others

M. Firsik, Connecticut DEEP
D. Galloway, Connecticut DEEP
J. Semancik, Director, Bureau of Air Management, Connecticut DEEP

LIST OF ITEMS OPENED, CLOSED, DISCUSSED, AND UPDATED

None

LIST OF DOCUMENTS REVIEWED