ML24281A207
From kanterella
Jump to navigation
Jump to search
ML24281A207 | |
Person / Time | |
---|---|
Site: | Millstone |
Issue date: | 06/20/2024 |
From: | James Holloway Dominion Energy Nuclear Connecticut |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML24176A259 | List: |
References | |
24-226 | |
Download: ML24281A207 (1) | |
Similar Documents at Millstone | |
---|---|
Category:Letter
MONTHYEAR05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024
[Table view]Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24162A0882024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24141A1502024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 ML24123A2272024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24093A1022024-04-0101 April 2024 Alternative Request IR-4-13, Proposed Alternative Request to Support Steam Genera Tor Channel Head Drain Modification IR 05000336/20240112024-04-0101 April 2024 Comprehensive Engineering Team Inspection - Inspection Report 05000336/2024011 and 05000423/2024011 ML24092A0752024-03-28028 March 2024 3R22 Refueling Outage Inservice Inspection (ISI) Owners Activity Report Extension ML24088A2352024-03-26026 March 2024 Decommissioning Funding Status Report 2024-09-04 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24281A2072024-06-20020 June 2024
[Table view]Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML23193A8842023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses ML23193A9072023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML23193A8962023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML23193A8902023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Frontmatter ML23193A8852023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 7, Instruments and Controls ML23193A9002023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML23193A9062023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics ML23193A8732023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23193A8912023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary System ML23193A8832023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML23193A8682023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 3, Reactor ML23193A8692023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems ML23193A9012023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML23193A8742023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System ML23193A8822023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Frontmatter ML23193A8582023-06-28028 June 2023 8 to Defueled Safety Analysis Report, Drawings Incorporated by Reference ML23193A8722023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment ML23193A8702023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems ML23193A8942023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems ML23193A8562023-06-28028 June 2023 Submittal of Updates to the Final Safety Analysis Reports ML23193A8872023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML23193A8652023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary ML23193A8982023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Drawing Incorporated by Reference ML23193A8812023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations ML23193A9022023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML23193A8782023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation ML23193A8882023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML23193A8952023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML23193A8992023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML23193A8892023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML23193A8772023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 15, License Renewal ML23193A8752023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Processing and Radiation Protection Systems ML23193A9032023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features ML23193A9052023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 19, License Renewal ML23193A9042023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 2, Tables 2.3-15 & Appendices, Monthly and Annual Wind Direction and Speed Distributions for 33-Foot Winds at Millstone ML23193A8592023-06-28028 June 2023 8 to Defueled Safety Analysis Report, Technical Requirements Manual ML23193A8672023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control ML23193A8862023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering ML23193A8572023-06-28028 June 2023 8 to Defueled Safety Analysis Report, Redacted ML23193A8762023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems ML23193A8712023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 5, Structures ML23193A8662023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted ML23193A8802023-06-28028 June 2023 1 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis ML23193A8972023-06-28028 June 2023 6 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report ML22193A0232022-06-23023 June 2022 7 to Defueled Safety Analysis Report ML22193A1352022-06-23023 June 2022 5 to Updated Final Safety Analysis Report ML22193A1362022-06-23023 June 2022 5 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML22193A1332022-06-23023 June 2022 5 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance 2024-06-20 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML24281A207&oldid=3687482"