IR 05000423/2015407; 12/08/2015 to 12/10/2015; Millstone Power Station, Unit 3; Supplemental Inspection, Inspection Procedure (IP) 95001 Letter Only
ML16020A091
Person / Time
Site: Millstone 
Issue date: 01/19/2016
From: Raymond Mckinley
Plant Support Branch 1
To: Heacock D
Dominion Resources
References
EA-14-159 IR 2015407
Download: ML16020A091 (5)


Text

January 19, 2016

SUBJECT:

MILLSTONE POWER STATION, UNIT 3 - SUPPLEMENTAL INSPECTION REPORT NO. 05000423/2015407 AND ASSESSMENT FOLLOW-UP LETTER

Dear Mr. Heacock:

On November 24, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection activity at Millstone Power Station (MPS) where it was identified that Unit 3 was not in compliance with a security-related requirement. Based on the results of that inspection, documented in NRC Inspection Report 05000336/2014201 and 05000423/2014201 dated January 5, 2015, and Final Significance Determination Report 05000423/2015405 dated April 5, 2015, the NRC identified a Greater-than-Green finding that resulted in an Action Matrix input to the security cornerstone beginning in the fourth quarter of 2014.

In response to this Action Matrix input, the NRC informed you that a supplemental inspection would be required. On November 5, 2015, MPS staff informed the NRC the station was ready for the supplemental inspection.

On December 10, 2015, the NRC completed the supplemental inspection and discussed the results of this inspection and implementation of your corrective actions with Mr. John Daugherty, Site Vice President, and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.

The NRC performed this supplemental inspection to determine if (1) the root and contributing causes for the significant issues were understood, (2) the extent of condition and extent of cause for the identified issues were understood, and (3) your completed or planned corrective actions were sufficient to address and prevent repetition of the root and contributing causes.

The NRC determined that the completed and planned corrective actions were sufficient to address the performance that led to the finding.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal Based on the results of this inspection, the NRC concluded that, overall, the supplemental inspection objectives were met and no significant weaknesses were identified. Additionally, no findings of significance were identified.

Based on guidance in Inspection Manual Chapter 0305, Operating Reactor Assessment Program, and results of this inspection, the Greater-than-Green Finding will be closed and MPS Unit 3 will transition from the Regulatory Response Column of the NRCs Action Matrix to the Licensee Response Column effective January 1, 2016.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publically Available Records (PARS) component of the NRCs Agencywide Document Access Management System (ADAMS). ADAMS is accessible from the NRC Web site at httpp://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390 (d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of the NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from Public Disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1). In accordance with 10 CFR 2.390 (b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Raymond R. McKinley, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 50-423 License No. NPF-49

ML16020A091 (Cover letter)

ADAMS ACCESSION NUMBER: ML16020A089 (Cover letter w/enclosure)

Cover Letter:

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter w/ Enclosure:

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRS RI/DRS RI/DRP RI/DRS

NAME SMcCarver JBream GDentel RMcKinley/DC

DATE 1/7/16 1/7/16 1/8/16 1/19/16 Enclosure:

NRC Inspection Report No 05000423/2015407 w/Attachment: Supplemental Information

cc w/encl; w/OUO-SRI:

M. Brown, Security Department Manager J. Semancik, Director, CT Dept of Energy and Environmental Protection

cc w/o encl; w/o OUO-SRI: Distribution via ListServ Distribution w/o encl; w/o OUO-SRI: (via e-mail)

DDorman, RA (R1ORAMAIL Resource)

DLew, DRA (R1ORAMAIL Resource)

MScott, DRP (R1DRPMAIL Resource)

JColaccino, DRP (R1DRPMAIL Resource)

RLorson, DRS (R1DRSMail Resource)

BSmith, DRS (R1DRSMail Resource)

GDentel, DRP ADeFrancisco, DRP JSchussler, DRP BPinson, DRP JAmbrosini, DRP, SRI LMcKown, DRP, RI CHighley, DRP, RI ARancourt, DRP, Admin Asst.

JJessie, RI, OEDO RidsNrrPMMillstone Resource RidsNrrDorlLpl1-1 Resource ROPreports Resource

Distribution w/encl; w/OUO-SRI: (via e-mail)

JBream, DRS RMcKinley, DRS GDentel, DRP JAmbrosini, DRP, SRI NSimonian, NSIR EWharten, NSIR CJohnson, NSIR BDesai, DRS, RII SOrth, DRS, RIII MHaire, DRS, RIV